HomeMy WebLinkAboutContract 43363 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: FW Mason Heights, L.P. Address, State, Zip Code: 300 Burnett St., Ste. 150 Fort Worth, TX 76102 Phone, E-Mail: Authorized Signatory/Title: Happy Baggett, Manager Project Name: Mason Heights Paving, Storm Drain & Street Lights Project Location: Masonic Home & School Add'n between Mitchell Blvd. & Wichita St. Plat Case No.: FS-012-004 Plat Name: The Shoppes at Renaissance Square Add'n Mapsco: 78 S, T, X CFA: 2012-019 DOE: 6849 To be completetr f Received by: 06-29-12 A09 : 5 9 IN Council District: 7 1 City Project No: 01862 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX atA NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement (`CFA') as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) , Sewer (A-1) , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such tniuraes. death or damages are caused. in whole or in part, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniurres, death or damages are caused, in whole or in part. by the alleged negligence of the Citv of Fort Worth. its officers. servants. or employees. Further Developer will require its contractors to indemnify, and hold harmless the City for any losses damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Mason Heights Paving, Storm Drain & Street Lights CFA No.: 2012-019 DOE No.: 6849 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 3. Storm Drain 4. Street Lights Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period Developer's Cost 634,048.50 218,541.00 193,021.00 1,045,610.50 1,045,610.50 34,103.58 17, 051.79 7,720.84 58,876.21 58,876.21 Choice Amount (ck one) 1,045,610.50 1,045,610.50 X 1,307, 013.13 1,307,013.13 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this in trument in quadruplicate, at Fort Worth, Texas this (.1 day of . 20 \t . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: ou a W. Black Assistant City Attorney M&C No. / % . Date: ATT OvfarST J. Kayser City Secretary ATTEST: Signature (Print) Name: Transportation & Public Works Department Douglas/yV. Wiersig, P.E. Director Approved by City Manager's Office 5—sines•4 Fernando Costa Assistant City Manager 0;00.-smixtb,_ .69107001114(344 ty- 4 e °0004%/40 so %test% 0 of 4 E*0• . e 0 %��°°�00000�°°0ti4 OPq atklbstITycycogtst. DEVELOPER: FW Mason Heights, L.P. By its General Partner FW Mason Heights Genpar, LLC Print Name: Signature Happy Baggett Title: General Manager FnncIRECORD ITY SEC s'ETA Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate II H AL III (Remainder of Page Intentionally Left Blank) 9 COMMUNITY FACILITIES AGREEMENT for MASON HEIGHTS PAVING & DRAINAGE LOTS 1-4 BLOCK 1 & LOTS 1-4 BLOCK 2 June 1, 2012 Exhibit "B" - Paving Description 1 6' Sidewalk including 2 4' Sidewalk including 3 8" Conc. Pavement 4 18" Saw cut existing pavement 5 HC Ramp 6 6" Lime stabilized Subgrade 7 Roadway Striping / Button 8 4" PVC Sleeve 9 Traffic Control 10 Subgrade Lime for Stabilization 11 Permanent Traffic Warning sign Exhibit "B-1" - Drainage Description 1 39" RCP 2 36" RCP 3 33" RCP 4 5 6 7 8 9 10 30" RCP 24" RCP 21" RCP 10' Curb Inlet 4'x4' Stm. Manhole 5'x5' Stm Manhole 36" Stm. Type "B" Headwall Engineers Unit Public Qty. LF LF SY LF EA SY LS LF LS Ton EA Unit LF LF LF LF LF LF EA EA EA EA 485 5855 12790 186 16 14290 1 1600 1 160.8 4 Unit Cost I Total Public Cost $15.00 $12.00 $32.00 $10.00 $950.00 $4.75 $12,500.00 $15.00 $2, 500.00 $120.00 $1,000.00 Quantity. Unit Cost 50 $85.00 236 $75.00 161 $70.00 148 $60.00 1764 $45.00 378 $42.00 14 $2,000.00 9 $2,000.00 3 $3,000.00 1 $1,200 00 $7,275.00 $70,260 00 $409,280 00 $1,860.00 $15,200 00 $67,877.50 $12,500.00 $24,000.00 $2,500.00 $19,296 00 $4,000.00 $634,048.50 Total Cost $4,250 00 $17,700.00 $11,270 00 $8,880.00 $79,380.00 $15,876.00 $28,000.00 $18,000.00 $9,000.00 $1,200 00 11 39" Stm. Type "B" Headwall 12 Rock Rip -rap 13 Seeding / Matting at Detention Ponds 14 Trench Safety 15 Inlet Protection 16 Construction Entrance 17 Silt Fence Exhibit "C" - Street Lighting Description 1 Street Light - Single Arm (Pole& One Luminaire heads) 2 Street Light - Double Arm (Pole& Two Luminaire heads) 3 Ground pull box w/concrete apron 4 2"PVC Sch.80 w/pull wire 5 Bore under Mitchell Blvd. 6 2/2/2/4 Aluminum Quadruplex 7 Lighting Contactor TOTALS Exhibit "B" -- Paving Exhibit "B-1" -- Drainage Exhibit "C" — Street Lighting I2% Testing Fee 14% Inspection Fee EA SF S.Y. LF EA EA LF 200 6090 2737 14 1 3942 1 $2,000.00 $8.00 $1.50 $1.00 $150.00 $1,500.00 $1.50 $2,000.00 $1,600.00 $9,135.00 $2,737.00 $2,100.00 $1, 500.00 $5,913.00 $218,541.00 Engineers Unit Public Qty. Unit Cost Total Public Cost EA EA EA LF LS LF EA 25 $4,000.00 2 $4,500.00 19 $350.00 4174 $11.50 1 $5,000.00 4174 $5.00 1 $3,500.00 Sub -Total Total $100,000.00 $9,000.00 $6,650.00 $48,001.00 $5,000.00 $20,870.00 $3,500.00 $193,021.00 $634,048.50 $218,541.00 $193,021.00 $1,045,610.50 $20,912.21 1 $41,824.42 $1,108,347.13 enA Q THANNISH w BURTON I of S BERRY S, WlitIk®ll n u 1rbl A®®®®ngitt®®, II>m®a CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale : 1 "= 400' Date : 5-16-2012 Design : W.A.I Drawn : W.A.I. Dwg. File : 26055 CFA 20120313.dwg Project No.: 26055.00 0 E BERRY_ 1-_MALVERN ASITE BURTIIN TARRANTI \111,:\ COMA (C L EASTLAND \ GRAYSON MONTAGUE GLEN N BAYLG)R / N GA�Jj v sl LOCATION MAP N.T.S. MAPSCO NO. 78/X COUNCIL DISTRICT 8 J. JUSTICE SURVEY A - 859 CITY OF FORT WORTH TARRANT COUNTY, TEXAS FORT WORTH MASON HEIGHTS, LP. 10000 N. CENTRAL EXPWY. / SUITE 1500 DALLAS TEXAS 75231 VICINITY MAP tL4SON HEIGHTS PAVING & DRAINAGE LOTS 1 4, BLOCK 1& LOTS 1 4 BLOCK 2 FORT WORTH, TARRANT COUNTY, TEXAS SHEET 1 OF 4 1 0 J : ]y�tj,1j)�I T *WO 713H31IWic \I f1 C- 0 • C)K go oz m e°s A®®®®neii®®9 lliuu 0 CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 scale : 1'= 400' Date : 5-16-2012 Design : W.A.I. Drawn : W.A.I. Dwg. File : 26055 CFA 20120313.dwg Project No. : 26055.00 OWNEM )f'IVM30IS ONOO ,4 )IlVM301s 'ONO° ,9 J. JUSTICE SURVEY A - 859 CITY OF FORT WORTH TARRANT COUNTY, TEXAS FORT WORTH MASON HEIGHTS, LP. 10000 N. CENTRAL EXPWY. / SUITE 1500 DALLAS, TEXAS 75231 ad o' 200' SCALE: 1'1= 400' PAVING EXHIBIT EXHIBIT 'B" 'dASON HEIGHTS PAVING & DRAINAGE LOTS 1-4, BLOCK 1& LOTS 1 4 BLOCK 2 FORT WORTH, TARRANT COUNTY, TEXAS ■ 400' SHEET 2 OF 4 • G Wfirmikelln anDarot a A®®®cenm*®®, Elmo CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale : 1 "= 400' Date : 5-16-2012 Design : W.A.I Drawn : W.A.I. Dwg. File : 26055 CFA 20120313.dwg Project No. : 26055.00 J. JUSTICE SURVEY A - 859 CITY OF FORT WORTH TARRANT COUNTY, TEXAS FORT WORTH MASON HEIGHTS, LP. 10000 N. CENTRAL EXPWY. / SUITE 1500 DALLAS. TEXAS 75231 sc.7. - 53, 0' 200' 400' SCALE: f= 400' DRAINAGE EXHIBIT EXHIBIT 'B-1 " MASON HEIGHTS PAVING & DRAINAGE LOTS 1-4 BLOCK 1& LOTS 1 4 BLOCK 2 SHEET 3 OF FORT WORTH, TARRANT COUNTY, TEXAS 4 '0A10 713H01UtY �Ir 0 t 1il 1 Cr r 2. Wfnakellatt mm A®®o close, Ikea CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale : 1'. 400' Date . 5-16-2012 Design : W.A.I Drawn : W.A.I. Dwg. File : 26055 CFA 20120313.dwq Proiect No. : 26055.00 OMER • J. JUSTICE SURVEY A — 859 CITY OF FORT WORTH TARRANT COUNTY, TEXAS FORT WORTH MASON HEIGHTS, LP. 10000 N. CENTRAL EXPWY. / SUITE 1500 DALLAS, TEXAS 75231 �«zz;Haw 1 cc _ J aa3 0' 200' 400' 1 I SCALE: 1"= 400' STREET LIGHTING EXHIBIT EXHIBIT 'B-3" &SON HEIGHTS PAVING & DRAINAGE LOTS 1-4, BLOCK 1 & LOTS 1-4 BLOCK 2 FORT WORTH, TARRANT COUNTY, TEXAS SHEET 4 OF 4