HomeMy WebLinkAboutContract 43313 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. 4333
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Phoenix — FWSouth, LLC
Authorized Signatory/Title: Stephen M. Eisner, Manager
Address, State, Zip Code: 200 Man 0 War Ct Burleson, TX 76028
Phone Number, E-Mail: (817) 426-5 85 9, eisnerl@flash.net
Project Name: The Phoenix
Project Location: 429 College Ave.
Plat Case No.: FS-011-062 Plat Name: Jennings South Addition
Mapsco: 76H
CFA: 2011-035 DOE: 6709
To be completed bstaff
Received by:
+ot
Council District: 9 City Project No: 01773
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Date: .5l2-3 /
06-1 4-1 2 A09 : 34 IN
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) X , Paving (B) _X , Storm Drain (B-1) , Street Lights &
Signs (C) X.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
dram, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or en7plovees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not suck
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers. servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by
the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
v. Notwithstanding the foregoing provisions, if construction of the facilities
described herein is not initiated within the two-year period (as defined
above) due to inadequate funding, all obligations of the City and Developer
under this Agreement shall terminate and be of no further force and effect.
The ability to terminate this Agreement for the reason stated in this
subsection may be exercised at any time within the two (2) year period.
City and Developer will cooperate, one with the other, to effect any
documentation reasonably required by City, Developer its contractor,
surety or lender to evidence termination of this Agreement for this reason.
Should the City desire, it may require as a condition to termination of this
Agreement, that Developer vacate the plat as well as the right-of-way
vacation associated with the contemplated project. Alternatively, the parties
may, upon mutual agreement, execute a new Community Facilities
Agreement.
Cost Summary Sheet
Project Name: The Phoenix
CFA No.: 2011-036 DOE No.: 6709
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting. An
itemized estimate corresponding to each project -specific exhibit is required to support the following
information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2 Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2 Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Sub -Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
106,756.00
5,530.00
112,286.00
$ 60,712 00
$
$ 52,850.00
$ 113,562.00
Total Construction Fees: $
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer— 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
225,848.00
2,245.72
2,245.72
4,491.44
2,428.48
1,214.24
2,114.00
5,756.72
10,248.16
Amount
225,848.00 X
225,848.00
140,357.50
141 ,952.50
282,310.00 I
Choice
fck one)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its naive and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instillment in at Fort Worth, Texas this r. day of (4
quadruplicate,
20 IV.
CITY OF FORT WORTH e Recommended by:
Water Department
A4
Wendy Cl
Developid t Engineering Manager
abulal, EMBA, P.E.
Approved as to Form & Legality:
DoZia—se-W. Black
Assistant City Attorney
M&C No. ail
Date:
ATTEST:
Secreta
ATTEST:
7Pak(hci
Signature
(Print) Name:
Transportation & Public Works Department
LJ
Dougla�Wiersig, P.E
Directo
Approved by City Manager 's Office
ce
nama,
Fernando Costa
Assistant City Manager
deSsetalletrati
aer FOR? 4*
01000o0000
Pit 4
Op
:rig
a
10
o
sas
%QC)
%0 0
Ss'
8 X 0
4c a
�cY
ts 00000a toe
cizzzlif-EICADt*
lztaminavis
DEVELOPER:
Phoenix-FWSouth, LLC
By its manager
FWS EMD, LLC
9
Signature
Print Name: Stephen M Eisner
Title: Manager
•
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken.
Checked items must be included as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
/1
rs
r"
►1
n
(Remainder of Page Intentionally Left Blank)
IX-.9,
CONNECT TO
EX. 6" WATER
PROPOSED 8"
WATER LINE
Hz
O HZ
GO
ND rn e5
jai
(n •
rn<o
w(N;
f7
ID
-
o
LOT 18C
CONNECT TO
EX. 6' WATER
1
IX.1
LOT 12
LOT 13
LOT14
LOT 15
LOT 16
CONNECT TO
EX. 10' WATER
for_ 1Q
PROPOSED 12"
WATER LINE
Ij
(
WEST TUCKER STREET _;
CONNECT TO
EX. 6" WATER
LOT 2A
BLOCK 34
WM
WM
LOT
BLOCK 34
PROPOSED 12"
WATER LINE
WEST $ROA®WAY.AVE..
_ St ILL.
CONNECT TO
EX. 6' WATER
tot®
10
1-4
1 �1
gct
PROPOSED 4" DOM.
WATER METER
PROPOSED 6"
FIRE SERVICE
PROPOSED 8"
WATER LINE
LOT 13R
I BLOCK 39
LOT 1
ELOCK 34
CONNECT TO
EX. 6" WATER
L_Exi_
NEST PETERSPATH -ST ti
1
CONNECT TO
EX. 8" WATER
civil engineering. planning
LOT 9R
BLOCK 39 I
1WMPENNSYLVANIA AVENUE` P
EwL
The Phoenix
429 College Ave.
Fort Worth Texas
1
a
Exhibit A
SCALE: DATE: SHEET: 1
1' 100' I 4/20/2012
•
mr
7
n
U)
1-1
K2
rr
n:
6
co
N
a_
LOT 12
LOT 13
LOT 14
LOT15
LOT 16
LOT
I8C
DBL. CLEANOUT
WET=BROADWAY AVE.� STA. 0+14
LCI
BLOCK
L234 --
I
A -LOT2 ,W �
34 BLOCK 34 I�
Ca
J
Sl IPROPOSED M.H.
@ STA. 1+66
AT
-
L 244 TO BE ABANDONEDIT
,..-' ISTA. 1+66 TO STA. 3+90
tx. OLSS
- WES PETERSNIltH S-T.
I I
LOT 13R
BIOCR 39
WEST _TUCKER STREET
civil engineering • planning
LAI �II"
_FX,=10_ SS -' "J_23
I ,. 1—
L-253 TO BE MADE PRIVATE
STA. 0+14 TO STA. 0+79
LCT1
BLOCK 34
PROPOSED 10"
SAN SEWER
I. I
L-246N TO BE ABANDONED
STA. 0+00 TO STA. 2+16
i
LOT 9R
BLOCK 39
PENNSYLVANIA AVENUE
The Phoenix
429 College Ave.
Fort Worth Texas
CONNECT TO EX.
15° PVC SS M-15R
Exhibit A-1
SCALE: DA1E: SHEET:
1° = 100 12/01/2011
20' (TYP.)
NEW CONCR
PAVEMENT
PARALLEL PARKING DETAIL
N.T S.
PROPOSED
SIDEWALK
;a:`
rtrfrrrnfie
I6'x24' ACCESSIBLEI
SPACE
/
P
s
LOT 13-
BLOCK 39
Lc
LI
S17.(_
apipirrlior
WEST PETERSMI TH ST.
vin
civil .,ng.n'-,. , _ p(onn?ng
LEGEND
The Phoenix
LO I YR
FLOCK 39
PROPOSED SIDEWALKS
PROPOSED PAVEMENT
Exhibit B
429 College Ave.
Fort Worth Texas 'SCALE DATE: SH e
1 a TC' 3/5/2012 I... ... 1
e
LOT 2A
ELOCK 34
PROPOSED LIGHT
STD (TYPICAL)
LOT 13R
BLOCK 39
LOT 2
BLOCK 34
Itati
qict
cct
WEST PETERSMITH ST.
civil engineering a planning
The Phoenix
429 College Ave.
Fort Worth Texas
LOT 1
BLOCK 34
LOT 9R
BLOCK 39
Exhibit C
SCALE: DAME:
1" 60' 12/01/2011
•
1
i
THE PHOENIX
CFA CONSTRUCTION ESTIMATE
A. WATER
DESCRIPTION
Pipe-Pressure-4 Inch - Install
Pipe-Pressure-6 Inch - Install
Pipe-Pressure-8 Inch - Install
Pipe-Pressure-12 Inch - Install
Pipe -Grout -Non -Shrink - Install
Valve-6 Inch -Gate Valve w/Box - Install
Valve-8 Inch -Gate Valve w/Box - Install
Valve-12 Inch -Gate Valve w/Box - Install
Fire Hydrant- Install
Meter Vault w/4 Inch Turbo & 2 Inch Bypass - Install
Water Service-4 Inch -Tap to Main - Install
Sample Station - Install
Trench Safety System 5 Foot Depth - Install
Water Service-1 Inch - Install
Water Service-2 Inch - Install
Water Service-1 Inch -Tap to Main - Install
SUB - TOTAL:
B. WASTEWATER
DESCRIPTION
Pipe-Sewer-10 Inch (All Depths) - Install
Manhole-Std 4 Ft Diam-(to 6 Ft Depth) - Install
Trench Safety System 5 Foot Depth - Install
SUB - TOTAL:
D. PAVING
DESCRIPTION
Pavement Concrete - Install
Curb & Gutter - Install
Subgrade-6 Inch -Lime Stabilized-28 lbslsy - Install
Walk-5 Ft - Install
Walk-ADA Wheelchair Ramp - Install
Pavement Marking -Crosswalk 12 Inch- P-H-A Thermoplastic -
Install
SUB TOTAL:
E. STREET LIGHTS
DESCRIPTION
UNIT
LF
LF
LF
LF
CY
EA
EA
EA
EA
EA
EA
EA
LF
LF
LF
EA
UNIT
LF
LF
LF
UNIT
SY
LF
SY
SF
EA
LF
UNIT
Light -Ornamental Pole & Fixture -item purchased from City - Install EA
Dbl Conduit-2 Inch-Sch 40 - Install LF
SUB -TOTAL:
APPROX.
QUANTITY
30
68
530
979
50
4
5
7
3
1
1
1
1,200
42
14
1
APPROX.
QUANTITY
30
2
30
APPROX.
QUANTITY
635
796
635
8,200
2
50.00
APPROX.
QUANTITY
14
550
UNIT
PRICE
35.00
30.00 $
39.00 $
45.00 $
25.00
700.00
900.00
1,500.00
2,200.00
8,500.00
975.00 $
800.00 $
1.00
22.00
28.00
500.00 $
UNIT
PRICE
$ 50.00
$ 2,000.00
$ 1.00
UNIT
PRICE
24.00
2.00
3.00
5.00
400.00
3.50
UNIT
PRICE
TOTAL
1,050.00
2,040.00
20,670.00
44,055.00
1,250.00
2,800.00
4,500.00
10,500.00
6,600.00
8,500.00
975.00
800.00
1,200.00
924.00
392.00
500.00
106,756.00
TOTAL
1,500.00
4,000.00
30.00
5,530.00 I
TOTAL
15,240.00
1,592.00
1,905.00
41,000.00
800.00
175.00
$ 60,712.00
$ 3,500.00 I $
$ 7.00 I $
TOTAL
49,000.00
3,850.00
$ 52,850.00
i
CPMS
BID-00605
BID-00615
BID-00617
BID-00590
BID-00224
BID-00745
BID-00749
BID-00717
BID-00546
BID-00563
No Bid Item
BID-00709
BID-00372
BID-00758
BID-00763
BID-00762
CPMS
BID-00227
BID-00213
BID-00372
CPMS
BID-00429
BID-00423
BID-00484
BID-00531
BID-01227
BID-00996
CPMS
BID-00970
BID-00175
i
2011013-CFA 20120417.xlsx
Evolving Texas Page 1 of 1