Loading...
HomeMy WebLinkAboutContract 43448-A1 (2)Crf$RCFJ!1»XYj ,„, A CONTRACT Ka ±retijirS_ AMENDMENT No. 01 TO CITY SECRETARY CONTRACT No. 43448 WHET{ AS, the City of Fort Worth (CITY) and_ Frcese and Nichols, Inc., (ENGINEER) macs and entered into City Secretary Contract No. 43448, (the CONTRACT) which was authorized by M&C C-25683 on the 2 7th day of July, 2012 in the amount of $ 3 8 9 , 18 4 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Brennan Avenue Drainage Improvements Project; anc WHEREAS, it has become necessary to execute Amendment No. 01 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREEORE, CITY and ENGINEER, acting herein by and through their duly authorized_ representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated_ May 1, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $148,133. (See Attached Funding Breakdown Sheet, Page -3- ) 2. Article II of the CONTRACT is amenocc to Provide for an increase in the fee to be Paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 537, 31 7. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 1 of 3 1- 1 V 17, II ()A 11_4; i1 tr*FICIAL RECORD gigt,ti;-7.77,71v7 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth cmizottolleas Fernando Costa Assistant City Manager DATE: APP' OVAL RECOMMENDED: Douglas jI Wiersig, P.E. Director, Transportatio and Public Works APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST] inag& j Mar J. Kayser City Secretary ..„..,0=1114,t p 1 Oltit bcv ()eggit eft.°o Pi ace \ City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 2 of 3 tittirAS ENGINEER Freese and Nichols, Inc. Join Dewar, P.E. P incipal DATE: 7 b ah%? M&C: C-263y/ • Date: 1-/b---/3 OFFICIAL RECORD CITY SECRETARY. FtWORTh,TX FUNDING BREAKDOWN SHEET City Secretary No. 43448 Amendment No. 01 Department Fund -Account -Center T/PW P227 531200 202280160230 Total: City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Amount $148,133 $148,133 Innovative approaches Practical results Outstanding service 4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com May 1, 2013 Vibhuti Pandey, Ph.D., P.E., CFM Project Manager Stormwater - Gordon SWIFT Building 900 Monroe Street, Suite 500 Fort Worth, TX 76102 Re: Brennan Avenue Drainage Improvements Project (Project No. 01602) — Amendment No. 1 Dear Mr. Pandey : Additional services have been requested for the Brennan Avenue Drainage Improvements Project (Project No. 01602, DOE No. 5689). The additional scope of work includes: 1. Design of Cold Springs Road roadway improvements from Northside Drive to Warfield Street, 2. Geotechnical analysis for roadway design, 3. Earthen roadside channel design along Cold Springs Road from Watauga Drive to Warfield Street, 4. Field survey for roadside channel, 5. Easement document preparation for roadside channel, 6. Culvert and headwall design for intersection of Cold Springs Road and Warfield Street, 7. Environmental soil testing along Brennan Avenue and Cold Springs Road for suspected petrochemical contamination, 8. Soil sample drilling for environmental testing; and 9. Laboratory testing of soil for environmental contamination. Attached Figure 6 shows the proposed additional design area. The additional engineering services, analyses, field survey and administration fees total $148,133. This brings the total contract amount to $537,317. Please contact me directly at 817-735-7460 if you require additional information. Thank you for your attention to this matter. Sincerely, Scott Berman, P.E., CFM, CPESC Project Manager Attachments ATTACHMENT B COMPENSATION Design Services for Brennan Avenue Drainage Improvements Project City Project No. 01602 Amendment #1 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $148,133 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. The ENGINEER shall be paid monthly payments as described in Section II Method of Payment. 11. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 1 of 3 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm P rime Consultant Freese and Nichols Primary Responsibility Design Services P roposed M/WBE Sub -Consultants Mas-Tek Gorrondona Gorrondona MagnaCore Geotechnical Services Easement Documents Design Survey Environmental Drilling XENCO Laboratories Environmental Testing N on-M/WBE Consultants TOTAL Fee Amount 123,710 8,290 3, 844 7,850' 675 3,764 $148,133 Ok 83.5 5.6 2.6 5.3 0.5 2.5 100% Project Number & Name Total Fee M/WBE Fee M/WBE % 01602-Brennan Avenue Drainage $148,133 $24,423 16.5% Improvements City M/WBE Goal = 16.0% Consultant Committed Goal = 16.5% City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 2 of 3 B-2 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 3 of 3 ID Task Name 1 Notice to Proceed 2 Project Management 3 Project Kickoff Meeting 4 Data Collection 5 Field Survey/SUE 6 Conceptual 30% Design 7 Submit 30% Design 8 City Review 9 Project Walkthrough 10 Amendment #1 Negotiation 11 Resume 60% Design ATTACHMENT D - SCHEDULE BRENNAN AVENUE DRAINAGE IMPROVEMENTS DESIGN CITY OF FORT WORTH CITY PROJECT NO. 01602 Duration Start Finish h12 iIf 1, 2012-1aIf 2, 201' FMAIMIJIJ AISIOINID Wed 8/8/12 Wed 8/8/12 8/8 Thu 8/9/12 Mon 12/10/12 1 day 88 days 1 day 28 days 28 days 12 Preliminary 60% Design 60 days 1 day 4 days 1 day 138 days 1 day 85 days 13 Submit 60% Design 14 City Review 15 Final 90% Design 16 Submit 90% Design 1 day Wed 8/8/12 Thu 8/9/12 Thu 8/9/12 Tue 9/18/12 Tue 12/11/12 Wed 12/12/12 Fri 1/18/13 Mon 1/21/13 Thu 8/1/13 Fri 8/2/13 Fri 11/29/13 15 days 73 days 1 day 17 City Review 15 days Wed 12/11/13 Wed 1/1/14 18 Final 100% Design 15 days 19 Submit Final Design 1 day 20 Bid Phase Assistance Mon 4/14/1 Wed 8/8/12 Mon 9/17/12 Mon 9/17/12 Mon 12/10/12 Tue 12/11/12 Mon 12/17/12 Fri 1/18/13 Wed 7/31/13 Thu 8/1/13 Thu 11/28/13 Fri 11/29/13 Tue 12/31/13 Fri 4/11/14 4 Mon 4/14/14 Tue 4/15/14 Tue 5/6/14 Tue 5/27/14 30 days Wed 5/28/14 21 Award Project 1 day 22 Construction Phase Assistance 196 days Wed 7/9/14 Mon 5/5/14 Mon 5/26/14 Tue 5/27/14 Tue 7/8/14 Wed 7/9/14 Thu 7/10/14 23 Project Compete 1 day Fri 4/10/15 Thu 4/9/15 Fri 4/10/15 8/8 2013 ,2014 12015 -lalf 1, 201:7calf 2, 201,, alf 1, 2014-lalf 2, 2011-1aif 1, 201,-la JIFIMAIMIJ �IAISIOINID JIFIMIAIMIJ JAISIOINID JIFIMIAIMIJ J. 12/11 1/18 11/29 �4/14 5/27 7/9 • 4/ 0 Page 1 M&C Review Page 1 of 2 CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 7/16/2013 R i i IFk1d.ri'h#tci##, kfirru'.tg ruik Akih { dv## FORT WoRTII REFERENCE 20SW_BRENNAN AVENUE ** DATE: 7/16/2013 NO.: C-26341 LOG NAME'• DRAINAGE AMENDMENT #1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUDJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 43448, an Engineering Services Agreement with Freese and Nichols, Inc., in the Amount of $148,133.00 for Additional Engineering Analysis and Design of the Brennan Avenue Drainage Improvements Project, Thereby, Increasing the Total Contract in the Amount of $537,317.00 (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 1 to City Secretary Contract No. 43448, an Engineering Services Agreement with Freese and Nichols, Inc., in the amount of $148,133.00 for additional engineering analysis and design of the Brennan Avenue Drainage Improvements Project, thereby, increasing the total contract in the amount of $537,317.00. DISCUSSION: The Amendment recommended by this Mayor and Council Communication will provide additional engineering analysis and design for areas outside the original project limits. During design, it was determined that these areas would contribute to flooding of the City Service Center and Maintenance Garage located on Brennan Avenue, and flooding of roadway and adjacent structures. On July 10, 2012, (M&C C-25683) the City Council authorized an engineering services Agreement with Freese and Nichols, Inc., for the design of the Brennan Avenue Drainage Improvements Project. Freese and Nichols, Inc., proposes to perform the amendment services for a lump sum fee of $148,133.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. M/WBE Office: Freese and Nichols, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 16 percent M/WBE participation on this Amendment No. 1. The City's goal on this Amendment is 16 percent. This project is located in COUNCIL DISTRICTS 2 and 9, Mapsco 62H, 62M, 63E and 63J (formerly in COUNCIL DISTRICT 2). FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P227 531200 202280160230 $148,133.00 http://fortworthtexas.gov/council_packet/mc_review.asp?ID=18630&councildate=7/16/2013 7/18/2013 M&C Review Page 2 of 2 Submitted for City Manauer°s Office bv: Fernando Costa (6122) Oriainatina Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Vibhuti Pandey (2424) ATTACHMENTS 01602 Brennan Avenue Drainaae Mao .odf • http://fortworthtexas.gov/council_packet/mc_review.asp?ID=18630&councildate=7/16/2013 7/18/2013 1 141 REMOVE AND REPLACE CULVERT CHESTER PROPOSED PAVEMENT IMPROVEMENTS W/ CURB AND GUTTER 4055 International Plaza, Ste. 200 Fort Worth, TX 76109-4895 (817) 735-7300 office (817) 735-7491 fax FORT WORTH REMOVE 45 LF OF EXISTING 48" CMP INSTALL 45 LF 48" RCP Additional Cold Springs Road Drainage and Roadway Improvements Brennan Ave. Drainage Study Fort Worth, Texas • • • • • • • Legend Pipe Replacement Existing Storm Drain 2-fit Contours (NCTCOG 2001) Existing Channel Proposed Channel Grading II Proposed Pavement Improvements FIGURE 6 • Verbal Scale: 1" = 150' Absolute Scale: 1 = 1,800 Date: March 2013 FN Job #: FT110437 HASTORMWATERIFINAL EXHIBITS IExlsting_Conditlons.mxd • • • Task No. Task Description Rate 1.0 Project Management 1.1 Managing the Beam 1.1.1 Internal Team Meetings 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting [monthly, bi-monthly, monthly] Project 1.2.2 Update Meetings 1.2.3 Design Submittal Review Meetings (1) 1.2.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2.5 Schedule 1.2.6 Prepare Monthly MWBE Reports 1.2.7 Invoicing 2.0 Conceptual Design (30-Percent) 2.1 Data Collection 2.2 !Cold Springs Road Roadway P/P and XS 3.0 'Preliminary Design (60 Percent) 3.1 Preliminary Design Drawings 3.2 Design 3.3 Constructability Review 3.4 public Meeting 3.5 'Utility Clearance 3.6 ',Traffic Control Plan 3.7 'Project Decision Log 3.8 'Construction Estimate r City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Project Director $195 18 Project Manager $164 6 4 16 2 2 1 01 1 1 1 12 1 6 6 01 30 24 2 2 2 Project Engineer $121 6 4 2 22 6 16 Construction Manager $166 0 0I 961 0 801 81 Attachment B o Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Brennan Avenue Drainage Design Amendment #1 City Project No. 01602 Labor (hours) Construction Contract Administrat9 8 0 CADD $95 4 Expense Administrative Total Labor Accounting Cost $771 MWBE Non-MWBE 01 $5,600 4I $1,520 $3,120 0 40 40 0 168 1601 8 $0 $0 $960 $01 $01 $ol $ol r 0l $8,4301 I $1,7101 $6,7201 01 $32,4961 I $28,8161 $ol $01 $01 $ol $2,056 $328 $1,2961 r Subconsultant $o $off $ol $0 1 $8,2901 $0 Total Expense Task Sub Total Travel Reproduction Cost $0I $0I $0I $5,600 $0 $0 $8,2901' $1,000 $0 $1,520 $0 $3,120 $0 $0 $0 $960 $o $o $0I $0 $ol $0 $ol $0 $01 $8,430 $0 $1,710 $01 $6, 720 $9,2901 $41,786 $1,0001 $29,816 $8,2901 $8,290 $ol $0 $ol $o $01 $0 $0 $2,056 $0 $328, $01 $1,296 r 1 of 3 Task No. Task Description Rate 4.0 Final Design Final Draft (90%) Construction Plans and 4.1 Specifications 4.2 Final (100%) Plans and Specifications 4.3 Project Decision Logs (90% and 100%) 4.4 Construction Estimates (90% and 100%) 5.0 Bid Phase 5.1 Bid Support Sell Contract Documents and Maintain 5.1.1 Plan Holders List 5.1.2 Issue Addenda 5.1.3 Attend Pre -bid Conference 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 5.1.6 Issue Conformed Contract Documents 6.0 Construction Phase Services 6.1 Construction Support 6.1.1 Attend Preconstruction Conference 6.1.2 Attend Public Meeting 6.1.31 Project Site Visits (up to 13) 6.1.41 Submittal Review Request for Information/Change Order 6.1.51 Review 6.1.61 Final Walk Through and Punch List 6.2 'Record Drawings 7.0 ROW/Easement Services 7.1right-of-Way Research Right-of-Way/Easement Preparation and 7.2 Submittal (2 Perm/ 3 Temp Easements) 7.3 !Temporary Right of Entry Submittal City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Project Director $195 0 Project Manager $164 54 24 24 4 2 0 0 0 0 0 Project Engineer $121 168 Construction Manager $166 0 Attachment B o Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Brennan Avenue Drainage Design Amendment #1 City Project No. 01602 Labor (hours) Construction Contract Administrat C $98 CADD $95 Expense Administrative Total Labor Accounting Cost $771 MWBE Non-MWBE 0 360 16 80 80 8 1 200 160 16 0I i 0 0I 01 0 0I 0 0 01 0 0 0 01 1 I 01 $64,616 $32,616 $30,048 $656 $1,296 $0 $ol $01 $01 $01 so' so' $O Subconsultant $0 $0 Total Expense Task Sub Total Travel Reproduction Cost $01 $3,000 $1,000 $2,000 $0 $0 $0 $3,000! $67,616 $1,000 $33,616 $2,000 $32,048 $0 $656 $0 $1,296 $01 $0! $01 $0 $0 $0 $0$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0, $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $o $0 $0 $01 $0 $0 $3,8441 $3,844 $01 $0 $3,8441 $3,844 $01 $0 $3,844 2 of 3 Task No. Task Description Rate 8.0 Survey 8.1 Design Survey 8.2 Temporary Right of Entry Submittal 8.3 Construction Survey 9.0 'Permitting 9.1 SWPPP 9.2 Environmental Services 9.3 Floodplain Services 9.4 TxDOT 9.5 Railroad 9.6 TDLR 9.7 City of Fort Worth Parks Conversion 10.0 Miscelanneous Design Allowance Totals' City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Project Director $195 0 Project Manager $164 0 2 12 2 12 201 114 Project Engineer $121 0 28 Construction Manager $166 0 0I Attachment B - Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Brennan Avenue Drainage Design Amendment #1 City Project No. 01602 Labor (hours) Construction Contract CADD Administrator $98 $95 0 0 0 4 Administrative Total Labor Accounting Cost $77 0 $0 $0 $0 $0 0 28 4 3201 0 01 576 16 $6,126 $0 $6,126 $0 $0 $ol $01 $01 $117,2681 Subconsultant MWBE $7,850 $7,850 $4,439 Expense Non-MWBE $01 i $0; Total Expense Task Sub Total Travel Reproduction Cost $0 $0 $7,850 $7,850 $0 $0 $0 $0l $4,439 $0 $4,439 $0 $ol $ol $01 $01 $0 $4,0001 $28,423 $4,439 $24,4231 $0 $0 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10% Sub Markup MWBE Participation Total Project Cost' $7,850 $7,850 $0 $0 $10,565 $0 $10,565 $0 $0 $0 $0 $0 $0 $145,691 1,046 $117,268 $28,423 $24,423 $0 $2,442 16.5% $148,133 3 of 3