This AGRLEMENT is between the City of Dort Worth, a Texas homenrulo municipality
(the "CITY"), and Freese and Nichols, Inc., authorized to do business in Texas, (the
"ENGINI=ER"), for a PROJECT generally described as: Royal Creek Channel Repair.
Article
Scope of Services
A. Tho Scope of Services is set forth in Attachment A.
Article II
Cornpensation
A. The ENGINEER's compensation is set forth in Attachment E.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but not
limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested will
be withheld from payment, and the undisputed portion will be paid. The CITY
will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved.
(5)
If the CITY fails to make payment in full to ENGINEER for billings contested in
good faith within 60 days of the amount due, the ENGINEER may, after giving
7 days' written notice to CITY, suspend services under this AGREEMENT until
paid in full. In the event of suspension of services, the ENGINEER shall have
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 1 of 14
05-17-1 2 P03: 39 IN
OFFICIAL RECORD'
CITY SECRETARY
ET, WORTH, TX d
no liability to CITY for delays or damages caused the CITY because of such
suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B Standard of Care
The standard of care applicable to the ENGINEER's services will be the degree
of skill and diligence normally employed in the State of Texas by professional
engineers or consultants performing the same or similar services at the time
such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise specified
in Attachment A.
(2) In soils foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive test
points and sample intervals and at locations other than where
observations, exploration, and investigations have been made. Because
of the inherent uncertainties in subsurface evaluations, changed or
unanticipated underground conditions may occur that could affect the
total PROJECT cost and/or execution These conditions and
cost/execution effects are not the responsibility of the ENGINEER
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 2 of 14
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in ink
on reproducible mylar sheets and electronic files in pdf format, or as otherwise
approved by CITY, which shall become the property of the CITY. CITY may
use such drawings in any manner it desires; provided, however, that the
ENGINEER shall not be liable for the use of such drawings for any project other
than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the CITY
and/or the CITY's construction contractors or other entities, and do not relieve
the construction contractors or any other entity of their obligations, duties, and
responsibilities, including, but not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract
Documents and any health or safety precautions required by such construction
work. The ENGINEER and its personnel have no authority to exercise any
control over any construction contractor or other entity or their employees in
connection with their work or any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment Al the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general, if
the work on the PROJECT is being performed in a manner indicating that the
PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to make
exhaustive or continuous on -site inspections to discover latent defects in the
work or otherwise check the quality or quantity of the work on the PROJECT. If
the ENGINEER makes on -site observation(s) of a deviation from the Contract
Documents, the ENGINEER shall inform the CITY.
(3)
When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance with
Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 3 of 14
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and matenals; unknown or latent
conditions of existing equipment or structures that may affect operation or
maintenance costs* competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel, and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule Therefore, the ENGINEER makes no warranty that the
CITY's actual PROJECT costs, financial aspects, economic feasibility, or
schedules will not vary from the ENGINEER's opinions, analyses,
projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects that the
ENGINEER has made an examination to ascertain how or for what purpose the
construction contractor has used the moneys paid; that title to any of the work,
materials, or equipment has passed to the CITY free and clear of liens, claims,
security interests, or encumbrances; or that there are not other matters at issue
between the CITY and the construction contractor that affect the amount that
should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
I. Minority and Woman Business Enterprise (M/WBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, as amended, the City
has goals for the participation of minority business enterprises and woman
business enterprises in City contracts Engineer acknowledges the M/WBE
goal established for this contract and its accepted written commitment to
M/WBE participation. Any misrepresentation of facts (other than a negligent
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 4 of 14
misrepresentation) and/or the commission of fraud by the Engineer may result
in the termination of this Agreement and debarment from participating in City
contracts for a period of time of not less than three (3) years
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after
final payment under this contract have access to and the right to examine and
photocopy any directly pertinent books, documents, papers and records of the
ENGINEER involving transactions relating to this contract ENGINEER agrees
that the CITY shall have access during normal working hours to all necessary
ENGINEER facilities and shall be provided adequate and appropriate work
space in order to conduct audits in compliance with the provisions of this
section. The CITY shall give ENGINEER reasonable advance notice of
intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such subconsultant,
involving transactions to the subcontract, and further, that the CITY shall have
access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space, in order to conduct audits in
compliance with the provisions of this article together with subsection (3)
hereof. CITY shall give subconsultant reasonable advance notice of intended
audits.
(3)
ENGINEER and subconsultant agree to photocopy such documents as may be
requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost
of copies at the rate published in the Texas Administrative Code in effect as of
the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain commercial
general liability (CGL) and, if necessary, commercial umbrella insurance
with a limit of not less than $1,000,000.00 per each occurrence with a
$2,000,000.00 aggregate. If such Commercial General Liability insurance
contains a general aggregate limit, it shall apply separately to this
PROJECT or location.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 5 of 14
The CITY shall be included as an insured under the CGL, using ISO
additional insured endorsement or a substitute providing equivalent
coverage, and under the commercial umbrella, if any This
insurance shall apply as primary insurance with respect to any other
insurance or self-insurance programs afforded to the CITY. The
Commercial General Liability insurance policy shall have no
exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability and, if
necessary, commercial umbrella liability insurance with a limit of not less
than $1,000,000 each accident Such insurance shall cover liability arising
out of any auto', including owned, hired, and non -owned autos, when said
vehicle is used in the course of the PROJECT. If the engineer owns no
vehicles, coverage for hired or non -owned is acceptable.
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers compensation
and employers liability insurance and, if necessary commercial umbrella
liability insurance with a limit of not less than $100,000.00 each accident for
bodily injury by accident or $100,000.00 each employee for bodily injury by
disease, with $500,000.00 policy limit.
i ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional liability a
claims -made policy, with a minimum of $1,000,000.00 per claim and
aggregate The policy shall contain a retroactive date prior to the date of the
contract or the first date of services to be performed, whichever is earlier.
Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 6 of 14
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall include
its employees, officers, officials, agents, and volunteers as respects the
contracted services.
c. Certificate(s) of insurance shall document that insurance coverage specified
in this agreement are provided under applicable policies documented
thereon.
d. Any failure on part of the CITY to request required insurance documentation
shall not constitute a waiver of the insurance requirements.
e.
A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium Notice shall be sent to
the respective Department Director (by name), City of Fort Worth, 1000
Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength and
solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that would
change or alter the requirements herein is subject to approval by the CITY
in writing, if coverage is not provided on a first -dollar basis. The CITY, at it
sole discretion, may consent to alternative coverage maintained through
insurance pools or risk retention groups. Dedicated financial resources or
letters of credit may also be acceptable to the CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation in
favor of the CITY as respects the PROJECT.
The CITY shall be entitled, upon its request and without incurring expense,
to review the ENGINEER's insurance policies including endorsements
thereto and, at the CITY's discretion the ENGINEER may be required to
provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims -made basis, shall contain a retroactive date coincident with or prior
to the date of the contractual agreement. The certificate of insurance shall
City of Fort Worth, Texas
Standard Agreement for Engineer ng Related Design Services
PMO Official Release Date: 11.29 2011
Page 7 of 14
state both the retroactive date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall
be maintained without interruption nor restrictive modification or changes
from date of commencement of the PROJECT until final payment and
termination of any coverage required to be maintained after final payments.
I. The CITY shall not be responsible for the direct payment of any insurance
premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be required
by the ENGINEER to maintain the same or reasonably equivalent insurance
coverage as required for the ENGINEER When sub
consultants/subcontractors maintain insurance coverage, ENGINEER shall
provide CITY with documentation thereof on a certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consultant
and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions of
the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications as required, at
its own cost and expense. However, if design changes are required due to the
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
MO Official Release Date: 11.29.2011
Page 8 of 14
changes in the permitting authorities' published design criteria and/or practice
standards cnteria which are published after the date of this Agreement which
the ENGINEER could not have been reasonably aware of, the ENGINEER
shall notify the CITY of such changes and an adjustment in compensation will
be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY s facilities as may be required in connection with
the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches drawings
specifications proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in wnting
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 9 of 14
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials including asbestos
containing materials, or conditions, and that ENGINEER had no prior role
in the generation, treatment, storage, or disposition of such materials. In
consideration of the associated risks that may give rise to claims by third
parties or employees of City City hereby releases ENGINEER from any
damage or liability related to the presence of such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is a
result of ENGINEER's negligence or if ENGINEER brings such hazardous
substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of Article
IV E regarding the ENGINEER's Personnel at Construction Site and
provisions providing contractor indemnification of the CITY and the ENGINEER
for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain no
direct action against the ENGINEER, its officers, employees,
and subcontractors, for any claim arising out of, in connection
with, or resulting from the engineering services performed.
Only the CITY will be the beneficiary of any undertaking by the
ENGINEER "
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3)
The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 10 of 14
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3)
The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required or
requested assistance to support, prepare, document, bang, defend, or assist in
litigation undertaken or defended by the CITY. In the event CITY requests such
services of the ENGINEER, this AGREEMENT shall be amended or a separate
agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of Services
in this AGREEMENT. If such changes affect the ENGINEER's cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT with appropriate CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments of
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 11 of 14
service for this PROJECT, whether the PROJECT is completed or not. Reuse,
change, or alteration by the CITY or by others acting through or on behalf of the
CITY of any such instruments of service without the written permission of the
ENGINEER will be at the CITY's sole risk. The CITY shall own the final
designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes lockouts, accidents, or other events beyond the
control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans, specifications
or other forms of ENGINEER'S work product
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document the
work underway at the time of the CITY'S termination for convenience so
that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will submit
to the CITY an itemized statement of all termination expenses The CITY'S
approval will be obtained in writing prior to proceeding with termination
services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay or
interruption, an equitable adjustment in the PROJECT's schedule, commitment
and cost of the ENGINEER s personnel and subcontractors, and ENGINEER's
compensation will be made.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 12 of 14
F. Indemnification
In accordance with Texas Local Government Code Section 271.904 the
ENGINEER shall indemnify, hold harmless and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER s agent,
consultant under contract, or another entity over which the ENGINEER
exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action except for willful
misconduct or gross negligence for limitations of liability and sole negligence
for indemnification. Parties mean the CITY and the ENGINEER, and their
officers, employees, agents, and subcontractors
Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims related to it. The venue
for any litigation related to this AGREEMENT shall be Tarrant County, Texas.
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V F VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or may
be enacted later by governing bodies having jurisdiction or authority for such
enactment. No plea of misunderstanding or ignorance thereof shall be
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 13 of 14
ATTEST:
j7in
Mary/J. Kayser
pity Secretary
-In
?ieh 2,„°00
APPROVED AS TO FORM ANDt
By:
Doug as W. Black
Assistant City Attorney
M&C No.: 2 5-6 00
M&C Date: Jg •
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 11.29.2011
Page 14 of 14
considered. ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be changed
by a written amendment executed by both parties. The following attachments and schedules
are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B — Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
Executed and effective this the day of 01\1,4
tOtQ0000frg1TY OF FORT WORTH
ijo0ff
Q4 % o
0
n
ari
0 �
000.1x gcy Assistant City Manager
.A)91
APPROVAL RECOMMENDED
o.
00
Fernando Costa
By: c
Douglas
Director,
Public Works
Freese and Nichols, Inc.
2012.
By:
John Dewar. P.E., S.E.
Pncipal
\�.
Wiersig, P.E. o%
Department of Transportation/
OFFICIAL RECURD
CITY SECRETARY
FT. WORTH, TX
ATTACHMENT "A"
Scope for Enaineerina Design Related Services for Storm Water Improvements Projects
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, ' ENGINEER"
is expanded to include any sub -consultant, including surveyor, employed or contracted by
the ENGINEER
OBJECTIVE
Royal Creek is experiencing severe erosion within its channel banks between Wycliff Street
and Marys Creek Drive. This project will include a channel condition assessment to
understand and document the cause of the erosion It will also include a scope assessment
phase to determine the scope of proposed improvements for final design.
Task 1.
Task 2.
Task 3.
Task 4.
WORK TO BE PERFORMED
Design Management
Channel Condition Assessment
Scope Assessment
Field Survey
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources ENGINEER will manage change,
communicate effectively coordinate internally and externally as needed and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
• Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements.
• Conduct and document monthly project update meetings with CITY Project Manager.
• Conduct review meetings with the CITY at the end of each design phase.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08/27/2010
Page 1 of 22
•
•
Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY
• Prepare and submit monthly progress reports in the format provided by the respective
CITY Department.
Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth s Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project.
Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design.
Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
•
•
ASSUMPTIONS
• Attend up to four (4) meetings with City staff to present project findings
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
TASK 2. CHANNEL CONDITION ASSESSMENT
ENGINEER will perform a stream geomorphological assessment of Royal Creek in the City
of Fort Worth. The limits of the detailed assessment will be from Marys Creek Drive to
Wycliff Street.
2.1. Desktop Analysis and Field Work Preparation
• Perform a desktop analysis of the channel, soils, geology, landscape and
watershed development (assessed with historical photographs) in preparation for
the stream assessment site visit and report
2.2. Stream Reconnaissance Field Visit
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08/27/2010
Page 2 of 5
• Conduct an investigation of the study reach using stream reconnaissance
techniques. This will be achieved by walking the channel and making observations
that will allow segmentation at approximately 100-foot intervals or will reference the
same cross section locations as available in the H&H model data (provided by the
Client) for data assimilation.
• The field reconnaissance will include characterizing channel morphology (pools,
bars riffles, benches) and a visual summary of the channel conditions by stream
reach (sketch and photographs) Locations of current and possible bank failures
including erosion and incision (slumps, knickpoints, etc.), areas of channel
aggradation and degradation, quality of riparian canopy, and debris dams will be
n oted.
• During the stream assessment the sediment source and discharge areas will be
n oted as well as hard points (manmade structures) within the creek and the distance
to and type of structure. Channel dimensions will be measured with a survey rod
and digital range finder to determine bed and bank geometry. Representative bed
material will be sampled for sieve analysis to determine the median grain size (D50).
All locations will be marked with GPS receiver employing sub -meter accuracy.
2.3. Bed and Bank Material Analysis
• Perform a Particle -Size Analysis (ASTM D-422) on the bed and bank material
sampled in the field to quantify the distribution of sediment particle sizes in the
streambed and streambank material ENGINEER will collect bulk density samples of
the bank material and one or more representative Submerged Jet Test (ASTM
D5852-95) will be performed to assess erosion rates and critical stress for erosion of
bank material For comparison and range, up to three methods will be used to
calculate the critical stress of the bank material.
2.4. Field Overview
• Perform a field assessment overview of the notes recorded during the field
reconnaissance including identification of existing channel geometries and the
current condition of the channel This will result in a map of erosion and instability
issues
2.5 Data Processing and Calculation
Establish the effective discharge for the study reach, conduct a bed and bank
material evaluation, sediment transport and degradation limited by armoring, and
estimate the equilibrium slope of the channel and potential for degradation. The
stream assessment calculations will be based on a synthesis of field work, hydrology
and hydraulics model data, gage data, bed material particle sizes, bed and bank
stability. The analysis will utilize up to three methods to estimate the degradation
limited by armoring, stable slope and depth of degradation.
2.6 Model Stable Channel Dimensions
• ENGINEER will utilize the SAMWin and Alluvial Channel Design model to identify
stable channel dimensions (width, depth, and slope) based on the water discharge,
bed and bank material evaluation, sediment transport analysis and equilibrium slope
calculations.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08/27/2010
Page 3 of 5
2.7 Analyze Geomorphic Stream Condition Results
• ENGINEER will give a description of the current and future status of the stream
according to the Channel Evolution Model, identify stable channel dimensions for
alluvial channels (width, depth, and slope), address potential erosion hazard zones
for structures along the channel, and calculate the potential number of grade
stabilization structures as needed related to the estimated channel degradation.
2.8 Geomorphic Stream Assessment Report
•
ENGINEER will prepare a report entitled, Stream Geomorphological Assessment for
Royal Creek, Fort Worth, Texas The draft report will be prepared for the Owner's
review and comment. The report will be finalized based upon the Owner's
comments The report will incorporate a brief summary of the study area, and
stream condition assessment methodology. The report will consist of a field
assessment overview and geomorphic summary describing the results of bed
material evaluation, channel transport capacity, equilibrium channel slope possible
areas of degradation or aggradation, and identify stable channel dimensions for the
creek. The field survey results will include detailed sketches of the channel,
photographs, channel geometry, streambank stability and erosion ratings, potential
erosion hazard zones for structures and suggested number of grade stabilization
along the channel. The report will also include a copy of the GIS database with GPS
referenced photos with image directional arrows. Labeled digital photos and
locations of special physical characteristics that may be relevant to future modeling
and locations of observed areas of concern will be identified and listed in the report.
DELIVERABLES
A. Up to Eight (8) copies of the DRAFT Geomorphic Stream Assessment Report
B. Up to Eight (8) hard copies and one digital PDF copy of the FINAL Geomorphic
Stream Assessment Report
TASK 3. SCOPE ASSESSMENT
The purpose of the Scope Assessment is for the ENGINEER to identify, develop, and
communicate the defined deliverables, and recommend the design concept that successfully
addresses the design problem, and to obtain the CITY's endorsement of this concept.
ENGINEER will complete the Scope Assessment as follows.
3.1. Data Collection
In addition to data obtained from the CITY, ENGINEER will research and make efforts to
obtain pertinent information to aid in coordination of the proposed improvements with
any planned future improvements that may influence the project ENGINEER will also
identify and seek to obtain data for existing conditions that may impact the project
including; utilities, agencies (such as TxDOT and railroads), CITY Master Plans, CITY
link -node GIS data, CITY drainage complaint files, existing applicable drainage studies,
FEMA floodplain and floodway maps, existing models of project area (if any) and
property ownership as available from the Tax Assessor's office.
3.2. Preliminary Engineering
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08/27/2010
Page 4 of 5
• The ENGINEER's responsibility includes recommendations for channel
improvements as deemed reasonable and consistent with CITY standards.
Based on the results of the channel condition assessment, up to three (3)
alternatives will be investigated identified and discussed with CITY staff to select
a final alternative for design.
3.3. Technical Memorandum
• The ENGINEER will summarize the results of the Scope Assessment in a
technical memorandum. The memorandum will document the strengths and
weaknesses of the alternatives considered and the rationale for selecting the
recommended design concept.
ASSUMPTIONS
• All storm water calculations and design shall conform to the City of Fort Worth
Integrated Stormwater Management Criteria Manual, 2012.
• CITY will provide hydrologic and hydraulic models, GIS, and survey data
developed as part of the Royal Creek Open Channel Study.
DELIVERABLES
A. Written summary of alternative design concepts considered, strengths and
weaknesses of each, and the rationale for selecting the recommended design
concept. Backup data will be attached. Up to twelve (12) hard copies and one
(1) digital PDF copy of the technical memorandum will be submitted to the CITY.
B. GIS Exhibit showing results of Scope Assessment Phase.
C. Project Decision Log.
D Estimates of probable construction cost.
TASK 4. FIELD SURVEY.
ENGINEER will provide survey support as follows.
4.1. ENGINEER will obtain four (4) additional topographic cross sections to supplement
study survey provided by CITY.
ASSUMPTIONS
•
Horizontal control shall be established on the Texas State Plan Coordinate
System, North Central Zone NAD83 and the vertical control shall be set from
NAVD 88 datum and tied to the City of Fort Worth Datum by utilizing GPS/RTK-
VRS methodology.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 08/27/2010
Page 5 of 5
ATTACHMENT B
COMPENSATION
Design Services for
Royal Creek Channel Repair
City Project No. 01853
Lump Sum Project
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $58,550.00 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5.19.2010
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm
P rime Consultant
Freese and Nichols, Engineering
Inc.
P roposed M/WBE Sub -Consultants
Gorrondona and Survey
Associates, Inc.
N on-M/WBE Consultants
N/A
Primary Responsibility
Fee Amount
$55,450.00
94.7%
$3,100.00 5.3%
TOTAL $58,550.00 100%
Project Number & Name 1 Total Fee
01853 — Royal Creek Channel Repair 1 $58,550.00
M/WBE Fee
$3,100.00
City M/WBE Goal = 5% Consultant Committed Goal = 5%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5,19.2010
Page 2 of 3
M/WBE %
5%
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 5,19,2010
Page 3 of 3
Professional Services Payment Request
Project: Royal Creek Channel Repair
City Project #: 01853
City Sec Number:
Company Name: IFreese and Nichols, Inc.
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Scott Hubley, P.E.
Project Manager: (Rick Shaffer
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: Iskhefreese.com i
Office Address:14055 International Plaza, Suite 200
Telephone: 1817-735-7300 1
Fax: 1817-735-7491 l
Remit Address:jPO Box 980004, Fort Worth, TX 76198-0004
FAC and Work Type Description
Storm Water P227-531200-203280185330
LOCK
UNLOCK
Agreement
Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Amount Date Amount Completed Previously Invoice Balance
$58,550.00 $58,550.00 $58,550.00
Totals This Payment Request $58.550.00 $58.550.00 $58.550.00
Overall Percentage Complete:
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Royal Creek Channel Repair
City Project No. 01853
<List any changes to the Standard Agreement>
None
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page 1of1
Consulting Contract Schedule Specifications
City of Fort Worth Capital Improvement Program
FORT WORTH
Attachment D - Project Schedule
This PROTECT requires a Tier 3 schedule as defined herein and in the Citu's Schedule Guidance
Document
D1. CONSULTING SERVICES SCHEDULE DEVELOPMENT: the CONSULTANT shall
prepare schedules for consulting services that meet the requirements described in this
specification, showing by Critical Path Method (CPM) the planned sequence and timing of
the Work associated with the Agreement All submittals shall be submitted in PDF format,
and schedule files shall also be submitted in native file format (i.e. file foxniats associated
with the scheduling software). The approved scheduling software systems for creating the
schedule files are:
Primavera (Version 6.1 or later or approved by CITY)
Primavera Contractor (Version 6.1 or later or approved by CITY)
Microsoft Project (Version 2003/2007 or later or approved by CITY)(PHASING OUT)
D2. BASELINE CONSULTING SERVICES SCHEDULE: Following notice -to -proceed, the
CONSULTANT shall develop, submit and review the draft detailed baseline consulting
services schedule with the CIl'Y to demonstrate the CONSULTANT s understanding of the
Agreement requirements and approach for performing the work The CONSULTANT will
prepare the final detailed baseline consulting services schedule based on CITY comments, if
any, and submit to the CITY no later than the submittal of the first project invoice.
1'he following guidelines shall be adhered to in preparing the baseline schedule, and as
described in further detail in the CITY s Schedule Guidance Document.
a. The scope shall be subdivided by work breakdown structure (WBS) representing the
tasks, subtasks and activities associated with delivering the work.
b. The schedule shall accurately describe the major work activities, key milestones, and
dependencies/relationships as appropriate to the work.
c. The schedule should include appropriate meetings, review periods, critical decision
points, including third party utility dependencies and reviewing agencies.
D3. PROGRESS CONSULTING SERVICES SCHEDULE* The CONSULTANT shall prepare
and submit monthly to the CITY for approval the updated schedule in accordance with D1
and D2 and the CITY's Schedule Guidance Document inclusive. As the Work progresses
the CONSULTANT shall enter into the schedule and record actual progress as described in
the CITY's Schedule Guidance Document.
The updated schedule submittal shall also include a concise schedule narrative that
highlights the following, if appropriate and applicable:
• Changes in the critical path,
• Expected schedule changes,
• Potential delays,
• Opportunities to expedite the schedule,
• Coordination issues the CITY should be aware of or can assist with,
City of Fort Worth, Texas
Attachment D
PMO Release Date: 02.15.2011
Page 1 of 2
• Other schedule -related issues that the CONSULTANT wishes to communicate to the
CITY.
D4. PERFORMANCE AND CONSULTING SERVICES SCHEDULE: If the work
accomplished falls behind that scheduled due to factors within the CONSULTANT's
control, the CONSULTANT shall take such action as necessary to improve the progress of
the Work. In addition, the CITY may require the CONSULTANT to submit a revised
schedule demonstrating the proposed plan to make up the delay in schedule progress and
to ensure completion of the Work within the allotted Agreement time.
D5. SCHEDULE TIERS SPECIAL INSTRUCTIONS:
The requirements for the schedule are determined based on the nature and needs of the
project. The schedule tier for this project is stated at the top of this document.
CONSULTANT shall submit each schedule relying on the CITY's current Schedule
Guidance Document.
D6. SCHEDULE SUBMI 1"1 AL AND PAYMENT:
As stated in III.A.(1). of the Agreement, CONSULTANT shall provide the information
required by Attachment D CONSULTANT's monthly invoices will not be accepted and
processed for payment without monthly schedule updates that are submitted in the time
and manner required by Attachment D and the CITY's current Schedule Guidance
Document.
City of Fort Worth, Texas
Attachment D
PMO Release Date: 02.15.2011
Page 2 of 2
73
()
m
m -
‘S's
BENBROOK-RD
114 A YP,4
66-BEN
BROOK-RD
•
DE
m
m
Task No.
rotal Expense Task Sub Total
Cost
1.0 Project $300
1.1 Managi
1.1.1 Intern
1.1.2 QA/Q
1.2 Comm'.
1.2.1 Pre D $0
1.2.2 Proles $250
1.2.3 Desig $0
1.2.4 Prepa $0
Prepa
1.2.5 Schec
1.2.6 Prepa
1.2.7 Invoic
$0
$0
$0
$0
$50
2.0 Charm $575
2.1 Desktot $0
2.2 Stream $75
2.3 feed anc $250
2.4 IField Oc $0
2.5 'Data Pr $0
2.6 'Model 5 $0
Analyze
2.7 Results
2.8 jGeomo $250
j
3.0 IScope, $200
3.1 'Data Cr $0
3.2 IPrelimir $0_
3.3 (Technic $200
4.0 !Field Si
4.1 ITopogn
$0
$3,100
$3,100
$4,175
roject Summary
Total Hours
Total Labor
Total Expense
Subconsultant
Subconsultant
Sub Markup
IE Participation
d Project Cost
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 5.19.2010
$8,175
$2,180
$620
$790
$2,130
$0
$155
$620
$620
$670
$33,715
$1,800
$4,035
$2,470
$4,040
$3,480
$5,640
$2,640
$9,610
$12,940
$1,230
$7,560
$3,760
$3,410
$3,410
$58,240
451
$54,065
$4,175
$3,100
$0
$310
5.3%
$58,550
1 of 1
City of Fort Worth, Texas
Mayor and ouncil Communication
COUNCIL ACTION: Approved on 5/8/2012
DATE• Tuesday, May 08, 2012
LOG NAME: 20DESIGN ROYAL CREEK CHANNEL
SUBJECT:
Authorize Execution of an Engineering Agreement with Freese and Nichols, Inc., in the Amount of
$58,550.00 for the Royal Creek Channel Repair Project (COUNCIL DISTRICT 3)
REFERENCE NO.: **C-25600
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an Engineering Agreement with Freese
and Nichols, Inc., in the amount of $58,550.00 for preliminary analysis and engineering services for the
Royal Creek Channel Repair project.
DISCUSSION:
The Engineering Agreement recommended by this Mayor and Council Communication will provide for
preliminary analysis and engineering services for the Royal Creek Channel Repair project Royal Creek is
experiencing severe erosion within its channel banks between Wycliff Street and Mary's Creek Drive that
poses a safety hazard and could potentially lead to additional erosion jeopardizing property fences and
backyard structures.
The preliminary analysis will include an analysis of the channel condition to determine the cause of the
erosion, and will include evaluations to determine the scope for the design portion of the project. Freese
and Nichols Inc., (Freese and Nichols) was selected to design this Project based on a request for
qualifications process. Upon completion of the preliminary analysis, it is anticipated that this contract will
be amended to secure final engineering design services.
Freese and Nichol, Inc., proposes to perform the preliminary analysis and engineering services for a lump
sum fee of $58,550.00. Staff considers the fee to be fair and reasonable for the scope of services
proposed.
Funding for the project is being provided from revenue bonds in the Storm Water Capital Project Bond
Fund.
Freese and Nichols Inc , is in compliance with the City's M/WBE Ordinance by committing to five percent
M/WBE participation. The City's goal on this project is five percent.
This project is located in COUNCIL DISTRICT 3, Mapsco 87D.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Storm Water Capital Project Bond Fund.
Logname: 20DESIGN ROYAL_CREEK CHANNEL Page 1 of 2
TO Fund/Account/Centers FROM Fund/Account/Centers
P227 531200 203280185330 $58.550.00
CERTIFICATIONS:
Submitted for City Manager's Office bv:
Originating Department Head:
Additional Information Contact:
Fernando Costa (6122)
Douglas W. Wiersig (7801)
Rick Shaffer (6821)
ATTACHMENTS
1. 01853 20120312 Oria Design Contract MWBE Compliance.pdf (CFW Internal)