HomeMy WebLinkAboutContract 43482 (2)CITY SECREmpy ONTR4mr NO, DESIGN PROCUREMENT AGREEMENT FOR DESIGN SERVICES NORTH RIVERSIDE DRIVE WHEREAS, Hillwood Alliance Services, LLC, a Texas limited liability company., ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), each desires to make certain roadway and street improvements to North Riverside Drive in the City of Fort Worth, Tarrant County, Texas, from Dalton Drive to the North Tarrant Parkway including related water, sewer, and drainage improvements (Phases 3 and 4) (the "Project") as further described on Attachment "A"; and WHEREAS, Developer is a company authorized to do business in Texas and is willing to advance the Project on an earlier schedule than it might otherwise have been implemented; and WHEREAS, Developer and City desire to enter into this Design Procurement Agreement ("Agreement") in order to accomplish the goals of the Parties; and WHEREAS, Developer will retain the services of Peloton Land Solutions ("PLS"). to provide for the design of the Project; and WHEREAS, Staff has reviewed both the scope, fee, and schedule for the design of the Project and find there to be fair and reasonable; and WHEREAS, it is understood that this Agreement may be amended from time to time to accommodate expanded scope and cost participation; and WHEREAS, construction of the Project may be accomplished in phases, and; WHEREAS, City and Developer intend to execute a Community Facilities Agreement that provides for the Developer to award, construct, and seek reimbursement from the City for the construction costs and certain construction related expenses for Phases 3 and 4 of the Project subject to the availability of funding and based on a public bid process, NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. Th Project will generally consist of certain water, sanitary sewer, paving, OFflC L rEC3R t cetscape, and drainage infrastructure improvements related to the corry =LUTA Tr w, orstruction of North Riverside Drive (Phase 3 and 4) from Dalton Rd to the L10 9 l tth Tarrant Parkway as further described on Attachment B hereto. DPA City of Fort Worth — Hillwood North Riverside Drive 03-09-1 2 P1 2:02 IN Page 1 B. Developer will retain Peloton Land Solutions as the "Engineer" for the Project pursuant to a written agreement approved by the City (the "Engineering Contract") attached as Attachment C. C. City agrees to reimburse Developer for 50% of the actual cost to complete the design of the project Phase 3, an amount not to exceed $100,000.00, upon presentation of plans for Phase 3, including, as appropriate, engineering drawings, studies, renderings, contract specifications, estimates, and other documents, (collectively the "Work Product") necessary to construct the improvements contemplated by this Agreement. Additionally, City agrees to reimburse Developer for 100% of the actual cost to complete the design of the project Phase 4, an amount not to exceed $200,000.00, upon presentation of plans for Phase 4, including, as appropriate, engineering drawings, studies, renderings, contract specifications, estimates, and other documents, (collectively the "Work Product") necessary to construct the improvements contemplated by this Agreement In the event City and Developer enter into a Community Facilities Agreement providing for the Developer to award, construct and seek reimbursement from the City for the City's share of the construction cost and certain related construction expenses for Phase 3 and 4 of the project, the Developer's cost incurred pursuant to the Engineering Contract will become part of the Developer's required participation as set forth in Attachment B In the event no Community Facilities Agreement is entered into on or before August 15, 2012, then City will reimburse Developer for 100% of all cost to design project. D. The Developer covenants and agrees to, and by these presents does hereby, indemnify, hold the city, its officers, agents and employees hainiless against any and all suits, actions or claims of any character, including, but not limited to, those for property damage or loss and/or personal injury including death, that may relate to, arise out of or be occasioned by (i) Developer's breach of any of the teens of this Agreement or (ii) any act or omission of Developer or any of its affiliates, officers, agents, associates, employees, DPA City of Fort Worth — Hillwood North Riverside Drive Page 2 contractors or subcontractors, related to the Project, except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence of the City its officers, agents, employees, or separate contractors, and in the event of joint and concurrent negligence of both Developer and the City, responsibility, if any, shall be apportioned comparatively in accordance with the laws of the state of Texas. E. Developer agrees that the Engineering Contract shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contract. IN TESTIMONY WHEREOF, the City and Developer have each caused this instrument to be executed in quadruplicate in its name and on its behalf by its duly authorized representative. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: CITY OF FORT WORTH J DEVELOPER Hillwood Alliance Services, LLC A Texas limited liability company Fernando Costa L. R ' ssell La Assistant City Manager DATE: SAIAZ. AP " OVAL RECOMMENDED: 1J tali DouglWiersig Director, Transportation and Pu i lic Works Department Vice President DATE: (e7120 ( Z DPA City of Fort Worth — Hillwood North Riverside Drive Page 3 APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: f r v Mary J. Kays r City Secretary DPA City of Fort Worth — Hillwood North Riverside Drive itto���oopoo�jzi Id U _aid AI riP bag % 0 't?sh °°00opoo" ‘444 raten""&i 411 M&C: ! - Z-�! 7- 3 Date: OFFICIAL RECORD CITY SECRETARY FT. Page 4 List of Attachments to this Agreement Attachment A — Project Description Attachment B - Project Design & Construction Financial Summary Attachment C — Engineering Contract [follows] DPA City of Fort Worth — Hillwood North Riverside Drive Page 5 • 1 LAND SOLUTIONS North Riverside Drive 5/3/12 Peloton Land Solutions (PLS) understands the project to be the survey and civil design of the proposed Improvements to North Riverside Drive. The project will be built in (2) phases to be defined as "Dalton - Shiver" (2,400 LF) and 'Shiver to North Tarrant Parkway (2 500 LF). The project will be designed utilizing the COFW design criteria unless otherwise specified or detailed below. BASIC SCOPE OF SERVICES- "DALTON - SHIVER" A. PRELIMINARY DESIGN: 1. PLS will attend a kick-off meeting with Owner to discuss and formalize the project scope, schedule and design parameters PLS will perform topographic field surveys to locate and tie existing driveways, signage, water/sewer/storm drain Infrastructure, trees and slope areas needed to complete the design. 3. PLS will prepare a preliminary alignment layout, centerline profiles and proposed storm drainage infrastructure plans for the proposed improvements. These documents will be submitted to the Owner and/or contractor for review and comment prior to preparation of the final construction documents. 4. PLS will perform a WOUS field investigation for the alignment that will document and/or delineate the current conditions of the area. This scope does not include any permitting of wetlands with the USACE. B. CONSTRUCTION DOCUMENTS: 1. Prepare final roadway construction plans including engineering, design and drafting for the proposed infrastructure improvements. These plans will be prepared in accordance with the City of Fort Worth criteria and include the following: o Paving plan and profile, and typical section consisting of additional turning movement lanes and driveways per the City of Fort Worth standards. Associated pedestrian access, ramps, street crossings and intersection improvements will be included in this design if warranted. o PLS will prepare (1) set of construction phasing plans to include traffic control measures and street lighting design (by outside consultant) per the COFW criteria. o PLS will prepare a drainage area map and the associated hydraulic calculations. o Drainage infrastructure plan and profiles for storm drain improvements / extensions across the roadway alignment. Peloton Land Solutions North Riverside Final • EL•T LAND SOLUTIONS 5/3/12 o Miscellaneous pavement, utility and storm drain details. o Pavement signage / striping plans and associated details. o Erosion and sediment control plan. o 16" potable water main design plan and profile. 2. Prepare a ROW Plat in accordance to the COFW criteria for conveyance of ROW. 3. Prepare Storm Water Pollution Prevention Plan (SWPPP) and Specifications. 4. Prepare construction contracts, specifications and construction quantities required for bidding purposes. 5. Easements or legal descriptions for dedication of ROW, utility extensions, slope e asements or access will be prepared by PLS in this scope. (6) Legal descriptions or e asements are anticipated. 6. PLS will prepare a CFA document for the project that will be submitted to the COFW and the contract for review and execution. C. CONSTRUCTION PHASE SERVICES: 1. PLS will provide the following service: o Assist the Owner in the opening and tabulation of bids for construction and recommended course of action. o Attend pre -construction conference at the City of Fort Worth. (Assumes 2 meetings) o Establish a minimum of 2 horizontal and 1 vertical control networks for survey construction staking by others. o Prepare and process change orders and review shop drawings with respect to Industry standard relevance and other submittals by the contractor (anticipates 8 submittals). o Attend a `Final Inspection or Acceptance" meeting for the project as conducted by the City of Fort Worth. 2. PLS will provide franchise utility coordination for the construction of the project. Peloton Land Solutions North Riverside Final L N LAND SOLUTIONS BASIS OF COMPENSATION: "DALTON - SHIVER" Preliminary Design Phase Design Survey Preliminary Grading and Utility Design WOUS Assessment / Delineation Update Total Preliminary Design Phase 5/3/12 $ 6,000.00 $ 20,000.00 $ 6,000.00 $ 32,000.00 Construction Documents Phase Final Roadway Construction Plan (North Riverside 2,403 I.f.) $76,000.00 Franchise Utility Relocation Plans $20,000.00 ROW Final Plat $ 7,000.00 SWPPP $ 3,000.00 Technical Specifications $ 6,000.00 Legal Descriptions / Easements (6) $ 6,000.00 CFA — City of Fort Worth $ 5,000.00 Total Construction Documents Phase $ 123,000.00 Construction Phase Services Construction Phase Services Franchise Utility Coordination Design Meetings (8) Total Construction Phase Services Total Estimated Fee Estimate of Reimbursable Expenses REIMBURSABLE EXPENSES: $ 5,000.00 $ 5,000.00 $ 6,000.00 $ 16,000.00 S 171.000.00 $ 5,000.00 1. Reimbursable Services - The following items shall be considered as reimbursable expenses to this contract: o Printing/reproduction services. o Travel / Mileage o Application and/or Review fees o Sales tax on survey work. Peloton Land Solutions North Riverside Final • L T N II LAND SOLUTIONS BASIC SCOPE OF SERVICES- "SHIVER - NORTH TARRANT PARKWAY" 5/3/12 D. PRELIMINARY DESIGN: 1. PLS will attend a kick-off meeting with Owner to discuss and formalize the project scope, schedule and design parameters 2. PLS will perform topographic field surveys to locate and tie existing driveways, signage, water/sewer/storm drain infrastructure, trees and slope areas needed to complete the design. 3. PLS will prepare a preliminary alignment layout, centerline profiles and proposed storm drainage infrastructure plans for the proposed improvements. These documents will be submitted to the Owner and/or contractor for review and comment prior to preparation of the final construction documents. 4. PLS will perform a WOUS field investigation for the alignment that will document and/or delineate the current conditions of the area. This scope does not include any permitting of wetlands with the USACE. E. CONSTRUCTION DOCUMENTS: 1. Prepare final roadway construction plans including engineering, design and drafting for the proposed infrastructure improvements. These plans will be prepared in accordance with the City of Fort Worth criteria and include the following: o Paving plan and profile, and typical section consisting of additional turning movement lanes and driveways per the City of Fort Worth standards. Associated pedestrian access, ramps, street crossings and intersection improvements will be included in this design if warranted. o PLS will prepare (1) set of construction phasing plans to include traffic control measures and street lighting design (by outside consultant) per the COFW criteria. o PLS will prepare a drainage area map and the associated hydraulic calculations. o Drainage infrastructure plan and profiles for storm drain improvements / extensions across the roadway alignment. o Miscellaneous pavement, utility and storm drain details. o Pavement signage / striping plans and associated details. o Erosion and sediment control plan. Peloton Land Solutions North Riverside Final • • L•T•N VIII LAND SOLUTIONS 5/3/12 2. Prepare a ROW Plat in accordance to the COFW criteria for conveyance of ROW. 3. Prepare Storm Water Pollution Prevention Plan (SWPPP) and Specifications. 4. Prepare construction contracts, specifications and construction quantities required for bidding purposes. 5. Easements or legal descriptions for dedication of ROW, utility extensions, slope e asements or access will be prepared by PLS in this scope. (6) Legal descriptions or e asements are anticipated. 6. PLS will prepare a CFA document for the project that will be submitted to the COFW and the contract for review and execution. F. CONSTRUCTION PHASE SERVICES: 1. PLS will provide the following service: o Assist the Owner in the opening and tabulation of bids for construction and recommended course of action. o Attend pre -construction conference at the City of Fort Worth. (Assumes 2 meetings) o Establish a minimum of 2 horizontal and 1 vertical control networks for survey construction staking by others. o Prepare and process change orders and review shop drawings with respect to Industry standard relevance and other submittals by the contractor (anticipates 8 submittals). o Attend a `Final Inspection or Acceptance" meeting for the project as conducted by the City of Fort Worth. 2. PLS will provide franchise utility coordination for the construction of the project. Peloton Land Solutions North Riverside Final LAND SOLUTIONS BASIS OF COMPENSATION: "SHIVER -NORTH TARRANT PARKWAY" Preliminary Design Phase Design Survey Preliminary Grading and Utility Design WOUS Assessment / Delineation Update Total Preliminary Design Phase Construction Documents Phase Final Roadway Construction Plan (North Riverside 2,403 I.f.) Franchise Utility Relocation Plans ROW Final Plat SWPPP Technical Specifications Legal Descriptions / Easements (6) CFA — City of Fort Worth Total Construction Documents Phase Construction Phase Services Construction Phase Services Franchise Utility Coordination Design Meetings (8) Total Construction Phase Services Total Estimated Fee Estimate of Reimbursable Expenses Peloton Land Solutions North Riverside Final 5/3/12 $ 5,000.00 $ 20,000.00 S 6,000.00 $ 31,000.00 $73,000.00 $19,000.00 $ 7,000.00 $ 3,000.00 $ 6,000.00 $ 6,000.00 $ 5,000.00 $ 119,000.00 $ 5,000.00 $ 5,000.00 $ 6,000.00 $ 16,000.00 $166,000.00 $ 5,000.00 P L • T Air LAND SOLUTIONS EXCLUSIONS: 1. Landscape Architectural service 2. Preparation of flood studies, LOMR, CLOMR 3. Water modeling or system analysis / design 4. Design of pump houses, pump stations or other water delivery feature 5. Design of retaining walls screening walls paved areas. 6. Geotechnical investigations or soil gradation analysis or recommendations 7. WOUS permitting with the Corp of Engineers 8. Services of other special consultants 9 Irrigation design or design of special structures not identified as standard 10. Legal descriptions or closing documents not identified in original scope 11. Planning, entitlement or zoning review, preparation or representation 12. TXDOT driveway permitting 13. Structural Paving sections to be provided by others. 14. Survey Construction Staking 15. Non-standard photometric streetlight designs. DELIVERABLES TO PLS: 5/3/12 Prior to starting the design of the proposed waterline the following information, data or documents will be delivered to PLS: 1. The associated legal documents for all encumbrances (old and new) along or near the proposed alignment. 2. A hard copy of the existing work product prepared by others. 3. An estimated timeline for production permitting and construction. 4. Rights to access the property (les) along the proposed alignment as representatives of Peloton Land Solutions. Peloton Land Solutions North Riverside Final • t�ll� LAND SOLUTIONS North Riverside 16" Water 5/3/12 Peloton Land Solutions (PLS) understands the project to be the survey and civil design of the proposed 3,500 LF of 16" water main improvements located adjacent to North Riverside Drive approximately from Heritage Trace Parkway to Shiver Road. The project will be designed utilizing the COFW design criteria unless otherwise specified or detailed below. BASIC SCOPE OF SERVICES- 16" WATERMAIN A. PRELIMINARY DESIGN: 1. PLS will attend a kick-off meeting with Owner to discuss and formalize the project scope, schedule and design parameters 2. PLS will perform topographic field surveys to locate and tie existing driveways, signage, water/sewer/storm drain infrastructure, trees and slope areas needed to complete the design. 3. PLS will prepare a preliminary alignment layout, centerline profiles for the proposed water main improvements These documents will be submitted to the Owner and/or contractor for review and comment prior to preparation of the final construction documents. B. CONSTRUCTION DOCUMENTS: 1. Prepare final water main construction plans including engineering, design and drafting for the proposed infrastructure improvements. These plans will be prepared in accordance with the City of Fort Worth criteria and include the following: o Water main plan and profile per the City of Fort Worth standards. o PLS will prepare (1) set of construction phasing plans to include traffic control measures per the COFW criteria. 2. Prepare Storm Water Pollution Prevention Plan (SWPPP) and Specifications. 3. Prepare construction contracts, specifications and construction quantities required for bidding purposes. 4. Easements or legal descriptions for dedication of ROW, utility extensions, slope easements or access will be prepared by PLS in this scope. (2) Legal descriptions or easements are anticipated. 5. PLS will prepare a CFA document for the project that will be submitted to the COFW and the contract for review and execution. Peloton Land Solutions North Riverside Water Tia LAND SOLUTIONS C. CONSTRUCTION PHASE SERVICES: 1. PLS will provide the following service: 5/3/12 o Assist the Owner in the opening and tabulation of bids for construction and recommended course of action. o Attend pre -construction conference at the City of Fort Worth. (Assumes 2 meetings) o Establish a minimum of 2 horizontal and 1 vertical control networks for survey construction staking by others. o Prepare and process change orders and review shop drawings with respect to industry standard relevance and other submittals by the contractor (anticipates 4 submittals). o Attend a `Final Inspection or Acceptance" meeting for the project as conducted by the City of Fort Worth. 2. PLS will provide franchise utility coordination for the construction of the project. BASIS OF COMPENSATION: "DALTON - SHIVER" Preliminary Design Phase Design Survey Preliminary Grading and Utility Design Total Preliminary Design Phase Construction Documents Phase Final Water Main Construction Plan (3,500 LF) SWPPP Technical Specifications Legal Descriptions / Easements (2) CFA — City of Fort Worth Total Construction Documents Phase Construction Phase Services Construction Phase Services Franchise Utility Coordination Total Construction Phase Services Total Estimated Fee Estimate of Reimbursable Expenses Peloton Land Solutions North Riverside Water $ 1,000.00 $ 6,000.00 $ 7,000.00 $12,000.00 $ 3,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 20,000.00 $ 2,000.00 $ 1,000.00 $ 3,000.00 $30.000.00 $ 2,000.00 • • L T+ N Ila LAND SOLUTIONS REIMBURSABLE EXPENSES: 5/3/12 Reimbursable Services - The following items shall be considered as reimbursable expenses to this contract: o Printing/reproduction services. o Travel / Mileage o Application and/or Review fees o Sales tax on survey work. EXCLUSIONS: 1. Landscape Architectural service 2. Preparation of flood studies, LOMR, CLOMR 3. Water modeling or system analysis / design 4. Design of pump houses, pump stations or other water delivery feature 5. Design of retaining walls screening walls paved areas. 6. Geotechnical investigations or soil gradation analysis or recommendations 7. WOUS permitting with the Corp of Engineers 8. Services of other special consultants 9. Irrigation design or design of special structures not identified as standard 10. Legal descriptions or closing documents not identified in original scope 11. Planning, entitlement or zoning review, preparation or representation 12. TXDOT driveway permitting 13. Structural Paving sections to be provided by others. 14. Survey Construction Staking 15. Non-standard photometric streetlight designs. DELIVERABLES TO PLS: Prior to starting the design of the proposed waterline the following information, data or documents will be delivered to PLS: 1. The associated legal documents for all encumbrances (old and new) along or near the proposed alignment. 2. A hard copy of the existing work product prepared by others. 3. An estimated timeline for production permitting and construction. 4. Rights to access the property (les) along the proposed alignment as representatives of Peloton Land Solutions. Peloton Land Solutions North Riverside Water City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/10/2012 - Ordinance Nos. 20261-07-2012 and 20262-07- 2012 DATE• Tuesday, July 10, 2012 REFERENCE NO.: **C-25673 LOG NAME 06NORTH RIVERSIDE DESIGN PROCUREMENT AGREEMENT S UBJECT: Authorize Execution of a Design Procurement Agreement with Hillwood Alliance Services LLC, in the Amount Not to Exceed $280,000.00 for the Engineering Design of North Riverside Drive from Dalton Road to North Tarrant Parkway and Adopt Appropriation Ordinances (COUNCIL DISTRICT 2) RECOMMENDATION. It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Special Assessments Fund in the amount not to exceed $280,000.00 from available funds; 2. Authorize the transfer of $280,000.00 from the Special Assessments Fund to the New Development Fund 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the New Development Fund in the amount not to exceed $280,000.00 from available funds; and 4. Authorize the execution of a Design Procurement Agreement with Hillwood Alliance Services, LLC, in the amount not to exceed $280 000.00 for engineering services related to the design of North Riverside Drive from Dalton Road to North Tarrant Parkway. DISCUSSION: The City of Fort Worth currently has a design contract with Teague Nall & Perkins for Phase 2 of North Riverside Drive (M&C C-25080) as reflected in the attached exhibit. Completion of design for Phase 2 of N orth Riverside Drive is scheduled for August 2012. The Transportation and Public Works Department would like to accelerate the engineering design for Phases 3 and 4 such that the design of all three phases are complete in August 2012. The execution of this Design Procurement Agreement will allow Hillwood Alliance Services, LLC, ("Hillwood') to advance the engineering design of Phases 3 and 4 of North Riverside Drive. Hillwood will be responsible for 50 percent of the design costs of Phase 3, North Riverside Drive from Dalton Street to S hiver Road, which abuts their property. The City will reimburse Hillwood Alliance Services 50 percent of the design costs for Phase 3 and 100 percent of the design costs for Phase 4, North Riverside Drive from S hiver Road to North Tarrant Parkway The total of the City's reimbursement under the Design P rocurement Agreement in the amount not to exceed $280,000.00 It is anticipated that the City and Hillwood will enter into a subsequent Agreement for construction of this project. The City's share shall be paid from Future Improvements funds previously collected for the design and Logname: 06NORTH RIVERSIDE DESIGN PROCUREMENT AGREEMENT Page 1 of 2 construction of North Riverside Drive. This project is located in COUNCIL DISTRICT 2, MAPSCO 21Y, 35C and 35G. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the New Development Fund. FUND CENTERS: TO Fund/Account/Centers 1) GS94 488100 020941369010 1) GS94 538040 020941369010 2&31 C202 472094 204760139330 3)C202 531200 204760139330 FROM Fund/Account/Centers $280.000.00 2) GS94 538040 020941369010 $280.000.00 4) C202 531200 204760139330 $280,000.00 $280.000.00 CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: Fernando Costa (6122) Randle Harwood (6101) David Schroeder (2239) Jim Walker (8009) $280.000.00 $2801000.00 ATTACHMENTS 1. 06NORTH RIVERSIDE DESIGN PROCUREMENT AGREEMENT C202 AO12 v.2.doc (Public) 2. 06NORTH RIVERSIDE DESIGN PROCUREMENT AGREEMENT GS94 AO12 v.2.doc (Public) 3. GS94 available funds.ndf (CFW Internal) 4. N Riverside Design and Construction Estimates.adf (CFW Internal) 5. N Riverside Drive Phases.odf (Public) Logname: 06NORTH RIVERSIDE DESIGN PROCUREMENT AGREEMENT Page 2 of 2 EXHIBIT A 1. 4: .",....................1 0 / I IcILIEI I IRfAI Gt.i BLVD I I' - HERITAGE TRACE RARKW ; 48+13.15 36+05 (-i )) MIMIC WU PI FM L-. AttlattA Li �I I 1 �w . 6 1� ,ram Z ij rc-�: Lti IL:�II i•_Ire..—._ u • PKWY. A C) ch O N GOLDEN TRIANGLE BLVD. Under Design by COFW HERITAGE TRACE PKWY. Complete * DALTON ROAD r North Riverside Drive Developer CFA Project Future Phase NORTH TARRANT PKWY. GT Construction (1) Landscaping and "Context "Util relocation" (6) ROW 2.0 ac East Side EXHIbI f B (1 OF 2) North Riverside Drive Project Design & Construction Financial Summary Monday, May 07, 2012 Estimates PHASE 2 6,543 LF eeeZZAHTP Unit $/Unit Extension 6,543 6,543 6,543 87,120 $ 810 $ 5,300,000 (1) $ 150 $ 981,482 $ 200 $ 1,308,642 $ 6 $ 522,720 (2) Total $ 8,112,844 Engineering Design $ 604,000 Phase 2 Total $ 8,716,844 Hillwood ROW (Hillwood) 4.04 ac City Percentage Cost Total Participation Percentage 100% $ 5,300,000 100% $ 981,482 100% $ 1,308,642 100% $ 522,720 $ 8,112,844 Total 100% $ 604,000 Developer - 0% $ 0% $ 0% $ 0% 0% $ Phase 2 Total $ 8,716,844 Phase 2 Total Impact Free Credit $ Cost 0 871,684 Dalton Construction Gen. Worth Tie-in Landscaping and "Context "Util relocation" (6) Engineering Design (4) $ 200,000 Hillwood ROW Shiver Construction Landscaping and "Context "Util relocation" (6) ���� 2,403 LF CL// //Shiver Percentage Cost Unit $/Unit Extension 2,403 $ 810 $ 1,946,430 65% $ 1,265,180 LS LS $ 447,000 100% $ 447,000 2,403 $ 150 $ 360,450 65% $ 234,293 2,403 $ 200 $ 480,600 (2) 65% $ 312,390 Total $ 3,234,480 Total $ 2,258,862 50% $ 100,000 Total Phase 3 $ 3,434,480 Total Phase 3 $ 2,358,862 4.10 ac PHASE 4 2,519 LF r//�����///�//////�////////////////riNTP Unit $/Unit Extension $ - $ 810 $ $ $ - $ $ - $ 200 $ Total $ Engineering Design (5) $ Phase 4 Total $ Total Estimates 200,000 Total 100% $ 100% $ 100% $ 100% $ 200,000 35% $ 0% 35% $ 35% $ Impact Free Credit $ Total 0% $ 200,000 Phase 4 Total $ 200,000 Phase 4 Total $ Phases 2 & 3 Design and Construction $ 12,351,324 and Phase 4 Design 1 Total Participation Summary City Total $ 11,275,706 Notes (1) From 30% "Opinion of Probable Cost" received from Teague Nall and Perkins, dated 01/20/2012 (6) Utility relocates include: Relocation of ONCOR overhead lines to an underground system Relocation of Tri-County overhead lines to an underground system Payment to Atmos to relocate gas lines Installation of underground conduit systems for ONCOR and Tri-County Percentage Cost 681,251 126,158 168,210 Total $ 975,618 50% $ 100,000 Total Phase 3 $ 1,075,618 343,448 Developer $ 1,075,618 NRD GT to HTP City Agreement Split2 page 1 of 2 Printed 5/7/2012 3:53 PM EXHIBIT B (2 OF 2) North Riverside Drive Phase 2, 3 & 4 Project Design & Construction Source -Use of Funds Source: CFA/Impact Fees - Phase 2 COFW/TIF #7 Development Agreement - Phase 2, 3 & 4 CFA/Impact Fees - Phase 4 Developer Participation - Phase 3 Use: Phase 2 Engineering Design Phase 2 Estimated Cost Phase 3 Engineering Design Phase 3 Construction Phase 4 Engineering Design $ 604,000 $ 10,400,000 $ 280,000 $ 1,075,618 Total Source $ 12,359,618 $ 604,000 $ 8,112,844 $ 200,000 $ 3,234,480 $ 200,000 Total Use $ 12,351,324 Net ("Deficit") or Excess funds $ 8,294 Notes: 1) Construction estimates include 5% contingency 2) Developer will be responsible for 100% water line construction in Phase 3 estimated at $335,000. NRD GT to HTP City Agreement Split2 page 2 of 2 Printed 5/7/2012 3:53 PM