Loading...
HomeMy WebLinkAboutContract 43518 (2)COPVIIVIJNITY HACTT,11 T 1111+;S AGB11+, '+ MENT THE STATE OF TEXAS § COUNTY01111 TARP,NT § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: The Southwestern Baptist Theological Seminary Address, State, Zip Code: 2001 West Seminary Dr., Fort Worth, TX 76115 Phone, E-Mail: (817) 923-1921 Ext. 2120 / kensley@swbts.edu Authorized Signatory/Title: Kevin Ensley - Vice President, Business Administration Project Name: Southwestern Baptist Theological Seminary Storm Drain Improvements Project Location: NW Corner of Seminary Dr. & W.M. Flemming Court Plat Case No.: FS-011-056 Plat Name: Seminary Addition Mapsco: 90 L & G Council District: 9 City Project No:01891 CFA: 2012-03 7 DOE: 6830 To be completed by staff* Received by: Date: 2 I YS[N'? 5g ffj !F To V?JO THHJ, T 0$21-12 P05 : 28 IN 1 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy m the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide fmancial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) , Sewer (A-1) , Paving (B) , Storm Dram (B-1) X� Street Lights & Signs (C) Combined CFA final Sept 12, 2008 2 E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the departinent having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perfoini water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. the submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement Combined CFA final Sept 12, 2008 4 L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, perfoiuiance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a faun to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. Combined CFA final Sept 12, 2008 6 ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its fmancial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's fmancial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's fmancial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the fmancial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet ;Project Name: Southwestern Baptist Theological Seminary Storm Drain Improvements CFA No.: 2012-037 DOE No.: 6830 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2 Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period Developer's Cost 72,516.00 72,516.00 72,516.00 2,900.64 1,450.32 4,350.96 4,350.96 Amount 72,516.00 72,516.00 90,645.00 90,645.00 Choice (ck one Combined CFA final Sept 12, 2008 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this ...2nintil day of 0-d. , , 20 f > . 0 CITY OF FORT WORTH - Recommended by: Water Department N/A Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approv - e as to Fonn & Legality: Douglas W. Black Assistant City Attorney M&C No. N/A - Date: ATTEST: Mary J`: Kayse, City Secretary ATTEST: Signature (Print) Name: .•\0` Y PU ���i • =• • • _ ••t W. .,„qiF 0 F ; • Tr s ortation & Public Works Department Li ) Douglas Wd Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager sc>-•iatnis'Qsaittitz acre *0 n a cp0000po 4 �� sus � AMY WATSON Notary Public, State of Texas My Commission Expires September 28, 2013 O8Z O *s% 0 d ��gNth000000°0 •Mkt! IfatiataCt w ' The Southwestern Baptist Theological Seminary 9 id•ritie Signa4 Print Name: Kevin Ensley Title: Vice President a OFFICIAL tEC CITY SLWRETAIf TUlfORTN9 T Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included AIL C E E CI n E Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) Combined CFA final Sept 12, 2008 10 FORT WORTH THE CITY OF FORT WORTH, TEXAS PLANS FOR THE CONSTRUCTION OF DRAINAGE IMPROVEMENTS To Serve SOUTHWESTERN BAPTIST THEOLOGICAL SEMINARY LOT IR, BLOCK A, SEMINARY ADDITION BETSY PRICE MAYOR M \E:11121g S DOUGLAS W. WIERS1G, P.E. McBTLVOYD'EVAIT-2.4ND S. FRANK CRUMB,,P.E. DlitECTOR, WATER DEPARTMENT DREW BOLT Bc'T PUNT = I NoMERLt.st7oN r tiro% Ir nitarNE OWNED/DEVELOPED BY: SOUTHWESTERN BAPTIST THEOLOGICAL SEMINARY D.O.E. NO. CITY PROJECT NO. FILE NO. EWAN TARRANT COUNTY MAPSCO 901.7. 90G LOCATION MAP MAPSCO 90L & 90G CUT 00199M. MILT 9 PREPARED BY: layl Pacheco lectl, rzscznmg0P.-.."-'- APRIL 2012 UNIT E STORMSEWER IMPROVEMENTS SIEETNa DESCRMON 000 COVER SHEET 001 FINAL PLAT — SHIM 1 OF 002 FINAL PLAT — SHEET 2 OF 3 003 FINAL PLAT — SHEET 9 OF 3 004, EXISTING DRAINAGE AREA IIAP 005 PROPOSED DRAINAGE AREA MAP 006 DEMOLITION PLAN 007 STORM SEWER PLAN 003 STORK SEWER PROFILE 009 EROSION CONTROL PLAN Sc DETAIIS 010 STORM SEWER DETAILS DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DOUGLAS W. WIERSIG, P.E. DATE: RECOMMENDED: DATE: g REVIEWED: DATE. I I a am lie r ammo MALL 1 FELT r i pirrr ! r J(' Im_l �� 1i T psc000OUMY "•°PSCC OaL6 WO igglitar OiOWN( ML A00MO11 QrL.1. K 1a1) Egr CITY PLAN COMMISSION MT or FORT WORM TEXAN THE KATIE VAUewv IF RECOR000W1NN NINETY (MI am AFTER DATE OP AV%tlNu w I Apv,°•d D•: Oy mr LOT1 IDM• laal w DOOR MO InnR C 1E MIA nM oar I"aL..l•-IR R 30 cabs at moat ea ow w. sY A[lal Fla. alaa eat— MAK21 a mar 1w ois. u4 �sw•11,ra11� LOT 1E ir F try" + wt.? T, r-rT N wy bott II COUIR Rouse T ,@TREETf II NORTH / 1 �O vm an a ' O . a at ME L. III III Eht—it mai max Meow a IDINT • mile a, WY IL KOOK A /I vitq.a d®0 `it41,'Il ll':Y M1I ON I�rvll '�Pr. •,n � / I I FERGUSON COURT ,.a a. 1� COURT " 11 �OI/1N 1F WEST pa. R M) 111/01SIL I11 .LT. LUT/ER .Rm fOMarrlar—It;-� (.6. RMI oETNLm O w1E Ile ■ tL.Ws AW COURT) MINIS WASS an Q'0 - ��anais�rt apti;' R >'�w wr , .a\ (BON / I2 Y mum. , vain rJ ' ra 6arrteaumnr 1i - D / 17 am s mr mass re•waa vumisilli raver ix71rLin.t=ins•PR, IMO r I aasr >Or fr � l-Y �nr at aarr•r Rt�a�;�r rRR,a r 1LOCK ID IDwr ft] +1.0T13 stir w•-•.•'••••• sea at -- 1111 as Mal 'wr nee.. was (Ma. MM •.:� ni7l va' Ida T��r kµ 1 O[O .Y, a��!p4:71 r I (�ellll/t • icas . s (l�Ol(OY�M,.I�,/�IO�I it t 701s lOf taR �'IOT t* 1T1D1't IOTipal,(ar+T. l irl1'D. PhD RN ISOM M DOQ16Y/ NO /JCL6. DAN tart 0 Ma KM f sex mq '1=VS MO LOT 1. MOM 1 11000111R 10104 411 it KOOK A if LOT 13 F1AT ARM (NU- pea. PC. SO m 8e a mot prim PIM) CONIC W. 81filIPIAR DRIVE MIMSTAMS Has Mae errnasaw Mao air. -J-air- - 1 .a at w . t T_1 .. H... J.af T` a • a. ••I ati '1••T" art-, j r ,..a:-•- ar aMirrrr- Mgrr-rar .rT-.: Ear T�— rr—SJ aT r7-7, tar • a+_ iJ arr Sr' -r J r+- rr Ire rT JaT- 'rT--..J a'r Err-.-rar+- •aT—: a.t I arT^-rw-+- �reZ AWL ��.,P�f�� `r GSM Amy �a�d sea M•q Ma{ a ,i• NS/m► a Wi ?tem rMa it awn Nam aY awl Y r11a, •ar as �Ia via a ad= rwp.Mi•Lao ila aN ~NYEaaMl.a sa rirat r semi mar • Ma r e ar • al Y a met as e e r rw••a Mr r w ar• l..s••rl •a Marna a.•a s --- as it r rtw r•••• iY- •raw Ss AS Y• r Ear r alai.*SS J sapaarratssloam ta:+ ar.•erw-Jraatr airs AMMON eal: alt NO. N-0/1-011$ OMNI Ma r 7®OIdL dIMP MIT OM a ]eta-em1 mRiCll MN MUM 1.1'L11a _ OM Plait Ma 7110 INS NM 03 Tr1.1-7I nc e771W COM=Y1l7iy6 L 121•11, at Miff 1 OF 3 MEAL PLAT LOT 'EI BLOCK A ausaARY gammon as A 1a07R OF 1.0f A, ROOK 1, M MOM 10INN r t !OR •tO106 NMI Ni MOpOm 01 YOKE i-ia1 ME 31 RAF 1-0 O' SIM OMOOY, INC ac 1a001 Meat 0111' OF M SIMS t 7 IMF surer. at NO. SNIT OOelh 700E a4Pacheco Koch ar"""""rrat la 010 ' Gn:W . f0[, K•]NH . Hn,TP'I IIfl a-Ia •i RISM. UMW ala->fM rer •4•0ay*l.ar —!a main 7J.a .we LIMIT TAILS ✓i Ina F".', J rr ra rr.-:.n rr:r'a rrr-Y."fr r-n-a ■rr-t-rar-T'a rar. r'a ar a yr - aarr Orr ra r rr-ra rT': rCr ra f a aiCr'a lirirr . rJar r .-r t nr'.r-a rra.-J-4r r. al ra fT -,&-1 "r-a ✓ rra rrlrrr r-.ra rf'.-A"arra rr ,-rrrnTCffr. rim. : i'arrra rat—cal:IT.-a n Tar ir-r"a r1 . .-a aErr i rT. r.�J acre r'r-.rnTr:'ra T-."ii r-r-a rrr rJ11 rra s..-: JraT'a rrTrat va rT- rrrn .. • J'irra •T :: a rr:a rr-STY: -.-a rr-a rrr-n rr'a T.--JTr r a rT.ra Mara rT -J■Marra rr :.'J RIMY a r-r-rnTrra T.: Jirra rT • •ra THY-Ca•r-a rr--rrr-r-a T.-. ill ciIlf-0-111 rr.. ,-Jar rr-a r1: ara rr::aaw- rra rT--JT rT'. SFral r ant • rJarrra Tr."JT.a ✓ Tr-rjTr t rn, in a rra .-a WTI- a r n-lrr'a IT. r.rJT rra rr Jr"ra rT_r J .r'.'ra rr .: Mora T. . alums r JTrra rrJarrail rT• -r • JT r lav a rr asr T al rrra rr-.Jar• • a r'r'.rrrn rra rT • -JTrat r T,ra4Aga flit T-rnr- T:.7a rr-rJ rrrep rr;r Jlrra Tr J'l r"ra rrT rn rra rT-.-.rar*'a LalrliLr raarr rrr: : 1rr-77.11W :. ••r. .a/S r' rr-.r.r TT ::•T. Trra'- r'r-.-JTrr- fr. i't'T- rrr-ranT •r-r.:J ar rr-r".. - rr .Th7s ' rr-.-Jrrr- rr: rJ__r' ra"r- rT-FJrar'r' R -: J z r rr.::Jair rT-,.-4r.. TrTIr n ✓ J inn, r.-.7J ra'.T r.-.9g r" rT-.Thr r rr :ad -, Er: ad rr. T• -r'i ST T- li rr .. rr•' rr-..-J-><r rr:.."no r- rJr- -1- • -r_rar-r .rlr- rT.-r: sr Parr' •y • - .1r- - J"r ✓ s rrrT` rrs rr-: J'MaT •- 54 T.r, aMru- rr- rr T- rrr-r r'i'r- F r-.-rJ'11rr ; rr-.-�J r'r rrnTrr rrrr ..- Zr rr r rr�'rT rrr .-r J"It 1 J a'r' rr":Ji• r'r I- a"rra T Ia-r rrrr raTr rrrrrrrr Tr�J'lr'r Pr .:Jrtr rr-.r a arr- ✓ �TJ' ri j- r' rrra-._nor rr-.^JET rr-.TJ'ar Mel T- rr-.TJ arT' T.'.TJ"- rr r rp -' fT.-.r[rr' NON CITY PLAN COMMIYRION CITY OF FORT VORTIL MAR 700 PtAt IS VAM0ONLY i? PC0000CD RAIIN PINUP I001[PVC AMR DATA OP APPROVAL ��•C / OO NA aF>4IRA 10 rOT 4,6 FLEIWWF" a r11r COURT /''*.I�II1 Ora ttr 1rA Widilktaffi r COURT 0 IOr 1R AtO(1 •w (Olt O. PR NO L. Lora b ■tom IKOCK IIO101 CO (CAL A1D`A R 11e LOT 13 Ir nr —T We BOLf II RQUSGN COURT STREET 11 NORTH lYY ralw war Wwn [MOW MIS n It IS) •�= MOM US Dian 12415 KOOK A 11�y//� MIMIC •Il MIMI flee �r0rraar,rr r maw le NE PP -rni Pr. Prj FEROUSON COURT Vail MO 7CrIRPar/i1 tn1� >w -Maria pat r6 1rn- Mar MIL SWIM ML r ra• IONS vaat (rv.-n Tar a inn // AMII ��// rLGI G' , / WEST /� �/ .COURT I� "" ®L�p[_ _ Ia>•-la R }O fa. i.i 01MOYw Y/arwir Ns..NNN \ s .-1.`= w I I .LT. LUT/ERJ r 1 /YE wM CO ar t aim laY KM 44,14.4.4.41 5Ih OMEN q FL II r MOM yam In it H MA ,' `S VT� ilia 111 ��a hi nit. = JIII s\IIII r s K� r w jar ilm Ilia. ill�m''l r tor ITOT �ar s l ir Ian fltl~m i a r art is rrrr awes _._in_rrr r -- IM s r rrrr•1�.r/R�.r�rrrrr R ISAMR/Am r{ ice/ . i,.naaMO S-1 r. MS: rr rr% a ISMS OJaa r aa,J NS la Ike -rl• rl�yso r lb1ra Isameterd rrr —s •M•m• . asa at rri MS Imo ara re arr.ri Arm, Mr Mr W 1aa rra, Ito tat ralaN Wows 0✓r rlcoo lwaled, r Ind bride Is art Sal Nora memo is r•r /,�.r� Oar- ~am ar SOS r a a•r r lase Om a ye J P�rr'`r0 ra�i .�rri -w�Jrr rJ+r rr^r nw ION IQnE N aOQ1OPraI /JZZc . a.r r ew • NIr� OIL ■ �•rrt• CORM Q pal Capri. rrrolT aminalma —a to FPY.r it ur -- snr Uirr Ir --Orr meta. In N 1 RI 11 it lrr•Irrllrr tra•Stfw_vm r I/ ^` `R r MIIILMar // / A vex_ // _ na wwr / fir / // BLOCK of i RIM art OF FORT UM r0 a- -O r icaz 0104 OM A M. IMO 1LOOCa LOT 13 CRY OF FCR IM 11 011. OIq Pr ma) / / 8771 A VOILE Qm Off -?-St ®{lrl r 1®JO rW IaaCO >BNNK A901II011 RIF. Olt 100. FIF011-0M OWN wn__ WRIT MINIMAL raraM mar dean,711172-0II OMB C 101-05- CalOILT 211110911 OM ROME PLC Mr RIO M 7007 07-40-700 W111LT barb L a r tm m OMEILL LULL IN FM TARRANT COUNTY MAPSCO➢OLLOfl IOP ONCOR cAmlarr (BT THIS PLAT) 4 Oar 2W2 lIWAL MAT LOT IRI BLOCK A SEIWIARY ®p A TIMM SO01Rr�AMMMON. eat 1. M M011201 TO Ile aw OF FORT Ni VOID I2 VOLUOL 315`-121, WM 31 MCI IIICONN1 OF vain COIMIY. 76HK NO 10.001 mac our OF INE MIMI W. WNW 14111025 SWF= M. 1045. MINIM mum. TOM Pacheco Koch rrr r' t "A0L mot: - -nIt lit mesa. u-vSWw rr., MIAOW sr fart w I1r 10040. i% aRRI J ar lj R.q ISM tigniArnamo MOW At Sat 411•21•1•1 Ialisirtlimwaii In M. WM ..M rasa ••a yn 00e1Ped sem 7O11100 JMIWI6 § '0Y01 no J ANA A$WS JNOS it NYw1Y A iLL t1 NO SA 1W'tt ON R VIAL AIIYOD MAN 6 a SOIO= JYY p It OIA VA AC 3IY11011 N COMO= N 34 MOM 'NOON and A AUD GI MOW MI 7001YJ0ItOMill YOWN V =I I AVVIIIINCil� LYIM Ins t tO t Jae Y '11011 lalaaII1LL �0:I4D® LOW XLALI EX MS IDYaaaaaa MU 0 I® MOON Aar NMIFICIVIICX t 10110-1XML XL alit aLM1 011 Aa•ar'117aaaMa IMllla CI nw 8001"L ,OMDMEOW 0 Y 310011111.708.1 ladaeadoommaloalemeda a Mewled. mappo de paw men Pa up dam iimoreel maimed al Pallaid uolidiolem•4 T Woo, Ware womminam ma ammo eau me poem Nampa mooq mooed, Iowa weNoNlo wN.1J'x.w n �aad JO ID amid Y/9 tznvj ►n•0a•1100 rw'�is* Y•�I•• rya SOWN wralrN •a.w�wr..a.•r.a, �I s• • nFens a • . •••••• rya± la••In • ••• AIN WI Mr�lr•.r a•p rem •r as la • w1r•r• • flaw• Inn Yea len rAI M •..1.IS 10Winn ya• tires - •a,•�w.r Via•• +ranal le r OM.* •* —M-- lr w w► a�•••men • ■ �r 1• al M w w IS Sal aai ••w r•nnr w4 Wane war gal e a-rr♦Jr� ~r ISM aawa4si• NMI — ar AN MARINrl./••OIi war —I•► rya salsa Sara MwN rya♦• o•• ��Oda go ammo as ISwwrw�•rw ••i�•r Ilaiwi r wM w •r•iniiriwi•-. aww.ww ass r ••••••iarl..••PYara . ."..:rw�.."•. sIlI-wawar`•:'.i.'r`/.."•nrwr"..•"�..a?r'.r'sl•"'yawa5 Yuan ttY ♦M•ama a Cana Ha mL „1 1 O.' w 1an lNallINI1O nv a•r s••aasla ►w •••=1.1 sans railr•w Mt/ ara• 1•M •was amen wear Mr MPS as NOS .1wra ono r ary{A. a w sI tans. 9r aN r an s wen r aw Oaf •IS AlalanI ALL GP Me* /Mr .r wsayaar• 1•I •r a w arras •M.a.an Sn♦eara lSw••FN •rwMMIPass• MM•••M.rr•raaaf&Mr SINS ea/ aSp♦wlaaa••lya all MINN • rya NM •a••tr Mrs w I yaw war Ml•••aIS rnala•M•LL!a•ya wai•. wawP•aw• 1r rasa aawn• raw 4P/.f.41A r♦ar�al o wIM•• •Fr• • • la Sala la•n ar rrr •Per la rya nrr•rrr♦amara % elm me art •Ft . r •rSOLO amp • w Sass a•r•r yaw M w ••l as • a r n Jaa aM•M ! n 1 PFN • • w aw a M•••. Mn Nagai w w r anal. a w elan aISF. nag n wa asps w•rNa•w r•1I•I••••1• an so Winn M aaa• rag • eaara.aaF•rLN•a••• OP Sya•FH•• wawlMr• alara••nna raw Sam MIS la Mean Meal!I•a-q •• w ea a ar•• SINS a a•sM wan • am wISMaSar•Nar•aIna INC •awrayawn erria wnowwrw 1r11•• IS r -Jr M ON•M/.�••INFO •P•a• 1•••••• r•rr a a.•• ••}• • ♦Sala MISt lava Nwx/ �•• /set • • w Imp ya e•eras a manna wasaw •••a••ISa•SpanaaMs!/a•I•.F•t••w MN• le• Ma rasa SONS aat=r -IU• nsan nr ya••r►wlalrw4'�Ma nawr►wryarwMr w a aw rsemno all !/a w••••t•• w Ma SEM • flog ale es as•• lrwar IInen••••a r is r•e+•• Meer•••• a• s•yaFr rya IMII •anna��w••a••••••!M!n r ��� yaw •FFya•a+r ra•as^ w►71nya••��w•es yaw �:rw *wag .••. n♦wla•a••wyayaa w sr:— se sa a�aw e•Ia. PIS S n.Iw MaaLL l S w *We •• w a aaya•• • na Pas M w■ w••aw •Mr.a n••♦nna•a•l is w net •• w al a amp • Wei yam a alwaa waFcr ••• a• as P•.Jnna ya net •wan - arras•a••••e MO a• -a r Spa man l S w .*e ••w awn ya••• I.•• Sr r WPM a MSCr r•M•w Ma as rear apm w•raver ISr M•wrrd•w f/wwaa•wasap sa al -- e-.. . w •aa••aa• . n In n r•w•.-.- -•• w .W., ai �a•••WIZ • arm IIF•n♦aa as % l pm ya.ra••• w sa r• • w non AO war aw ••law•a.nnalMwLLsrreat••wallwar•1!Sasa•wasleaaw ••••M• MISS Sr rs.•4•• w M•1a•nna. 1.M•as a ••••M raw Saes ail S S•r a S.4•• w IMF" rya • eras a was r NI an ••/•r aIS •••r•as •10w• rM asayaw. VIM TM" a wa "Oaaw ••la•MISS aLaaaass !I.lw•.FN••w w/•.w• nSr M••Spa M wwM••1• ••• Me•••aa r as••alr•I w wawa r Mr tar aw Spa M•/FaF ass —y•a Ras. r1 wasl•r AA—••••M��al I � map a wnrawrrrnn•n.raaaaInom •rt Spa sin • was rya �+i= ••Irasa•~srser.aa.";:P►..•..:;...•Ia Cana •aya•CZ MS alga /y f�•�.•1•t atlas w wwl.wrrwnn- a•alswya• �,-. Ia•swan Ira as Fr aa•Mr Mar l.•Ilasr MnlNr•San' IPI Ara a4 •waMw DREW BOLT w c9 0 z BOYCE BOLT FLINT r w 0 Q w N z 0 0 0 0 z w In z 5 0 Southwestern Baptist Theological Seminary DREW 2 1- BOLT CO r z Rosemont Park SEMINARY CO BROAIDUS BEDDELL , I I PROJECT LOCATION �-- 1 TARRANT COUNTY MAPSCO 90L & 90G VICINITY MAP aPacheco och 8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS, TX 75206 972.235.3031 TX REG. ENGINEERING FIRM F-469 DALLAS . FORT WORTH • HOUSTON TX REG. SURVEYING FIRM LS-100080-00 DRAWN BY 'CHECKED SCALE DATE RJK BYI NTS I 05/11/2012 I 3139-11.046 JOB NUMBER RJK SOUTHWESTERN BAPTIST THEOLOGICAL SEMINARY LOT 1R, BLOCK A LOCATED IN THE CITY OF FORT WORTH, TEXAS TARRANT COUNTY, TEXAS 0 50 100 200 thU SCALE IN FEET GRAPHIC T OP PROPOSED STORM MANHOLE BEGIN 24" STORM DRAIN CONNECT TO EX. STORM MANHOLE 1110 5ij Pacheco Koch DALLAS . FORT WORTH . HOUSTON END PROP. 24' STORM DRAIN. CONNECT TO EX. STORM MANHOLE END STORM lasail DRAIN REMOVAL 1 J.T. LUTHER DR. -st ccmm 411)» O cn 1- _ , i N Z LL Q a-- 00 to _ LOT 1R, BLOCK A LOT 1, BLOCK A SEMINARY ADDITION -_ (VOL 388-129, PAGE 31) _ 40.548 ACRES (1,766,273 SF) (ZONED: PD (885)) REMOVE 555 LF EX. - o 24" STORM DRAIN REMOVE EX STORM MANHOLE I BEGIN STORM DRAIN REMOVAL W. SEMINARY DRIVE LOT 12R LOT 13R 1 TOM BUTLER ADDITION (CAB. B SLIDE 735) 8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS, TX 75206 972.235.3031 TX REG. ENGINEERING FIRM F-469 TX REG. SURVEYING FIRM LS-100080-00 • ENSIIP LOT LOT 10I LOT 9 LOT 8 TOM BUTLER ADDITION (CAB. 388-K, SLIDE 37) f EWU O O oir wVe SOUTHWESTERN BAPTIST THEOLOGICAL SEMINARY LOT 1R, BLOCK DRAWN BY CHECKED BY RJK RJK SCALE NTS DATE I 05/11/2012 JOB NUMBER 3139-11.046 LOCATED IN THE CITY OF FORT WORTH, TEXAS TARRANT COUNTY, TEXAS 2230 Joe Field Dallas, TX 75229 Phone 972-243-5455 Fax 972-243-5227 www.c-conservices.com Underground Utility ( nct ructt< U REVISION 2 PROPOSAL MANHATTAN CONSTRUCTION SWBTS CFA PLANS PLAN DATE: FORT WORTH ESTIMATOR: COREY CAUGHRON NO ITEM DESCRIPTION STORM DRAINAGE 1 24" CL-III RCP 2 CONNECT TO EXISTING MANHOLE 3 4' STORM MANHOLE 4 REMOVE 24" RCP 5 REMOVE EXISTING MANHOLE 6 EROSION CONTROL 7 TRENCH SAFETY SUBTOTAL STORM DRAINAGE UNIT QTY COST LF EA EA LF EA LS LF TOTAL BID (includes all items listed above this line) ALTERNATE ADD LAYOUT HAUL OFF EXCESS (DIRT SITE) 540 $70.00 1 $2,765.00 2 $6,318.00 555 $18.00 1 $1,505.00 1 $7,280.00 540 $1.00 RECEIVED ADDENDUM LF 540 $1.10 TCY 504 $5.25 24-May-12 TOTAL $37,800.00 $2,765.00 $12,636.00 $9,990.00 $1,505.00 $7,280.00 $540.00 $72,516.00 NONE $594.00 $2,646.00 1 C-Con Services, Inc. - 4607 SWBTS CFA PLANS REV. 2.xls Page 1 of 2 5/24/2012 - 3:22 PM INCLUSION / EXCLUSIONS JOB: SWBTS CFA PLANS INCLUDED Permit Fees NO Inspection Fees NO Tap Fees NO Impact Fees NO All Other City Fees - NO Construction Staking ADD Density Testing NO Air Test, Mandrel, and TV Inspect Sanitary Sewer NO P ressure and Bacteria Test Water Line NO TV Inspect Storm Drain NO Excess to be left adjacent to trench YES P lace Excess Excavation On Site NO Haul Off of Excess Excavation ADD Inlet Throat - NO Roof Drain to 5' of building NO Roof Drain Stub up 1' above flowline of main NO Trench Dewatering NO Roof Drain Downspout Connection NO FDC NO Maintenance Bonds NO P erformance and Payment to Bond _ NO Erosion Control While On Site YES Barricades For Our Work YES Topsoil or Top soiling NO Storm Water Pollution Prevention Plan NO Meters greater than 2" NO Meters 2" and smaller - NO Adjust or Relocate Existing Utilities NO N OTES: PROPOSAL BASED ON CIVIL PLANS ONLY. EXCLUDES ANY WORK SHOWN ON OTHER DOCUMENTS ADD $3500 FOR EACH ADDITIONAL MOBILIZATION. ERSOSION CONTROL INCLUDES TRIANGULAR SEDIMENT FILTER DIKE (600LF) AND INLET PROTECTION C-Con Services, Inc. - 4607 SWBTS CFA PLANS REV. 2.xls Page 2 of 2 5/24/2012 - 3:22 PM