Loading...
HomeMy WebLinkAboutContract 43397-A1 (2)AMENDMENT NO, 1 to AGREEMENT for ENGINEERING SERVICES for the GENDY STREET ENHANCEMENTS PHASE 2 PROJECT at WILL ROGERS MEMORIAL CENTER STATE OF TEXAS COUNTY OF TARRANT CITY SECRETARY CONTRACT NO. 1-12y-q-aviiii WHEREAS, The City of Fort Worth (the "City') and CMJ Engineering, Inc., a Texas Limited Partnership (the "Engineer"), made and entered into City Secretary Contract No. 43397 (the "Contract') which was administratively executed in the amount of $10,000.00 on the 16th day of July, 2012; and WHEREAS, the Contract involves engineering services for the Gendy Street Beautification Phase 2 project at the Will Rogers Memorial Center; and WHEREAS, it has become necessary to execute Amendment No. 1 to said contract to incorporate additional construction materials testing services for the Gendy Street Enhancements Phase 2 project at the Will Rogers Memorial Center; and NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, SCOPE OF SERVICES, of the Agreement is amended for additional design services to incorporate the additional construction materials testing services ($2,965.00) for the Gendy Street Enhancements Phase 2 as specified in the Email from the Engineer dated October 30, 2012, subject: CMJ Gendy Phase II with the fee proposal, attached hereto as Attachments "A" and made a part of this Agreement. 2. rticle II, COMPENSATION, of the Agreement is amended for the total Agreement price of $12,965.00 for • 3. ovisions of this Contract which are not expressly amended herein shall remain in full force and xE6gre this the 3 1 day of Or_ !�/� - . 2012, in Fort Worth, Tarrant County, Texas. �o � oo • i a MaryJ. Kays City Secretary • Fernando Costa Assistant City Manager APPROVAL AS C .FORM AND LEGALITY: APPROVAL RECOMMENDED: By: Do -sIN. Black Assistant City Attorney Lj toBy. - alS' Douglas UV. Wiersig, PE • Director, transportation & Public Wor s Department M&C Is Not Required ENGINEER: Contract Authorization • • By: R. Carl Lee, S.E.T. Executive Vice President WRMC Gendy Street Enhancements Phase 2, Amendment No. I (Oct 2012) CMJ Engineering, Inc. 1 r, y (_J)I U. �ii: ;I r i tl 11-O6-12 PO4 35 IN Murayama, Dalton From: Sent: To: Subject: Attachments: Will Avila [wavila@cmjengr.com] Tuesday, October 30, 2012 1:37 PM Bagamery Alan; Murayama, Dalton CMJ Gendy Phase II 20121030133704944.pdf 2012103013370494 4 pdf (119 KB)... This E-mail was sent from "RNP0026732E5D83" (Aficio MP C4501). Scan Date: 10.30.2012 13:37:04 (-0500) • • 1 • eArk7- or* CMJ ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax (817) 689-9993 The City of Fort Worth Estimate No. 12-148C October 30, 2012 ESTIMATE CONSTRUCTION MATERIALS TESTING SERVICES FOR GENDY PHASE 2 AT WILL ROGERS MEMORIAL CENTER FORT WORTH, TEXAS Our Estmate is based on your stated project scope of a remainder of ten concrete placements We have proposed that each placement will be covered within the three hour minimum each requiring four cylinders and a specimen ,collection trip All work is proposed to be performed between the hours of 7:00 a.m. and.5:00 p.m., Monday through Friday. CMJ ESTIMATE Concrete Concrete Test Cylinders (ASTM C31/39 - Min. 3/set) Engineering Technician (Min, 3 hours/trip) Cylinder Pick Up Vehicle Trip Charge Estimated Total for Concrete Services: Notes: 40 30 5 15 $ 16.00 $ 40.00 $ 120.00 $ 35.00 each hour each trip 640.00 1,200.00 600.00 525.00 2,965.00 1. Project Management fees will only be charged for actual field services requiring a project manager or as requested by client. 2 Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked over ten (10) hours per day or hours worked before 7:00 aim. and/or after 5:00 p.m. Monday thru Friday, All lab and field services performed on Saturday or Sunday; will be billed at 1.5 times the regular rate. All services performed on recognized holidays will be billed at 2.0 times the regular rate. 3. All laboratory test fees are F.O.B. our laboratory, Engineering technician minimums and vehicle trip charges will apply to all trips to the job -site including sample pickups and specimen pickups. 4 A minimum of three (3) hours, technician time and vehicle trip charges will be billed for each callout, sample pickup or specimen pickup unless noted otherwise. 5. Technician time is charged portal-to-portal from our Fort Worth office. 6 Additional tests not specified in this fee schedule will be quoted upon request. 7 4"X8" concrete compression test specimens will be used unless instructed otherwise.