HomeMy WebLinkAboutContract 41663 (2)CITY OF FORT WORTH, TEXAS
(wry SECRETARY
CONTRACT NO, _ L
STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a home -rule municipal
corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and
Dannenbaum Engineering Corporation, (the "ENGINEER"), for a PROJECT generally
described as: Sanitary Sewer Rehabilitation, Contract LXXXIII (83).
Article 1
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article 11
Compensation
A. The ENGINEER's compensation is set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but not
limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested will
be withheld from payment, and the undisputed portion will be paid. The CITY
will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved.
(5)
If the CITY fails to make payment in full to ENGINEER for billings contested in
good faith within 60 days of the amount due, the ENGINEER may, after giving
7 days' written notice to CITY, suspend services under this AGREEMENT until
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
MO Official Release Date: 5.19.2010
Page 1 of 15
paid in full. In the event of suspension of services, the ENGINEER shall have
no liability to CITY for delays or damages caused the CITY because of such
suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the degree
of skill and diligence normally employed in the State of Texas by professional
engineers or consultants performing the same or similar service:; at the time
such services are performed.
C. Subsurface Investigations
(1)
The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise specified
in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive test
points and sample intervals and at locations other than where
observations, exploration, and investigations have been made Because
of the inherent uncertainties in subsurface evaluations, changed or
unanticipated underground conditions may occur that could affect the
total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 2 of 15
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in ink
on reproducible mylar sheets and electronic files in .pdf format, or as otherwise
approved by CITY, which shall become the property of the CITY. CITY may
use such drawings in any manner it desires; provided, however, that the
ENGINEER shall not be liable for the use of such drawings for any project other
than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the CITY
and/or the CITY's construction contractors or other entities, and do not relieve
the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract
Documents and any health or safety precautions required by such construction
work. The ENGINEER and its personnel have no authority to exercise any
control over any construction contractor or other entity or their employees in
connection with their work or any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general, if
the work on the PROJECT is being performed in a manner indicating that the
PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to make
exhaustive or continuous on -site inspections to discover latent defects in the
work or otherwise check the quality or quantity of the work on the PROJECT. If
the ENGINEER makes on -site observation(s) of a deviation from the Contract
Documents, the ENGINEER shall inform the CITY.
(3)
When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1)
The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance with
Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 3 of 15
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation or
maintenance costs; competitive bidding procedures and market
conditions time or quality of performance by third parties; quality, type,
management, or direction of operating personnel, and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that the
CITY's actual PROJECT costs, financial aspects, economic feasibility, or
schedules will not vary from the ENGINEER's opinions, analyses,
projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects that the
ENGINEER has made an examination to ascertain how or for what purpose the
construction contractor has used the moneys paid; that title to any of the work,
materials, or equipment has passed to the CITY free and clear of liens, claims,
security interests, or encumbrances; or that there are not other matters at issue
between the CITY and the construction contractor that affect the amount that
should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
1. Minority and Woman Business Enterprise (M/WBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, as amended, the City
has goals for the participation of minority business enterprises and woman
business enterprises in City contracts Engineer acknowledges the MNVBE
goal established for this contract and its accepted written commitment to
M/WBE participation. Any misrepresentation of facts (other than a negligent
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 4 of 15
misrepresentation) and/or the commission of fraud by the Engineer may result
in the termination of this Agreement and debarment from participating in City
contracts for a period of time of not Tess than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after
final payment under this contract, have access to and the right to examine and
photocopy any directly pertinent books, documents, papers and records of the
ENGINEER involving transactions relating to this contract ENGINEER agrees
that the CITY shall have access during normal working hours to all necessary
ENGINEER facilities and shall be provided adequate and appropriate work
space in order to conduct audits in compliance with the provisions of this
section. The CITY shall give ENGINEER reasonable advance notice of
intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such subconsuitant,
involving transactions to the subcontract, and further that the CITY shall have
access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space, in order to conduct audits in
compliance with the provisions of this article together with subsection (3)
hereof. CITY shall give subconsultant reasonable advance notice of intended
audits.
(3)
ENGINEER and subconsultant agree to photocopy such documents as may be
requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost
of copies at the rate published in the Texas Administrative Code in effect as of
the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain commercial
general liability (CGL) and, if necessary, commercial umbrella insurance
with a limit of not Tess than $1,000,000.00 per each occurrence with a
$2,000,000.00 aggregate. If such Commercial General Liability insurance
contains a general aggregate limit, it shall apply separately to this
PROJECT or location.
i. The CITY shall be included as an insured under the CGL, using ISO
additional insured endorsement or a substitute providing equivalent
coverage, and under the commercial umbrella if any This
insurance shall apply as primary insurance with respect to any other
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 5 of 15
insurance or self-insurance programs afforded to the CITY. The
Commercial General Liability insurance policy shall have no
exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b Business Auto — the ENGINEER shall maintain business auto liability and, if
necessary commercial umbrella liability insurance with a limit of not less
than $1,000 000 each accident. Such insurance shall cover liability arising
out of "any auto', including owned, hired, and non -owned autos, when said
vehicle is used in the course of the PROJECT. If the engineer owns no
vehicles, coverage for hired or non -owned is acceptable.
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 6 of 15
c. Workers' Compensation —ENGINEER shall maintain workers compensation
and employers liability insurance and, if necessary commercial umbrella
liability insurance with a limit of not less than $100,000.00 each accident for
bodily injury by accident or $100,000.00 each employee for bodily injury by
disease, with $500,000.00 policy limit.
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional liability a
claims -made policy, with a minimum of $1,000,000.00 per claim and
aggregate The policy shall contain a retroactive date prior to the date of the
contract or the first date of services to be performed, whichever is earlier.
Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall include
its employees, officers, officials, agents, and volunteers as respects the
contracted services.
c. Certificate(s) of insurance shall document that insurance coverage specified
in this agreement are provided under applicable policies documented
thereon.
d. Any failure on part of the CITY to request required insurance documentation
shall not constitute a waiver of the insurance requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) claw; notice shall be
.
acceptable in the event of non-payment of premium Such terms shall be
endorsed onto ENGINEER'S insurance policies. Notice shall be sent to the
respective Department Director (by name), City of Fort Worth, 1000
T hrockmorton, Fort Worth, Texas 76102
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A M.
Best Key Rating Guide or have reasonably equivalent financial strength and
solvency to the satisfaction of Risk Management.
g.
Any deductible or self insured retention in excess of $25,000 00 that would
change or alter the requirements herein is subject to approval by the CITY
in writing, if coverage is not provided on a first -dollar basis. The CITY, at it
sole discretion, may consent to alternative coverage maintained through
insurance pools or risk retention groups. Dedicated financial resources or
letters of credit may also be acceptable to the CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation in
favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring expense,
to review the ENGINEER's insurance policies including endorsements
thereto and, at the CITY's discretion; the ENGINEER may be required to
provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims -made basis, shall contain a retroactive date coincident with or prior
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 7 of 15
to the date of the contractual agreement. The certificate of insurance shall
state both the retroactive date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall
be maintained without interruption nor restrictive modification or changes
from date of commencement of the PROJECT until final payment and
termination of any coverage required to be maintained after final payments.
I. The CITY shall not be responsible for the direct payment of any insurance
premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be required
by the ENGINEER to maintain the same or reasonably equivalent insurance
coverage as required for the ENGINEER. When sub
consultants/subcontractors maintain insurance coverage, ENGINEER shall
provide CITY with documentation thereof on a certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY.
Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions of
the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required, at
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 8 of 15
its own cost and expense. However, if design changes are required due to the
changes in the permitting authorities' published design criteria and/or practice
standards criteria which are published after the date of this Agreement which
the ENGINEER could not have been reasonably aware of, the ENGINEER
shall notify the CITY of such changes and an adjustment in compensation will
be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines and
other components of the CITY s facilities as may be required in connection with
the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 9 of 15
D Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER'S services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had rio prior'role
in the generation, treatment, storage, or disposition of such materials. In
consideration of the associated risks that may give rise to claims by third
parties or employees of City City hereby releases ENGINEER from any
damage or liability related to the presence of such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is a
result of ENGINEER's negligence or if ENGINEER brings such hazardous
substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of Article
IV E regarding the ENGINEER's Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the ENGINEER
for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain no
direct action against the ENGINEER, its officers employees,
and subcontractors for any claim arising out of, in connection
with, or resulting from the engineering services performed.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5,19,2010
Page 10 of 15
Only the CITY will be the beneficiary of any undertaking by the
ENGINEER "
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3)
The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation or such on a certificate of
insurance.
(3)
The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required or
requested assistance to support, prepare, document, bnng, defend, or assist in
litigation undertaken or defended by the CITY. In the event CITY requests such
services of the ENGINEER, this AGREEMENT shall be amended or a separate
agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of Services
in this AGREEMENT If such changes affect the ENGINEER's cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT with appropriate CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 11 of 15
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments of
service for this PROJECT, whether the PROJECT is completed or not. Reuse,
change, or alteration by the CITY or by others acting through or on behalf of the
CITY of any such instruments of service without the written permission of the
ENGINEER will be at the CITY's sole risk. The CITY shall own the final
designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond the
control of the ENGINEER that prevent ENGINEER s performance of its
obligations hereunder.
D Termination
(1)
This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans, specifications
or other forms of ENGINEER'S work product
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.)
The time requirements for the ENGINEER'S personnel to document the
work underway at the time of the CITY'S termination for convenience so
that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will submit
to the CITY an itemized statement of all termination expenses The CITY'S
approval will be obtained in writing prior to proceeding with termination
services
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 12 of 15
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT s schedule, commitment
and cost of the ENGINEER s personnel and subcontractors, and ENGINEER's
compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER s agent,
consultant under contract, or another entity over which the ENGINEER
exercises control.
Assignment
Neither party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action except for willful
misconduct or gross negligence for limitations of liability and sole negligence
for indemnification. Parties mean the CITY and the ENGINEER, and their
officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims related to it. The venue
for any litigation related to this AGREEMENT shall be Tarrant County, Texas.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 13 of 15
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid illegal, or unenforceable in any respect such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI B , VI D , VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or may
be enacted later by governing bodies having jurisdiction or authority for such
enactment. No plea of misunderstanding or ignorance thereof shall be
considered ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 14 of 15
Attachments, Schedules, and Signatures
Article VII
This AGREEME.NT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be changed
by a written amendment executed by both parties. The following attachments and schedules
are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D -Project Schedule
Attachment E -Location Map
Executed this the r\Ah day of )c , 2011.
ATTEST:
Marty Hendrix
City Secretary
contract✓ Authorizati
18 i‘
s :-sue,-.r"sr-.z— r-�- -
bate
AP{�RO
4)9, #1704(;)°"°°°0 bcgi
on A
S4t2(‘
a,a
8 :CI 0
rf
_a oo00 yciA
aufr.�00000 �7'
brE X AS •46cr
ORM AND LEGALITY
Assistant City Attorney
ATTEST:
off0
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 5.19.2010
Page 15 of 15
CITY OF FORT WORTH
By a 4.744101°004.aussei
Fernando Costa
Assistant City Manager
APPR OVAL REOM•.MMEND D,,
\‘,/
,}) t(A4fily
S. Frank Crumb, P.E.
Director, Water Department
Dannenbaum Engineering Corporation
a/11/4st l/
Wayne/Ahrens, P.E.
Executive Vice President
By:
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH' TX
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
ATTACHMENT A
Scope for Enaineerina Desian Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.: 01502
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
Street
Penrose/Davenport
Penrose/Davenport
Penrose/Davenport
Davenport/Gaston
Davenport/Gaston
Davenport/Gaston
Penrose/Garza
Penrose/Garza
Penrose/Garza
Pensacola/Llano
Pensacola/Llano
Llano/Ewing
Llano/Ewing
Llano/Ewing
Llano/Ewing
Marks Place
Ewing/Mohawk
Ewing/Mohawk
Ewing/Mohawk
Ewing/Mohawk
Pensacola/Marks Place
Aberdeen
Aberdeen
Mohawk/Willis
Mohawk/Willis
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 1 of 15
g:\1210\0045-74\admin\agreement\attachment a - water (pmo_release_20100827).doc
Council
District
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Mapsco
73V
74S
74S
73Z
73Z
73Z
73V
73V
73V
74W
74W
73Z, 74W
73Z
73Z
74W
74W
74W
74W
74W
73Z, 74W
74W
87D
87D, 88A
73Z
73Z
Segment
L03099
L03099
L03099A
L03100
L03100A
L3100B
L03101
L03101
L03101A
L03103
L03103B
L03113
L03113B
L03113C
L03113D
L03114
L03116
L03116A
L03116B
L03117
L03121
L03133
L03113
L03205
L03205A
Existing
Size (in.)
8
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
•
Proposed
Size (in.) Length (ft.)
8 697
8 71
8 69
8 730
8 50
8 74
8 262
8 176
8 85
8 93
8 46
8 1650
8 79
8 48
8 92
8 176
8 423
8 82
8 65
8 1427
8 375
8 49
8 632
8 , 1200
8 205
Marks Place/Roanoke
Marks Place/Roanoke
Marks Place/Roanoke
Marks Place/Willis
Cedar HIII/Penrose
Cedar HiII/Penrose
Cedar Hill/Penrose
Gilbert Trail
3
3
3
3
3
3
3
3
88A
74W
74W
74W
87D
73Z
73Z
87D
L03228
L03228
L03228A
L03228B
L03249
L03249
L03249B
L03673
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
6
6
6
6
6
6
6
6
ATTACHMENT
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
8
8
8
8
8
8
8
8
498
1050
25
84
359
408
99
178
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively
■ coordinate internally and externally as needed, and
• proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 2 of 15
e
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
Conduct review meetings with the CITY at the end of each design phase
Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENG!NEER shall work with regulatory
authorities to obtain approval of the designs and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• 12 MWBE reports will be prepared
• 8 meetings with city staff
• 12 monthly water department progress reports will be prepared
• 12 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 3 of 15
ATTACHMENTA
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
■ Identify and develop alternatives that enhance the system,
• Present (through the defined deliverables) these alternatives to the CITY
• Recommend the alternatives that successfully addresses the design problem, and
• Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project.
The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.2. Geotechnical Investigations
• ENGINEER shall advise the CITY of test borings and other subsurface
investigations that may be needed for the project If the CITY determines that
such borings or investigations are needed then the ENGINEER shall work with
the CITY and CITY s geotechnical consultant to draw up specifications for such
testing program The cost of such testing will be paid for by the CITY.
2.3. The Conceptual Design Package shall include the following:
•
•
•
•
Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept.
• Proposed phasing of any water and sanitary sewer work that is included in this
project documented in both the project schedule and narrative form.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 4 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
• Documentation of key design decisions.
• Estimates of probable construction cost.
ASSUMPTIONS
• 0 Geotechnical borings are expected for this project.
•
4 copies of the conceptual design package (30% design) will be delivered..
Report shall be letter sized and comb- bound with a clear plastic cover. Drawings
will be 11' X17" size fold outs bound in the report
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw
ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report, if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
•
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
• A Proiect Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not Tess than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base Z coordinate on City Datum only; descriptive location
(i e set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
• Overall Droiect easement layout sheet(s) with property owner information.
• Overall proiect water and/or sanitary sewer layout sheets. The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 5 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity.
• Overall water and/or sanitary sewer abandonment sheet.
• Coordinates on all P.C.'s, P T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
• Bearinas given on all proposed centerlines, or baselines.
• Station eauations relating utilities to paving, when appropriate.
• Plan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
n umbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
n eeded to construct the project. Legal description (Lot Nos. Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed provisions will be made in the final plans and/or specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction During
design survey if a rod can be inserted through the cleanout to the bottom of the
service line, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid If the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed) The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or (3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de -
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 6 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D-section of the CITY's specifications. These may included connection details
between various parts of the project, tunneling details, boring and jacking details,
waterline relocations, details unique to the construction of the project trenchless
details, and special service lateral reconnections.
3.2. Geotechnical Investigation
• Soil investigations, including field and laboratory tests, borings, related
engineering analysis and recommendations for determining soil conditions will be
made. In addition to the above investigations, borings and appropriate field and
laboratory analysis will be made at reasonable intervals along the project
alignment for the Contractor's use in determining soil conditions for preparing
bids and a Trench Safety Plan.
3.3. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY s comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.5. Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as ' Typicals' on the CITY's Buzzsaw website. The typicals need not be
sealed individually, if included in the sealed contract documents.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 7 of 15
•
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
Develop supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas.
3.6. Storm Water Pollution Prevention Plan
• For projects that disturb an area greater than one (1) acre, ENGINEER will
prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the
Project for use by the Contractor during construction. ENGINEER will prepare
drawings and details for proposed SWPPP improvement that the Contractor must
use during construction. Contractor will be responsible for filing the SWPPP with
appropriate regulatory agencies.
ASSUMPTIONS
• 1 public meeting(s) will be conducted or attended during the preliminary
design phase.
• 0 borings at an average bore depth of 0 feet each will be provided.
• Traffic Control ' Typicals' will be utilized to the extent possible. It is assumed an
additional Q project specific traffic control sheets will be developed for
•
•
4 sets of 22" X 34" size plans will be delivered for the Constructability
Review.
• 8 sets of 22" X 24" size plans will be delivered for the Preliminary Design
(60% design).
• 1_ sets of specifications will be delivered for the Preliminary Design (60%
design).
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
• The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
• 15 sets of 11" X 17" size drawings will be delivered for Utility
Clearance.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Traffic Control Plan
D. Storm Water Pollution Prevention Plan
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 8 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT {_XXXII' (83)
CITY PROJECT NO.:01502
E. Estimates of probable construction cost
F. Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• 3 sets of 22" X 34" size drawings and 10 sets of 11" X 17' size
drawings and 5 specifications will be delivered for the 90% Design package.
A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• 2 sets of 22" X 34" size drawings and 2 specifications will be delivered for
the 100% Design package.
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• The plan set is anticipated to consist of Cover Sheet, Index Sheet, 3 General Notes
Sheets, 2 sanitary sewer layout sheets, 6 P&P layout sheets 27 plan and profile sheets,
1 water line lowering sheet, 1 erosion control plan sheet, and two general detail sheets.
•
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 9 of 15
ATTACHMENTA
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a .xls file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files.
The .pdf will consist of one file of the entire plan set. The .dwf will consist of
individual files one for each plan sheet, and will be numbered and named in
a manner similar- to that -of the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation is to be uploaded into the project's Bid Responses folder on Buzzsaw.
• Incorporate all addenda into the contract documents and issue conformed sets.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 10 of 15
5.2 Mylar Drawings
The ENGINEER shall submit a set of sealed conformed mylar drawings for
record storage
• Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set Singular PDF and DWF files for each sheet of a
Plan set will not be accented. PDF and DWF files shall conform to naming
conventions as follows:
•
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
I. TPW file name example — "W-1956 org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, ` 47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755_orgl8.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawing folder
in Buzzsaw.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number (817) 392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 25 sets of construction documents will be sold to and made available on
Buzzsaw for plan holders and/or given to plan viewing rooms.
4 sets of 22' X34" size and 8 sets of 11 ' X 17' size drawings
plans and 8 specifications (conformed, if applicable) will be delivered to the
CITY.
•
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27,2010
Page 11 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
• PDF and DWF files will be uploaded to Buzzsaw.
• 1 copy full size (22" x 34") mylar plans (conformed, if applicable) will be delivered
to the CITY.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. Recommendation of award
D. Construction documents (conformed, if applicable)
E. Conformed mylar plans
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
• After the pre -construction conference the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents review change orders, and make
recommendations as to the acceptability of the work.
• The ENGINEER shall attend the ' Final" project walk through and assist with
preparation of final punch list.
ASSUMPTIONS
• 0 RFI's are assumed.
• 0 Change Orders are assumed.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 12 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per sowing direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research
• The ENGINEER shall determine rights -of -way, easements needs for construction
of the project Required temporary and permanent easements will be identified
based on available information and recommendations will be made for approval
by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to
CITY PM for real property acquisition
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction the ENGINEER shall prepare and submit Temporary Right
of Entry documents for landowners to CITY PM for real property acquisition. It is
assumed that letters will only be required for land owners adjacent to temporary
construction easements or who are directly affected by the project and no
easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
ASSUMPTIONS
• Q Easements or right-of-way documents will be necessary.
• 200 Temporary right -of -entry documents will be necessary.
•
Right -of -Way research and mapping includes review of property/right-of-way
records based on current Internet based Tarrant Appraisal District (TAD)
information available at the start of the project and available on -ground property
information (Le. iron rods, fences, stakes, etc ). It does not include effort for chain
of title research parent track research, additional research for easements not
included in the TAD right-of-way takings, easement vacations and
abandonments, right-of-way vacations, and street closures.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 13 of 15
ATTACHMENT A
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT I.XXXIII (83)
CITY PROJECT NO.:01502
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
•
ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall include topographic
data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations,
location of buried utilities, structures, trees (measure caliper, identify overall
canopy and have qualified arborist identify species of trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
by field surveys. Spot elevations will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
A Project Control Sheet, showing ALL Control Points, used or set while
gathering data Generally on a scale of not less than 1:400:
The following information about each Control Point,
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
Coordinates on all P.C.'s, P.T.'s, P.I. s, Manholes, Valves, etc., in the
same coordinate system, as the Control.
No less than two horizontal bench marks, per line or location.
Bearings given on all proposed centerlines, or baselines.
Station equations relating utilities to paving, when appropriate.
•
•
8.2. Temporary Right of Entry Preparation and Submittal
•
Prior to entering property, the ENGINEER shall prepare and submit Temporary
Right of Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 14 of 15
ATTACHMENTA
DESIGN SERVICES FOR
SANITARY SEWER CONTRACT LXXXIII (83)
CITY PROJECT NO.:01502
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each
direction.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existina Scone of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services
described in the tasks above. However, ENGINEER can provide these services, if
needed, upon the CITY's written request Any additional amounts paid to the
ENGINEER as a result of any material change to the Scope of the Project shall be
agreed upon in writing by both parties before the services are performed. These
additional services include the following
• Negotiation of easements or property acquisition including temporary right -of -
e ntries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests bid rejection
and re -bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...)
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to
easements right-of-way, and/or temporary right -of -entries.
• Services to support, prepare document, bring defend, or assist in litigation
u ndertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by
the contractor.
• Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08.27.2010
Page 15 of 15
ATTACHMENT B
COMPENSATION
Design Services for
SANITARY SEWER CONTRACT LXXXIII (83)
City Project No. 01502
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $ 174.760 00 as
summarized in Exhibit B 1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department, monthly progress reports and schedules in the format
required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 1 of 6
g:\1210\0045-74\admin\agreement\attachment b for lump sum design projects (pmo_release_20100519).doc
B-1
IV.
ATTACHMENT B
COMPENSATION
S ummary of Total Project Fees
Firm
P rime Consultant
Dannenbaum
Engineering
Corporation
P roposed M/WBE Sub
S pooner and
Associates Surveying
Primary Responsibility
Engineering
-Consultants
Surveying
Non-M/WBE Consultants
P roject Number & Name
City M/WBE Goal = ? %
TOTAL
Total Fee
$ 176,760.00
1 Fee Amount I %
$110,675.00 63.33
$64,085.00
$ 174, 760.00
M/WBE Fee
$ 64,085.00
36.67
100%
M/WBE %
36.67% 1
Consultant Committed Goal = 36.67
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 2 of 6
g:\1210\0045-74\admin\agreement\attachment b for lump sum design projects (pmo_release_20100519).doc
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 3 of 6
g:\1210\0045-74\admin\agreement\attachment b for lump sum design projects (pmo_release_20100519).doc
Professional Services Payment Request Project Manager:
Project: (Water and Sanitary Sewer Replacement Contract
City Project #: 101502
City Sec Number:
Purchase Order:
Company Name: IDannenbaum Engineering Corp
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Water Invoice
Sewer Invoice
1Dannenbaum EngineerinpCorporation
W ater
Sewer
email:
Office Address:
Telephone:
Fax:
FAC and Work Type Description
Totals This Payment Request
EXHIBIT B-1
Rakesh Chaubey, M.S., P.E.
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Projects folder.
txvan.sherrieb gennenbaum. 1_
6421 Camp Bowie Bvld. Suite 400, Fort Worth, TX 76116
817-570-1313
817-344-2956
Agreement
Amount
$0.001
$174,760.00
$174,760.00
Amendment
Amount
$0.00
$0.00
$0.00
Agreement
Amount to
Date
$0.00
$174,760.00
$174,760.00
Overall Percentage Complete:
Completed Percent
Amount Completed
$0.00
$0.00
$0.00
0.00000000%
LOCK
UNLOCK 1
($) Invoiced Current
Previously Invoice
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
Remaining
Balance
$0.00
$174,760.00
$174 760.00
Professional Services Payment Request
Project: Water and Sanitary Sewer Replacement Contract
City Project #: 01502
Work Type Desc: SEWER
F/A/C: P258-70x17xxxxx31,32,33,51
City Sec Number: 0
Purchase Order: 0
Company Name: X Engineer Inc
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Pay Items
31 - Conceptual Design
32 - Preliminary Design
33 - Final Design
51 - Preliminary Survey
Submitted by:
Dannenbaum Engineering Corporation
0
0
1/0/1900
1/0/1900
1/0/1900
Description
Totals This Unit:
email:
Office Address:
Telephone:
Fax:
EXHIBIT B-1 B
Project Manager: Rakesh Chaubey, M.S., P.E.
Consultant Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and close, start Buzasaw and Add your invoice to the
Consultant folder within Project's folder.
1 brvan.snextietyiddannenbaumtgro, I
16421 Camp Bowie Bvld. Suite 400. Fort Worth, TX 76116
1817-570-1313 ' '
$17,344-2956
Agreement
Amount
$32,414.00
$64,827.00
$10,804.00
$66,715.00
1
Amendment Amendment
Number Amount
$174,760.00 $0.00
Agreement
Amount to Completed
Date Amount
$32,414.00 $0.00
$64,827.00 $0.00
$10,804.00 $0.00
$66,715.00 $0.00
$0.00 $0.00
$0.00 $0.00
$o.00 $0.00
$0.00 $0.00
$0.00 $0.00
$o.00 $0.00
$0.00 $0.00
$o.00 $0.00
$174.760.00 $0,00
Overall Percentage Complete:
Percent ($) Invoiced
Completed Previously
0.00000000%
$0.00
Current Remaining
Invoice Balance
$0.00 $32,414.00
$0.00 $64,827.00
$0.00 $10,804.00
$0.00 $66,715.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0,90 $174.760.90
EXHIBIT "B-2"
ENGINEER LEVEL OF EFFORT
(Supplement to Attachment B)
Insert level of effort following this page.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 4of6
g:\1210\0045-74\admin\agreement\attachment b for lump sum design projects (pmo_release_20100519).doc
Task No.
Task Description
Hate
1.0 Project Management
1.1 Managing the Team
1.1.1 Internal Team Meetings
1.1.2 OA/OC (NOTE: Incl. on each phase.)
12 Communications and Reporting
1.2.1 Pre -Design Coordination Meeting
1.2.2 Quarterly Project Update Meetings
1.2.3 Prepare Baseline Schedule
1.2.4 Prepare Monthly. Progress Reports
12.5 Update Monthly Schedule
1.2.6 Prepare Monthly MWBE Reports
1.2.7 Invoking
2.0 Conceptual Design (30-Percent)
2.1 Data Collection
Communications and coordinate with other
2.2 agencies and City Departments
2.3 City Review Meeting
2.4 Conceptual Design Package
2.4.1 Cover Sheet
2.4.2.1 Internal OA/OC
Develop Plan Sheets With Conceptual
2.42 layout
Develop Conceptual Opinion of Probable
2.4.3 Construction Cost
Submit Conceptual Design to City for
2.4.4 Review
Conduct Review Meeting w/City Develop
2.4.5 Minutes and action Items
Receive Permission to Proceed with
2.4.6 Preliminary Design
3.0 Preliminarv.(Design (60 Percent)
3.1 Preliminary Design Drawings
3.1.1 Revise Cover Sheet
3.1.2 Develop Index
3.1.3 Develop General Notes
Develop Project Control and Monument
3.1.4 Sheet on City Datum
Develop Project Easement and R.O.W..
3.1.5 Sheet (none)
3.1.6 Develop Overall Sewer Layout Sheets
3.1.7 Develop Plan and Profile Sheets
3.1.8 Prepare Standard and Special Detail Sheets
3.1.9 Develop Preliminary Specifications
Develop Preliminary Opinion of Probable
3.1.10 Construction Cost
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date:5.192010
Basis for
Hour
Estimate
Unit
3 Ea
Ea
Ea
Ea
12 Monthly
12 Monthly
1
1
1
8
1
1
1
3
4
0
6
27
1
1
Ea
Ea
Ea
Ea
Ea
Sheet
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Sheet
Sheet
Sheet
Sheet
Ea
Ea
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
SANITARY SEWER CONTRACT LX(XIII (83)
City Project No. 01502
Labor (hours)
Project Project
Principal Manager Engineer ER CADD
$ 200 $ 145 $ 136 $ 87 $ 70 $
0 36 0 12 0
4
16
4
10
2
8
0 16 0 94 0
12
2 6
2
2
4
4 60
2 12
4 2
48
2
4
8
8 269 253
1
1
6
28
32
160 245
4 6
2 8
2
Adminlstrative Total Labor
cost
68
14 $ 7,216
2
•
928
2,320
1 y276
1 586
12 1,106
Expense
Subconsultant
MWBE ' Non-MWBE
$ - $ -
5 S 10A38 S
1,044
812
174
580
4 6.072
1.334
1 822
16 S
•
We" S
87
87
812
2,726
3,364
6 33;038
1,102
8 1,530
6 812
• S
Travel and
Delivery
Reproduction TCost Expense Task Sub Total
and Postage
72 $
8
64
$ 24 S
12
12
$ 8 S
27 $
99 $ 7,315
8 936
64 2,384
1,276
15 15 1,801
12 12 1,118
35 S
5
30
680 $
580
59 $ 10,897
17 1,061
42
812
174
580
6,114
1.334
822
688 $ 51,337
87
87
812
580
2.726
3,364
33,618
1.102
1,530
812
G:\1210\0045-74\Admin\BillingUnvoices\contract 83 LOE-template.xis
1 of 3
Task No.
Task Description
Hate
3.1.11 Internal QA/QC
32 Constructibilty Review with City
3.3 Meet on -site with City
3.4 Submit Utlity Plans for Utlily Clearence
Consult with Other City Department and
3S otherAaencies on Utlity Locations
3.6 Develop Standard Traffic Control Plans
3.7 Develop SWPPP Plan Sheet
3.8 Develop SWPPP Plan
3.9 Submit Preliminary Plans to City for Review
Conduct Review Meeting w/City Develop
3.10 Minutes and action Items
Receive Permission to Proceed with Final
3.11 Design
0.0 Final Design
4.1 Final Draft 90% Construction Plans
Final 90% Final Opinion of Probable
4.2 Construction Cost
Develop 90% Final Construction
4.3 Specifications
4.3.1 Internal QA/QC
4.4 Provide Cover Mylar for Signature
4.5 Submit Final Plans to City for Review
4.6 Conduct Review Meeting, Develop Minutes
Receive Permission to Proceed to Bid
4.7 Phase
4.8 Final Revisions
5.0 Bid Phase
5.1 Bid Support
Upload Plans & Specifications into Buzsaw
5.2 in PDF Format
Sell Contract Documents and Maintain
5.3 Plan Holders List
Receive, log and respond to all bidders
5.4 questions and request
Develop addenda and upload addenda in
5.5 Buzzsaw
5.6 Attend Bid Opening
Tabulate and Review Bids Received,
5.7 evaluate and make Recommendations
5.8 Mylar Drawings
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 5.19.2010
Basis for
Hour
Estimate
1
1
1
1
1
1
1
1
1
1
Unit
Ea
Ea
Ea
Ea
Ea
sheet
sheet
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Sheet
Principal
$ 200
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
SANITARY SEWER CONTRACT LXXXIII (83)
City Project No. 01502
Labor hours)
Project Project ER CADD Administrative Total Labor
Manager Enoineer Cost
S 145 S 136 S 87 $ 70 S 68
12
4
4
4
8
4
2
2
2 30 C 122 80
2 12 80 80
2 8
4 8
8
1
2
4
2
2
2
20
2
20
4 12
2
1 2
8
1 740
928
1 242
580
435
1256
1.0R8
Expense
Subconsultant Travel and Reproduction T'°tal�spense Task Sub Total
MWBE Non-MWBE Delivery and Postage
1 822
19 S 21,848 S - $
14.700
986
8 1.820
1,160
319
174
1 532
4 21157
42 S 8366 S
174
16 1888
8 2.168
290
113E
727
696
8
24 S
12
12
100
100
{
774 S 798 S
770 770
4
16
12
1.740
936
242
580
435
1256
1.188
822
22,646
151470
986
1.820
1.160
335
186
532
27157
• S 20 S 1560 $ 1.580 S 9.946
8
8
174
1,088
31136
2.168
298
727
696
G:U 210\0045-74\Admin\Billing\Invoices\contract 83 LOE-template.xls
2 of 3
Task No.
Task Description
5.9 Submit Mylar Drawings
6.0 Construction Phase Services
6.1 Construction Support
6.1.1 Attend Preconstruction Conference
6.1.2
6.1.3
6.1.4
6.1.5
Rate
Develop Project Exhibits
Attend Public Meeting
Project Site Visits
Submittal Review (none)
Request for Information/Change Order
6.1.6 Review (none)
6.1.7 Final Walk Through and Punch List
6.1.8 Record Drawings (None)
6.1.9 Construction Survey (none)
7.0 ROW/Easement Services
7.1 Rightof-Way,Research
Right-of-Way/Easement Preparation and
7.2 Submittal
7.3 Temporary flight of Entry Submittal
8.0 Survey
Develop and submit Right of Entry letter for
8.1 survey
8.2 Conduct Survey
8.3 Prepare Base Map
8.4 Temporary Right of Entry Submittal (None)
8.5 Construction Survey (None)
9.0
9.1
9.2
Permitting
TxDOT
Hatlroad
Totals
Descrption
Conceptual Design {30%)
Preliminary Design {60%)
Final Design (10%)
Survey
Subtotal
Total
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 5.19.2010
Basis for
Hour Unit
Estimate
1
3
1
4
Ea
Ea
Sheet
Ea
Ea
1 Ea
Ea
Ea
LF
LF
Ea
LF
Ea
to
Water line Footage
Sewer Line Footage
(A) Total Fee
(B) Survey Fee
(C) Total Fee,(-). survey Fee
I Water Fee (60%ofC)
$0.00
WP
31
32
33
51
Water
$0.00
$0.00
$0.00
$0.00
Principal
$ 200
0
8,000
8,000
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
SANITARY SEWER CONTRACT LXXXIII (83)
City Project No. 01502
Labor hours)
Project Project ER CARD AdministrativeTotal Labor
Manager Enaineer Cost
$ 145 $ 136 S 87 $ 70 S 68
1 87
78 0 32 0 6 $ 5t802 S
2 2 1 532
2 12 1,-334
2 2 1 532
12 8 4 ;7p8
0
8
0 0
O 16
16
159 8 590
0%
100%
100%
$174,760
$66,715
$108.045
Sewer Fee 140"/ of Cl 1
$108,045.00
Sewer
$32,414.00
$64.827.00
$10,804.00
$66,715.00
$0.00 $174,760.00
$174,760.00
696-
0 S • $
MWBE
Ex lane
Subconsultant Travel and
Delivery
12
Non-MWBE
16 $ 2A80$ 64.085 $
16
0
2,,480
- S
112_ $ 107,199 $ salsas $
52 $
8
12
20
12
• S
$
S
200 $
Reproduction Total Expense
and Postage Cost
1 560 1 r572
50 $ 102 $
50
150
150
8
50
12
20
12
$ • $
$0
$0
64,235 $
150
$ - $
3,276 $ 67,561 $
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
5% Sub Markup
MWBE Participation
Total Project Cost
Task Sub Total
1.659
51804
540
1,384
544
2.728
708
.10
SD
$0
50
667715
363°
•
174,760
1,206
$107,199
$67.561
$64,085
$0
19
36.7%
$174,760.00
G:\1210\0045-74V\dmin\Billfng\Invoices\contract 83 LOE-template.xls
3 of 3
EXHIBIT "B-3"
ENGINEER OPINION OF PROBABLE CONSTRUCTION COST
(Supplement to Attachment B)
Insert opinion of probable construction cost following this page.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 5 of 6
g:\121010045-74\admin\agreenienhattachment b for lump sum design projects (pmo_release_20100519).doc
EXHIBIT B-3
PROJECT NAME: Sanitary Sewer
Sanitary Sewer Rehabilitation Contract 83
Project Manager: Rakesh Chaubey, P.E.
ITEM
NO.
BID-00094
BID-00126
BID-00134
BID-00137
BID-00147
BID-00196
B1D-00201
BID-00202
BID-00206
BID-00207
BID-00208
BID-00211
BID-00213
BID-00214
BID-00217
BID-00349
BID-00350
BID-00351
BID-00354
BID-00355
BID-00356
BID-00361
BID-00362
B1D-00363
B1D-00372
BID-00401
BID-00423
BID-00443
BID-00458
B1D-00493
BID-00528
BID-00539
BID-00839
BID-00841
BID-00901
BID-00954
BID-00955
BID-00959
BID-00961
BID-01165
DESCRIPTION
RipRap- < Than 18 Inch Rock e.j Install
Fence -t Install
Grass-Hvdromulch Seeding Install
Grass -Sod - Install
Topsoil - Install
Collar -Manhole - Install
Inspection -Post Construction Cleaning & TV - Study
Inspection-Preconstruction Cleaning & TV - Study
Manhole .4 Remove
Manhole-Drop-Std 4 Ft Diam-(to 6 Ft Depth)
Manhole-Drop-Std 4 Ft Diam-Added Deoth (Over 6 Ft Depth)
Manhole -Paint & Coating -Interior Protective Coating - Install
Manhole-Std 4 Ft Diam-(to 6 Ft Depth)
Manhole-Std 4 Ft Diam-Added Depth (Over 6 Ft Depth)
Manhole -Vacuum Test -' Services
Pipe-Sewer-8 Inch Other Than Open Cut - Install
8' SDR-26 Sanitary Sewer Pipe (All Depths)
8' PVC Sanitary Sewer Pipe by Open Cut (All Depths)
Sewer Service-4 Inch - Install
Sewer Service-4 Inch Service Tap - Install
Sewer Service-4 Inch 2 Way Clean Out Install
Sewer Service-6 Inch Service Tap - Install
Sewer-Service-6 Inch-2 Way Clean Out -j Install
Sewer-Service-6 Inch-SDR26 - Install
Trench Safety System 5 Foot Depth Install
Driveway - Install
Curb & Gutter -, Install
Pavement-2 Inch Min. HMAC on 2/27 Concrete Base (STR-0281 Ins
Pavement -Concrete on 2/27 Concrete Base (STR-031) ' Install
Crushed Limestone for Misc Placement
Walk - Install
Dehole-O to 5 Ft Depth - Study
Concrete Type E - Install
Concrete -Encasement Install
Pipe - Abandon
Manhole -Watertight Insert -Locking Stainless Steel - Install
Pipe-10 Inch HDPE By Pipe Enlargement Techniques Install
Pipe-Sewer-8 Inch -Other Than Open Cut ' Install
Sewer Service-4 Inch Tap to HDPE by Pipe Enlargement - Install
Pipe -Sewer 8-inch in Casing Pipe - Other Than Open Cut ' Install
Construction Cost Subtotal
Contingencies (25%)
TOTAL CONSTRUCTION COST
UNIT UANTIT
CY 0
LF 0
SY 0
SY 0
CY 0
EA 56
LF 11,279
LF 13.023
EA 27
EA 0
VF 0
VF 0
EA 56
VF 0
EA 56
LF 2,019
LF ( 0
LF 14,276
LF 12,750
EA 255
EA 0
EA 0
EA 0
LF 0
LF 14,276
SF 0
LF 16
LF 13 651
LF 630
CY 0
SF 0
EA 0
CY 0
LF 0
LF 0
EA 56
LF 0
LF 0
EA 0
LF 0
Date: Sept. 01, 2010
DEC Job No. 4574
UNIT
PRICE
95.00
25.00
2.50
5.00
16.50
350.00
2.00
2.50
475.00
3.600.00
170.00
175.00
2,500.00
165.00
120.00
65.00
38.00
35.00
13.50
355.00
180.00
475.00
300.00
35.00
1.00
6.50
30.00
35.00
135.00
25.00
8.00
1,400.00
50.00
40.00
5.00
125.00
80.00
70.00
1,200.00
200.00
1
TOTAL
AMOUNT
19,600.00
22,558.00
32.557.50
12,825.00
140, 000.00
6,720.00
131,235.00
499, 660.00
172,125.00
90.525.00
_
14,276.00 ,
480.00
477.785.00
85,050.00
7,000.00
1,712,396.50
428,099,13
2,140,495.63
1
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 6of6
g:\1210\0045-74\admin\agreement\attachment b for lump sum design projects (pmo_release_20100519).doc
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Sanitary Sewer Contract LXXXIII (83)
City Project No. 01502
None.
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page 1 of 1
g:\1210\0045-74\admin\agreement\attachment c (pmo_release_20100519).doc
Consultant Baseline Schedule
ID Activity ID Task Name
O
1
2 a
3 3
4.3
5 3
7
8 3
9
t0 3
11 3
12
13 3
14
15 3
16 .I
17 !3
18
21
22
23
24
25 3
26
27 a
28
29 3
30 i3
31 :3
32
33
34
35
36 3
37
38 i3
39 3
40 i,
41 3
42
43 3
44 3
45
46 3
47
48
49
1.30.323.0 Preliminary Design (60%)
1.0 Project Management
3.1 Preliminary Design Drawings
3.1.1 Revise Cover Sheet
3.12 Develop Index
3.1.3 Develop General Notes
3.1.4 Develop Poroject Control and Monument Sheet on City Datum
3.1.6 Develop Overall Sewer Layout Sheets
3.1.7 Develop Plan and Profile Sheets
3.1.8 Prepare Standard and Special Detail Sheets
3.1.9 Develop Preliminary Specifications
3.1.10 Develop Preliminary Estimate of Probable Cost
3.1.11 Internal QA
3.2 Constructabilty Review with City
3.3 Meet on -Site with City
3.4 Submit Utility Plans for Utility Clearance
3.5 Consult with Other City Departments and Agencies
3.6 Develoop Standard Traffic Cotnrol Plans
3.7 Develop SWPPP Plan Sheets
3.8 Develop SWPPP Plan
3.9 Submit Prelinary Plans to City for Review
3.10 Conduct Review Meeting, Develop Minutes
3.11 Receive Permission to Proceed with Final Design
1.30.33 4.0 Find Design
1.0 Project Management
4.1 Final Draft (90%) Construction Plans
4.2 Final (90%) Estimate of Probable Cost
4.3 Develop Final Construction Specifications
4.3.1 Internal QA/QC
4.4 Provide Cover Mylar for Signature
4.5 Submit Final Plans to City for Review
4.6 Conduct Review Meeting, Develop Minutes
4.7 Receive Permission to Proceed to Bid Phase
4.8 Find Revisions
1.80.81.10 5.0 Bid Phase
5.1 Bid Support
Contract XLLLIII
Baseline Schedule
Dannenbaum Engineering Corp
Task
Split
issammasi
Progress
Milestone
Attachment D - Tier 3 Baseline Consulting Schedule
Project: Contract XLLLIII (83)
Duration Remaining performance Start Finish
Duration '%Complete
1.30.31 20 Concepual Design 98 days?
1.0 Project Management 98 days?
2.1 Data Cdlection 11 days
2.2 Communications and coordinate with other agencies and City Departments 98 days?
2.3 City Review Meeting 1 day?
2.4 Conceptual Design Package _ 88 days?
2.4.1 Cover Sheet 1 day?
2.4.2 Develop Plan Sheets with Conceptual Layout 27 days
2.4.2.1 Internal CA/QC 5 days
2.4.3 Develop Conceptual Estimte of Probable Cost 5 days
2.4.4 Submit Conceptual Design to City for Review 28 days
2.4.5 Conduct Review Meeting with City, Develop Minutes and Action Items 1 day?
2.4.6 Receive Permission to Proceed with Preliminary Design 1 day?
95 days?
90 days?
52 days
1 day
1 day
1 day
5 days
5 days
28 days
3 days
5 days
5 days
5 days
5 days
10 days
28 days
28 days
14 days
14 days
14 days
14 days
1 day
1 day
56 days?
1 day?
21 days
10 days
10 days
5 days
10 days
14 days
1 day
1 day
5 days
35 days?
35 days?
98 days?
98 days?
11 days
98 days?
1 day?
88 days?
1 day?
27 days
5 days
5 days
28 days
1 day?
1 day?
95 days?
90 days?
52 days
1 day
1 day
1 day
5 days
5 days
28 days
3 days
5 days
5 days
5 days
5 days
10 days
28 days
28 days
14 days
14 days
14 days
14 days
1 day
1 day
56 days?
1 day?
21 days
10 days
10 days
5 days
10 days
14 days
1 day
1 day
5 days
35 days?
35 days?
Summary
Project Summary GT-
Reporting Date: Mon 3/21/11
1 OF 2
2012 2013
Mar 'Aor May Jun I Jul Aua sSeo':Oct'Nov.Dec clan Feb'Mar Aor Mav;Jun Jul 'Auo'Seo i Oct Nov :Dec Jan Feb
:Mar Aor
0% Wed 4/13/11 Fri 8/26/11
0% Wed 4/13/11 Fri 8/26/11
0% Wed 4/13/11 Wed 4/27/11
0% Wed 4/13/11 Fri 8/26/11
0% Thu 4/21/11 Thu 4/21/11
0% Wed 4/27/11 Fri 8/26/11
0% Wed 4/27/11 Wed 4/27/11
0% Thu 6/9/11 Fri 7/15/11
0% Mon 7/18/11 Fri 7/22/11
0% Mon 7/18/11 Fri 7/22/11;
0% Tue 7/19/11 Thu 8/25/11
0% Fri 8/26/11 Fri 8/26/11 `.
0% Fri 8/26/11 Fri 8/26/11
0% Mon 8129111 Fri 1/6/12
0% Mon 8/29/11 Fri 12/30/11
0% Mon 8/29/11 Tue 11/8/11
0% Mon 8/29/11 Mon 8/29/11
0% Mon 8/29/11 Mon 8/29/11
0% Mon 8/29/11 Mon 8/29/11
0% Tue 8/30/11 Mon 9/5/11
0% Tue 9/6/11 Mon 9/12/11
0% Tue 9/13/11 Thu 10/20/11
0% Fri 10/21/11 Tue 10/25/11,
0% Wed 10/26/11 Tue 11/1/11
0% Wed 10/26/11 Tue 11/1/11
0% Wed 11/2/11 Tue 11/8/I 1
0% Wed 11/9/11 Tue 11/15/11'
0% Wed 11/16/11 Tue 11/29/11
0% Wed 11/9/11 Fri 12/16/11
0% Wed 11/9/11 Fri 12/16/11
0% Wed 11/9/11 Mon 11/28/11
0% Wed 11/9/11 Mon 11/28/11
0% Tue 11/29/11 Fri 12/16/11
0% Mon 12/19/11 Thu 1/5/12
0% Fri 1/6/12 Fri 1/6/12
0%--- Fri1/6/12 Fri1/6/12'
0% Mon 1/9/12 Mon 3/26/12
0% Mon 1/9/12 Mon 1/9/12
0% Mon 1/9/12 Mon 2/6/121
0% Tue 2/7/12 Mon 2/20/12
0% Tue 2/7/12 Mon 2/20/12
0% Tue 2/21/12 Mon 2/27/12
0% Tue 2/7/12 Mon 2/20/12
0% Tue 2/28/12 Fri 3/16/12,
0% Mon 3/19/12 Mon 3/19/12i
0% Mon 3/19/12 Mon 3/19/12
0% Tue 3/20/12 Mon 3/26/12'
0% Tue 3/27/12 Mon 5/14/12
0% Tue 3/27/12 Mon 5/14/12;
External Task S..
External Milestone
J1,11011' (I'1iiii p11 1,111' I
1M_I IIIIJII„nyi ,011!II\I4 iilL II'hpImo
r
I
Deadline
1S
\\dannenbc,umJocal\dtsroot\Data\PTWDATA\ Projects \1210\0045-74\Admin\AgreementVns project Schedule\01502-Contract 83_basdine.mpp
Consultant Baseline Schedule
ID
0
50 ''
51
52
3
54 :
55
56 -13
57
58
59
60 3
61
62
63
64
66 a
67 3
68 3
69
70 2
71
72 3
Activity ID Task Name
52 Upload Plans & Specifications into Buzsaw in PDF Format
5.3 Sell Contract Documents and Maintain Plan Holders List
5.4 Receive, log and respond to all bidders questions and request
5.5 Develop addendas and upload addendas In Buzsaw
5.6 Attend Bid Opening
5.7 Tabulate and Review Bids Received, evaluate and make Recommendat
5.8 Mylar Drawings
5.9 Submit Mylar Drawings
1.80 6.0 Construction Phase Services
6.1 Construction Support
6.1.1 Attend Preconstniction Conference
6.1.2 Develop Project Exhibits
6.1.3 Attend Public Meeting
6.1.4 Project Site Visit
6.1.7 Final Walk through and Punch List
1.407.0 ROW/Fastement Services
7.1 Right of Way Research
7.2 Right of Way/Easement Preparation and Submittal
7.3 Temporary Right of Entry Submittal
1.50 8A Survey
8.1 Develop and Submit Right of Entry Letter for Survey
8.2 Design Survey
8.3 Prepare Base Map
Contract XLLLIII
Baseline Schedule
Dannenbaum Engineering Corp
Task
Split
lrialattitr - Progress
„1, 1,.,,, 1„., Milestone C
Attachment D - Tier 3 Baseline Cons
Project: Contract XLLLIII
Duration
1 day
28 days
28 days
28 days
1 day
5 days
5 days
1 day?
202 days?
202 days?
1 day?
15 days
1 day?
200 days
1 day?
30 days?
30 days
1 day?
1 day?
41 days
5 days
21 days
10 days
Remaining Performance
Duration :%Complete
1 day
28 days
28 days
28 days
1 day
5 days
5 days
1 day?
202 days?
202 days?
1 day?
15 days
1 day?
200 days
1 day?
30 days?
30 days
1 day?
1 day?
41 days
5 days
21 days
10 days
Start
0% Tue 3/27/12
0% Wed3/28/12
0% Wed3/28/12
0% Wed 3/28/12
0% Mon5/7/12
0% Tue 5/8/12
0% Mon 5/7/12
0% Mon 5/14/12
0% Fri 6/15/12
0% Fri 6/15/12
0% Fri 6/15/12
0% Mon 6/18/12
0% Mon 7/9/12
0% Mon 6/18/12
0% Mon 3/25/13
0% Wed4/13/11
0% Wed 4/13/11
0% Wed4/13/11
0% Wed4/13/11
0% Wed 4/13/11
0% Wed4/13/11
0% Wed 4/20/11
0% Thu 5/26/11
Summary ar
Project Summary c
ulting Schedule
(83)
Finish
Ma
Tue 3/27/12
Fri 5/4/12;
Fri 5/4/12,
Fri 5/4/12
Mon 5/7/12:
Mon 5/14/12
Fri 5/11 /121i
Mon 5/14/12!
Mon 3/25/13
Mon 3/25/13;
Fri 6/15/121
Fri 7/6/12:
Mon '/9/12
Fri 3/22/13
Mon 3/25/13
Tue 5/24/11
Tue 5/24/11
Wed 4/13/11'
Wed 4/13/ 11
Wed 6/8/11
Tue 4/19/11 j
Wed 5/18/11
Wed 6/8/111
Anr
av ,h q Jul •Auo SeD Q
Reporting Date: Mon 3/21/11
20F2
'2012 2013 _
Nnv :Den 'Jan Feb Mar Anr Mav"un Jul lAun,Seo+Oct' Nov Dec 'Jan Feb 'Mar Apr
-f Deadline
External Milestone O
Syr
ILW IFI IIJIlIIIII, del mull l Him oil lit unu W11 Willa ouuwl m II I l',4tl are,
\\dannenbaum.locat\dIsrooAData\Ff W DATA\Projects\1210\0045-74\Admin\Agreement\ms project Schedule\01502-Contract 83_baseline.mpp
s"
22
6�r--
9
10
12
13
14
15 m
17
18
O
TR. M2
LEGEND
9
2A
28
Li
PROJECT IMPROVEMENTS
ATTACHMENT E
CO
KERMIT
�P
«0
AVE.
—^�• 20
A SAVE O-r' L
17 1& 15 114 13 12 f1
PENS COLA
26 25 24 23 +21
2
8 9 ID tl
ARID fEA
/ \27
St
12 13 14 15 16 17 18 1 i9
L- 917
6„ WrS T
0 200 400
GRAPHIC SCALE IN FEET
SANITARY SEWER MAP #
12372S 12376S 12380S,
18372S, 18376S, & 18380S
MAPSCO 73V, 73Z, 74S, 74W
37
L-
2
6"
15 L—rits
25 1—
Co
20
171.
IS 42
co
3 04
•
•
•
02
4
SANITARY SEWER REHABILITATION
CONTRACT LXXXIII (83)
LOCATION MAP
LATERALS 3099, 3100, 3101, 3103, 3113,
3114, 3121
DANNENBAUM
COUNCIL DISTRICT 3
ENGINEERING CORPORATION
T.B.P.E FIRM REGISTRATIONIM92
etttCrap 'OWE Rw_ seam rt. WORM itttte 1,if,EJ4io
0
(`1
o4N
0
1-
0
a /
RIM' 3
CT.-
i
2
30
21
�15
9
7 -3
eo
26 J
24 IL
22
zl
0
26
26
25 c
0
24 U 4
10'
23
21
cy
La I
w
0
O
WYCLIFF
14
CC15
p
cc
\// 22
33 23 O¢
24 3- CC
25�
NN,
28
29
6
4
3 a
2 :EK
R11
13
2 N
l0
3
4A
30 w„ 5
6 J
t7�
J
6
LEGEND
3
5
5
9
0 10
11
12
14
17
zo LL
5
22
23
24
c
Ut 25
io
I42
3
4
4
II
1
291 301 31
28
a
4
9
17
wID
L-3
•
•
:UL/EF
10
w 9
PROJECT IMPROVEMENTS
ATTACHMENT E
28 Y� I 5I )4MOHAWKI 24E / / MOjiA. }( AVtl. I .0
1
5.
to 10
•C4A
0 200 400
GRAPHIC SCALE IN FEET
SANITARY SEWER MAP #
12372S 12376S 12380S,
18372S, 18376S, & 18380S
MAPSCO 73V, 73Z, 74S, 74W
25,
2G5
33 13
VIL
0
O 9
29 63
23
27
^_6
N 14
T RIC
WYCLIFF
713 I3
R13
17
16
tar
19
20
22
23
1
i
TR 5A
TRIA
A
AVE.
h
5 \5
/
9
1,
12
2
5
o_ ft3__j
L-97124
TR `,CI
TR .S PiURr°16
TRUCI
4 43
w
fi
TR 51
FR 5.0
TR2C
��Y war
SANITARY SEWER REHABILITATION
CONTRACT LXXXIII (83)
JIPf
• SUFV265
LOCATION MAP
LATERALS 3116, 3117, 3133, 3205, 3228,
3249, 3673
DANNENBAUM
COUNCIL DISTRICT 3
ENGINEERING CORPORATION
T.B.P.E FlRM REGISTRATION 1392
WI CAS DOME KW- STE CO t ViCKTh TX. MN R1nr^.so
M&C Review
Page 1 of
Official site of the City of Fort Worth, Texas
FORT WORTI
COUNCIL ACTION: Approved on 3/8/2011 - Ordinance No. 19579-03-2011
DATE: 3/8/2011 REFERENCE NO.: **C-24773 LOG NAME 60SS83-DEC
CODE- C TYPE: CONSENT PUBLIC HEARING NO
SUBJECT: Authorize Execution of an Engineering Agreement in the Amount of $174,760 00 with
Dannenbaum Engineering Corporation, for Sanitary Sewer Replacement Contract 83 in an
Area Bound by Weatherford Traffic Circle, Vickery Boulevard/Marks Place, Southwest
Boulevard and Old Benbrook Road and Adopt Appropriation Ordinance (COUNCIL
DISTRICT 3)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $193,760.00 from the Water and Sewer Fund to the Sewer Capital
Projects Fund
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Sewer Capital Projects Fund by $193,760.00; and
3. Authorize the City Manager to execute a contract in the amount of $174,760.00 with Dannenbaum
Engineering Corporation for Sanitary Sewer Rehabilitation Contract 83 in an area bound by
Weatherford Traffic Circle, Vickery Boulevard/Marks Place, Southwest Boulevard and Old Benbrook
Road.
DISCUSSION:
This project consists of the preparation of plans and specifications for the rehabilitation of
deteriorated sewer mains in an area that is generally bound on the north by the Weatherford Traffic
Circle, on the south by Vickery Boulevard/Marks Place on the east by Southwest Boulevard on the
west by Old Benbrook Road.
Dannenbaum Engineering Corporation proposes to perform the design work for a lump sum fee of
$174,760.00. City staff considers this fee to be fair and reasonable for the scope of services
proposed.
M/WBE — Dannenbaum Engineering Corporation is in compliance with City's M/WBE ordinance by
committing to 37 percent M/WBE participation. The City's goal on this project is 22 percent.
In addition to the contract amount, $19,000.00 is required for project management, real property
acquisition and utility coordination.
The project is located in COUNCIL DISTRICT 3.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations, and adoption of the attached appropriation ordinance, funds will be available in
the current capital budget as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers
1&2)
P258 476045 7031701502ZZ
$1931760.00
FROM Fund/Account/Centers
1) PE45 538040 0709020 $193.760.00
3) P258 531200 703170150231 $33.202.00
http://apps.cfwnet.org/council packet/mc review.asp'1D 14800&councildate=3/8/2011 3/21/2011
M&C Review Page 2 of 2
2) P258 511010
2) P258 531200
2) P258 531200
2) P258 531200
2) P258 541100
2) P258 531350
2) P258 531350
2) P258 531200
703170150230
703170150231
703170150232,
703170150233
703170150241
703170150242
703170150273
703170150251
$10.000.00
$33.202.00
$66,405.00
$11.068.00
$5,000.00
$2.000.00
$2.000.00
$64.085,00
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact -
ATTACHMENTS
60SS83 DEC AO.doc
60SS83-DEC MAP.pdf
3) P258 531200 703170150232
3)P258 531200 703170150233
3) P258 531200 703170150251
Fernando Costa (6122)
S. Frank Crumb (8207)
Rakesh Chaubey (6051)
$66.405.00
$11.068.00
$64,085.00
http://apps.cfwnet.org/council packet/mc_review.asp2ID=14800&councildate=3/8/2011
3/21/2011