HomeMy WebLinkAboutContract 43275 (2)CONSTRUCTION REIMBURSEMENT AGREEMENT EMTA eon -mutt Not . CITY OF FORT WORTH, TEXAS BNSF RAILWAY TRACK INSTALLATION ALLIANCE AIRPORT RUNWAY EXTENSION PROJECT THIS AGRLEIVMI-NT is made and entered into by and between the CITY OF FORT WORTH, a Texas home -rule municipal corporation ("City"), by and through its duly authorized assistant city manager, as authorized by the City Council (M&C C-25470), and Enbridge Gathering (North Texas) L.P., with a mailing address of 1100 Louisiana Street, Suite 3300, Houston, Texas 77002 ("Company"). WITNESSETH: WHEREAS, Company owns and operates a natural gas pipeline system (the "Facility") in Denton County, Texas, said Facility being a part of Justin system; and WHEREAS, City is expanding its Alliance Airport and desires to install or cause to be installed new BNSF Railway tracks in Fort Worth, Texas (the "BNSF Tracks") and City has requested that Company reroute, adjust and/or take protective action on a portion of the Facility (the "Relocation"), in order to accommodate the BNSF Tracks; and WHEREAS, Company has agreed to provide the Relocation services subject to payment for relocation costs as detailed herein as generally depicted on Exhibit "A"; and WHEREAS, City has agreed to reimburse Company for the costs and expenses for the Engineering and/or Construction and Field Services for the Relocation project, estimated at $346,376 as shown on Exhibit "A" attached hereto and made a part hereof; and NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter set forth, it is hereby agreed by and between City and Company as follows RECITALS: The recitals, above, are incorporated into this Agreement insofar as they contain material elements germane to the Parties. REIMBURSEMENT BY CITY: A. City agrees to pre -pay Company $173,188.00 (equal to 50%) of the estimated maximum cost for the Relocation, based on Exhibit "A" attached hereto. B. Company shall prepare, and City shall review, an estimated cost for the Engineering and/or Construction and Field Services necessary for the Relocation. The estimated Relocation cost is $346,376.00 (Exhibit "A"). These costs will be reimbursed by City to Company (excluding the amount paid in A, above and excluding 5% per invoice which shall be withheld as retainage by City) within 30 days of presentation of a at tpment(s) showing actual costs and supporting documentation of work completed. OFFICIAL RECOh` . Should the verified actual cost o be greater than the estimated cost, City shall CITY SECRETARY remit the difference to Company within thirty (30) days of the presentation of Fit,WORTH T F a statement showing actual costs and support materials. b. If the actual cost exceeds the estimated cost by more than Fifty Thousand Dollars ($50,000), City must obtain City Council authorization for the Reimbursement Agreement City of Fort Worth & Enbridge Gathering (North Texas) L.P. Alliance Runway Fxtpncinn IItiiity RPlnr.atinn -0]-72 PO4:77 IN increased payment amount and shall not be bound to the 30 day payment requirement but shall seek said approval within a reasonable time C. City reserves the right to review and verify any presented invoice or statement for accuracy D. Company shall submit to City within 45 days of completion a final accounting for all Relocation expenses incurred under this Agreement. Upon verification City will remit the retainage held. E. The obligation of the City to make a cost reimbursement payment under this Agreement does not constitute a general obligation or indebtedness of City for which the City is obligated to levy, pledge or collect any form of taxation. INGRESS AND EGRESS: City hereby grants to Company the right of ingress and egress across all lands owned, leased or controlled by City as may be reasonable and/or necessary for Company to perform the Relocation. AUDIT: City shall have the nght, upon reasonable notice and during normal business hours, to audit and obtain copies of the books, records, and accounts of Company relating to the Relocation for up to two years after the date Company completes the Relocation. HOLD HARMLESS AND INDEMNIFICATION: City its successor or assigns, shall hold Company harmless and free from any and all claims of damages which may occur arising out of City's, its successors and assigns negligence in connection with the development of the land or in particular with this project to install new BNSF Railway tracks. Company shall be liable for and shall promptly and fully compensate City for liabilities, claims and costs resulting either from the negligent activities of Company employees, agents and/or contractors or from spillage or discharge of petroleum products or other hazardous substance from the Pipeline. Company agrees to indemnify and hold harmless the City, its officers, agents and employees, against and from any and all liability, loss and expense and shall defend all claims resulting from loss of life or damage or injury to persons or property directly or indirectly resulting from the work performed by Company to the extent such loss, damage or injury, is caused by the negligence or willful misconduct of Company or its agents or arises out of or in connection with the Relocation Services. As a necessary condition for such indemnity to be enforceable against Company: (i) Company shall be notified in writing promptly of any and all claims, liability, loss and expense for which City seeks indemnification from Company, and (ii) Company shall have sole control of the defense of any and all claims, liability, loss and expense and all negotiations for their settlement or compromise. NO THIRD PARTY: This Agreement is solely for the benefit of the City and Company, and neither the City nor Company intends by any provision of this Agreement to create any rights in any third -party beneficiaries or to confer any benefit or enforceable rights, under this Agreement or otherwise, upon anyone other than the City and Company. VENUE AND JURISDICTION: This Agreement shall be governed by the laws of the State of Texas. Venue for any action brought to interpret or enforce, or arising out of or incident to, the terms of this Agreement shall be in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. Reimbursement Agreement City of Fort Worth & Enbrldge Gathering (North Texas) L.P. A ll;annn T?„nn,w Rvtanoinn TTtilih, 1nlnnot'nn ENTIRETY OF AGREEMENT: This Agreement constitutes the entire agreement between the parties hereto relating to the subject matter hereof and no alterations of the terms and conditions of this Agreement shall be valid unless in writing and signed by both of the parties hereto. This Agreement shall be binding upon and inure to the benefit of the parties hereto, their successors and assigns SIGNATURE PAGE TO FOLLOW Reimbursement Agreement City of Fort Worth & Enbridge Gathering (North Texas) L.P. Alliance Runway Pytencinn TTtility Relnratinn IN WITNESS WHEREOF, this Agreement shall become effective as of the date it becomes fully executed by the parties. ENBRIDGE GATHERING (NORTH TEXAS) L.P. BY: ENBRIDGE HOLDINGS (TEXAS SYSTEMS) L.L.C., Its general partner By: Date: David K. Martin Agent and Attorney -in -Fact MC' 2- 5"(1 Date: Reimbursement Agreement City of Fort Worth & Enbridge Gathering (North Texas) L.P. Alliance Runway F.xtencinn T Ttility R elnratinn CITY OF FORT WORTH By: e)-441400.4 Fernando Costa Assistant City Manager Date: .0'/AZ Recommended by: Douglas W. Wiersig Director, T/PW Department Apprs to Form and legality: Doti, glasBlack Assistant City Attorney Attest: Mary J Kayser �^ City Secretary 1 4,irat\tt� E.0„ 0 00°,4( (c)':e 0 00.000° ib 41`exixsa...4Ce OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AC KNOWLE DG ilfl E NTS STATE OF TEXAS COUNTY OF PA RV,� Before me, a Notary Public in and for said county and state, on this d.2_, day of 1441 , 2012 personally appeared David K. Marlin, to me known to be the identical person )(who subscribed the name of the maker thereof to the foregoing instrument as Agent and Attorney - in -Fact for Enbridge Holdings (Texas Systems) L.L.0 , and acknowledged to me that he executed the same as his free and voluntary act and deed, and as the free and voluntary act and deed of such corporation for the uses and purposes set forth. Witness my hand and official seal this the a of co/ , 2012. My Commission Expires: 11 /6/?o c3 tor STATE OF TEXAS COUNTY OF TARRANT l ;CAUL, PIETER ER HANCI(E My Cornrriisioo Expires Movohihor 6, 2013 Before me, the undersigned authority, on this day personally appeared Fernando Costa, Assistant City Manager of the CITY OF FORT WORTH, a Texas home -rule municipal corporation, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that in his capacity as Assistant City Manager of the CITY OF FORT WORTH, he executed the same as the act of such corporation for the purposes and consideration therein expressed. Witness my hand and official seal this thaslas day of ._ •• :.Ike • •• �t,10 oto%•� .. L. . _i ;I. .1 z r_. lA MARIA S. SAANCHEZ MY COMMISSION EXPIRES December 14, 2013 414 L!_j�. My Commission Expires: 0 Notary Public Reimbursement Agreement City of Fort Worth & Enbridge Gathering (North Texas) L.P. Alliance Runway Fxtencinn T Ttility Relnr.atinn , 2012. EXHIBITS TO FOLLOW: LIST Reimbursement Agreement City of Fort Worth & Enbridge Gathering (North Texas) L.P. Alliance Runway Pytpncinn TTtility Relnratinn ESTIMATE Exhibit "A" 84 10.750 0.365 11 " O.D. "WT i REPLACE APPROX. 232 FEET OF LINE J-I0" DUE TO BNSF TRACK #2 CONSTRUCTION PROJECT LOCATED IN DENTON COUNTY 40.48 #/fl 0.02 miles tons i Op. Press (psig) MAOP (psig) SMYS (psi) 175 720 52,000 MATERIALS 3 3" ANSI 600 JUNIOR FITTING ORIFICE METER WITH SKID 4 TOTAL FLOW COMPUTER WITH COMM. 5 2" ANSI 600 JUNIOR FITTING ORFICE METER WITH SKID 6 5-VALVE MANIFOLD, STABILIZERS, THERMOWELI., AND PRESSURE GAUGE 7 YZ AUTO SAMPLER 8 PIPE AND FITTINGS - MINOR MATERIALS 9 CONCRETE BLOCKS AND GRAVEL 10 PAINT 11 12 TAXES INSTALLATION COSTS 13 CONTRACT FABRICATION & INSTALLATION 14 PAINTING CONTRACTOR 15 COMMUNICATION CONTRACTOR/COMPANY INSTALLATION 16 X-RAY 17 COMPANY INSTALLATION 18 SITE 19 CONTRACT ENGINEERING COST 20 INSPECTOR COST 21 PIPE INSPECTOR COST 22 ENGINEERING COST 23 COMPANY INSTALLATION PART 02 - PIPELINE: MATERIALS 1 10.750" O.D., 0.219", API-5L, X-52, FI3E COATED LINE PIPE 2 10.750" O.D. 0.365",API-SL,X-52, ARO COATED DRILL PIPE 3 8.625" O.D., 0.219" WALL, X-52, SEAMLESS, API-SL FBE PIPE 4 6.625" O.D., 0.280", A-106 GRADE B SEAMLESS FAB PIPE 5 10" ANSI 600 F.E., F.O. BALL VALVE 6 8" ANSI 600 F.E., F.O. BALL VALVE 7 6" ANSI 600 C.E., F.O. BALL VALVE 8 4" ANSI 600 F.E., F.O. BALL VALVE 9 3"-ANSI 600 F E f= O BALL VALVE 10 2" ANSI 600 F.E. F.O. BALL VALVE 11 6" PIG TRAP CLOSURE 12 6" PIG TRAPS( labor incl.) 13 CORROSION INHIBITOR PUMP, TANK, COUPON HOLDER 14 RECTIFIER AND GROUND BED 15 HOT TAP FITTING 16 FITTINGS & FLANGES 17 WATER KNOCK OUT 18 MINOR MATERIALS 19 SALES TAX 20 FREIGHT 3.53 (psig) «< Calculated MAOP 100% 2. 5-12 (psig) «< Calculated MAOP Class I 2.1 19 (psig) cc< Calculated MAOP Class II i . 766 (psig) «< Calculated MAOP Class III TOTAL CONTRACT LABOR TOTAL (Y)1111'.ANV LABOR PIPE TOTAL: VA1.\TE TOTAL: MISC. FITTING TOTAL: S 10,395 SO A MOUNT 0 0 0 0 0 0 0 UNIT EA. EA. EA. LOT EA. LOT LOT LOT UNIT COST COST $9,756 $5,668 $7,751 $800 $3,000 $500 $500 $500 8.25% OF SO METER STATIONMATERIALS: 0 LOT 0 LOT 0 LOT 0 LOT 0 HR(S) 0 EA 0 HR(S) 0 DAY(S) 0 DAY(S) 0 DAY(S) 0 DAY(S) S5,000 $950 $3,000 $1,200 $82.00 $2,500 $82.00 $725 $600.00 $650.00 INSTALLATION COST: Tot METER ST.lTION COST: SO SO $0 So So $0 S0 SO $0 S0 SO $0 $0 $0 $0 $0 $0 $0 $0 SO %cIl $0 SO i) SO SO AMOUNT UNIT IINIT COST COST 210 FT. $30.50 $6,405 84 FT. $47.50 $3,990 - FT. $0.00 $0 - ET. $27.00 $0 SIB MP EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. EA. 1 LOT EA. 10.0% OF 8.25% OF 5 TON S 10,779 $8,300 $3,100 $1,500 $950 $450 $1,295 S11,000 $4,500 $30,000 $1,800 $6,500 $5,665 S16,895 $18,583 $300 Still-TOINL: $0 $0 SO SO $0 $0 $0 $0 SO $0 $0 $6,500 $0 $ 1,690 $1,533 $1.500 S21,617.72 ESTIMATE R.O.W. COSTS 21 LAUNCHER SITE 22 R-O-W AGENTS 23 LEGAL 24 RIGHT OF WAY AND DAMAGES ESTINIATED # OF TRACKS: INSTALLATION COSTS -OUTSIDE 21 CONTRACTOR TO INSTALLATION COST -TYPICAL R-O-W 22 CONTRACTOR TO COMPACT DITCH 23 COMPACTION TESTING 24 ROCK LAY COST 25 INSTALL ROCK SHIELD 26 DOUBLE DITCH OR TOP SOILING ROW 27 PADDING DITCH 28 PAINTING CONTRACTOR 29 SURVEY & RE -STALLING 30 DRAFTING 31 X-RAY 32 REMOVE EXISTING PIPELINE - LABOR 33 INSTALL AND MAINTAIN SILT FENCE 34 INSPECTION No. of Inspectors: 1 35 ENVIRONMENTAL ASSESSMENT & PERMITTING INSTALLATION COST - COMPANY 36 ENGINEERING 37 GAS LOSS 38 CONSTRUCTION COORDINATOR AND/OR MANAGERS 39 SHUTDOWN (COMPANY FIELD TECHNICIANS) MISCELLANEOUS COST 39 40 41 CONTINGENCIES 42 CAPITALIZED INTEREST "AFUDC" 43 AID IN CONSTRUCTION " SUMMARY .k LAND & LAND RIGHTS $66.93() A.1 Routing & Permiting (Agreements) A.2 Damages A.3 Legal F METERING FACILITIES 13 MAIN 8 FEEDER LINES $2 I M 18 B.I Procurement B.1.1 Misc Fittings B.1.2 Valves B.1.3 Pipe Z GENERAL S257.$19 Z.35 Contract Labor Z.40 Company Labor Z.94 AIC Z.90 AFUDC Z.96 Contingency TOT.AL ESTIMATED) COST $346.376 1 DAVS/TRACK 11) 276.2% Work DaysiWk : 6 Wks : $12,700 $24.239 $30.000 SO $11.223 $0 S 10.395 $204.556 $27.860 SO $0 S25.403 $346.376 EA 10 DAY(S) I EACH 232 FT. 20 DAY(S) 10 DAY(S) 1 JB 232 FT. 232 FT. 232 FT. 232 FT. LOT 2.0 DAY(S) 4 DAY(S) 3 DAY(S) 4 DAY(S) FT. 36 DAY(S) 0.0 MILE(S) 4 DAY(S) 2 DAY(S) 10 DAY(S) 4 DAY(S) JOB DAY(S) t 0.0 t;) OF 1 Job 5- ..,. $1,270 $30,000.00 S104 SUB -TOTAL: $5,500.00 $4,000.00 $2,500.00 $9.00 $4.50 $3.50 $3.50 $3,000.00 $1,800 $500 $1.200 $3,000 5.0 $725 $0 SUB -TOTAL: $1,270 $2,500 $1,270 $1,270 SUB -TOTAL: $254,034 $0 SUB -TOTAL: PIPELINE COST: TOTAL PROJECT COST: Estimated Bv: Janes Cheshire Date: 1/18/2012 $0 $12,700 $30,000 S2.1,239 S66, 939.36 $I 10,000 $40,000 $2,500 $2,088 $1,044 $812 $8I2 $0 S3,600 $2,000 $3,600 $12,000 0.0 $26,100 $0 S204,556 $5,080 $5,000 $12,700 $5,080 S27, 860 $0 $0 $25,403 0 $0 525,403 $346,376 $346,376 I City of Fort Worth, Texas Mayor and Council Communication COUNCIL, ACTION: Approved on 3/6/2012 "MEMO.'" saatearafaithedillM".=-&;z:ercettgagtaAtni- DATE: Tuesday, March 06, 2012 REFERENCE NO.: **C-25470 LOG NAME: 55AFW RWY EXT UTILITY RELOCATION_ENBRIDGE (BNSF) SUBJECT: Authorize Execution of a Utility Adjustment Agreement with Enbridge Gathering, North Texas, L.P., in the Amount of $346,376.00 for Construction Fees Associated with the Relocation of a Gas Pipeline as Part of the Runway Extension Project at Fort Worth Alliance Airport (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of a Utility Adjustment Agreement with Enbridge Gathering, North Texas, L.P., in the amount of $346,376.00 for construction fees associated with the relocation of a gas pipeline as part of the Runway Extension Project at Fort Worth Alliance Airport DISCUSSION: This Construction Utility Relocation Reimbursement Agreement is required to pay for the relocation of certain Enbridge Gathering (North Texas) L P (Enbridge) gas pipelines to allow the realignment of the Burlington Northern Santa Fe Railroad (BNSF) Main Line as a part of the Runway Extension Project at Fort Worth Alliance Airport. In order to construct the new runway extension, it is necessary to relocate all private utility service conflicts located on the proposed BNSF Main line. Enbridge has gas pipelines that will need to be relocated to allow BNSF to construct their new Main Line Track and Collector Track. The utility facilities will be relocated by Enbridge and Enbridge will be reimbursed for the agreed -upon amount. Federal Aviation Administration funds from Runway Extension Grant 3-48-0296-43-2011 will be used for this Project. Existing land credits that remain from the original land donation for Alliance Airport will be used for the City of Fort Worth's five percent in -kind match A waiver of the DBE goal was requested by the Aviation Department and approved by the M/WBE Office. This work will be done by Enbridge and not by the City of Fort Worth. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Airports Grant Fund. FUND CENTERS: TO Fund/Account/Centers Logname: 55AFW RWY EXT UTILITY RELOCATION_ENBRIDGE (BNSF) Page 1 of 2 &LI I I101.1.i .11111i ii I Ili 'III IIIill ,1iii1,ii I. !III ii.III iIOR 011111111111111111.11111 i1i1o111111 I,oe�o�ei��ieiie�i��ii ALUMINUM DI N:7068308.11 •2334837.09 • DENTON COUNTY, TEXAS mwayrsit TEMPORARY WORKSPACE • M POLK SURVEY ABSTRACT NO. 993 WILLIAM CAFFIELD SURVEY ABSTRACT NO. 448 ONCRETE MONUMENT EI NE 7068208.83 47.70 CONCRETE MONUMENT 4 N,706 8171.7915 £: 2335244. N t EXISTING 20' CANTER4 GAS GATHERING 20' HIDE PERMANENT E%4S /ENT TP PART OF A RESIDUE OF A� .44c . CALLED 136.16 ACRES EUGENE WILEY VOL. 836, PC. 477 VOL 888, PG. 665 ANNETTE (WILEY) LOWRY VOL. 836, PC. 474 VOL. 686, PG. 563 BETTYE NEELY VOL. 885, PG. 475 VOL. 636, PC. 564 TRUST f�'b/o CAROL VARDAKIS AND HOWARD RAY SCHTOPE DOCUMENT NO. 2007-123520 NOTES • POO N: 7067856.10 E: 2335188.04 t. IFE ONEWAW OF DE SUDIC! sus!. SOW IEFIEBIt K RANO UM CS PREMED BY IT[ CUM 2 ALL BEVINCS AMD OSTNKES ARE GAD No /RE R�1ROCED SO DE TEXAS S!A$ RARE OOCRDMAIE SYSTOE MAD 87 FM81N EINIPAn ZONE (42J21. OS SIPttiY FEEL USED OPON OPS OSSYADOMA W COAST ORO TO CM* OWN --ME B-CRWW) CONCOCTED �M DEMO 2DI1.• OER14D !xO! AN R Sts CDCm$. aim SAME NA NO O TOA 'RCM FD US. us MST DOES HOT 11 AMY VAS ANT A 'V L WARY SUM' !JO DOTS NOT COiWIY IMP LOT'AS. SOMA( STANDARDS of moose FIN A BdWARY SUR10. :DRAWN BY.• PIS — WO, `DATE:• January 17, 2012 IIWG. NO.: Wilav -BOOK NO.: F5 _REVISED: AT. it S.F. RWY. CO. G4LLED 12.852 ACRES DOCUMENT 194-R0084569 4 N:70 8E 0 MONUMENT E: 2335329.86 10265. N 2T26$r E H'POT HN: 7068012,82 It:2335292.33 170.90' S 69`46:26" E CONCRETE MONUMENT' N: 7067794.20 E: 2335350.84 EXISTING PIPELINE b SCALE: 1" igr WO FEET LEGEND 0 4. ALUMINUM DISK ■ = CONCRETE MONUMENT POUND C/L OP EASEMENT = DEED UNE x— : FENCE UNE .. SURVEY UNE - EASEMENT UNE EUGENE WILEY TOTAL DISTANCE ACROSS PROPERTY: 235.23 FEET TOTAL AREA OF PERMANENT EASEMENT: 0.100 OF AN ACRE TOTAL AREA OF TEMPORARY WORKSPACE: 4.981 ACRES N11N1DGE PRWZ7` LAT ✓LVY..R RA',rPUR PLAT SHOWING THE 6252212E OF A ZQ FEET-4YT7E PETf1LWENT wee LOCATED IN THE NiYLN2 CAPFTe2A S7RVfY, ABSTRACT 413 448 1N D£NTON COUNTY, TEOIS. PO NO. OF t 3OF3 DENTON COUNTY, TEXAS WILLIAM GAFFIELD SURVEY, ABSTRACT NO. 448 EXHIBIT "A" ENBRIIDGE G & P (NORTH TEXAS), L.P. LINE 7 B.N.S.F. RAILROAD SPUR EUGENE WILEY ANETTE WILEY LOWERY BETTYE NEELY TRUST f/b/o CAROL VARDAKIS AND HOWARD RAY SCHWOPE 20 FEET -WIDE PERMANENT EASEMENT Description of a 20 feet -wide permanent easement being located in the William Gaffield Survey. Abstract No. 448, Denton County, Texas; being part of a residue of a called 136.16 acre tract described to Deed to Eugene Wiley. recorded to Volume 635, Pagt, 477 of the Deed Records of Denton County, Texas and Volume 636, Page 565 of said Deed Records; to Annette Wiley Lowry, recorded in Volume 635, Page 474 of said Deed Records and Volume 636, Page 563 of said Deed Records; to Bettye Neely, recorded in Volume 635, Page 475 of said Deed Records and Volume 636, Page 564 of said Deed Records; and Trust f/Wo Carol Vardakis and Howard Ray Schwope, recorded in Document No. 2007-123520 of said Deed Records; said 20 feet -wide permanent easement being described by a centerline which is bound by lines 10 feet each side of and parallel with said centerline, being described as follows: BEGINNING at a point in said 136.16 acre tract in a Northwesterly line of a 20' wide easement to Cantera Gas Gathering, Inc., from which a concrete monument found at the intersection of the Westerly line of caned 10.125 acre tract for the Westerly line of State Highway 156 to the State of Texas recorded in Document No. 94-R0084569 of said Deed Records and the Soutlteriy line of a called 12.852 acre tract to A.T. & S.F. Railroad Company, recorded in said Document No. 94-R0084569, bears South 69°46'26" Pact a distance of 170.90 feet THENCE North 40°54'05" East, a distance of 53.79 feet to a point; THENCE North 49°03'47" East, a distance of 181.44 feet to the POINT OF TERMINATION in a Westerly line of said 20 wide easement, from which a concrete monument found in said Westerly Right -of -Way Tine of State Highway 156, bears North 21 °26'57" East, a distance of 102.65 feet, and said centerline length being 235.23 feet and containing 0.100 of an acre of land, more or less TEMPORARY WORKSPACE Temporary Workspaces as shown on Page 1 of 3". said Temporary Workspaces containing a total of 4.981 acres. more or less I, James Paul Ward, Registered Professional Land Surveyor No. 5606 of the State of Texas. do hereby cenify that this plat shows the results of an an the ground survey and office computations made under my direction. Original siyaa4 ra red Ink. Date of Signature: January 17, 2012 �`J•A'MES PAUL WARD f `'REGISTERED PROFESSIONAL LAND SURVEYOR NO. 5606 FOR PIPELINE LAND SERVICES, INC. 875 ENTERPRISE PLACE, SUITE A, SOUTHLAKI:, TEXAS, 76092 (817) 562-2555 OFFICE (817) 562-2557 FAX