Loading...
HomeMy WebLinkAboutContract 41663-A1 (2)GUY RETARV : ©ONTRACT NOE • 1_ • AMENDMENT No . 1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Dannenbaum Engineering Corporation, (ENGINEER) made and entered into City Secretary Contract No. 41663, (the CONTRACT) which was authorized by M&C C=24773 on the 8th day of March, 201.1 in the amount of $174,760.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 83; and WHEREAS, it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 18, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $1, 904 . 00 . 2. Article II of the CONTRACT is amended to provide for an .increase in no ;pee to be paid to Engineer for all work and services perf ot=med under the Contract, AS amended, so that the total fee paid by the City for all work and services shall be an amount of $176 , 664 .00 . All other provisions of the Contract, which are not expressly amended heroin, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Ft WORTh, Pagm m RECEIVED MAY 14 2013 EXECUTED and EFFECTIVE an of the date last written by a signatory, below. City of Fort Worth .J PINGXNEAR MAnneaboum Engineeaing CorpoKti on c7iPii****4‘1—• /VIA tom.. F�nando Costa Assistant City Manager dr) i S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: Mary J . City Secretary Mark Co L orance , P.M. MoKth Texas _egionaJ Manager DATA. 4113120)3 M&C: N/A Date: N/A �,. . ' volhy2Ti:, 41,44 % 1St 0 onoota tka_°°00Q0C1Q° rajakeket sonINir Page -2 PHIC11811, R CUR DANNENBAUM ENGINEERING CORPORATION 6421 CAMP BOWIE BOULEVARD, SUITE 400 FORT WORTH, TEXAS 76116 (817) 763-8883 April 18, 2013 Mr. Rakesh Chaubey Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: Supplemental Agreement No. 1 Sanitary Sewer Rehabilitation Contract LXXXIII (83) Morris Dido Road Water Line Adjustment Dear Mr. Chaubey: We have prepared and are submitting for your review the attachments for Supplemental Agreement No. 1 in order to produce the plan sheet, as requested by John Kasavich, to adjust a six inch water line on Morris Dido Road in northwestern Tarrant County. Tarrant County is reconstructing Morris Dido, and will be affecting this water line As this line will need to be relocated quickly, Darmenbaum will produce one plan sheet and will submit it to Mr Kasavich. this water line relocation will not be included in the bid or constructed by the contractor selected for Contract 83. If you are in agreement with the attachments for Supplemental Agreement No. 1, our authorized compensation will increase by $1,904.00. The $174 760.00 original contract amount will be increased to $176,664.00. Please do not hesitate to call if you have any questions or require any additional information. In this agreement, no principal time is being used in this amendment. Sincerely, Bryan E. Sherrieb, P.E. Project Manager cc: Mark C. Lorance, P E File 4574-01 U:\ 1210\4574-01 \Admin\Agrcemcnt\sa N l\Letter c haubey.doc 'Task tb. 11..0 12.0 19.0 14.0 Task Description Prolect Management Ieoncepluai Designleo-Percent/ Preliminary Dnlq 16o Peicenll final De,ion Oki Phase 6.0 7.o )en nnslnsclbn Phase Services 'ROWIEasament Services Lsureey .0 (Permitting Cry al Fort Wore( Taws Attacbrent B - Level gr Et'ert 90W-errant Plea OHcbi Re'ease Date 5 19 2010 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for SANITARY SEWER CONTRACT LXXXIII (83) - Supplemental Agreement #1 - Morris Dido Road Water line I Basis for Hour Estimate Rate• 1 City Project No. 01502 1 Labor Mount Unit Pdnclpal Prefect Pnlect Mpnpper Spoilt/try 200 S, 145 $ 136 0 0 - 1 Totals' f o1 I 0I 01 i 01 01 01 O 01 14 0 O t. - Of - 0 01 o1 0� 0 01 Oi 14 CADD Administrative Total Labor Cool a - 66-I o) a g' Expense Subconsuaant MWBE Non-MWBE $ •5 •£ .s . O i • 1 i O) 01 01 0S 0 o s 01 a ol_s -11 0 01 0 -Is"' 01 01 01a 1.904 I1 Trani and Reproduction (Total Expanse Delversand Postage Cost 4 •s • ! •s • s 3 - 3- s Task Sub Total 04 • 1i •;s•, • -1a 1,404 •1s -} __ • 13 • .f 1 Protect Summary 1 TotalHours) I TotalLabor Total Exoense� C MWBE St.bconsulant NornM'WBE Subconsutanll 1 5% Sub Markool MWBE PatbNoatonl Total Protect Costl 14 61904 SO 0 1 40 0 034 51,904.00 0.12104574-01'Adn n Agreerrent se d1,LOE'or Tyucal Design Pro s.^s 1P1'O11 'ease 20100519;201010 n1'6 el I