HomeMy WebLinkAboutContract 41562 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
Contract No. t' I
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: HEGRE, LLC
Authorized Signatory: Rachel Blake
Title: Manager
Project Name: IN-N-OUT Burger Water, Sewer & Paving Improvements
Project Location: 2900 W. 7tn Street
Additional Streets:
Plat Case No.: FS-010-112 Plat Name: K.M. VanZandt's Second Addition
Mapsco: 4R, 17R
To be completed b ' staff.•
Received by: `_ -
Council District: 9 City Project No: 01667
CFA: 2011-004 DOE: 6603
OFFICIAL RECORD
CITY 3:CRETAfdX
FT. WORTH, TX
1
Date:
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto;
provided, however, that the parties acknowledge that construction costs are
subject to adjustment during the course of development.
D. The following checked exhibits are made a part hereof:
Water (A) X ,
Sewer (A-1) X , Paving (B) X Storm Drain (B-1) ,Street
Lights & Signs (C) _.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
Combined CFA final Sept 12, 2008 2
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy;
provided, however, that City acknowledges and agrees that Developer is
not obligated to competitively bid any contracts for the work contemplated
by this CFA.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
3
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees under this CFA,
Combined CFA final Sept 12, 2008 4
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees under this CFA.
M. Developer will further require its general contractor to indemnify, defend
and hold harmless the City, its officers, agents and employees from and
against any and all claims, suits or causes of action of any nature
whatsoever, whether real or asserted, brought for or on account of any
injuries or damages to persons or property, including death, resulting from,
or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such iniuries, death or damages
are caused, in whole or in part. by the alleged negligence of the
City of Fort Worth. its officers. servants, or enzplovees. Further,
Developer will require its general contractor to indemnify, and hold
harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said general contractor's failure to
complete the work and construct the improvements specified in this CFA
in a good and workmanlike manner, free from defects, in conformance
with the Policy, and in accordance with all plans and specifications and
shall cause to be executed and delivered to the City an indemnity
agreement from such general contractor on a form to be promulgated by
the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with its general contractor shall include provisions granting to the
City the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost of the applicable
infrastructure improvements specified in this CFA, as stated in the
5
construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost of
the applicable infrastructure improvements specified in this CFA, as stated
in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted, unless previously extended as permitted herein.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction.
Combined CFA final Sept 12, 2008 6
Cost Summary Sheet
Project Name: IN-N-OUT Burger Water, Sewer & Paving Improvements
CFA No.: 2011-004 DOE No.: 6603
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 61,622.00
$
$
13, 802.00
47, 820.00
B. TPW Construction
1. Street
2. Storm Drain
TPW Construction Cost Sub -Total $ 89,830.04
$ 89, 830.04
$
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
$ 151,452.04
$
$
$
1,232.44
1,232.44
2,464.88
E. TPW Inspection Fee (4%) $ 3,593.20
F. TPW Material Testing (2%) $ 1,796.60
G. Street Light Inspsection Cost $
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 5,389.80
Total Construction Fees:
$ 7,854.68
Choice
Financial Guarantee Options, choose one Amount (ck one)
Bond = 100% $ 151,452.04 X
Completion Agreement = 100% / Holds Plat $ 151,452.04
Cash Escrow Water/Sanitary Sewer= 125% $ 77,027.50
Cash Escrow Paving/Storm Drain r= 125% I $ 112,287.55 I
Letter of Credit = 125% w/2yr expiration period I $ 189,315.05 I
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in quadruplicate, at Fort Worth, Texas this I \C\r'e day
of ��Gs-...�L , 20
CITY OF FORT WORTH - Recommended by:
Water Department
7•
WendY Chi abulal EMBA, P.E.
z`�
Development Engineering Manager
Approved as to Form & Legality:
Marcia Wise
S/l, Assistant City Attorney
ATTEST:
Marty Hendr
City Secretary
ATTEST
Transportation & Public Works Department
Greg S'mmons, P.E.
Acting Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
Z1��
r �a
n
i;
1-5
HEGRE, LLC,
a Texas limited liability company
By: RLES, LLC, a Nevada limited liability company
its sole member
YDAA-e7)1/4-, enna. R,L9 'LLst
Signature
(Print) Name:
MANY M . MoS t1a
Signature
Print Name: Rachel Blake
Title: Manager
OFFICIAL RECORD
CITY SECRETARY
Combined CFA final Sept 12, 2008
8
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
0
n
n
(Remainder of Page Intentionally Left Blank)
9
FORT WORTH
MIKE MONCRIEF
MAYOR
THE CITY OF FORT WORTH , TEXAS
PLAN FOR THE CONSTRUCTIONS OF
TER, SANITARY SEWER, PAVING ND
DR INA GE I I! PRO VE ENTS
To Serve
IN-N-OUT BURGER, HE GRE, LLC
K N Z A ND T'S 2ND DDITION
LOTS 4R, & 17R, BLOCK 11
DALE A. FISSELER, P.E
CITY MANAGER
WILLIAM A. VERKEST, P.E.
DIRECTOR, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
S. FRANK CRUMB, P.E.
WATER DEPARTMENT DIRECTOR
D.O.E. NO.
FILE NO
TPW PROJECT NO.
WATER PROJECT NO.
SANITARY PROJECT NO
CITY PROJECT NO.
Nl
MF ar cel
pc;
Tr
ye
MILTO
4TH 0
Tu
111111111
0
0
RITE S
W
k1 ¢w'_
•0,0 WEI
( ING
J � Z
ii S
✓i Y
w
[ 'ARNELL
0
0
oI sTH
W7TH
(LA. K
ORT4N
ED E
TTLEMENT
ITMORE
NBE GER
TE
0
o:
0
0
Vicinity Map
NOT TO SCALE
COUNCIL DISTRICT EB
MAPSCO 766
Engineering
Associates, Inc.
ENGINEERS • PLANNER$ • SURVEYORS
LAN05CAPF' ARCHITECTS • ENVIRONMENTAL $CIrSI 7SW
3030 LBJ Freeway, Sulte 700 (972)488-3737
Dallas, TX 75234 (972)488-6732
77/"EAR2 ACt F7524
LL
x
0
0
x
0
0
0
11
HE GRE, LLC, A TEXAS LLC
1331 N. CALIFORNIA BLVD, 5TH FLOOR
WALNUT CREEK, CAUFORNIA 9459E
(626) 277-7913 (PHONE)PHONE)
CONTACT; MARK J NOACK
NOVEMBER 2010
SHEET INDEX
SHEET NO. DESCRIPTION
001 COVER SHEET
002 PLATS
003 TOPOGRAPHIC SURVEY
004 GENERAL CONSTRUCTION NOTES
005 GRADING PLAN
006 PRE DRAINAGE AREA MAP
007 POST -DEVELOPED DRAINAGE AREA MAP
008 DEMOLITION PLAN
009 PAVING PLAN
010 PAVING DETAIL
011 WATER LINE PLAN
012 SANITARY SEWER LINE PLAN AND PROFILE
013 UTILITY DETAIL
014 EROSION & SEDIMENT CONTROL PLAN
015 EROSION & SEDIMENT CONTROL DETAILS
016 TRAFFIC CONTROL PLAN
017 TRAFFIC CONTROL PLAN DETAILS
Mall A. DIRECTOR TRANSPORTATION AND PUBLIC WORKS
RECOMMENDED BY:
PROTECT MANAGER
OATS
DATE
DATE
::.v
-"^1L'—N-
Li. 11
•
' ,;.,Lt777:7,v IL ., .I,. RC Derr
•
1 not N. aro
i
1 a. op pan.",
1,111
, .rr ..-ry,..
xL. x
.- M1'._C7LL s- :RA
ssi
-f-
,f
al 4111. Dee
tat fa Ft
ru., r L. 1 , L uTry..•
GRAPHIC S'C'AEX
1 Re
DP ran
,.,,•e.. o . . 4 I, ,,.,.,�
-neat= t.r•m .<u I,
LLit
Is
PEISER SURVEYING CO.
wires pcist rsurveytnZ.com
PV .DE' rel.
ms
ARCH
FOCH
WILL
r--
0
(1)
0
rri
NO1KV013Ne1Va
CURRIE
FOCH
mONITGOM RY
HASKLL 4/o 7)0
K
N-6-'
IviON-IC LC) a)
0-1 -p• K SA1
DC 441.4is&40
--I -I
--1
BO AND -•
o
ARCH ADA,MS
A RDEN
\ _..
UNIVERSITY /
t?
o
0 NOWC OD
m *
-1 ---.1 CD
--I --I ---1 CURRIE WIMBERLY
a :--1
2 Fri m
.-, F./5 v)
m
7J 0 N 1-1 FT] = --I
AL° L > WI / m0:1 K
0 ril
-- M Z --I --I
CD *-' M
o u) 7u 70 K
0 m m
P1 Z
73 --I
J111111111111111111111111111111111111111111111111111..,
TEMPLETpN DRIAN
ADO _PH
r.
h
7TH STREET
_
DRIVE-THRU
RESTAURANT
±3,750 SF
F.F.E= 543.90'
Engineering Associates, Inc.
ENGINEERS • PLANNERS • SURVEYORS
LANDSCAPE ARCHITECTS • ENVIRONMENTAL SCIENTISTS
12±LF 4" FIRE LINE
1-6"X4" TAPPING
1-4" VALVE
FIRE HYDRANT ASSEMBLY
1-6"X6" TEE
1-6" VALVE
3 LF 6" FIRE LINE
(PLAT, CALL 125')
SO1'10'14"W
124.77'
1/31/11 I LWY FOA1 PHY PHY 3030 LBJ Freeway, Suite 100 (972)488-3737
DATE PRN I PM DES DRW Dallas. TX 75234 (972)488-6732
HE GJ�E LLC EXHIBIT A WATER 2/21/11
2900 [ . 7TH STREET 4: 57 PM EX A
FORT WORTH, TEXAS REV-0
0 2011 CEI ENGINEERING ASSOCIATES, INC
0 DRA{NNG: 2612IEXH/BIT.dwg LAST SAVED BY: FADEOYE
PRIVATE SANITARY
41- SEWER LINE
ci
G1
4' SANITARY
-SEWER MANHOLE
3_..�
4' SANITARY
SEWER MANHOL
) cc
„PUBLIC SANITARY SEWF,,gFNE
PRIVATE SANITARY
SEWER LINE
Engineering Associates, Inc.
ENGINEERS • PLANNERS • SURVEYORS
LANDSCAPE ARCHITECTS • ENVIRONMENTAL SCIENTISTS
265 LF 8" SS PVC
1731/11 I LWY
DATE I PRN
FOA IPM
4' SANITARY
SEWER MANHOLE
PH Y
DES
HE GRE, LLC
DRIVE-THRU
RESTAURANT
f3,750 SF
F.F•E= 543.90'
IPHY 3030 LBJ Freeway, Suite 100
DRW Dallas. TX 75234
EXHIBIT Al -WASTEWATER
2* I W 7TH S EET
FONT WORTH, TEXAS
(972)488-3737
(972)488-6732
2/11/11
10:59 AM EX Al
REV-0
(PI 91117 rF FN/:IAIFFRINR dCCM`Id TFC INC
-0,3
g
—8
N591rOBV 150.00'
PARCEL Ir.'
(BASE BEARING)
S8909'55E
150.00'b.
79±LF. 4WIDE
CONCRETE SIDEWALK
'41
77±LF. 4' WIDE
CONCRETE SIDEWALK
r -
(
5,100±SF. 6"
REINFORCED CONCRETE
PAVMENT (ALLEY)'
35±SF. 6" REINFORCED
CONCRETE DRIVEWAY
APPROACH
Engineering Associates, Inc.
ENGINEERS • PLANNERS • SURVEYORS
LANDSCAPE ARCHITECTS • ENVIRONMENTAL SCIENI7STS
6TH STREET
P.O.B.
/PARCEL I
swoon mar
36±LF. 4' WIDE
CONCRETE SIDEWALK
41N-952±SF. REINFORCED
CONCRETE DRIVEWAY
APPROACH
;C•1
.S;
Iv'
DRNE-THRU
RESTAURANT
±3,750 SF
L F.F.E= 543.90
135±LF. 4' WIDE
CONCRETE SIDEWALK
1/18(11 I LWY
DATE PRN
FOA PHY PHY
PM DES DRW
HE GRE, LLC
ti
(PLAT CAU. 125)
S0110'14.W
124.77'
116±LF. 4' WIDE
CONCRETE SIDEWALK
3030 LBJ Freeway, Suite 100
Dallas. TX 75234
EXIHIBIT B-PAVING
2900 W. 77H STREET
FORT WORTH, TEXAS
0 2011 CEI ENGINEERING ASSOCIATES, INC.
(972)488-3737
(972)488-6732
1/18/11
6:56 PM EX B
REV- 0
Paving
Improvements
BID-00401
Driveway
-
Install
Square
Foot
1596
$ 9.00
$14,364.00
BID-00402
Driveway
-
Remove
Square
Foot
1596
$ 9.00
$14,364.00
BID-00404
Driveway-6
Inch
- Install
Approach
Square
Foot
1300
$ 4.70
$6,110.00
BID-00415
Alley
- Install
Square
Yard
566.7
$ 40.50
$22,951.35
BID-00416
Alley
-
Remove
Square
Yard
266.7
$ 3.56
$949.45
BID-00418
Base
-
Compact
Square
Yard
933.4
$ 2.58
$2,408.17
BID-00423
Curb
&
Gutter
,-
Install
Linear
Foot
515
$
6.00
$3,090.00
BID-00424
Curb
&
Gutter
-
Remove
Linear
Foot
250
$
7.00
$1,750.00
BID-00430
Pavement
Asphalt-
Remove
Square
Yard
234
$
3.64
$851.76
BID-00450
Pavement-6
Inch
Concrete
- Install
Square
Yard
26.8
$ 108.35
$2,903.78
BID-00457
Pavement
-Concrete
-
Remove
Square
Yard
26.8
$
108.35
$2,903.78
BID-00529
Walk
-
Remove
Square
Foot
3650
$
0.77
$2,810.50
BID-00530
Walk-4
Ft
-
Install
Square
Foot
1850
$
4.00
$7,400.00
BID-01227
Walk-ADA
Wheelchair
Ramp
--
Install
Each
1
$
800.00
$800.00
BID-00121
Miscellaneous
- Install
Irrigation
Lump
Sum
1
$
1,200.00
$1,200.00
BID-00132
Grass
-Bermuda
Sod
--
Install
Square
Yard
477
$ 2.25
$1,073.25
BID-00181
Traffic
Control
-
Install
Lump
Sum
1
$ 3,900.00
$3,900.00
Subtotal
$89,830.04
Improvements
BID-00546
_Water
Fire
Hydrant
-
Install
Each
1
$ 2,600.00
$2,600.00
BID-00568
Pipe
Fittings
TN.
0.2
$ 3,160.00
$632.00
BID-00605
Pipe-Pressure-4
Inch
-
Install
Linear
Foot
70
$
40.00
$2,800.00
BID-00616
Pipe-Pressure-6
Inch
-
Install
Linear
Foot
3
$
80.00
$240.00
BID-00682
Fire
line
-Tapping
Sleeve
6" X 4"
-
Install
Each
1
$ 3,300.00
$3,300.00
BID-00693
Pipe
-Cut
in
6" X
6"
Tee &
6" Valve
Each
1
$ 3,500.00
$3,500.00
Trench
Safety
L.F.
73
$ 10.00
$730.00
Subtotal
$13,802.00
Sanitary
Sewer
Improvements
BID-00115
Manhole
-
Install
Connect
to
Existing
_
Each
1
$ 1,200.00
$1,200.00
BID-00118
Manhole-4
Ft
-
Install
Each
2
$ 4,500.00
$9,000.00
BID-00332
Pipe-Sewer-8
Inch
(All
Depths)
-
Install
Linear
Foot
266
$ 118.00
$31,388.00
BID-00361
Sewer-Service-6
Inch
Service
Tap - Install
Each
3
$ 1,400.00
$4,200.00
BID-00372
Trench
Safety
System
5
Foot
Depth
-
Install
Linear
Foot
50
$
10.00
$500.00
TV
& Vacuum
Testing
L.F.
266
$
2.00
$532.00
Cut
&
Plug
Exisitng
Service
EA.
2
$ 500.00
$1,000.00
Subtotal
$47,820.00
TOTAL
$151,452.04