Loading...
HomeMy WebLinkAboutContract 41585-A1itestit 2016 �29 c)\\\ S-0 0-1(\ asEri-ari ° c EREAS A ENO ENT No 0 r TO CITY SECRETARY CONTRACT No. 41585 the City of Fort Worth (CITY) and Haiff Associates, Inc., 1lS!5'.k) CITY 4Ec r 0� `2R 1, t G tACT i \a ! V (ENGINEER) made and entered into City Secretary Contract No. 41585, (the CONTRACT) which was authorized by M&C C-24447 on the 14th day of September, 2010 in the amount of $ 156, 595. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Lnr& L 1 n Creek Plaster Plan, Study No SWS=029 and IAREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THXREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 15, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer totals $36, 529. 00. (See Attached Funding Breakdown Sheet, Page -3 2 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $193,124.00. All other provisions City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 3. of the Contract, which are not expressly C SCANNED [1 on sIrcm-L-Ginia' 'OFFICIAL f €N.) FT„ M' RC1iia amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Raiff Associates, Inc. Jesus J. Chapa Assistant City Manager DATE: `71 a, -ice APP'OVAL RECOMMENDED: C3 Douglas Wiersig, P. Director, Transportation and Public Works Department "2 Be jamin B. ylant Project Manager DATE: 4/21JIC p APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: M.ry J. K.��,,-r City Secretary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 M&C: N/A Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 41585 Amendment No. 1 Department 020E431 City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 3 of 3 Fund -Account -Center 52002-5330500-100089 Total: Amount $36,529.00 $36,529. 00 HALFF' April 15, 2016 AVO 28076 Ms. Mary Hanna, P.E., CFM City of Fort Worth Storm Water Division Transportation and Public Works 1000 Throckmorton Fort Worth, TX 76102 RE: Contract Amendment for Ludelle Creek Master Plano Amendment to City Secretary Contract No. 41585 Dear Ms. Hanna: Halff Associates is pleased to present this Amendment to the Scope of Services for the above referenced project. This amendment includes the tasks required to extend the floodplain study and alternatives analysis upstream to the FEMA floodplain mapping extents. Included is the standard Amendment to Professional Services, Scope of Work (Attachment "Al"), and Level of Effort to be considered under this amendment. Thank you for the opportunity to allow Halff to continue assisting the City with this important project, if you have any questions please feel free to contact me at (817) 764-7488. Sincerely, HALFF ASSOCIATES, INC. Benjamin B. Pylant, PE, CFM Project Manager C: HALFF ASSOCIATES, INC. 4000 FOSSIL CREEK BOULEVARD TEL (817) 847-1422 WWW.HALFF.COM FORT WORTH, TX 76137-2720 FAX (817) 232-9784 ATTACHMENT "Al" Scope of Work Ludelle Creek Master Plan City Secretary Contract No. 41585 The scope set forth herein defines the work to be performed by the ENGINEER in completing the study Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the study. Under this scope, "ENGINEER" is expanded to include any sub -consultant, including surveyor, employed or contracted by the ENGINEER OBJECTIVE ENGINEER will extend the floodplain study and alternatives analysis upstream approximately 2,200 linear feet to the FEMA floodplain mapping extents near Campbell Street. WORK TO BE PERFORMED The CITY has requested that the current Master Plan study extents be extended upstream to the FEMA mapping extents The ENGINEER will provide the following services and provide the requested deliverables by incorporating the additional study data with the current Ludelle Creek Master Plan Deliverables: Task 1: Proiect Management No additional tasks, deliverables or budget changes are included for this amendment. Task 2: Field Reconnaissance The ENGINEER shall perform field reconnaissance to become familiar with the main stem and the appropriate tributaries, the hydraulic and hydrologic structures, land use, vegetative cover conditions of the floodplain, and special features and problems within the watershed. The ENGINEER is aware that not all natural channels are contained within City easements therefore property owner permission must be obtained by the ENGINEER to access private property The ENGINEER shall document their reconnaissance efforts findings with labeled digital photographs. Typical channel and over -bank types shall be photographed and labeled with location and Manning "n" value assumptions The ENGINEER shall document physical characteristics of the watershed relevant to modeling, including but not limited to: specific features of all major detention ponds and outlet discharge structures vegetative and built structure conditions along the floodplains, types and number of hydraulic structures involved, apparent maintenance condition of channels, over -banks and existing hydraulic structures, locations and descriptions of stream cross -sections to be surveyed (including bridge railings and obstructed flow areas). City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 1 of 3 Task 2 Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. Task 2a: Finished Floor Elevations This task will include budget for 40 additional finished floor surveys. These finished floor surveys will included effort for 22 additional structures from the original study extents and 18 structures within the extended study extents that are estimated to be at risk of flooding based on current FEMA floodplain delineations. Task 2a Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. Task 3: Development of Detailed Hydrologic Models The ENGINEER shall utilize detailed hydrologic models from original study scope. No additional tasks, deliverables or budget changes are included for this amendment. Task 4: Development of Hydraulic Models and Floodplain Maps No additional survey data is included for Amendment 1 but survey data from the original contract will be incorporated as needed. The study extents will be extended approximately 2,200 linear feet upstream to Campbell Street. Modeling will meet the requirements of the original contract study scope for model development flow data, and results A floodway will be developed for the current FEMA floodway extents The 2D model prepared by Freese and Nichols, Inc. will be incorporated with limited changes to extend the 2D trunkline modeling upstream through the new study extents. The conveyance capacity of the existing storm drain system will be subtracted from the peak discharges and the remaining discharges will be modeled using HEC-RAS for overland flow conditions and floodplain delineations. Task 4 Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. Task 5: Watershed Flood Hazard Assessment The ENGINEER shall assess the capacity of stream roadway crossings and summarize flooding hazards at the stream roadway crossings through the extended study extents. The ENGINEER shall provide an estimate of the number of roadway crossings inundated and depth of inundation for each return event analyzed ENGINEER shall provide an estimate of the number of structures within the delineated extents of the 100-year floodplain. The ENGINEER shall document the results from the watershed flood hazard assessment. Task 5 Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 2 of 3 Task 6: Proposed Flood Mitigation Alternative Analysis ENGINEER shall evaluate the conceptual sizing for the reconstruction of the existing storm drain line matching the same alignment to convey the 100-year discharges from the existing study extents upstream to Campbell Street. Based on discussions with City, an alternate parallel system may also be considered as a possible alternative. ENGINEER shall evaluate the acquisition costs for residential structures within the extended study extents. The proposed mitigation alternatives scope of work for the extended study extent will be consistent with the original study scope unless otherwise stated in this amendment. Task 6 Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. Task 7: Quality Assurance and Quality Control Procedures The ENGINEER shall provide for internal QAQC of the extended study extents consistent with the original scope of work. Task 7 Deliverables will be consistent with the Ludelle Creek Master Plan and will be integrated with the Ludelle Creek Master Plan Report. City of Fort Worth, Texas Attachment A PMO Release Date: 07/23/2012 Page 3 of 3 Ludelle Creek Master Plan City of Fort Worth Amendment 1 Halff Associates AVO 28076 4/15/2016 Project Phases and Tasks c _ m cv cm °- ti .c C •` U n $225.00 3 .., `a, o `C 0 m 0 a) °' E N E o c w m m N ,,.. C d g 0 O W a $170.00 $205.00 4 7a L o `m o— a) E c a� ,� C 5 W a $130.00 w c 2 i- 0) ` rot a) E R. o ai E i C. c 'ca a� E n C 7 'Q) L- H U Ern w a $103.00 $65.00 69 Fee Subtotal O CO O O Subconsultant Fee Subtotal To o F-- ., U a1 O a Task 2: Data Collection, Field Recon, Stream Stability, Surveys Field Investigation Field Reconnaissance Task 2A: Survey Information 6 $1,298 Finished Floor Surveys I I I I I I $4,500.00 $4,500.00 $4,500 Subtotal Task 2 I 4 I 6 $1,298.00 $4,500.00 $5,798 Task 4: Development of Hydraulic Models and Floodplain Maps Hydraulic Models Model Development Development of Hydraulic Parameters 2 8 $1,164.00 $1,164 Finalize Hydraulic Section Layout 2 6 $958.00 $958 Data Extraction and Model Setup (HEC-GeoRAS) 1 4 $582.00 $582 Import Bridge/Culvert Data 2 2 $546.00 $546 Model Completion 1 4 $582.00 $582 Model Run and Troubleshoot 1 2 32 $3,861.00 $3,861 Encroachment Analysis 6 16 $2,668.00 $2,668 Steady Flow Data Determine Appropriate Flow Change Locations 2 2 $546.00 $546 Input Steady Flow Data 1 2 $376.00 $376 Hydraulic Model Results Results Tables 1 4 $582.00 $582 Water Surface Profiles (RASPLOT) 1 4 $582.00 $582 Documentation of Methodologies and Assumptions 1 2 4 4 $1,237.00 $1,237 Floodway Data Table 2 4 $752.00 $752 Floodplain Mapping Floodplain Mapping 1 2 16 $2,213.00 $2,213 Floodway Mapping 2 8 $1,164.00 $1,164 Base Flood Elevations 1 2 $376.00 $376 Subtotal Task 4 I 3 30 I I I 118 I 4 $18,189.00 $18,189 I:\28000s\28076\Admin\Contracts\Amendmentl\Ludelle Creek Budget.xls Ludelle Creek Master Plan City of Fort Worth Amendment 1 Halff Associates AVO 28076 4/15/2016 c c >_ m `m L- o `a) o `m m — io t 0. °' aa) °' o 'N c o '— c a�i c (-)to o Project Phases and Tasks m c �, . E a G •� y fl- �v a.g N 6u5 6u5 Gi— O Eu) a a a. w a $225.00 $170.00 $205.00 $130.00 $103.00 $65.00 Fee Subtotal _ ca O a c= Fee Subtotal c7 o 1— -- d 'o a Task 5: Watershed Flood Hazard Assessment Assess Capacity of Roadway Crossings 2 4 Summarize Flooding Hazards 2 4 Documentation of Methodologies and Assumptions 1 2 4 2 $752.00 $752.00 $1,107.00 $752 $752 $1,107 Subtotal Task 5 1 6 12 1 2 $2,611.00 $2,611 Task 6: Proposed Flood Mitigation Alternative Analysis Develop Preliminary Alternatives Evaluate Preliminary Alternatives 1 2 8 Finalize Alternatives 1 8 Perform Benefit/Cost Analysis 2 4 Documentation of Methodologies and Assumptions 2 8 $1,389.00 $994.00 $752.00 $1,164.00 $1,389 $994 $752 $1,164 Subtotal Task 6 1 I 7 I I 28 I $4,299.00 $4,299.00 Task 7: Quality Assurance/Quality Control Perform QA/QC Tasks Hydraulic Models 1 2 8 4 Floodplain/Floodway Mapping 1 2 2 4 Provide Work Products Generated 2 2 6 4 $2,617.00 $1,387.00 $1,628.00 $2,617 $1,387 $1,628 Subtotal Task 7 2 I 6 12 14 4 $5,632.00 $5,632.00 PROJECT TOTALS 7 53 12 178 10 $ 32,029.00 $ - $ 4,500.00 $ 36,529.00 I:\28000s1280761Admin\Contracts\Amendmentl\Ludelle Creek Budget.xls