Loading...
HomeMy WebLinkAboutContract 43538 (2)CONSTRUCTION REIMBURSEMENT AG E F MVI E N T +;IxYSECRE'dARX CONTRACTNO9. (., r�` CO`a Y or FORT WORTH, TEXAS • BNSF RAILWAY TRACK INSTALLATION ALLIANCE AIRPORT RUNWAY :O(TENSION PROJECT THIS AGREEMENT is made and entered into by and between the CITY OF FORT WORTH, a Texas home -rule municipal corporation ("City"), by and through its duly authorized assistant city manager, as authorized by the City Council (M&C C-25412), and SUNOCO PIPELINE, L.P., with a mailing address of P.O Box 5095, Sugar Land, Texas 77487-5095 ("Sunoco") ("Company"). WITNESSETH: WHEREAS, Company owns and operates a 16-inch diameter petroleum pipeline (the "Facility") in Tarrant County, Texas, said Facility being a part of Sunoco's Ringgold to Corsicana crude system; and WHEREAS, City is expanding its Alliance Airport and desires to install or cause to be installed new BNSF Railway tracks in Fort Worth, Texas (the "BNSF Tracks") and City has requested that Company reroute, adjust and/or take protective action on a portion of the Facility (the "Relocation"), in order to accommodate the BNSF Tracks; and WHEREAS, Company has agreed to provide the Relocation services subject to payment for relocation costs as detailed herein as generally depicted on Exhibit "A"; and WHEREAS, City has agreed to reimburse Company for the costs and expenses for the Engineering and/or Construction and Field Services for the Relocation project, estimated at $501,100 as shown on Fxhibit "B" attached hereto and made a part hereof; and NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter set forth, it is hereby agreed by and between City and Company as follows: RECITALS: The recitals, above, are incorporated into this Agreement insofar as they contain material elements germane to the Parties. REIMBURSEMENT BY CITY: A. City agrees to pre -pay Company $0 (equal to 0%) of the estimated maximum cost for the Relocation, based on Exhibit attached hereto. B. Company shall prepare, and City shall review, an estimated cost for the Engineering and/or Construction and Field Services necessary for the Relocation. The estimated Relocation cost is $501,100 (Exhibit "B"). These costs will be reimbursed by City to Company (excluding the amount paid in A, above and excluding 5% per invoice which shall be withheld as retainage by City) within 30 days of presentation of a statement(s) showing actual costs and supporting documentation of work completed. a. Should the verified actual cost be greater than the estimated cost, City shall remit the difference to Company within thirty (30) days of the presentation of a statement showing actual costs and support materials. Reimbursement Agreement City of Fort Worth & Sunoco Alliance Runway Extension Utility Relocation.) c _ 2 9 _ 2 ,� '� I N Page 1 of 5 b. If the actual cost exceeds the estimated cost by more than Fifty Thousand Dollars ($50,000), City must obtain City Council authorization for the increased payment amount and shall not be bound to the 30 day payment requirement but shall seek said approval within a reasonable time. C. City reserves the right to review and verify any presented invoice or statement for accuracy. D. Company shall submit to City within 45 days of completion a final accounting for all Relocation expenses incurred under this Agreement Upon verification, City will remit the retainage held. E The obligation of the City to make a cost reimbursement payment under this Agreement does not constitute a general obligation or indebtedness of City for which the City is obligated to levy pledge or collect any form of taxation. INGRESS AND EGRESS: City hereby grants to Company the right of ingress and egress across all lands owned, leased or controlled by City as may be reasonable and/or necessary for Company to perform the Relocation. AUDIT City shall have the right, upon reasonable notice and during normal business hours, to audit and obtain copies of the books, records, and accounts of Company relating to the Relocation for up to two years after the date Company completes the Relocation. HOLD HARMLESS AND INDEMNIFICATION: City its successor or assigns, shall hold Company harmless and free from any and all claims of damages which may occur, arising out of City's, its successors and assigns' negligence in connection with the development of the land or in particular with this project to install new BNSF Railway tracks. Company shall be liable for and shall promptly and fully compensate City for liabilities, claims and costs resulting either from the grossly negligent activities of Company employees, agents and/or contractors in the performance of the Relocation. NO THIRD PARTY: This Agreement is solely for the benefit of the City and Company, and neither the City nor Company intends by any provision of this Agreement to create any rights in any third -party beneficiaries or to confer any benefit or enforceable rights, under this Agreement or otherwise, upon anyone other than the City and Company. VENUE AND JURISDICTION: This Agreement shall be governed by the laws of the State of Texas. Venue for any action brought to interpret or enforce, or arising out of or incident to, the terms of this Agreement shall be in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. ENTIRETY OF AGREEMENT: This Agreement constitutes the entire agreement between the parties hereto relating to the subject matter hereof and no alterations of the terms and conditions of this Agreement shall be valid unless in writing and signed by both of the parties hereto. This Agreement shall be binding upon and inure to the benefit of the parties hereto, their successors and assigns SIGNATURE PAGE TO FOLLOW Reimbursement Agreement City of Fort Worth & Sunoco Alliance Runway Extension Utility Relocation Page 2 of 5 IN WITNESS WHEREOF, this Agreement shall become effective as of the date it becomes fully executed by the parties. SUNOC PIPELINE L.P., a Texas limited partnership By: Sunoco Logistics Partners Operations OP LLC, a Delaware limited liability Company, as its general partner By: Date: Todd M Stamm, Manager Western Area Operations Ict it /1_ M&C: C -2 rill Date: Z Li % I 'Z Reimbursement Agreement City of Fort Worth & Sunoco Alliance Runway Extension Utility Relocation Page 3 of 5 CITY OF FORT WORTH By: Fernando Costa Assistant City Manager Date: a/zs/z Recommended by: DouglW. Wiersig Director, T/PW Department p roved as to Form and Legality: Muglas W.Black Assistant City Attorney oc.;57 0000000000 pie LAP A no-, gag" c) ,4zr°°e" At/G? (;), %A 1_4 ftvlary J Kayser City Secretary gl\titzeittsNwncle OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ACKNOWLEDGMENTS STATE OF TEXAS )ss COUNTY OF ir\RI- 11, and for said countyand state, on this i � � � day of A'aticAff3f Before me, a Notary Public in y 2012 personally appeared Todd M. Stamm, to me known to be the identical person wao subscribed the name of the maker thereof to the foregoing instrument as Manager, Western Area Operations of Sunoco Logistics Partners Operations GP LLC, a Delaware limited liability company, in its capacity as general partner of SUNOCO PIPELINE L.P., a Texas limited partnership, and acknowledged to me that he executed the same as his free and voluntary act and deed, and as the free and voluntary act and deed of such corporation for the uses and purposes set forth. Witness my hand and official seal this the UV day of at.v),LAISA , 2012. My Commission Expires: le ' K IMBERLY ANN STENSVMG MY COMMISSION EXPIRES October 16, 2015 STATE OF TEXAS ) )ss COUNTY OF TARRANT ) Before me, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the CITY OF FORT WORTH, a Texas home -rule municipal corporation, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that in his capacity as Assistant City Manager of the CITY OF FORT WORTH, he executed the same as the act of such corporation for the purposes and consideration therein expressed. Witness myhand and official seal this the 23 dayof 2012. otary Public My Commission Expires: 9•-/ne-R k1. "?i .si EVONIA DANIELS MY COMMISSION EXPIRES July 10, 2013 Reimbursement Agreement City of Fort Worth & Sunoco Alliance Runway Extension Utility Relocation Page 4 of 5 EXHIBITS TO FOLLOW: Exhibit A — Drawing No. W-22002-C100003 dated 3/12/12 Exhibit B — Cost Estimate and Assumptions Reimbursement Agreement City of Fort Worth & Sunoco Alliance Runway Extension Utility Relocation Page 5 of 5 C4 ',arm RNROAW Ent}16'C5' LEGEND V OUT WPC MOOR MIT POWER POW —P— POWER UM —4— RAL ROAD UNC -ID GAS LIE —X— FENCE tNE W AIMDW FOLK V. EASOMINT M6MIYM 2M0-117700 CA ERISRNC NY SUNOCO PIPANE 8"I "Cr I MI I 7". I 742 2W 1 OW' 20' 712 GENERAL NOTES NMR4 rr ESSRVCIS' SUNOCO J t• PR�OI INN NO TO.. =0MM 2-0 ASMC RONRINCED - 2. DOING PIPE 10 EC MOO MIA 0*L t 1 PROM= RN10.01D OIDII ONION (1Va2.W) PROOC niOO= FROM O-F MNM UPC p ROOMED MOO lei NO #121 A PROPOSED O YC P W4A OOiIOi MN. R DOTKATW ODOT 110. M 1 IMATM Of iK GON2NOMAL INC MYC FOR WGORL PRY. W WIO CIX IACTUO OWL DC ROMMll[ FOR M WRC PIT COOL PG DOA 311143M0& CONStRUC110N UNITS n7700 OCWn60 DCNMANCO PIPE DATA: MDR 100 op FOE W//]G UItS MO COAARIG MON B 0 O 'II D • D'OW MT. AP1-5L-F42/52 iw1 MEs FO< WMIMG 5' WAMJTW a=cc MAON 045 PIM MOE PRODUCT IRNT20 'JMRP CRUSE22201130C MEMO. DOC DAIW DAWD OR 1db STATE PLANE COORDINATED 11.3 mM M. ix. NA bNELEVATIONS WOW ROD CPS OOAIV 1O1C. COAST 'A' DFNTON COUNTY TEXAS CRCCKET PEERY SURVEY. A-1031 hi 0450 z SR CONSTRUCRON LAMBS ts�/7//i• PLAN 0n - mil PROFILE 1.00 ey 1 IIP i ;l'.J ammo IS' SUNOCO \-PROPOSED fa' Pif1NE CC/ -I < E y.1.. PMFIN'E NnP tAn oak-PIT PIT LOax f sxv in• /L !DOSING 1a• SUNOCO PIPELINE 21) 1430 x.00 O SCALE. 1 - SO HORD k VERT. NOV 762 740 730 I no 210' ENGINEERING RECORD PRAWN BY W.B.B CMCMEO BY T,R.B. APPROVED BY DATE 02/1S/12 SCALE AS SHOWN OLD DRAWING NO. 1 03/12/12 1REV. DATE API,/ Sunoco Logistics I Partners L.P. DWG. NO. VICINITY MAP N.T 5, FOR REVIEW 03-1412 TIN ••111sTkmil "Lb, SLOT MO GENERAL REMSION DESCRIPTION 16" Corsicana to Ringgold PIPELINE - RELOCATIONS BNSF Railroad Widening Denton County Texas W_22002_C100003 APPRVOVAI 1 Page 1 0f 2 MUSTANG ENGINEERWG, WC. CLIENT: SUNOCO PROJI{: 17336 G:\198721EsemateVl8 In Sunoco PL - BNSF RR-)Qno - Bore R-F.,dslEstinate F COST ESTIMATE Page 1 of 1 Revision F+ PROJECT: Sunoco - BNSF RR -Xing - 16" O.D., 0.500" wt, 200 Ft. QUANTITY QTY ( UNITS I. ENGINEERING, PROJ. MGT., INSPECTION A. Proj. Mgt., Engr., Drafting, Purch., Insp. B. Programming TOTAL I II. RIW: LABOR TO ACQUIRE & PURCHASE COST A. Labor to Settle Damages B. Labor & Fees to obtain permits C. Right of Way Payment 1. Pipeline - Damages 2. Station, Ground Bed Site - Fee Purchase Field Office Expenses & Mileage 3. Field Survey - Dry Land 4. BNSF permit handling TOTAL II III. MATERIALS A. Pipeline, Pig Traps, Block Valves, Tie -Ins 1. 16" Pipe, 0.500" W.T., X-52 FBE Coating for Pipe, 14 -16 mills avg. 2. ARO Coating for Pipe, 30 mills min. 3. Weld Ell, 45 Deg. 3DR, Seg., 16" O.D. Heat Induction Bends 4. Cathodic Protection - New Rectifier Bed 5. Marker Signs B. Pump Station Pump & Motor, 800 HP , 2,500 BPH Electrical Substation/Drop C. Metering( For Both ends of Pipeline) D. Freight on materials E Misc. F. Tax on Materials @ 8.25% TOTAL III IV. INSTALLATION A. Pipeline, Pig Traps, Block Valves, Tie -Ins 1. Mobe & Demobe 2. RR & Hwy (Bore) 3. Test & Drain 4. Clean & Dry 5. Install Rectifier & Groundbed Nitrogen Purge 6. X-Ray 7. Misc. paint, test leads , Fence, Gravel, etc. B. Removal Cost Remove existing 16" pipe Cut, fill w/grout & cap C. Metering Foundation Misc. paint, tests, etc. D. Environmental TOTAL IV V. PROJECT INSURANCE A. Builder's Risk TOTAL V VI. CONTINGENCY A. Overall Project Contingency TOTAL VI NOTES: 0 0 1 7 1 12 0.25 0 5 80 240 240 4 0 1 1 0 0 8% 0% 8.25% 1 200 1 1 1 1 1 10 1 Lot Lot Man Days Lot Rods Acre Months Days hours Feet Feet Each Each Each Lot Each Each Rate Rate Rate Lot Feet Lot Lot Lot Lot Crews Days Lot 1 Lot 1 Lot 0 0 2.50% Each Lot Of A. - C. 5.00% of Basis 15.00% of Basis GRAND TOTAL UNIT COST COST I UNITS $300 $750 $10,000 $1,000 $100 $63.17 $12.97 $15,225 $30,000 $1,000 $110,200 $110,200 $60,000 $325 $3,000.00 $3,000.00 $30,000 $45,000 $1,000 $11,000 $20,000 $3,500 $250,500 $384,900 $435,700 / Lot / Lot / Men -Day / Rod / Acre / Month / Crew -Day /hour / Foot / Foot / Each / Each / Each / Lot / Each / Each Basis Basis Basis / Each / Foot / Each / Each / Each / Each / Crew -Day / Lot / Lot / Lot / Each / Lot Basis Basis Basis MIMMMMI 14-Jun-12 04:32 PM TOTAL $0 $0 $0 $2,100 $5,000 $9,000 $2,500 $0 $5,000 $8,000 $31,600 $15,200 $3,100 $60,900 $0 $30,000 $1,000 $0 $0 $8,800 $0 $9,100 $128,100 $60,000 $65,000 $3,000 $3,000 $30,000 $45,000 $10,000 $11,000 $20,000 $3,500 $0 $0 $6,300 $256,800 $19,200 $65,400 $501,100 Exhibit B - Page 2 of 2 Assumptions Sunoco BNSF RR -Xing ASSUMPTIONS: Sunoco - BNSF RR -Xing - 16" O.D. pipeline (410' HDD) R-El Use 16" O.D. x 0.500" W.T. Gr. X-52 API5L Pipe, w/14-16 mils FBE & 30 mils ARO coating Directional Drill to include new track expansion right of way only. 1 1 1 1 Assume 100' x 150' working space for directional drill rig & 100' x 450' for pipeline layout area. Install new rectifier and anode bed. Tie-ins with piggable 3 diameter radius fittings. Abandon existing crossing in -place, fill with concrete grout and cap. 1 jMaintain 16' depth under RR tracks. Some additional costs may be required for permits and access. Temporary shoring not included. Flagmen shall be provided, if required, as negotiated with BNSF Railroad. 1 J Original Estimate did not include extra dollars for encountering rock. Based on new geotech info, we now know that rock is in the area. Page 1 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/24/2012 DATE: Tuesday, January 24, 2012 REFERENCE NO • **C-25412 LOG NAME* 55AFW RWY EXT UTIL RELOC_SUNOCO PIPELINE L P (CONSTRUCTION) S UBJECT: Authorize Execution of a Utility Adjustment Agreement with Sunoco Pipeline L.P., in the Amount of $501,100 00 for Construction and Relocation of Its Pipeline as Part of the Runway Extension Project at Fort Worth Alliance Airport (COUNCIL DISTRICT 2) RECOMMENDATION. It is recommended that the City Council authorize execution of a Utility Adjustment Agreement with S unoco Pipeline L.P. in the amount of $501,100.00 to construct and relocate its pipeline as part of the Runway Extension Project at Fort Worth Alliance Airport. DISCUSSION: On November 15, 2011, (M&C C-25286) City Council approved the reimbursement of expenses to S unoco Pipeline L.P., (Sunoco) associated with the design portion of this project. This Utility Relocation Reimbursement Agreement is required to pay for the costs and expenses for the construction of the relocation of certain Sunoco pipelines to allow the realignment of the Burlington Northern Santa Fe Railroad (BNSF) Main Line as a part of the Runway Extension Project at Fort Worth Alliance Airport. In order to construct the new runway extension, it is necessary to relocate all private utility service conflicts located on the proposed BNSF Main line. S unoco has a distribution line east of John Day Road at Station 19262-00 of the proposed BNSF Main Line Relocation that must be relocated to allow BNSF to construct its new Main Line track The utility facilities will be relocated by Sunoco and it will be reimbursed for the agreed -upon amount. Federal Aviation Administration funds from Runway Extension Grant 3-48-0296-40-2009 will be used for this project. Existing land credits that remain from the original land donation for Alliance Airport will be used for the City's five percent in -kind match. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION / CERTIFICATION. The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Airport Grants Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers GR14 539120 055218187720 $501.100.00 Logname: 55AFW RWY EXT UTIL RELOC_SUNOCO PIPELINE L P (CONSTRUCTION) Page 1 of 2 CERTIFICATIONS: Submitted for city Manager's Office by: Fernando Costa (0122) Originating Department Head: Kent Penney (5403) Ruseena Johnson (540?) Additional Information contact: Patrick Buckley (2443) ATTACHMENTS 1. 55AFW-SuncoMa df (Public) 2. Available Funds 218187.0f (CFW Internal) 3. Utility FAR.pdf (CFW Internal) Logname: 55AFW RWY EXT UTIL RELOC_SLJNOCO PIPELINE L.P. (CONSTRUCTION) Page 2 of 2