Loading...
HomeMy WebLinkAboutContract 43464-A1 (2)AMENDMENT No 1 cry SECRETARY COM:DUCT 4".(‘-ko4 CITY SECRETARY CONTRACT No. 43464 WHEREAS, the City of Fort Worth (CITY) and. Neel Schaffer, Inc, (ENGIN FIE,R) made and entered into City Secretary Contract No. 43464, (the CONTRACT) which was authorized by M&C C-25737 on the 17th day of July/ 2012 in the amount of $90, 927. 00; and_ W--WEt E S, the CONTRACT involves enc-ineerinc services for the followinc- Project: Fleetwood Ground. Storage Tank Rehabilitation Project; and WHEREAS, it has become necessary to execute Amendment No. ___ to the CONTRACT to include an increased scope of work and revised_ fee. NOW THEREFORE, CITY and ENGINKHR, actinc herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended_ to include the additional engineering services specified in a proposal dated October 29, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to De performed by Engineer totals $8, 000 . 00 . 2. Article II of the CONTRACT is amended to Provide for an increase in the fee to be Paid to Engineer for all work and services Performed under the Contract, as amended, so that the total fee Paid by the City for all work and services shall be an amount of $ 98, 927. 00. amend 3. All other provisions of the Contract, which are not ex_cressly ec_ herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 2 OFFICIAI. RECORD (W1` SECRETARY FT. WORTJP. TX ar TIVED NOV i 5 10 EXECUTED an elow. c: EFFHCTIVH as of the c. APPROVED: City of Fort Worth sa44e4CL Vernando Costa Assistant City Manacer • WAS A3 DATE: APPRO)1AL RECOMMENDED: S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: PAAJIAA IAA AA Dietag-Ffts W :_ _B�a-E-l� � 1 C � e � (t Vt/L {t6c- Assistant City Attorney ATTEST: Mary J. Kay91% City Secretes-y City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 2 ate last written by a signatory, ENGINHER Neel -Schaffer, Inc. oames P. Amick, P.E. F'ngineer Manager DATE: October 31, 2013 Iv&C: Date: NEEL SCHAFFER + Cheatham & Associates October 29, 2013 Mr. Chris Harder, P.E. Engineering Manager Fort Worth Water Department 1511 11 th Avenue Fort Worth, Texas 76102 Reference: Fleetwood Contract Amendment 1 for Additional Services Dear Mr. Harder: Neel -Schaffer, Inc. offers additional Professional Engineering Services for this project. These additional services were required for two reasons. First, due to the need to redesign the roof rafters of the tank during construction (after blasting) when it was discovered that significantly more rafters needed to be replaced than originally planned, and second, to redesign the overflow inlet to accommodate the overflow piping that the contractor installed. These services were discussed as they were needed; primarily during the mid May to mid July timeframe. Neel -Schaffer, Inc. proposes to increase the contract amount by $8,000.00 for these additional services. Based on our records we have spent approximately $8,549.22 for the services. Alt additional services were performed in accordance with the original contract dated August 1, 2012. Summary of Contract Fee Original Contract Amount Proposed Amendment No. 1 Revised Contract Amount $90,927.00 $8,000.00 $98,927.00 If you have any questions or we may be of further service, please call me at 817/870-2422. Sincerely, NEEL-SCHAFFER, INC. James P. Amick, P.E. Engineer Manager 4:\Jobs111190 - Fleetwood\Admin\Contract\Amendment 11Amendment 1 Letter.doc ARLINGTON • DALLAS * FORT WORTH o HOUSTON engineers • planners 9 surveyors • environmental scientists • emergency management 512 Main Street. Suite 416 • Fort Worth, TX 76-102 • phone 81 7-870-2422 • fax 817-87O-2489 • www nee'--schaffer.com