HomeMy WebLinkAboutContract 43541 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. 143y4 1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: D.R. Horton — Texas, Ltd.
Address, State, Zip Code: 6751 North Freeway, Fort Worth, TX 76131
Phone, E-Mail: 817-230-0800
Authorized Signatory/Title: Don E. Allen, Secretary
Project Name: Santa Fe West Ph. 2
Project Location: East of Blue Mound Rd., South of Basswood Blvd., West of Robert W. Downing
Plat Case No.: FP-012-006 Plat Name: Parr Trust (Santa Fe West)
Mapsco: 34V
CFA: 2012-032 DOE: 6795
To be completed by staffs
Received b
Council District: 2 City Project No: 01861
Date: 3 I 41 I a-----
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) _X_,
Sewer (A-1) _X Paving (B) X Storm Drain (B-1) X , Street Lights
& Signs (C) _X_.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers. servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in confounance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Santa Fe West Ph. 2
CFA No.: 2012-032 DOE No.: 6795
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2)/0)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100%
'Completion Agreement = 100% / Holds Plat
ICash Escrow Water/Sanitary Sewer= 125%
'Cash Escrow Paving/Storm Drain = 125%
'Letter of Credit = 125% w/2yr expiration period
$
140,032.50
256,345.25
$ 396,377.75
$
$
$
535,085.95
212,636.00
78,558.00
$ 826,279.95
$ 1,222,657.70
$
$
$
$
$
$
$
$
$
$
7,927.56
7,927.56
15, 855.11
29,908.88
14,954.44
3,142.32
980.00
48,985.64
64,840.75
Amount
1,222,657.70
1,222,657.70
495,472.19
1,032,849.94
1,528,322.13
Choice
(ck one)
X
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this '1 day of i ,20
CITY OF FORT WORTH - Recommended by:
Water Department
4
J Wendy
�T
endy Cl-Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Forn? & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. dAr-
Date:
Ma iy J. Kayser
City Secretary
ATTEST:
Signature
(Print) Name: ',
1
Transportation & Public Works Department
Dougla
Director
i
Wiersig, P.E.
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
arac0,174 t20
417 p4°a°Oa°
01p .*
qbgtvgwe
D.R. Horton
N M&C REQUIRED
-- - - - 9
By:
Texas, Ltd.
D.R. Horton, Inc.
Authorized Agent
Signature
Print Name: ce, A Wit „\
Title:
Sz
ce_ric.—ettrt
•
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
/1
W.
r
r
In
/l
/1
m
M
M
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
•
Summate,
Notthwast
Pa
NORTH
SCALE • NTS
SANTA FE WEST
PHASE 2
DATE: JULY 2012
DEVELOPER:
DR H O RTO N- TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
ENGINEER:
°..E
_*_ P E LOTO N
VCLAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
64
H\GN�
BASSWOOD BOULEVARD
I
w
z
Q
J
1—
LL
0
0
0
D
0
J
0
I
B ,,,,( PN Y I P
OMEN
trcuE
LEGEND
PROPOSED WATER LINES
EXIST WATER LINES
NOTE: ALL PROPOSED WATER LINES
ARE 8" UNLESS OTHERWISE NOTED
EXHIBIT A - WATER
EX 16" WATER LINE
0
Q
0
z
J
ID
C241
POTRILLO LANE t
CAPULIN ROAD
iicate
WEDGE• 6g51
VN
0
NORTH
200'
SANTA FE WEST
PHASE 2
GRAPHIC SCALE DATE: JULY 2012
DEVELOPER:
DR HORTON - TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
PELOTON
11111 LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
EX 12" SS
in
B Gosi
OKMP S RN A
BASSWOOD BOULEVARD
EX 12' SS
TO BE REMOVED
LEGEND
P ROPOSED SEWER LINES
EXIST SEWER LINES
EXIST SEWER LINES TO BE REMOVED
S DR 26 SERVICES
S ERVICES FOR FUTURE LOTS
NOTE: ALL PROPOSED SANITARY SEWER
LINES ARE 8" UNLESS OTHERWISE NOTED
EXHIBIT Al - WASTEWATER
0 NORTH 350'
SANTA FE WEST
PHASE 2
GRAPHIC SCALE DATE: JULY 2012
S FPE
* * * * * * * * * * * * * *
If * * * * IC IC IC * IC * IC * IC IC IC*
SPNPHASE
`N EST 6661
* * * * * * * * *
FPShSE
EX 12" SS
DEVELOPER.
DR HORTON - TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
0
z
z
0
0
1-
W
m
0
* * cc
* *
* *
* *
* *
IIII1 PELOTON
umLAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
BASSWOOD BOULEVARD
1
I11
ni
i
II�L� L\N
.. .. .. .. .. .. .. ..
FUL
LEGEND
ASPHALT PAVEMENT (BY SEPERATE CONTRACT WITH TXDOT)
28' B-B / 130' ROW (TYP) CONC
29' B-B / 50' ROW (TYP) CONC
VAR B-B / VAR ROW (TYP) CONC
SIDEWALK BY DEVELOPER
SIDEWALK BY HOME BUILDER
ADA RAMPS BY DEVELOPER
EXHIBIT B - PAVING
E
aim
INIR
ri
0
NORTH
300'
SANTA FE WEST
PHASE 2
GRAPHIC SCALE DATE: JULY 2012
DEVELOPER:
DR HORTON - TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
II
PELOTON
LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
LOT
7'X4' RCB
6'X4' RCB
---- 24"-A
24"
6'X4' RCB
0.351
OK� iO
e G14••
TEMPORARY
DRAINAGE
CHANNEL
TEMPORARY
DRAINAGE
CHANNEL
BASSWOOD BOULEVARD
27"
24"
1
LEGEND
PROPOSED STORM DRAIN
- - - - - - EXIST STORM DRAIN
EXHIBIT B1 - STORM DRAINAGE
0
POTRILLO LANE
z_
J
0
D_
Qi
0`--- - -
CAPULIN ROAD
Sti ANSE
#551 6651
TEMPORARY
DRAINAGE
CHANNEL
O NORTH 300'
GRAPHIC SCALE
SANTA FE WEST
PHASE 2
DEVELOPER:
in PELOTON
DR HORTON - TEXAS, LTD p�q LAND SO LYTIO NS
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
DATE:JULY 2012
LOt AND �ch \ON
N\GNP
g cpKM f1/4$ RN
l
it
•
T
LEGEND
PROPOSED STREET LIGHTS
EXIST STREET LIGHTS
EXHIBIT C - STREET LIGHTS
BASSWOOD BOULEVARD
9 :%p5P\-
I( O• ( PCTRILLC LANE
yESTEGebl \
DO
0
NORTH
300'
SANTA FE WEST
PHASE 2
DEVELOPER:
DR HORTON - TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
il€ PELOTON
I'III LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
GRAPHIC SCALE
DATE: JULY 2012
BASSWOOD BOULEVARD
1
L
0 cO°S RN AT
A
LEGEND
PROPOSED STREET SIGNS
EXIST STREET SIGNS
EXHIBIT Cl - STREET SIGNS
•
POTRILLO LANE
CAPULIN ROAD
sal -co p5E
/4 t o� 655i
0
NORTH
200'
SANTA FE WEST
PHASE 2
GRAPHIC SCALE DATE: JULY 2012
DEVELOPER:
DR HORTON - TEXAS, LTD
6751 NORTH FREEWAY
FORT WORTH, TEXAS 76131
PHONE: 817-230-0800
FAX: 817-230-0899
li PE LOTO N
I1' LAND SOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: D.R. Horton -Texas, Ltd.
PROPOSAL FOR: Paving Improvements
PROJECT NAME' Santa Fe West Phase 2
D.O.E NO. 6795
FILE NO. W-2190
`X' NO. X-21652
CITY PROJECT NO. 01861
Includes the furnishing of all materials, equipment and labor for the installation of paving
improvements and all necessary appurtenances and incidental work to provide a complete and
serviceable project designated as:
Santa Fe West Phase 2
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the General
Contract Documents and General Specifications for Water Department Projects, the General
Contract Documents and General specifications for Transportation and Public works Projects,
the site of the project and understanding the amount of work to be done and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas;
and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond Maintenance Bond, and such other bonds, if any, as may be
required by the Contract Documents for the performing and completing of the said work:
Contractor proposes to do the work within the time stated and for the following sums:
Updated: 8/30/2010 Page 1 of 5
Furnish and install, including all appurtenant work, complete in place, the following items
PAVING IMPROVEMENTS -RESIDENTIAL
ITEM # I DESCRIPTION
6' Reinf. Conc. Pvmt. w/ 6" Curbs for Variable ROW
Street
1 Twenty-six dollars and fifty cents.
6" Reinf Conc. Pvmt. w/ 6" Curbs for 29' B-B street
2 Twenty-five dollars an fifty cents.
6" Lime Stabilized Subgrade
3 Two dollars and sixty-five cents.
Hydrated Lime (30#/SY)
4 One hundred fifty dollars and no cents.
Std. Street Header
5 Fifteen dollars and no cents.
Std Street Barricade
6 Forty dollars and no cents.
4 Barrier Free Ramp, Type H
7 Nine hundred fifty dollars and no cents.
Connect to Ex. Header and Remove Barricade
8 One thousand. five hundred dollars and no cents.
TOTAL PAVING -RESIDENTIAL
PAVING IMPROVEMENTS -BASSWOOD
ITEM # DESCRIPTION
9.5" Reinf, Conc. Pvmt. w/ 7" Outside Curbs and 6"
Inside for Variable ROW Street -Basswood
1 Forty dollars and twenty-five cents.
9.5' Reinf. Conc Pvmt. w/ 7" Outside Curbs and 6"
Inside for 28' B-B street -Basswood
2 Thirty-nine dollars and twenty-five cents.
8" Lime Stabilized Subgrade
3 Two dollars and seventy-five cents.
Hydrated Lime (34#//SY)
4 One hundred fifty dollars and no cents.
5', 4' Conc. Sidewalk
5 Twelve dollars and fifty cents
5' Barrier Free Ramp, Type H
6 One thousand, two hundred dollars and no cents.
Std. Street Header
7 Fifteen dollars and no cents.
Std Street Barricade
8 Forty dollars and no cents.
Updated: 8/30/2010
UNIT
SY
SY
SY
TON
LF
LF
EA
EA
IUNIT
SY
SY
SY
UNIT
QTY PRICE
1,308
8,443
10,383
156
145
145
10
1
26.50
25.50
2.65
150.00
15.00
40.00
950.00
1,500.00
UNIT
QTY PRICE
688
3,034
3,983
TON 68
40.25
39.25
2.75
TOTAL 1
$ 34,662.00
$ 215,296 50
$ 27,514.95
$ 23,400.00
$ 2,175.00
$ 5,800.00
$ 9,500.00
$ 1,500.00
$ 319,848.45
TOTAL
$ 27,692.00
$ 119, 084.50
$ 10,953.25
150.00 $ 10,200.00
LF 894 12.50 $ 11,175.00
EA
LF
2
28
LF 28
1,200.00
15.00
40.00
$ 2,400.00
$ 420.00
$ 1,120.00
Page 2 of 5
6" Concrete Curb and Gutter
9 Twenty dollars and no cents.
Pavement Markings - Type W-4
10 Five dollars and no cents.
Pavement Markings - Type II-CR-4
11 Five dollars and no cents.
Remove Exist. Pavement Markings
12 Three dollars and no cents.
Remove Exist. Barricades & Guardrails
13 Two thousand dollars and no cents.
Sawcut, Remove, and Haul Off Exist. Conc. Curb and
Gutter
14 Twenty dollars and no cents.
Sawcut, Remove, and Haul Off Exist. Asphalt
Pavement
15 Twelve dollars and no cents.
Sawcut, Remove, and Haul Off Exist. Conc. Pavement
{ 16 Fifteen dollars and no cents.
Construct Std End of Road Barricade (Non -
Destructive to Conc. Pavement)
17 Forty dollars and no cents.
Topsoil (6"), Seeding/Hydromulch of all Parkways and
Medians (Includes Watering/Irrigation until 80%
Vegetative Cover is Attained)
18 Three dollars and twenty-five cents.
I TOTAL PAVING -BASSWOOD
SUMMARY:
PAVING IMPROVEMENTS -RESIDENTIAL
PAVING IMPROVEMENTS -BASSWOOD
GRAND TOTAL
Updated: 8/30/2010
LF 152
EA 296
EA 74
EA 195
EA 2
LF 208
SY 9
SY 105
LF 69
SY 4,343
20.00
5.00
5,00
3,00
2,000.00
$ 3,040.00
$ 1,480.00
$ 370,00
$ 585.00
$ 4,000.00
20.00 $ 4,160,00
12.00 $ 108.00
15,00
40.00
$ 1,575.00
$ 2,760.00
3.25 $ 14,114.75
$ 215,237.50.
$ 319,848.45
$ 215,237.50
$ 535,085.95
Page 3 of 5
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful performance of the Contract. The attached bid security, if required is to become
the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978,
and that he has read and thoroughly understands all the requirements and conditions of those
General Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all purposes:
1. The General Contract Documents and General Specifications for Water Department
Projects dated January 1, 1978, which may be purchased from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction which may be
purchased from the Department of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any
Iabor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms
of City Ordinance No. 7278 as amended by City Ordinance No 7400.
Updated; 8/30/2010 Page 4 of 5
1'he Bidder agrees to begin construction within Vti(g__,)1 calendar days after issue of the work
order, and to complete the contract within fifty-five (55) calendar days after beginning
construction as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
( ) A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Nonresident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
(X ) B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (.initials)
Respectfully submitted,
Conatser Construction TX, L.P.
Name of Contractor
By:
Printed Name:
Title:
d
Brock Huggins, Vice President of
Conatser Management Group
Inc, G.P.
Address: PO Box 15448
Fort Worth, Texas 76119
Telephone: 817-534-1743
Fax: nla
Updated: 8/30/2010
Page 5 of 5
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents
TO: D.R. Horton -Texas, Ltd.
PROPOSAL FOR:
PROJECT NAME*
Water, Sanitary Sewer, Storm Drainage Improvements
Santa Fe West Phase 2
WATER PROJECT NO. P265-602150186183
SEWER PROJECT NO. P275-702130186183
FILE NO. W- 2190
X NO. X- 21652
CITY PROJECT NO. 01861
Includes the furnishing of all matenals, equipment and labor for the installation of water, sanitary
sewer and storm drain improvements and all necessary appurtenances and incidental work to
provide a complete and serviceable project designated as:
Santa Fe West Phase 2
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the General
Contract Documents and General Specifications for Water Department Projects, the General
Contract Documents and General specifications for Transportation and Public works Projects,
the site of the project and understanding the amount of work to be done, and the pievaihng
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas;
and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be
required by the Contract Documents for the performing and completing of the said work.
Contractor proposes to do the work within the time stated and for the following sums:
Updated: 8/30/2010 Page 1 of 5
Furnish and install, including all appurtenant work, complete in place, the following items*
WATER IMPROVEMENTS
ITEM # DESCRIPTION
8" PVC Water Line
1 Twenty-three dollars and no cents.
16"x8' Tapping Sleeve & Valve
2 Three thousand, five hundred dollars and no cents.
8' Gate Valve & Box
3 Nine hundred fifty dollars and no cents.
Fire Hydrant Assembly (w/ 6' Gate Valve)
4 Three thousand, two hundred dollars and no cents.
Cast Iron Fittings
5 Three thousand, five hundred dollars and no cents.
Concrete Blocking - Type B
6 Fifty dollars and no cents.
Water Service, 1 ' Tap to Main (Residential & Irrigation)
7 Four hundred dollars and no cents.
Meter Box, Class A (Polyethylene) - Residential
8 Fifty dollars and no cents.
Meter Box, Class B (Polyethylene) - Irrigation
9 Fifty dollars and no cents.
2-4" PVC for Irrigation
10 Fifteen dollars and no cents.
Trench Safety
11 Twenty-five cents.
TOTAL WATER IMPROVEMENTS
SANITARY SEWER IMPROVEMENTS
ITEM #
1
2
3
4
5
DESCRIPTION
12" Sanitary Sewer Main (SDR-35 PVC)
Thirty-six dollars and no cents.
12" Sanitary Sewer Main (SDR-26 PVC)
Thirty-eight dollars and no cents.
8" Sanitary Sewer Main (SDR-35 PVC)
Twenty-six dollars and no cents.
8" Sanitary Sewer Main (SDR-26 PVC)
Twenty-eight dollars and no cents.
Connect to Ex 8 SS Main
One thousand, two hundred dollars and no cents.
UNIT QTY
UNIT
PRICE
LF 3,010 23.00
EA 1 3,500.00
EA 10
EA
TON
CY
950.00
4 I 3,200.00
1.7
5.2
EA 82
EA 81
EA 1
LF
LF
UNIT
76
3,010
QTY
LF 332
LF 1,422
LF
3,500.00
50.00
400.00
50.00
50.00
15.00
0425
UNIT
PRICE
36.00
38.00
1,143 26.00
LF 824
EA
1
28.00
1,200.00
TOTAL
$ 69,230.00
$ 3,500.00
$ 9,500.00
$ 12,800.00
$ 5,950.00
$ 260.00
$ 32,800.00
$ 4,050.00
$ 50.00
$ 1,140.00
$ 752.50
$ 140,032.50
TOTAL
$ 11,952 00
$ 54,036.00
$ 29,718.00
$ 23,072.00
$ 1,200.00
Updated: 8/30/2010
Page 2 of 5
Remove Exist. 12" SS Main. (Natural ground to rock
layer to be filled with standard fill. Rock layer to pipe
elevation to be filled with flowable fill.)
6 Fifteen dollars and no cents.
Remove Ex Manholes on Ex 12" SS Main
7 Five hundred dollars and no cents.
Manhole - Std 4' Dia.
8 Two thousand, six hundred fifty dollars and no cents.
Manhole - Std 4' Dia. Over Ex 12" SS Main
9 Three thousand dollars and no cents.
Drop Manhole - Std 4' Dia.
10 Three Thousand, two hundred dollars and no cents.
Manhole - Vacuum Test
11 Fifty dollars and no cents.
Sewer Service - 4" Tap
12 Four hundred twenty-five dollars and no cents.
Adjust Exist MH Rim on Exist. 12" SS Main to Proposed
Grade
13 Five hundred dollars and no cents.
Trench Safety
14 One dollar and no cents.
Post Construction CCTV
15 One dollar and twenty-five cents.
TOTAL SANITARY SEWER
STORM DRAIN IMPROVEMENTS
ITEM #
1
2
3
4
5
6
7
8
9
DESCRIPTION
7'x4' RCB
Two hundred twenty-five dollars and no cents.
6'X4` RCB
One hundred ninety dollars and no cents, LF
27" RCP
Fifty-five dollars and no cents. LF
24' RCP
Forty-five dollars and no cents. LF
10' Recessed Curb Inlet
Two thousand, two hundred dollars and no cents. EA
15' Std Curb inlet
Three thousand dollars and no cents. EA
4' Access Manhole
Two thousand, six hundred fifty dollars and no cents. EA
Std. FW-0 Headwall (7'X4' RCB)
Seven thousand, five hundred dollars and no cents EA
Modified FW-S Headwall wfSET (6'X4' RCB)
Fifteen thousand six hundred fifty dollars and no cents. EA
LF 1,558
EA 4
EA 14
EA 4
EA 1
EA 19
EA 115
EA 1
LF 3,721
LF 3,721
15.00 $ 23,370.00
500.00
2,650.00
3,000.00
3,200.00
50.00
425.00
500.00
1.00
1.25
I UNIT QTY PRICE
UNIT
LF 204
258
50
334
2
2
2
1
225.00
190.00
55.00
45.00
2,200.00
3,000.00
2,650.00
7,500.00
15,650.00
$ 2,000.00
$ 37,100.00
$ 12,000.00
$ 3,200.00
950.00
$ 48,875.00
500.00
$ 3,721.00
$ 4,651,25
$ 256,345.25
TOTAL
$ 45,900.00
$ 49,020.00
$ 2,750.00
$ 15,030.00
$ 4,400.00
$ 6,000.00
$ 5,300.00
$ 7,500.00
$ 15,650.00
Updated: 8/30/2010
Page 3 of 5
12" Rock Rip Rap
10 Fifty-five dollars and no cents.
18' Rock Rip Rap
11 Sixty-five dollars and no cents.
Trench Safety
12 One dollar and no cents.
TOTAL STORM DRAIN IMPROVEMENTS
SUMMARY:
WATER IMPROVEMENTS
SANITARY SEWER IMPROVEMENTS
STORM DRAIN IMPROVEMENTS
GRAND TOTAL
PART B - PROPOSAL (Cont.)
SY
SY
LF
73
865
846
55.00
65.00
1.00
$
4,015.00
56,225.00
$ 846.00
$ 21 2,636.00
140, 032.50
256, 345.25.
212,636.00
609,013.75
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful perfounance of the Contract. The attached bid security, if required is to become
the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978,
and that he has read and thoroughly understands all the requirements and conditions of those
General Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all purposes*
1. The General Contract Documents and General Specifications for Water Depatinient
Projects dated January 1, 1978, which may be purchased from the Water Department.
2, The Standard Specifications for Street and Storm Dram Construction which may be
purchased from the Department of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the teznus
of City Ordinance No. 7278 as amended by City Ordinance No. 7400,
Updated: 8/30/2010 Page 4 of 5
The Bidder agrees to begin construction within 1 E (IL)) calendar days after issue of the work
order, and to complete the contract within fifty-five (55) calendar days after beginning
construction as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
( ) A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Nonresident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
(X) B. The principal place of business of Qur company or our parent company or
majority owner is in the State of Texas.
1 (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
Conatser Construction TX. L.P.
Name of Contractor
By:
Printed Name*
Title:
Address:
Brock Huggins, Vice President of
Conatser Management Group
Inc, G.P.
PO Box 15448
Fort Worth. Texas 76119
Telephone: 817-534-1743
Fax: n/a
Updated: 8/30/2010
Page 5 of 5
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
Phis proposal must not be removed from this book of Contract Documents.
TO: D.R. Horton -Texas, Ltd.
PROPOSAL FOR:
PROJECT NAME:
Street Lighting Improvements
Santa Fe West Phase 2
DOE. NO. 6795
FILE NO. W-2190
"X" NO. X-21652
CITY PROJECT NO. 01861
Includes the furnishing of all materials, equipment and labor for the installation of Street
Lighting and all necessary appurtenances and incidental work to provide a complete and
serviceable project designated as:
Santa Fe West Phase 2
Pursuant to the foregoing `Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the General
Contract Documents and General Specifications for Water Department Projects, the General
Contract Documents and General specifications for Transportation and Public works Projects,
the site of the project and understanding the amount of work to be done, and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas;
and brads himself upon acceptance of this Proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be
required by the Contract Documents for the perfouning and completing of the said work.
Contractor proposes to do the work within the time stated and for the following sums:
Updated: 8/30/2010 Page 1 of 4
0
Furnish and install, including all appurtenant work, complete in place, the following items:
STREET LIGHTING IMPROVEMENTS -RESIDENTIAL
ITEM #
1
2
QTY
1,665
555
3 10
4
10
UNIT DESCRIPTION
#10 THHW Copper
LF One dollar and twenty cents.
Conduit - 2 Inch - Open Cut - Sched. 40
LF Eight dollars and no cents.
Rdwy Ilium Foundation TY 1
EA Eight hundred dollars and no cents.
Rdwy Ilium Assembly TY 11*
EA Two thousand, five hundred dollars and no cents.
TOTAL STREET LIGHTING -RESIDENTIAL
*Illumination Assembly includes the light fixture
STREET LIGHTING IMPROVEMENTS -BASSWOOD
ITEM #
1
2
3
4
QTY
965
970
1
6
UNIT
LF
LF
EA
EA
DESCRIPTION
2 2 2-4 Quadplex Alum Sec Conductor
Four dollars and no cents.
Conduit - 2 Inch - Open Cut - Sched. 40
Eight dollars and no cents.
Electrical Ground Box
One thousand dollars and no cents.
Rdwy Ilium Foundation TY 3
One thousand, two hundred dollars and no cents.
Rdwy Ilium Assembly TY 18**(Doub}e Arm)
5 6 EA Two thousand, eight hundred dollars and no cents.
Contact Enclosure, Pad Mount
6 1 EA Two thousand, five hundred dollars and no cents.
TOTAL STREET LIGHTING -BASSWOOD
**Illumination Assembly includes the light fixture
S UMMARY:
S TREET LIGHTING IMPROVEMENTS -RESIDENTIAL
S TREET LIGHTING IMPROVEMENTS -BASSWOOD
GRAND
TOTAL
Updated; 8/30/2010
UNIT
PRICE
1.20
8.00
800.00
2,500.00
UNIT
PRICE
4.00
8.00
1,000.00
1,200.00
TOTAL
$ 1,998.00
$ 4,440.00
$ 8,000.00
$ 25,000.00
$ 39,438.00
TOTAL
$ 3,860.00
$ 7,760.00
$ 1,000.00
$ 7,200.00
2,800.00 $ 16,800.00
2,500.00
$ 2,500.00
$ 39,120.00
$ 39,438.00
$ 39,120.00
$ $78,558.00
Page 2 of 4
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents,
for the faithful performance of the Contract. The attached bid security, if required is to become
the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978,
and that he has read and thoroughly understands all the requirements and conditions of those
General Documents and the specific Contract Documents and appurtenant plans.
The successful bidder shall be required to perform the work in accord with the following
publications, both of which are incorporated herein and made a part hereof for all purposes:
1 The General Contract Documents and General Specifications for Water Department
Projects dated January 1, 1978, which may be purchased from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction which may be
purchased from the Depai tinent of Transportation & Public Works.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors, or employment agency in either furnishing or referring
employee applicants to the undersigned are not discriminated against as prohibited by the terms
of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
Updated: 8/30/2010 Page 3 of 4
The Bidder agrees to begin construction within ftli GO calendar days after issue of the work
order, and to complete the contract within fiftv-five SS calendar days after beginning
construction as set forth in the written work order to be furnished by the Owner
(Complete A or B below, as applicable:)
( ) A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Nonresident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
(X) B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration on preparation of the
foregoing bid:
Addendum No. 1 (Initials) Addendum No, 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
Conatser Construction TX L P
Name of Contractor
By:
Printed Name:
Title:
Brock Huggins, Vice President of
Conatser Management Group
Inc, G.P.
Address: PO Box 15448
Fort Worth, Texas 76119
Telephone: 817-534-1743
Fax: n/a
Updated: 8/30/2010
Page 5 of 5