HomeMy WebLinkAboutContract 41723-A1 (2)CITY SECRETARY 11-1 Z3 -I�� CONTRACT dNO.� AMENOWINT No. i TO CITY SVICRETARY CONTRACT TATIMMAS, the City of Fort Worth (CITY) and Baird, Hampton & Brown, Inc., (ENGINE c;1R) made and entered into City Secretary Contract No. 41723, (the CONTRACT) which was authorized by ME C Cr. C=24831 on the 5th day of April, 2011 in the amount of $197,6000O; and WHER1;AS , the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 82; and WHEREAS , iL has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENG LNj ER , acting, herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 2, 2013, a copy of which is a t tarihed hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $2 4 , 214 . 6O . 2. Article II of the CONTRACT is ascended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $221, 822 . 60 . 3. Ali other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page =1 al rOP�rYCiilL RECORD" �Mf SECRETARY i WORTH, TX EXECUTED and EFFECTIVE as of signatory, below. APPROW,D City of Fort Worth Fernando Costa Assistant City Manager DATE: /%f /3 RECOMMENDED: S. Frank Crumb, P.E. Director, Water De artmen b APPROVED AS TO FORM AND L TIG i. ITY Douglas 1W. Black Assistant stant City Attorney ATTE Mary J. Kayser City Secretary the date last written by a ENGINEER Baird, Hampton & Brown, Inc Konstantine`Bak±etas, P.E. Principal, Civil Enginear DATE: c\ M&C N/A Date: N/A tnnmal'oy, fotirqk, arow.Q.00000 i j'IUa '`Jlil(=-»)u`S i1l111ln 7 2i Page -2 Baird, Hampton & Brown, Inc. January 2, 2013 Mr. Tony Sholola, PE, Engineering Manager c/o Liam Conlon, Project Manager Fort Worth Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth TX 76102 RE: REQUEST FOR CONTRACT AMENDMENT Sanitary Sewer Rehabilitation Contract 82 City Secretary Contract No. 41723 City Project No 01501, BHB 10.708.00 Mr Sholola: Engineering & Surveying It has been a pleasure assisting the Fort Worth Water Department with the referenced project. We believe the project has progressed smoothly and we anticipate addressing final review comments and proceeding to construction within the next two or three months. During the Concept and Preliminary Plans submittals and subsequent reviews, we found several of the sewer lateral alignments and lengths adjusted to address field conditions and sewer collection system iequtrements. The table below documents the original and revised lateral lengths. Please note the overall pipeline length for this project increased by 1,156 linear feet; this equates to an 8.79/0 increase. Sewer Lateral L-1957 L-1958 L-1959 L-1960 L 2347 L-2352 I, 2473 L-2756 L-3587 L-3903 I Original Length (ft) 358 427 422 142 3,036 573 1,040 485 458 310 I Revised Length (ft) 589 425 420 184 3,136 572 1,302 485 576 309 Increased Length (ft) 231 (2) (2) 42 100 (1) 262 EiME 118 (1) DELIVERING INNOV.1TIVF DESIGN SOLLIIIONS 6300 Ridglea Place, Ste. 700, Fort Worth TX 76116 / Tel: 817-338-1277 Fax: 817-338-9245 TBPL Firm #44 / www.BHBINC.com Mr Tony Sholola, PE, Engineering Manager c/o Liam Conlon, Project Manager January 2, 2013 Page 2 Sewer Lateral L-5581 L-7921 M-136 M-137 Meacham Sub -Totals Original Length (ft) 563 692 4,525 310 13,341 Revised Length (ft) 558 729 4,736 476 14,497 Increased Length (ft) (5) 37 211 (310) 476 1,156 The original contract provided for design of 13,341 linear feet of sanitary sewer line for the contract amount of $144,093; which excludes Survey Permitting and ROW/fiasement. This equates to $10.80 per linear foot of sanitary sewer. Therefore, we respectfully request an additional professional services fee, for the additional 1,156 linear feet of pipeline, of ($10 80/LF X 1 156 LF =) $12,485 68 Similarly, for topographic surveying of the new 476 liner foot later within Meacham, we propose a fee of ($41,170/13,341 X 476 =) 1,468.92 Please also note that the final sewer alignments required the relocation of an existing water line, adding 325 linear feet to this otherwise all sanitary sewer project; refer to plan sheet 50, 51 & 52. Finally, our coordination and review meetings with Meacham Airport staff identified a need for us to prepare a permit application and a set of airport safety specific construction drawings; refer to plan sheets 59 & 60. We've estimated our efforts for the un-anticipated water line re -alignment, and airport permit and safety plans as follows: Task Task Basis for No. Description Hour Estimate 4.0 4.1 4.1.1 4.1.2 4.1.3 Final Design Water Line Plans Unit II - Water Cover Sheet Overall Project (Water) Layout Water Line !A Improvements Unit Labor (hours) 1 Sheet 1 Sheet 1 Sheet 6300 Ridglea Place, Ste. 700, Fort Worth, '1 Project Direct or $175 2 1 Project Manager $175 4 1 1 Project EIT Engineer /CAD D $125 $85 Survey \dminis -trative $150 $50 Total Labor Cost 26 56 0 4 $10,260 4 4 12 8 16 $590 $1,695 $2,710 76116 / Tel: 817-338-1277 Fax: 817-338-9245 / www.BHBINC.com Mr Tony Sholola, PE, Engineering Manager c/o Liam Conlon, Project Manager January 2, 2013 Page 3 4.2 4.2.1 4.2.2 4.2.3 Airport Permit & Plans Airport 1 Operation Safety Notes Airport Work Limits FAA Permit 1 Application Sheet Sheet Ea 0.5 0.5 0.5 0.5 1 4 4 4 16 12 4 2 2 $1,028 $2,035 $2,203 For all of the above described additional scope of work items, we propose, for your consideration, a professional services fee increase of ($12,485.68 + $1,468.92 + $10,260.00 =) Twenty Four Thousand One Hundred Fourteen ($24,214.60) Dollars and 60/100 Cents. To assist in your review and processing of this request, we've prepared and have enclosed the City's standard Professional Services Agreement Amendment form. Thank you, BHB Engineering & Surveying Konstantine Bakintas, PF Principal, Civil Engineer Enclosure* Standard Professional Services Agreement Amendment e:\2010.000.000\2010.708.000\dots\contract\amendment\amendment requestjan'13doc 6300 Ridglea Place, Ste. 700, Fort Worth, TX 76116 / Tel: 817-338-1277 Fax: 817-338-9245 / www B1 IB1NC.cotn