HomeMy WebLinkAboutContract 43335 (2)THE STA COIV-MI.; NII 1Y FAO{ II ,II JK OF TJft;XAS § COUNTY OF ARRANT II KS AGREEMENT City Secretary Contract N o . • WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Commercial Metals Company Address, State, Zip Code: 6565 N. MacArthur Boulevard, Suite 4800 / Irving, TX 75039 Phone, E-Mail: Russell Reinhard, Project Manager (214) 689-5886/Russell.reinhard@cmc.com Authorized Signatory/Title: racy P0r4e, Sr. Via PrescAerr-L Project Name: CMC Recycling Facility 16 in. Waterline Project Location: Old Decatur Road & IH-820 Plat Case No.: FP-O 11-033 Plat Name: Quarry Falls Industrial Growth Center No. 1 Mapsco: 34N CFA: 2012-028 To be completed Received by:( DOE• 6846 y staffrenft&A 06-20-12 hiv: • Council District: 2 City Project No: 01916 . 1 Date: QJIa'j)7 OFFICIAL RECfl RP CITY SECRI:-aAlia - FTR a rr ii-!(9 NOW9 THEREFORE, KNOW ALL y THESE RIESJF: ITS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided ' under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X_, Sewer (A-1) Paving (B) - Storm Dram (B-1) , Street Lights & Signs (C) _. Combined CFA final Sept 12, 2008 2 E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in confou nance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the team of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harrrrless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by Combined CFA final Sept 12, 2008 4 any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stoiin drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall ten ninate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may requestthat the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. Combined CFA final Sept 12, 2008 6 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet ;Project Name: CMC Recycling Facility 16 in. Waterline CFA No.: 2012-028 DOE No.: 6846 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information.. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 85,597.00 S 85.597.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: s s s $ $ 85,597.00 $ $ $ $ 1,711.94 1,711.94 3,423.88 $ 3,423.88 Choice Financial Guarantee Options, choose one Amount (ck one) IBond = 100% $ 85,597.00 t/ 'Completion Agreement = 100% / Holds Plat $ 85,597.00 (Cash Escrow Water/Sanitary Sewer= 125% $ 106,996.25 'Cash Escrow Paving/Storm Drain = 125% $ - 'Letter of Credit = 125% w/2yr expiration period I $ 106,996.25 1 Combined CFA final Sept 12, 2008 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this ids day of 1`i �- , 20 /2-'. CITY OF FORT WORTH - Recommended by: Water Department i ( /2/7CiA Ao (' l L Wendy Chi- abulal, EMBA, P.E. Developmen Engineering Manager Approved as to Form & Legality: Douglas W.,mlack Assistant C t� Attorney M&C No. t Date: ATTEST: 14ary J. Kayser City Secretary ATTEST: Signature (Print) Name: Vzotbfa• Qsy4oz- atiRuix .•• V Piro! :k. 14 • • •*= ._ • EUZABETH CORTEZ MY COMMISSION EXPIRES August 21, 2012 Transportation & Public Works Department 091 Douglas W. Wiersig, P.E Director Approved by City Manager's Office Fernando Costa Assistant City Manager • 14 oFooao„ram ?a % 00 o� o�P o�0 0 0taiX0 0 oa o o �as 422 000 4iiiinfxreeiAS,* Commercial Metals Company 9 Title: L) Print Name. TRRC,Y L. PORTER S2.VtCt ?(./EstD4.ir Signature Signature OFFICIAL RECORD cflY SECRETARY Ft WORTH, TX ENGINEER'S OPINION Summary of OF Construction Cost PROBABLE CONSTRUCTION COST for Water Improvements for CMC Recycling Facility CONSTRUCTION COSTS 1. WATER DISTRIBUTION TOTAL CONSTRUCTION COST 85,597.00 85,597.00 6-Apr-12 570-W2 OPG-CFA-CMC 12-o406 Page 1 of 2 i I, CPMS ITEM I RECORD NO. WATER DISTRIBUTION 1 00592 2 00617 3 1 01154 4 I 00719 5 00749 6 00745 7 00546 8 00568 9 00538 10 00372 SUBTOTAL ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST DESCRIPTION Pipe-Pressure-16 Inch — Install Pipe-Pressure-8 Inch — Install Valve — 4-inch Blow -off Valve with Vault Valve-16 Inch -Gate- w/Vault — install Valve-8 Inch -Gate Valve w/BOx — Instal( Valve-6 Inch -Gate Valve w/Box — Install Fire Hydrant -- Install I Pipe Fittings- < Than 16 Inch DI Pipe -- Install I Concrete -QUICK SET - Install !Trench safety TOTAL PROBABLE CONSTRUCTION COST 570-002 OPC-CFA-CMC 12-0406 QTY/UNIT I I 1,208 5 1 1 1 2 2 3.00 10.00 1,213 PRICE LF $ 48.00 $ LF $ 30.00 $ EA $ 3,500.00 $ EA $ 6,000.00 $ EA $ 1,000.00 $ EA $ 800.00 $ EA I $ 2,500.00 I $ TN I $ 3,000.00 I $ CYI$ 15.00I$ LFI$ 1.00I$ AMOUNT 57,984.00 150.00 3,500.00 6,000.00 1,000.00 1,600.00 5,000.00 9,000.00 150.00 1 213 00 85,597.00 85,597.00 Page 2 of 2 LOCATION MAP N.T.S. MAPSCO No. 34N COUNCIL DISTRICT 2 ill I r+ r a I/o'y+ 0 .1� "mu CO 0 O 'Q D as> ‘2" 0 O C`•••.,. 3 1 a 1 1 1 / w� ti.. to s\4' e CO ti vgar A 0.w Ct CL IP 0 act ,,,.416, 1— w w — 0 CD i 0 co 0 0 p} • 1 0 O' • • 1 91 magi 16" tap, 2" irr and 2" domestic meters f -- done by misc �` contract LaJ 0 O.z A LO r Lai = 0 IX ccRic ..3 (4».......,1,5 NF ttttttt 1111111 r. ILocksisoocka 8" sanitary sewer line done by misc contract with city Lai CC f • J :::::-aaEi............... r �w^s\ s 4:. ! w- MPROVEMENTS 3