Loading...
HomeMy WebLinkAboutContract 41561COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. i k f e WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Lake Hollow Corporation Authorized Signatory: Randal D. Johnson Title: Vice President Project Name: Marine Creek Ranch Phase B2 Project Location: South of Texas Shiner & West of Huffines Boulevard Additional Streets: N/A Plat Case No.: FP-010-032 Plat Name: N/A Mapsco: 46H To be completed by staff Received by. Council District: 7 City Project No: 01648 k CFA: 2010-067 DOE: 6583 OFFICIAL RECORD CITY SECRETARY FT. WORTh, TX 1 Date: NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) Sewer (A-1) X Paving (B) X Storm Drain (B-1) X , Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such aniunes. death or damages are caused, in whole or in part. by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniurres, death or damages are caused, in whole or hi part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Marine Creek Ranch Phase B2 CFA No.: 2010-067 DOE No.: 6583 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 30,603.70 $ $ 11,669.00 18, 934.70 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Sub -Total $ 611,152.90 $ $ $ 562,128.40 13,175.00 35, 849.50 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: $ 641,756.60 $ $ $ $ $ $ $ $ 612.07 612.07 1,224.15 23,012.14 11, 506.07 1,433.98 3,185.00 39,137.18 $ 40,361.33 Financial Guarantee Options, choose one Amount Bond = 100% I $ 641,756.60 Completion Agreement = 100%: Water, Sewer, Paving, S torm Drain $ 641,756.60 Cash Escrow Water/Sanitary Sewer= 125% $ 38,254.63 Cash Escrow Street Lights = 125% $ 44,811.88 Letter of Credit = 125% w/2yr expiration period $ 802,195.75 Choice (ck one) X X IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this CITY OF FORT WORTH - Recommended by: Water Department Wendy Chic abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: toal ader Marcia Wise „WI Assistant City Attorney ATTEST: Marty Hendrix City Secretary ATTEST 7e0A,Ja,/fi a Lai.70,,, Signature (Print) Name: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ketLb day Transportation & Public Works Department Will.I Director erkest, P.E. Approved by City Manager's Office Fernando Costa Assistant City Manager Ate `, ,, 4,- (›s- N A • r isQ, ,,Etoefoinevart,i4,_ o�0a oo0oc ofi�o �� . x pi o ori o d pi Lake Hollow Corporation Signature Print Name: Randal D. Johnson Title: Vice President NO M&C REQUIRED Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Nir AL tz a .12 ►1 ►1 ►s Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 CROMWELL MARINE CREEK RD cy: PHASE A m. TE .i%uitt ii^ttits srrxt^tttryn: ~...... . Ynv MARINE LAKE. TARRANT COUNTY COLLEGE t.: 31411 Hl--- it1tH:1 :- :. :;._' :..a; �c...::._ta':.::il i`•.`••."'.•s•.'•th. .:off'•. ; �r •1:eF.•.•xma ia:ni,.i,.,..t3• saicz.r`"-= a•-v w • • :isi..?ii3�a�litlWy▪ yq.,1ty?i,ii3i!'::� 3 u3�:ii3S.e3±3ca:a °.-..1.iihtaUi h:• ��L�N•ILA'r�R:4�Xti:'�S4t11:1" ( = t t311.alala�....11 3::ilf�• 14'1,...1.....1:11:``1^ •....t'.1• ▪ -tatatetvatimn &::a t.......s:::cN:tlxr...... • tratte 1 CY �al1WbN W.Y.Ir^ •••PXXti.. LOCATION. • MAP O PJ EXHIBIT "A" rd WATER MARINE CREEK RANCH, PHASE B2 CITY OF' FORT WORTH, TARRANT COUNTY, TEXAS CP4 E 0: q.( 54 53 52 51 5 49 48 47 46 45 44 15 14 13 12 6 7 8 EX. SCHOOL SITE BLUEGILL 1 0 ILCONN tC 18 WATER 3 17 16 15 14 13 12 4 5 6 7 8 9 13 12 • , • 11 10 01 10 Inc • - DUPER DR. 43 37 42 41 40 39 38 36 35 34 33 HAYCO REALTY, LTD. (VOL. 14192, PG. 644) D.R.T. C.T. 32 31 30 7 8 9 29 0 75' R.O.W. TEXAS UTILITIES ELEC. CO. (VOL. 2103, PG, 290) 28 27 25 26 27 26 25 24 21 22 23 24 • 23 22 21 5 •kf,„ 4-44.6lx1 49 HAYCO REALTY, LTD. (VOL. 14192, Pa 644) D,R.T.C.T. 41 H.O.A. OPEN SPACE PHASE LINE —/ Quote To: EXHIBIT "A" WATER I.MPROVEMENTS JACKSON CONSTRUCTION, LTD. 5112 Sun Valley Drive Fort Worth, Texas 76119 Contact Steve Haberstroh Phone: 817-572-3303 Email: steve©jacksonconstruction.net Mr. Randal Johnson Job Name: MARINE CREEK RANCH, PHASE 2 Lake Hollw Corporation Fort Worth, Texas 76121 Phone: 817-797-7977 Revision Date: November 12, 2010 Email: rj@havener.com havener.com ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 1 RECONNECT EXISTING WATER MAIN 6.00 2 PRESSURIZE/STERILIZE WATER MAIN 5,669,00 GRAND TOTAL EA 1,000.00 6,000.00 LF 1.00 5,669.00 $11,669.00 Page 1 of EXHIBIT "Al" r%) SEWER MARINE CREEK RANCH, PHASE B2 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS cpcl 51 • a 50 a 20 PH ASE — LINE 8-SS:a1JE "}ri 1 03? -se LUNNEIL 1 tel Z " SS I 2 I BIAP:K BATS DR 18 3 17 16 15 11 14 13 12 4 6 7 8 9 10 , EX. SCHOOL SITE BLUEGILL CONN SS 17 16 15 14 13 C: I 3 2 5 6 7 8 ETRIPEP DR. 43 37 42 41 40 39 36 12 9 10 36 35 34 33 I HAYCO REALTY, LTD. (VOL. 14192, PG, 644) D.R.T,C.T. CONNE 17 16 E 15 14 13 12 11 10 15 1 4b of 3 7 8 9 32 31 30 29 0 751 R.O.W. TEXAS UTILITIES ELEC, CO, (VOL. 2103, PG. 290) 28 27 25 26 31 30 29 28 27 26 25 24 21 22 23 24 23 22 4 3 EX. 10" S.S. k12' 2 44&1,45. H.OA EN SPACE •• 4 all* a** akfttr INA* a* 16 aft 111, 21 20 CARP DR 19 18 15 17 16 HAYCO REALTY, LTD. (VOL. 14192, PG. 644) 0,R.T.C.T. 15 PHASE LINE EX. 12" S.S. L • Ouote To: Phone: Email: ITEM EXHIBIT "A-1" SEWER IMPROVEMENTS JACKSON CONSTRUCTION, LTD. 5112 Sun Valley Drive Fort Worth, Texas 76119 Contact. Steve Haberstroh Phone: 817-572-3303 Email. steve(rt@jacksonconstruction.net Mr. Randal Johnson Lake Hollw Corporation Fort Worth, Texas 76121 817-797-7977 rj@havener.com Job Name: MARINE CREEK RANCH, PHASE 2 Revision Date: November 12, 2010 DESCRIPTION QUANTITY 1 INTERIOR MANHOLE PROTECTIVE COATING 8.30 2 VACUUM TEST MANHOLES 19.00 3 RECONNECT EXISTING SEWER MAIN 6.00 4 TV INSPECT SANITARY SEWER MAIN 5,607.00 5 CLEAN SANITARY SEWER MAIN 5,607.00 GRAND TOTAL UNIT VF EA EA LF LF UNIT PRICE AMOUNT 200.00 1,660.00 100.00 1,900.00 600.00 3,600.00 1.00 5,607.00 1.10 6,167.70 S18,934.70 Page 1 of 1 EXHIBIT ''B" PAVING MARINE CREEK RANCH, PHASE B2 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS BOWMAN ROBERTS RD. /// I 1;'• - 55 53 x - 0 ir.V. CID 4;1; W 31: • !sig • ,t • r, I 50 „at 4/41 49 48 54 52 51 20 19 18 7 16 EX. SCHOOL SITE gr Fa BLUEGILL DR. PHASE LINE 2 5 15 0 , 6 fi4 Fr' 14 13 7 8 7 20 19 18 17 16 (EL: 5 15 6 14 rzi • , 13 8 C.t1 : 12 7 27 22 rr F., d 1 1 47 :i,I1 12 F., i 12 " ' 4, D 9 •.•,n . (..... 41'di 4 , 1, ,,,, as 1 1 la 10 9 I i '10 11 10 ( i 4:'l11111-,1441.3lilsiq ;H.q. Fridrritzt,ttill':L1141:11:NLII.J.)":11ttEt.: lat't,i,.:Slt:t ._- 1 'i Cs:',c!,:- STRIPEF, DR , , . 261-1‘:111' ' '14-31$ititiliti''T'fiiT :3J'ihi. it, ill r, i,P,,,,,,,,f,,,t ii., ,,,,,,",-(4.6•1n,„1,•-•,...Liiy,- it _.... . , ,,,, • ,,,,,,,„,„„ „ 11011.,:;':1,1Pi'l :1:d 1 V 44 43 42 41 40 39 38 37 36 35 34 33 32 — HAYCO REALTY, LTD. (VOL. 14192, PG. 644) D.R.T.C.T. . — 31 30 29 75 R.0.W. TEXAS UTILITIES ELEC, CO. (VOL. 2103, PG. 290) D.R.T.0 28 27 26 25 24 23 22 2 16 15 CARP DR 19 HAYCO REALTY, LTD. (VOL. 14192, PG. 644) 4 1 PEN SPACE 15 PHASE LINE LEGEND PROPOSED PAVEMENT 111 Ouote To: Phone: Email: ITEM EXHIBIT "B" PAVING IMPROVEMENTS JACKSON CONSTRUCTION, LTD. 5112 Sun Valley Drive Fort Worth, Texas 76119 Contact Steve Haberstroh Phone: 817-572-3303 Email. steve@jackcsonconstruction.net Mr. Randal Johnson Lake Hollw Corporation Fort Worth, Texas 76121 817-797-7977 rj@havener.com havener.com DESCRIPTION 1 1 RE-ESTABLISH STREET GRADE 2 6' LIME STABILIZED SUBGRADE TREATMENT 3 LIME MATERIAL FOR SUBGRADE 30LB/SY 4 7' 3600# STREET PAVING W/CURB 5 WHEEL CHAIR RAMPS GRAND TOTAL Job Name: MARINE CREEK RANCH, PHASE 2 Revision Date: November 12, 2010 QUANTITY UNIT 20,273.00 SY 20,273.00 SY 304.00 TN 18,905.00 SY 12.00 EA UNIT PRICE 1.15 2.15 140.00 23.50 700.00 AMOUNT 23,313.95 43,586.95 42,560.00 444,267.50 8,400.00 $562,128.40 Page 1 of 1 EXHIBIT "B 1"eNJ DRAIN AGE MARINE CREEK RANCH, PHASE B2 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS BOWMAN ROBERTS RD. • 54 53 52 5 50 49 48 BLACK BASSIDR 20 19 18 17 16 15 14 13 12 11 PHASE LINE 2 P 3 4 Ll 6 O 7 8 9 0 EX. SCHOOL SITE BLUEGILL DR. 20 19 18 17 16 15 14 13 12 11 STRIPE 2 3 4 5 6 7 8 9 10 DR. MACKEREL DR. 12 11 10 43 42 41 40 39 38 37 36 35 34 33 32 31 HAYCO REALTY, LTD. -� (VOL. 14192, PG. 644) D.R.T.C.T. 7 8 9 30 29 A 75' R 0. W. TEXAS UTILITIES ELEC. CO. (VOL. 2103, PG. 290) 27 26 25 26 25 23 23 22 D PROPOSED CH-PW-0 HDWL. � \ PROPOSED RIP -RAP 5 At, s 2`9 —PROPOSED 10' CURB INLET (STAGE 2) 30 LINE 411,,PHASE Ng I � 8 1� - PROPOSED 20' CURB INLET (STAGE 2) HAYCO REALTY, LTD. (VOL. 14192, PG. 644) D.R.T,C. T. PROPOSED 10' CURB INLET (STAGE 2) 1 LEGEND MI PROPOSED CURB INLET PROPOSED HEADWALL PROPOSED RIP —RAP EXHIBIT "B-1" STORM DRAIN IMPROVEMENTS 11111111111111111111111 Quote To: Phone: Email: ITEM JACKSON CONSTRUCTION, LTD. 5112 Sun Valley Drive Fort Worth, Texas 76119 Contact. Steve Haberstroh Phone: 817-572-3303 Email. steve rGi}jacksonconstruction.net Mr. Randal Johnson Job Name: Lake Hollty Corporation Fort Worth, Texas 76121 817-797-7977 Revision Date: November 12, 2010 rj@havener.com DESCRIPTION QUANTITY 1 STD, 20' CURB INLET (STAGE 2) 2 STD. 10' CURB INLET (STAGE 2) 3 CH-PW-O STORM DRAIN HEADWALL 4 NCTCOG TYPE A 24" ROCK RIP RAP • GRAND TOTAL UNIT UNIT PRICE 1.00 EA 5.00 EA 1.00 EA 25.00 I SY 1 2,100.00 1,350.00 1,700.00 105.00 MARINE CREEK RANCH, PHASE 2 AMOUNT 2,100.00 6,750.00 1,700.00 2,625.00 $13,175.00 Page 1 of 1 EXHIBIT " C" N LIGHTS AND SIGNS MARINE CREEK RANCH, PHASE B2 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS BOWMAN ROBERTS 55 54 53 52 51 50 49 48 47 44 BLACK BASS I➢R 19 18 17 k16 15 14 13 12 11 EX. SCHOOL SITE FE PHASE LINE 2 3 4 5 6 7 0 0 O BLUEGILL DR. 15 14 13 12 1 2 3 4 5 6 7 8 10 STRIPE DR. 43 42 41 40 39 38 37 36 35 34 33 32 12 10 31 30 R 29 28 HAYCO REALTY, LTD. .--11 75' R O.W. (VOL. 14192, PG. 644) TEXAS UTILITIES ELEC. CO. D.R.T.C.T. (VOL. 2103, PG. 290) _ _ D.R. T.C. T._ _ 27 26 25 26 25 21 22 23 24 24 1 23 1 22 21 HAYCO REALTY, LTD. (VOL. 14192, PG. 644) D.R.T.C.T. 2 4 H.O.A. PEN SPACE PHASE LINE s n 3* PROPOSED STREET LIGHT LEGEND STOP SIGN STREET SIGN EXISTING STREET LIGHT nny r �... at BID-01308 BID-01226 BID-00373 `BID-00379 BID-00374 BID-01261 BID-01307 BID-00375 BID-00376 BID-01258 BID-00377 BID-00378 BID-00380 BID-00381 BID-01318 BID-01317 BID-01315 BID-01316 BID-01314 BID-01309. BID-01260 BID-00382 BID-01113 BID-01107 BID-01110 BID-00383 BID-00384 BID-01112 BID-01263 BID-01109 BID-00388 _ BID-01111 BID-01262 BID-01108 G(v\ - rum xyf CPMS ;Cable -Duplex Overhead Num 6 -Install Cable -Electrical Install ;Cable-Num 1 Insulated Stranded XHHW - Install ;Cable-Num 10 Insulated Stranded XHHW -. Install ;Cable-Num 14 Solid - Install ?Cable-Num 14-20 Conductor Stranded Cable - Install !Cable-Num 2 Insulated Stranded XHHW - Install Cable-Num 4 Insulated - Install Cable-Num 4 Insulated Stranded XHHW - Install Cable-Num 6 XHHW - Install Cable-Num 8 AWG-Stranded-Bare - Install Cable-Num 8 Bare - Install _,....,..:,......... ;Cable-Num 8 XHHW - Install ;Cable-Num 8 XHHW WHITE - Install ;Cable-Quadruplexed Aluminum Underground 1/0-1/0-1/0-2 - Install ;Cable-Quadruplexed Aluminum Underground 2-2-2-4 - Install Cable -Triplex Aluminum Underground 1/0-1/0-2 - Install .. . ;Cable -Triplex Aluminum Underground 250-250-3/0 - Install - W ;Cable -Triplex Aluminum Underground 6-6-6 Install Cable -Triplex Overhead Num 4 - Install !Cable -Triplex Overhead Num 6 - Install 'Conduit - Install Conduit-1 1/4 Inch-Bore-Sch 40 - Install Conduit-1 1/4 Inch -Open Cut-Sch 40 - Install Conduit-1 1/4 Inch -Rigid Metal - Install ,Conduit-1-1/4 Inch Rigid Metal For Riser with Hardware - Install Conduit 2 Inch Rigid Metal For Riser with Hardware Install Conduit-2 Inch=Bore Sch 40 i Install Conduit-2 Inch -Open Cut-Sch 40 - Install Conduit-2 Inch -Rigid Metal -Install €Conduit-2 Inch-w/3 Num 4 AWG & 1 Num 8G-Sch 80 - Install }Conduit-3 Inch-Bore-Sch 40 - Install Conduit-3 Inch -Open Cut-Sch 40 - Install 1Conduit-3 Inch -Rigid Metal - Install Unit^Of M _Bid_4Sub_Bidf?MSMaterpMS Discip ine ,Linear Foot Street ;Lighting Copper Electrical ;Linear Foot Street Lighting Copper Electrical Linear Foot Street Lighting :Copper •Electrical Linear Foot Street Lighting :Copper ; Electrical 6,100 0.37 $2,257.00 Linear Foot ;:Street 'Lighting Copper wElectrical Linear Foot ;Street Lighting Copper :Electrical `: Electrical Electrical Electrical !Electrical Electrical .:............................ Electrical Electrical Electrical ;Electrical Electrical !Electrical, Electrical Electrical Electrical Electrical Electrical ;Electrical Electrical 1,500 $3.77 $5,655.00 ,1,Electrical ;Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Linear Foot Street Lighting Copper : Linear Foot L Street Lighting Copper .Linear Foot Street !Lighting Copper Linear Foot Street Lighting Copper ;Linear Foot Street ;Lighting :Copper Linear Foot 1 Linear Foot I Linear Foot !Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot Linear Foot 1 Linear Foot Linear Foot Linear Foot Linear Foot Street Lighting :Copper Street Lighting ;Copper ,Street Lighting iCopper Street ;Lighting !Aluminum Street Lighting rtAluminum Street Lighting ;Aluminum Street Lighting iAluminum Street ;Lighting ;Aluminum Street Lighting Copper Street Lighting Copper Street Lighting ;PVC a Street 1Lighting '. PVC ;Street Lighting PVC ;Street _...._;Lighting ;Steel St Street Lighting :Steel Street Lighting `Steel Street Lighting ;PVC .,Street Lighting ;PVC Street Lighting Steel Street Lighting PVC Street ;Lighting PVC Street Lighting w PVC Street Lighting Steel BID-00391 Electrical Ground Box - Install Each Street Lighting Assembly Electrical BID-01114 Electrical Ground Box with Lid - Small - Install Each Street Lighting Assembly Electrical BID-01115 Electrical Ground Box with Lid and Apron - Large - Install Each Street Lighting Assembly Electrical BID-01116 Electrical Ground Box with Lid and Apron - Small - Install Each Street Lighting Assembly Electrical BID-00395 Electrical Pull Box - Install Each Street Lighting Assembly Electrical BID-00396 Electrical Service inci Relay 7 Install Each Street Lighting Assembly Electrical BID-00965 Light-100 W HPS Cobra Head Fixture; Photo -Cell & Lamp - Install Each Street Lighting :Assembly Electrical 15 $212.50 $3,187.50 BID-01310 Light-100 W MH Cobra Head Fixture; Photo -Cell & Lamp - Install Each Street Lighting Assembly Electrical BID-01311 Light-150 W MH Cobra Head Fixture; Photo -Cell & Lamp - Install Each Street Lighting Assembly Electrical BID-00966 Light-200 W HPS Cobra Head Fixture; Photo -Cell & Lamp - Install : Each Street Lighting Assembly Electrical BID-00967 Light -Concrete Foundation Type 1, 2 & 4 - Install Each Street Lighting Assembly Electrical 15 $750.00 $11,250.00 BID-00968 Light -Concrete Foundation Type 3, 5, 6, & 8- Install Each Street Lighting Assembly Electrical BID-00969 Light -Concrete Foundation Type 7 7 Install Each Street Lighting Assembly Electrical BID-00970 Light -Ornamental Pole & Fixture -item purchased from City - Install Each Street Lighting Assembly Electrical BID-00971 Light -Photo -Cell Contact Closure Circuit Control - Install Each Street Lighting Assembly Electrical BID-00972 Light -Roadway Lighting System --Install Lump Sum Street Lighting :Assembly Electrical BID-00400 Light -Salvage & Re -install Street Light - Rehab Each Street Lighting Assembly . Electrical .. BID-00399 Remove Each Street LightingServiceCS ;Electrical BID-00973 Light -Salvage Existing Street Light Equipment - Remove Each Street . Lighting Assembly Electrical City -I BID-00974 Light -Type 1, 4, & 6 Pole &Arm-itempurchased from Install Each Street Lighting;Assembly Electrical 3ID-00975 Install Each Street Lighting Assembly Electrical 15 $900.00 $13,500.00 3ID-00976 Install Each Street Lighting Assembly Electrical BID-01319 Reconnect Conductors At Standards or Service Install Each Street Lighting CSService Electrical 3ID-01312 Wood Pole - Install : Each Street . Lighting Wood . Electrical 3ID-01313 Wood Pole Arm - Install Each Street : Lighting Assembly Electrical Street Lights Total $35,849.50 ITEM DESCRIPTION 1 STREET SIGNS I I EXHIBIT "C" SIGNS Marine Creek Ranch Ph B2 ESTIMATE OF COST QUANTITY UNIT COST/UNIT TOTAL COST 13 EA. $245.00 $3,185 I