HomeMy WebLinkAboutContract 43542 (2)CONSTRUCTION
REIIVIUURSE1111ENT AORELI LENT
Oro? CETARV
CONTRACTPIO. ��_
CITY OF FORT WORTH, TEXAS o I NSF RAILWAY TRACK INSTALLATION
ALLIANCE AIRPORT RUNWAY TIHi\1SION PROJI:=.CT
THIS AGRI ENIENT is made and entered into by and between the CITY OF FORT
WORTH, a Texas home -rule municipal corporation ("City"), by and through its duly authorized
assistant city manager, as authorized by the City Council (M&C C-25511), and *west
Communications Company, LLC d/b/a CenturyLink QCC with a mailing address of 700 W.
Mineral Avenue, Littleton, Colorado 80120 ("Company").
WI T NESSETH:
WHEREAS, Company owns and operates a fiber optic system (the "Facility") in Tarrant
County, Texas, said Facility being a part of relocating a 13.64 mile fiber optic (splice to
splice) and 10.92 miles conduit construction re-route for the relocation of the fiber
system within the BNSF Railway Right of Way; and
WHEREAS, City is expanding its Alliance Airport and desires to install or cause to be
installed new BNSF Railway tracks in Fort Worth, Texas (the "BNSF Tracks") and City has
requested that Company reroute, adjust and/or take protective action on a portion of the Facility
(the "Relocation"), in order to accommodate the BNSF Tracks; and
WHEREAS, Company has agreed to provide the Relocation services subject to payment
for relocation costs as detailed herein as generally depicted on Exhibit "A"; and
WHEREAS, City has agreed to reimburse Company for the costs and expenses for the
Engineering and/or Construction and Field Services for the Relocation project, estimated at
$1,274,844.51 (One Million Two Hundred Seventy-four Thousand Eight Hundred Forty-
four and 51/100 dollars) as shown on Exhibit "B" attached hereto and made a part hereof; and
WHEREAS, City has previously reimbursed Company for engineering and design
services in the amount of $80, 000.00 (M&C C-24934).
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between City and Company as follows:
RECITALS:
The recitals, above, are incorporated into this Agreement insofar as they contain
material elements germane to the Parties.
REIMBURSEMENT BY CITY:
A.
H.
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utili
Page 1 of 8
1
City agrees to pre -pay Company $318,711.13 (equal to 25%) of the estimated
maximum cost for the Relocation, based on Exhibit _"B"_ attached hereto.
City agrees to reimburse Company the balance on an "invoice -received" basis.
Company shall prepare invoices for City review. Unless disputed, Ci#�r shall
reimburse Company (excluding 5% per invoice which shall newitnlierd"as retainac e
OFFICIAL REGARD`
GITY SECRETARY
n.WORTH,TX
Relocation _7-12 ` j IN
by City) within 30 days of presentation of an invoice showing actual costs and
supporting documentation of work completed.
a. Should the verified actual cost be greater than the estimated cost (exhibit
B), City shall remit the difference to Company within thirty (30) days of the
presentation of a statement showing actual costs and support materials.
b. If the actual cost exceeds the estimated cost by more than Fifty Thousand
Dollars ($50,000), City must obtain City Council authorization for the
increased payment amount and shall not be bound to the 30 day payment
requirement but shall seek said approval within a reasonable time
C. City reserves the right to review and verify any presented invoice or statement for
accuracy.
D. Company shall submit to City within 45 days of completion a final accounting for
all Relocation expenses incurred under this Agreement. Upon verification, City will
remit the retainage held.
E. The obligation of the City to make a cost reimbursement payment under this
Agreement does not constitute a general obligation or indebtedness of City for which
the City is obligated to levy, pledge or collect any form of taxation.
INGRESS AND EGRESS: City hereby grants to Company the right of ingress and
egress across all lands owned, leased or controlled by City as may be reasonable and/or
necessary for Company to perform the Relocation.
AUDIT: City shall have the right, upon reasonable notice of not less than 30 days and
during normal business hours, to audit and obtain copies of the books, records, and accounts of
Company relating to the Relocation for up to two years after the date Company completes the
Relocation.
HOLD HARMLESS AND INDEMNIFICATION: City, its successor or assigns, shall hold
Company harmless and free from any and all claims of damages which may occur, arising out
of City's, its successors' and assigns' negligence in connection with the development of the land
or in particular with this project to install new BNSF Railway tracks. Company shall be liable for
and shall promptly and fully compensate City for liabilities, claims and costs resulting either from
the negligent activities of Company employees, agents and/or contractors or from Company's
spillage or discharge of petroleum products or other hazardous substance from the Pipeline.
Company agrees to indemnify and hold harmless the City, its officers, agents and
employees, against and from any and all liability, loss and expense and shall defend all
claims resulting from Toss of life or damage or injury to persons or property directly or
indirectly resulting from the work performed by Company to the extent such loss,
damage or injury, is caused by the negligence or willful misconduct of Company or its
agents or arises out of or in connection with the Relocation Services. As a necessary
condition for such indemnity to be enforceable against Company:
(i) Company shall be notified in writing promptly of any and all claims,
liability, loss and expense for which City seeks indemnification from
Company, and
(ii) Company shall have sole control of the defense of any and all claims,
liability, loss and expense and all negotiations for their settlement or
compromise.
VENUE AND JURISDICTION: This Agreement shall be governed by the laws of the
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utility Relocation
Page 2 of 8
State of Texas. Venue for any action brought to interpret or enforce, or arising out of or incident
to, the terms of this Agreement shall be in Tarrant County, Texas or the United States District
Court for the Northern District of Texas, Fort Worth Division.
ENTIRETY OF AGREEMENT: This Agreement constitutes the entire agreement
between the parties hereto relating to the subject matter hereof and no alterations of the terms
and conditions of this Agreement shall be valid unless in writing and signed by both of the
parties hereto. This Agreement shall be binding upon and inure to the benefit of the parties
hereto, their successors and assigns
SIGNATURE PAGE TO FOLLOW
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utility Relocation
Page 3 of 8
IN WITNESS WHEREOF, this Agreement shall become effective as of the date it
becomes fully executed by the parties.
Qwest Communications Company, LLC
By: fr
Maxine Moreau
S enior Vice President Network Services
Dat : ,�Jy �/ e , J
By:
P ieter Poll
S enior Vice president Network Planning &
Construction
Date: g/f3h-
M&C: 2 � 1
Date:, i Z
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utility Relocation
Page 4 of 8
Attest:
CITY OF FORT WORTH
-
By:
Fernando Costa
Assistant City Manager
Date: 8.IZilZ
Dougl W. Wier�ig
Rec mmended by:
6.LJ
Dougl W. Wiersig
Director, T/PW Department
Approved as to Form and Legality:
Sp o L/1y
Douglas .. Black ISA,t 0
00),
Assistant CityAttorne �4 o
1 ?it 0i-'
00
Uid
k.
tiVlarS, J Kayser
City Secretary
4 4)0
vtjt
0Qg4Q
Diktilatt
U
OFFICIAL RECORD
CDTY SECRETARY
eamisusiimmi
i
ACKNOWLEDGMENTS
STATE OF Colorado }
)ss
COUNTY OF
Before me, a Notary P blic in and for said orunty and state, on this day of i
2012 personally appeared , to me known to be the identical
person w o subscribed the ame of the maker thereof to the foregoing -instrument as
of rr&W14 4 4'4$4 aC. and acknowledged to me that he/she
executed the same as his/her free and voluntary act and deed, and as the free and voluntary act
and deed of such corporation for the uses and purposes set forth.
Witness m hand and official seal this the 1 day of )A&4 2012.
ty b'4
Y Y
My Commission Expires August 21,2015 '//--A; A ot J Aj
Notary Public
My Commission Expires:
r`••9660640r04
*r VkOTAJt,r
•
i r
•
i
r �
r •
• ftnue•r
r• •
•
f••ra•RRRR�•*•
STATE OF TEXAS }
)sS
COUNTY OF TARRANT }
Before me, the undersigned authority, on this day personally appeared Fernando Costa,
Assistant City Manager of the CITY OF FORT WORTH, a Texas home-rule municipal
corporation, known to me to be the person whose name is subscribed to the foregoing
instrument and acknowledged to me that in his capacity as Assistant City Manager of the CITY
OF FORT WORTH, he executed the same as the act of such corporation for the purposes and
consideration therein expressed.
VII' m h hand and official seal this the da of 2012.
fitness y a a o y ,
gotar,y Public
My Commission Expires:
:.��'''Y�.:_•: EVOII[IA DANA
ELS
MY rkMMiSSION EXPIRES
4 10,2013
Reimbursement Agreement
City of Fort Worth&
Alliance Runway Extension Utility Relocation
Page 5 of 8
IJXHIBI T S TO FOLLOW:
Exhibit "A"
The Burlington Northern Santa Fe Railroad (BNSF) is moving forward with their plans to
relocate 12 5 miles near Ft. Worth (Haslet), Texas. The relocation will make room for the future
expansion of Alliance Airport runways Construction will begin on the BNSF Main, 3,000ft South
of Bonds Ranch Rd. and will stretch north and end near i=M166, on the BNSF Main, 2 miles
south of Justin. A one mile connector track will connect the existing south intermodal lead track
to an extension auto facility to the East. CC's contractor will design, engineer and produce
CAD drawings for an alternate route for the entire length required by the runway extensions at
Alliance Airport. QCC will need to work closely with the BNSF and their design engineers.
Drawings will be submitted by QCC to BNSF for approval; S CC will make any necessary
changes required by BNSF to obtain the final approval. Final staking will be performed
approximately one week before the construction begins and a required response within 72
hours of notice to perform. QCC construction Contractor will plow or trench in 90% of the build if
field conditions permit set Handholes, place cable and splice.
Ft+ s Aif e%i
``. DELORME
Rita use s t$ed to tcente.
.32007 Deane. beet Mn USA 4J 2003.
Y WW &tne_.tOm
Reimbursement Agreement
City of Fort Worth & _
Alliance Runway Extension Utility Relocation
Page 6 of 8
t.tN 14.4° E)
Fott With
1:11Ftiicrest % Siege Coach Fibs
�I
i
Keller
L)
0 '4 1 1'A 1
Data Zoom 107
rnI
Project Name
Project Location
Exhibit "B"
DNSF FAA Relocation
Haslet / FT. Worth, TX
Cost Detail of OSP, FOC and Splicing
Material Cost (Qwest Supplied)
OSP Materials
Splice Materials
Fiber Optic Cable (FOC)
Shipping on Materials & FOC
Shipping
Taxes on Materials & FOC
Taxes on Materials and FOC
Quantity UOM
72,000 If
Estimated
Cost
4,655.00
1,650.00
115,200.00
Total
Material
Cost
(Qwest) 121,505.00
600
rri
810.00
Total
Shipping
Cost
810.00
9,112.87
Total
Tax
Cost 9,112.87
Ixternal Labor Costs
External OSP Construction Costs (Labor & All Remaining Materials)
External Splicing Costs
Engineering and Inspection Costs
If
829,936.43
13,248.00
200,220.00
Total External Costs
1,043,404.431
Other Fees Including Permit & Right of Way Costs
Railroad ROW fees
Private ROW fees
Miscellaneous ROW fees
BNSF Coordinater
Qwest Splicing
0
0
0
Internal Labor & Flagging Costs
Field Support Construction
Field Operations Construction Support
Field Support Engineering & Permitting
Field Support Splicing (from SFP)
Field Operations Splicing Support (from
Testing & Acceptance Support (from SFF
Fiber Planning
Project Analysts
CAD
Fiberbase
Fiber Leasing/Contracts
Railroad Flagging
0.00
0.00
0.00
30,000.00
0.00
0.00
0.00
0.00
Total Other Fees
30,000.00
500 hrs
120 hrs
hrs
20 hrs
60 hrs
hrs
24 hrs
60 hrs
100 hrs
24 hrs
24 hrs
days
39,000.00
7,570.80
0.00
1,560.00
3,785.40
0.00
1,872.00
4,680.00
7,800.00
1,872.00
1,872.00
0.00
Total Internal Support & Flagging Costs
70,012.201
Total Estimated Construction Cost 1,274,844.51
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utility Relocation
Page 7 of 8
Project Name
Project Location
BNSF FAA Relocation Engineering Only
Haslet / FT. Worth, TX
Cost Detail of OSP, FOC and Splicing
Material Cost (Qwest Supplied)
OSP Materials
Splice Matenals
Fiber Optic Cable (FOC)
Shipping on Materials & FOC
Shipping
Taxes on Materials & FOC
Taxes on Matenals and FOC
Quantity UOM
If
Estimated
Cost
0
0
0
Total Material Cost (Qwest)
0
nri
0
Total Shipping Cost
0
0
Total Tax Cost
0
External Labor Costs
Extemal OSP Construction Costs (Labor & All Remaining Materials)
External Splicing Costs
Engineering and Inspection Costs
if
0
0
63,900
Total External Costs
63,900
Other Fees Including Permit &z Right of Way Costs
Railroad ROW fees
Private ROW fees
Miscellaneous ROW fees
BNSF Coordinater
Qwest Splicing
0
0
0
Internal Labor & Flagging Costs
Field Support Construction
Field Operations Construction Support
Field Support Engineering & Permitting
Field Support Splicing (from SFr)
Field Operations Splicing Support (from
Testing & Acceptance Support (from SFF
Fiber Planning
Project Analysts
CAD
Fiberbase
Fiber Leasing/Contracts
Railroad Flagging
0
0
0
11,200
0
0
0
0
Total Other Fees
11,200
50 hrs
hrs
hrs
hrs
hrs
hrs
hrs
16 hrs
hrs
hrs
hrs
days
3,900
0
0
0
0
0
0
1,248
0
0
0
0
Total Internal Support & Flagging Costs 5,148
Total Estimated Construction Cost 80,248
Reimbursement Agreement
City of Fort Worth &
Alliance Runway Extension Utility Relocation
Page 8 of 8
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 3/20/2012
DATE* Tuesday, March 20, 2012
REFERENCE NO.: C-25511
LOG NAME: 55AFW RWY EXT UTILITY RELOCATION_QWEST CONSTRUCTION (BNSF)
SUBJECT:
Authorize Execution of a Utility Relocation Reimbursement Agreement with Qwest Communications
Company, LLC, in an Amount Not to Exceed $1,274,844 51 for Relocating 12 5 Miles of Fiber Optic Line as
Part of the Runway Extension Project at Fort Worth Alliance Airport (COUNCIL DISTRICT 2)
RECOMMENDATION.
It is recommended that the City Council authorize the execution of a Utility Relocation Reimbursement
Agreement with Qwest Communications Company LLC, in an amount not to exceed $1,274,844 51 as
required for relocating 12.5 miles of fiber optic line as part of the Runway Extension Project at Fort Worth
Alliance Airport.
DISCUSSION:
On June 7, 2011, (M&C C-24934) City Council authorized the execution of a Utility Relocation
Reimbursement Agreement with Qwest Communications Company, LLC (Qwest), for an amount not to
exceed $80,248.00 as required for preparing construction plans and estimates (engineering services) to
relocate 12 5 miles of fiber optic line as part of the Runway Extension Project at Fort Worth Alliance
Airport.
This Utility Relocation Reimbursement Agreement is for construction fees associated with the realignment
mentioned of said 12.5 miles of fiber optic line and for preparing construction plans and estimates to
relocate 8 7 miles of conduit made necessary by the Runway Extension at Fort Worth Alliance Airport. In
order to construct the new Runway Extensions, it is necessary to relocate all private utility service conflicts
located on the proposed Burlington Northern Santa Fe Railroad (BNSF) Main Line
The utility facilities will be relocated by Qwest and it will be reimbursed for the agreed upon amount.
A waiver of the DBE goal was requested by the Aviation Department and approved by the M/WBE
Office. This work will be done by Qwest and not the City of Fort Worth (City).
Federal Aviation Administration funds from Runway Extension Grant 3-48-0296-43-2011 will be used for
this Project. Existing land credits that remain from the original land donation for Alliance Airport will be
used for the City's five percent in -kind match. The amount of the FAA grant is $10,000,000.00 and the
local match is $526,315.79 in land credits
This project is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION / CERTIFICATION:
mm
Logname: 55AFW RWY EXT UTILITY RELOCATION_QWEST CONSTRUCTION (BNSF) Page 1 of 2
current capital budget of the Airports Grant Fund.
FUND CENTERS:
To Fund Account/Centers FROM Fund/Account/C nters
G R14 53 120 055218517730 Ll L.274.844-51
CERTIFICATIONS:
Submitted for City hLanacter's Office by Fernando Costa (6122)
orininat� De artment Head: Bill Welstead (5402)
Ruseena Johnson (5467)
Additional Information Contact: Patrick Buckley (2443)
ATTACHMENTS
1. 00960,Project Ma�p,.pdf (Public)
2. 960 Utility FAR3.pdf (CFW Internal)
3. Available funds 216517.doc (CFW Internal)
4. Q west waiver_(L60j.pdf (CFW Internal)
Logname: 55AFW RWY EXT UTILITY RELOCATION_QWEST CONSTRUCTION(BNSF) Page 2 of 2