HomeMy WebLinkAboutContract 43455 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. q3u1
viC
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: FJM Properties, LP
Address, State, Zip Code: 1223 N. Rock Road - Bldg. H-200, Wichita, KS 67206
Phone, E-Mail: (316) 636-2100 / johnny@marchoil.com
Authorized Signatory/Title: Johnny Stevens, President
Project Name: Weatherby Station
Project Location: SW of intersection of Granbuiy Rd. & Dirks Rd.
Plat Case No.: FS-012-039 Plat Name: Weatherby Farms Addition
Mapsco: 102 D, H
CFA: 2012-053 DOE: 6878
To be completed by staff
Received by:
Council District: 6 City Project No: 01947
Date:
JFFICIAI, : ECORD
07-,0-12 P^t:zt IN i @TYSECRFTARY
IVORTHI9 TX
_
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) X ,
Sewer (A-1) _X , Paving (B) X ,Storm Drain (B-1) , Street Lights &
Signs (C)
Combined CFA final Sept 12, 2008 2
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
Combined CFA final Sept 12, 2008 4
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries. death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers. servants. or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries. death or damages are caused. in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period the developer
may request that the CFA be extended for one year If the community
facilities are not completed within such extension period, there will be no
Combined CFA final Sept 12, 2008 6
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
,Project Name: Weatherby Station
CFA No.: 2012-053 DOE No.: 6878
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information!.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 208,882.00
$
$
178,057.00
30,825.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total $ 3,379.00
$ 3,379.00
$
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$ 212,261.00
$
$
$
$
$
$
$
$
$
4,177.64
4,177.64
8,355.28
135.16
67.58
202.74
8,558.02
Amount
212.261.00
212,261.00
261,102.50
Choice
(ck one)
4,223.75
265,326.25
v
Combined CFA final Sept 12, 2008 8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said,Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this , day of
20/
CITY OF FORT WORTH - Recommended by:
Water Department
ALL
Wendy Chi- abulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas �:tlack
Assistant City Attorney
M&C No. il/A--
Date:
ATTEST:
Mary J. Kayse
City Secretary
ATTEST:
Signature
(Print) Name:
Transportation & Public Works Department
DouglasWiersig, P.E.
Director
Approved by City Manager's Office
-74-1444444Cisears.
Fernando Costa
Assistant City Manager
,ob�na�ati,�
4,44,5),Ro Qzkt
0.00
d
p g
O
00
itc-AmerA/ L. //iO VAS
%A A
,•1?).
%Zt
g00
4 0
o°
ow so
4.,°-vVyv- ,S 00000n
eta11A'i1i1.U4b
FJM Properties, LP
By its General Partner
FJM General, Inc.
v
Signature
Print Name: Johnny W. Stevens
Title: President
OFFICIAL RECORD
CITY SECRETARY
FT. WORTK, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Dram Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
rs
/1
(Remainder of Page Intentionally Left Blank)
Combined CFA final Sept 12, 2008 10
Mira Visia
Vista Ridge
Addil"tr':
Dirks Rd
0
R—
r •1
2000'
2000'
GRAPHIC SCALE
3
0
.3
03
Ole
t)
vriff C i&n C
Critilyard
4
1� nits' 'Isla
T ,�
Scone:
IP
Quail Ridge
Estates
tr
ti
1
•
Estates Phase II
PROJECT
-iQ.
,
•
•
F ta .
• Millen 8erid
Estates
Park
PaI sad.:ies
1
1
C..rthrribus frcs
Oakmont rit RI
1
6.
leiVedgwood
IN Alta n1LE.A Bka d
•
2
c+L
I(I ing r
WEATHERBY STATION
DATE: JULY, 2012
st
'/
l i -Iit ist ; ,h ir" "
r" r
4.�ree �
-utiarg Cy.
44
King sinond
Place
C4en�I
Candle cgre
Ridge West Fiy
0,74.
Meadows cf
•C e ndleridg e
Columbus Trey
OWNER / DEVELOPER:
FJM PROPERTIES, LP
1223 N. ROCK ROAD
BLDG. H-200
WICHITA, KANSAS 67206
PHONE 316-636-2100
FAX: 316-636-2102
Hulenl
Heights
store
fiat e'a dow
.y�til r,r hr R:i.
•
•
•
•
•
•
•
4
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
C� J.'I'. .'•
ENGINEER:
Hill PELOTON
Pill LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
W-1 STA 7+92,08
INSTALL:
1-10' x 10' TEE
2-10' GATE VALVES
8 LF 10" PVC FOR FUTURE USE
F.H.
W-1 STA 7+33.30
INSTALL:
1-10" x 45° BEND
W-1 STA 6+90.88
INSTALL:
1-10" x 45° BEND
W-1 STA 3+65.66
INSTALL:
1-10' x 10" TEE
2- 10" GATE VALVES
W-1 STA 3+60.66
INSTALL:
1- FIRE HYDRANT ASSEMBLY
INSTALL 40 LF OF
WATER LINE BY OTHER
THAN OPEN CUT
SAWCUT, REMOVE , AND REPLACE
100 SF EX. CONCRETE PAVEMENT
0
16" D.I.
8" PVC
t
n:
O .
a
•
0)
;(7
o
< !n
m -I
0
Z
m
PRESSURE PLANE NOTE:
THE EXTENTS OF THE PROJECT SITE IS LOCATED INSIDE OF THE
SOUTH SIDE III PRESSURE PLANE, BASED ON THE PRESURE
PLANE AREAS DESCRIBED IN THE CITY OF FORT WORTH'S DESIGN
CRITERIA FOR WATER PROJECTS. THE SOUTH SIDE III PRESSURE
PLANE IS BETWEEN THE GROUND ELEVATIONS OF 720' AND 860',
AND HAS A STORAGE OVERFLOW ELEVATION OF 990'.
LEGEND
EXISTING PROPOSED
WATER LINE
FIRE HYDRANT
WATER VALVE
SEWER LINE
SEWER MANHOLE
FJM PROPERTIES, L.P.
VOL.15367 PG. 209
D.R.T.C.T.
INSTALL 52 LF STUB OF 10"
WATER & CAP FOR FUTURE USE
tF.H
T
tFH
O •
FUTURE DEVELOPMENT
ROADWAY ALIGNMENT
W-1 STA 0+00
CONNECT TO EX 16" D.I. W.L.
INSTALL:
1-16' x 10' TAPPING SLEEVE AND VALVE
GRANBURY ROAD
C(120' WIDTH R.O.W.)
N
CtH.
F.H.
0o
0
100'
GRAPHIC SCALE
EXHIBIT "A" - WATER
(SHEET 1 OF 3)
WEATHERBY STATION
DATE: JULY, 2012
OWNER / DEVELOPER•
FJM PROPERTIES LP
1223 N. ROCK ROAD
BLDG. H-200
WICHITA, KANSAS 67206
PHONE: 316-636-2100
FAX: 316-636-2102
ENGINEER*
li!II PE LOTO N
MO LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
OL. 7511, PG. 1519
D.R.T.C.T.
SEAM GAS SERVICES, LLC
J.VV AGREEMENT
ERK S DOCUMENT NO.
058615, D.R.T C.T
W-1 STA 16+59.94
W-2 STA 15+50 08
END WATER LINE
INSTALL:
1-10" x 10' TEE
2-10" GATE VALVES
FJM PROPERTIES, L.P.
VOL.15367, PG. 209
LOT 1, BLOCK 1
WEATHERBY FARMS ADDITION
2-1
mn
m=
-I r
m
PROP. 10" W.L.
lot®
WATER LINE
PRESSURE PLANE NOTE:
THE EXTENTS OF THE PROJECT SITE IS LOCATED INSIDE OF THE
SOUTH SIDE III PRESSURE PLANE, BASED ON THE PRESURE
PLANE AREAS DESCRIBED IN THE CITY OF FORT WORTH'S DESIGN
CRITERIA FOR WATER PROJECTS. THE SOUTH SIDE III PRESSURE
PLANE IS BETWEEN THE GROUND ELEVATIONS OF 720' AND 860',
AND HAS A STORAGE OVERFLOW ELEVATION OF 990'.
I
PROP. 10" W.L.
(SEE SHEET 3)
WATER LINE
FIRE HYDRANT
LEGEND
EXISTING PROPOSED
F.H.
WATER VALVE T
SEWER LINE
SEWER MANHOLE 0
FJM PROPERTIES, L.P.
VOL.15367, PG. 209
D.R.T.C.T.
W-1 STA 10+77.00
INSTALL:
1-10" x 45° BEND
Tt FH
T
•
EXHIBIT "A" WATER
0 100' (SHEET 2 OF 3)
WEATHERBY STATION
GRAPHIC SCALE DATE: JULY. 2012
OWNER / DEVELOPER'
FJM PROPERTIES LP
1223 N. ROCK ROAD
BLDG. H-200
WICHITA, KANSAS 67206
PHONE: 316-636-2100
FAX: 316-636-2102
ENGINEER'
P E LOTO N
MO LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
1
Ex`ONCREr SCOAsF3
=L. Mr
FUTURE 24" W L
Of TRPCT N0.2
REMPINP M 66 PP g 4'
VOIUM p.R. G'T
CONSTRUOr otv esMr
R• PNCH. GE 2g6
p1RK-ssp61P
o .9
W-2 STA 4+43.94
INSTALL.
1-10"GATE VALVE
W-2 STA 9+45.00
INSTALL:
1-10" x 45° BEND
W-2 STA 9+77 62
INSTALL:
1-10" x 45° BEND
W-2 STA 15+50.08 =
W-1 STA 16+59 94
INSTALL:
1-10"x10'TEE
2-10" GATE VALVES
W-2 STA 15+55.16
END WATER LINE
INSTALL.
1-10" CAP FOR FUTURE
CONNECTION
/C
LOTY STAT ON�9399`ON
GWPc NET PT
P•R' W-2 STA 0+00
CONNECT TO
INSTALL:
1-24 x10" TAPPING SLEEVE
1-10' GATE VALVE
DRivNA
ESMr/
/ / ooNSTRUor/O
(1
N ESMr
OURRS Poo EA �g90N
GR�`cask pµT G•
EX. 24" CONC. W.L.
INSTALL 40 LF OF
WATER LINE BY OTHER
BAN OPEN CUT
R1/40.40
FUTURE DEVELOPMENT
ROADWAY ALIGNMENT
15'PERMANENT WATER
FACILITY EASEMENT
15' PERMANENT WATER
FACILITY EASEMENT
M PROP550 `PPGEZ
•
LEGEND
WATER LINE
FIRE HYDRANT
WATER VALVE
SEWER LINE
SEWER MANHOLE
EXISTING PROPOSED
tFH.
T
t'"
O •
PRESSURE PLANE NOTE:
THE EXTENTS OF THE PROJECT SITE IS LOCATED INSIDE OF THE
SOUTH SIDE III PRESSURE PLANE, BASED ON THE PRESURE
PLANE AREAS DESCRIBED IN THE CITY OF FORT WORTH'S DESIGN
CRITERIA FOR WATER PROJECTS. THE SOUTH SIDE III PRESSURE
PLANE IS BETWEEN THE GROUND ELEVATIONS OF 720' AND 860',
AND HAS A STORAGE OVERFLOW ELEVATION OF 990'.
0
NORTH
EXHIBIT "A" - WATER
200' (SHEET 3 OF 3)
WEATHERBY STATION
1 GRAPHIC SCALE
DATE: JULY. 2012
OWNER / DEVELOPER*
FJM PROPERTIES, LP
1223 N. ROCK ROAD
BLDG. H-200
WICHITA, KANSAS 67206
PHONE: 316-636-2100
FAX: 316-636-2102
ENGINEER:
IPJI PELOTON
VOI LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
LEGEND
WATER LINE
FIRE HYDRANT
WATER VALVE
SEWER LINE
SEWER MANHOLE
EXISTING PROPOSED
` F,H.
T
O
tFH
•
SS-1 STA 0+00.00
CONNECT TO EXIST MH
EX. 8' S.S.
STUB
SAWCUT, REMOVE,
AND REPLACE
EX. CONCRETE
PAVEMENT
UdON
0
INSTALL 22 LF OF
8' PVC BY OTHER
THAN OPEN CUT
EXISTING
FIRE HYDRANT
40'
GRAPHIC SCALE
-�-- PR
;tray"
e •IF Arfl.wifor
P. 8" S.S.
EXHIBIT "A-1" - SANITARY SEWER
WEATHERBY STATION
DATE: JULY, 2012
FJM PROPERTIES, L.P.
VOL.15367 PG. 209
D.R.T.C.T.
FUTURE PRIVATE
DRIVE
0)
can H
co0co
�Uw
15' PRIVATE
SEWER ESMT
FUTURE PRIVATE
FORCE MAIN
STA 1+13.89
CONST STD 4' DIA MH
\\_. RIM = 804 44
INSTALL 30 LF OF
8' PVC BY OTHER
THAN OPEN CUT
•
OWNER / DEVELOPER*
FJM PROPERTIES LP
1223 N. ROCK ROAD
BLDG. H-200
WICHITA, KANSAS 67206
PHONE: 316-636-2100
FAX: 316-636-2102
FJM PROPERTIES, L.P.
VOL.15367, PG. 209,
D.R.T.C.T.
ENGINEER*
li!II PELOTON
IBM LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
CITY OF FORT WORTH
TEMPORARY CONSTRUCTION EASEMENT
COUNTY CLERK'S DOCUMENT N .D 9075491 Ly)
D.R,T. .T i r
r
O
I �
' 61Y END EAWCUT AND REMOVAL Lu
CENTERLINE
OF EXISTING PAVEMEI T.
BEGIN PROPOSED CONCRETE
DRIVE APPROACH.
MATCH EXISTING GRADES.
N 6918477.0061
E 2304339.7090 I
r
# D CONCRETE
DRIVE APPROACH {
zo N 6918459.3251 .
E 2304329.4329
` 0'R
-40 '
+ < ■
► 11.45'
uu 0
�!uj
it :,1 • W s
lk
co PROPOSED PRIVATE DRIVE
i ,
Lu LU
CD( ,
(D 2 Lu
'loop p U)
i>>
: '
r
END CONCRETE
�••�
DRIVE AP..1♦OAD# I r
6918420.4615
E 2301329.8521
LEGEND
END SAWCUT AND REMOVAL
OF EXISTING PAVEMENT. i �. ..,. ��.� PROPOSED 6"CONCRETE
BEGIN PROPOSED CONCRETE � ,n 4: PAVEMENT
DRIVE APPROACH.
MATCH EXISTING GRADES.
N 6918403.0059 c SAWCUT EXISTING
E 2304340.4615 CONCRETE PAVEMENT
i
EXISTING CONCRETE
w + PAVEMENT
} CONSTRUCTION NOTES
{
FULL DEPTH SAWCUT AND REMOVE EXISTING CONCRETE CURB
FJI I PROPERTIES,7'�E�, L.P. AND P)WEMENr. BAWCUT HALL BE AMINIMUIM OF i8 INTO THE
STREET FROM THE BACK OF CURB.
END CONCRETE PAVING SECTION AT THE PROPERTY LINE FOR
CONNECTION TO FUTURE PRIVATE DRIVE.
z
CONSTRUCT W THICK REDWOOD EXPANSION,JOINT THE FULL
_ DEPTH AND WIDTH OF CONCRETE. #4 SLICK DOWELS, 4"IN
CITY OF FORT WORTH � LENGTH.SHALL BE INSTALLED 4*ON CENTER AND SHALL BE
TEMPORAR Y'CONSTRUCTION EASEMENT � PLACED THROUGH THE CENTER OF THE REDWDOO E}�PAN ICN {
COUNTY CLERK'S DOCUMENT Nor D200�5491 JOINT ACRD THE B. WIDTH THE APPROACH THREE
DOWEL BARS ARE TO BE PLACED IN THE REDWOOD JOINTS AT
D.F .T. .T THE SIOEWALK SECTION O'FAPPROACH.
4
INSTALL#4 BARS,1O"IN LENGTH,DRILLED A MINIMUM OF 6"DEEP
INTO THE EXISTING STREET AND SECURED WITH EPDXY-
PROPOSED CONCRETE SECTION(3500 PSI),REINF0RCED WITH
4 BARS AT 12"O.C,E.W.OVER COMPACTED SUBGRADE.
. - - -- - - ----- -.-. - - ..... -..... ....... .....--.... - r
•. - OWNER DEVELOPER: ENGINEER:
:
EXH(BIT "B"- PAVING IMPROVEMENTS 1x!11 PELOTON '
0 20' F PROPERTIES, L LANG SOLUT
J0140
1223 N.ROCK ROAO
BLDG,
?5T 1RIlE EATH E R S A ION WICHI1 6720 SUITE 8
PHONE:316-636-2100 D E L LE F,TX 78244
RAPHIC SCALE DATE.JULY 2012 FAX-318-03642102 PHONE,817-662-3350
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185 KELLER TX 76244(817) 562-3350
CFA ESTIMATE FOR:
WEATHERBY STATION
7/18/2012
EXHIBIT A - WATER IMPROVEMENTS
ITEM # CITY BID # DESCRIPTION
1 00588 10" PVC Water Line
2 00618 8" PVC Water Line
3 00715 10" Gate Valve & Box
4 00749 8" Gate Valve & Box
5 00626 24"x10" Tapping Sleeve w/ 10" Gate Valve
6 00623 16"x10" Tapping Sleeve w/ 10" Gate Valve
7 00546 Fire Hydrant assembly (includes 6" GV)
8 I 00568 Pipe Fittings
9 I 00579 24" Pipe Casing w/Pressure Grout
10 I 00372 'Trench Safety
11 I 00457 !Remove Ex. Concrete Pavement
12 I 01267 !Install Concrete Pavement
TOTAL WATER
UNIT
LF
LF I
EA I
EA
EA
EA
EA
TON
LF I
LF I
SY I
SY I
QTY
3,280
0
9
0
1
1
1
3.28
70
3,210
12
12
UNIT PRICE
35.00 $
30.00 $
1,306.00 $
935.00 $
5,000.00 $
3,185.00 $
2,360.00 I $
3,600.00 I $
400.00 I $
1.00I$
6.00 I $
40.00 I $
TOTAL
114,800.00
11,754.00
5,000.00
3,185.00
2,360.00
11,808.00
28,000.00
3,210.00
72.00
480.00
180,669.00 •
CFA-Weatherby Station.xls, cfa 1 of 3
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185 KELLER, TX 76244(817) 562-3350
CFA ESTIMATE FOR:
WEATHERBY STATION
7/18/2012
EXHIBIT A-1- SANITARY SEWER IMPROVEMENTS
ITEM # CITY BID #
1
2
3
4
5
6
7
8
9
10
11 00181 Traffic Control for Utilities
TOTAL SANITARY SEWER
00350
00245
00213
00214
00198
00457
01267
00372
00201
00217
DESCRIPTION
8' Sewer Pipe, SDR 26
8' Sewer Pipe w/ 16" Casing Pipe (Other than Open Cut)
Std 4' Dia Manhole (Up to 6' Depth)
Std 4' Dia Manhole Added Depth (Over 6' Depth)
Install Concrete MH Collar
Remove Ex. Concrete Pavement
Install Concrete Pavement
Trench Safety
Post Construction Cleaning & TV Inspection
Vacuum Test - Manhole
UNIT
LF
LF
EA
VF
EA
SY
SY
LF
LF
EA
LF
QTY
62
52
1
3
1
10
10I
62
114 1
11
775 I
UNIT PRICE
$45.00 $
$252.00 $
$2,340.00 $
$148.00 $
$39.00 $
$6.00 $
$40.00 $
$1.00 I $
$2.00 1 $
$104.00 I $
$15.00 I $
TOTAL
2,790.00
13,104 00
2,340.00
444.00
39.00
60.00
400.00
62.00
228.00
104.00
11,625.00
31,196.00
CFA-Weatherby Station.xls, cfa 2 of 3
PELOTON LAND SOLUTIONS, LLC
5751 KROGER DR, SUITE 185 KELLER, TX 76244(817) 562-3350
CFA ESTIMATE FOR:
WEATHERBY STATION
7/18/2012
EXHIBIT B- PAVING IMPROVEMENTS
IITEM # CITY BID # DESCRIPTION
I 1 00457 Remove Ex Concrete Pavement
I 2 00842 6" Concrete Curb
I 3 00404 6" Concrete Driveway
I 4 00532 ADA Wheelchair Ramp
[TOTAL PAVING
UNIT
SY
LF
SF
SF
QTY
13
44
585
48
UNIT PRICE
$6.00 $
$2.00 $
$5.00 $
$6.00 $
TOTAL
78.00
88.00
2,925.00
288.00
3,379.00
CFA-Weatherby Station.xls, cfa 3 of 3