HomeMy WebLinkAboutContract 43242 (2)ip
jc.
GITY SECREARYL4'jLftcoMrRAcr No..
GOVERNMENTAL ENTITY
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Governmental Entity ("Developer") desires to make
certain improvements ("Improvements") related to a project as described below ("Project"),
an addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Name: Tarrant County
Address, State, Zip Code: 100 E. Weatherford St., Fort Worth, Texas 76196
Phone: (817) 884-1441
Authorized Signatory/Title: B. Glen Whitley, Tarrant County Judge
Project Name: Tarrant County Civil Courts Building
Project Location: 100 North Calhoun Street
Plat Case No.: N/A Plat Name: N/A
Mapsco: 63W Council District: 9 City Project No: 01785
CFA: 2012-023 DOE: 6714
To be completed by staff.•
Received by:
05-21-1 2 A08 : 22 IN
Date:
/j
*
OFFICIAL RECORD
CITY SECRETARY
'ff t `NORTh, `
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of
said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires it to submit an Affidavit of Bills paid signed by its
contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water (A) X ,
Sewer (A-1) X ; Paving (B) X ; Storm Drain (B-1) ; Traffic
Signal (C-2) X .
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract
price of the infrastructure for a period of two (2) years insuring the
maintenance and repair of the constructed infrastructure during the term of
the maintenance bond. All bonds to be furnished before work is
commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, and not to install or relocate any sanitary sewer,
storm drain, or water pipe unless a responsible City inspector is present
and gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water mains
and service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. City is requiring the widening and/or straightening of the City road(s)
contemplated herein. City shall not be responsible for any costs that may be
incurred for the relocation of any utilities that are or may be in conflict with
any of the community facilities to be installed hereunder.
I. Developer agrees that the City shall not be responsible for any inadequacies in
the preliminary plans, specifications and cost estimates supplied by the
Developer for this Agreement and hereby releases the City from same.
J. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
K. Developer will require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any
and all claims, suits or causes of action of any nature whatsoever, whether
real or asserted, brought for or on account of any injuries or damages to
persons or property, including death, resulting from or in any way connected
with, the construction of the infrastructure contemplated herein, whether or
not such iniuries. death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers.
servants. or employees. Further, Developer will require its contractors to
indemnify, and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure
to complete the work and construct the improvements in a good and
workmanlike manner free from defects, in conformance with the Policy, and
in accordance with all plans and specifications and shall cause to be executed
4
and delivered to the City an indemnity agreement from such contractors on a
form to be promulgated by the City.
L. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
M. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated
in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
COST SUMMARY TABLE
Items
A. Water Construction
1. Water
2. Sewer
Water and Sewer Construction Total
B. TPW Construction
1. Paving
2. Storm Drain
3. Traffic Signal
TPW Construction Cost Total
Total Construction Cost (excluding fees)
C. Construction Fees
1. Water/Sewer Inspection Fee (2%)
2. Water/Sewer Material Testing Fee (2%)
Subtotal for Water/Sewer Construction Fees
3. TPW Inspection Fee (4%)
4. TPW Material Testing Fee (2%)
5. Traffic Signal Inspection Fee (4%)
6. Street Name Sign Installation Cost
Subtotal for TPW Construction Fees
Total Construction Fees
Financial Guarantee Options - Choose One
Bond = 100%
Set -Aside Letter = 100%
Completion Agreement = 100%/Holds Plat
Cash Escrow Water/Sewer = 125%
Cash Escrow TPW = 125%
Letter of Credit = 125%
Developer's Cost
67, 510.00
9,850.00
77,360.00
214,544.62
5,490.50
220,035.12
297,395.12
1,547 20
1,547 20
3,094.40
8,581.78
4,290 89
219.62
13,092.30
16,186.70
Amount
297,395.12
N/A
297,395.12
96,700.00
275,043.90
371,743.90
Choice
(Ck. One)
X
The Items Checked Below Must be Included as Attachments to this Agreement
Included
►/
►1
IZ
►1
C
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Dram Estimate
Exhibit C2: Traffic Signal Exhibit
Traffic Signal Estimate
(Remainder of Page Intentionally Left Blank)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in
quadruplicate, licate, at Fort Worth, Texas this a I day of
CITY OF FORT WORTH
ernando osta
tetr,
6 1 tbir
Assistant City Manager
Recommended by:
Transportation & Public Works Department
4ts J
ougls W. Wiersig, P.E.
Director
Water Department
Wendy Chi;Piabulal, EMBA, P.E.
Water Development Engineering Manager
APPROVED AS TO FORM & LEGALITY:
Douglas W rB lacy
Assistant City Attorney
M&C No.: N(4-
Date:
ATTEST:
Miry J. Kayser
City Secretary
8
2012.
DEVELOPER
Tarrant County
Name: B. Glen Whitley
Title: Tarrant County Judge
APPROVED AS TO FORM:
District ney's Office
Certification of Available Fy. ds in the
Amount Of $ /‘ / Be.7:5/
i
gei<
Tarrant County Auditor's Office
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Ar
CALHOUN STREET
•
•
•
E BELKNAP STREET
TARRANT COUNTY
CIVIL COURTHOUSE
100 NORTH CALHOUN STREET
•
E WEATHERFORD STREET
VICINITY MAP
NTS
J
E'Ll7
ENCROACHMENT AGREEMENT
Tarrant County Civil Courts Building
Fort Worth, Texas
•
40
•
•
JONES STREET
16 January 2012
jy' FOC '" .-FO^
w
i5c
FOct--,_
w'- w l
h.! WW1U4E POI Olt MS
Sr CHIC. WATERNPR1 CITY GG
UE -LIE
f1i
SD. - SO'
I, �0 T!
11 ,
�
Ni ns N0. FrA
r
Mh
(1
N
STA. 0+51 EXIST. 8' WATER
INSTALL:
1-8'X4' TAPPING SLEEVE
1-4' VALVE
1-4-X3' REDUCER
1-3' WATER METER (DOM.) W/VAULT
1-410' REDUCER
c18 LF 4' PVC WATER PIPE
END 4" PVC PIPE 5' FROM BASEMENT FACE.
REFER TO P2.02 FOR FLOWLINE AND
CONTINUATION
STA 0+47 EXIST. 6' WATER
INSTALL'
/1-8'X6' TAPPING SLEEVE
l I-8- VALVE
18 LP 6' PVC WATER PIPE
END 6' PVC 5' FROM BASEMENT FACE
REFER TO P2.02 FOR FLOWJNE AND
CONTINUATION
TA. 04 00 EXIST. 8' WATER
u/t GI:Cnvc NNE
UT
If ItlMav 4
t] RI
'ER A4I rn
NiYu ,;Ir 4NEILC
SIN, :.:� �u-x,N.«,
- G t�
-UT
�4 _...�.-I
of \ -
P('R
fortiza my
IQNGNpR FSACT CONDUIT
UE UE--- UE -LIE JNOUE UE
z , t FY!
um nXC. UNt
w' \m' oNur
Omura, wP
I
/-CP/0.4 T-41
•
VARIABLE WITH PERMANENT
PEDESTRIAN EASEMENT
(BY SEPARATE INSTRUMENT)
STA. 0+00 UNE 'W-i'
INSTALL:
6 LF Y PIPE (PRIVATE)
T WATER METER (IRR.)
EFEA TO LANDSCAPE FOR
ONNECIION AND FLO
Ntin
w
0
2
0
APRY. LOC.. OF CA: LWC.
O I • I 0
UST& 0+44 UNE 'W-3-
INSTALL:
'2-8-X45' VERT. BEND
I END 6'PVC (F1RE SVC.) AT '
BUILDING FACE. REFER TO
:P2.02 FOR FLOWJNE AND
CONTINUATION.
"�Y§) FDC ruurrt-: �`S _,FGC FOC
W NfNM6 f KD
f/ DEG N
Si nuL P4,' L \ W x• GSi WAn.�N
w w w y w
'iv
/ ■%�J�p�/ warmA; r. V)afl w_ irAi 24 w Nu.r x
ivIV ' IL��II/I/Y�� w .-.Rtili.4!a �-I tb.
F'!F �]> �7`-es B• 9.6 w�;:.: J Cs cc. SUE
�iµ LIE U" f l n
SAN TE: i1eg/ ,1 :
N.o,k: N
•
G vC
E. I11E4THERFOR® ST
O AaivJ
r
µ
B' 'NAIt9UNE PER tltt ,.
♦of.t.A LW.. OF 4 GAr..:411: `CF.N ADIOS
K 4-V$ i 9w4_:y�.'N OAK 9_,"-�I^oI w@ 4-10lO flat 4_101 i
OR2R. OOtt cw.l't uRIIt C54R
Arr A(JA.MMic r,tvrcn:t I.wc
BLOCK 23
w
UT
TIl
yrANwld �l
�r \ 3 /') bSETsn
(.T A, T-40
'etw
G L-G
}1 TvaF
OrM1V WIJP $�
/V`
L'.`>1, vW41
APP./WWI PRIMO
0T !]
1
1 §GN S
--'r"^r^° BLOCK 15
ORIGINAL TOWN OF
FORT WORTH
1,OWNER:
EHASE BANK OF TEXAS
STA. 0+00 UNE -W-3'
INSTALL'
1-8'X6' TAPING SLEEVE
-6' VALVE
' PRGIECT EXIST. U/C
1 TRAFFIC SIGNAL CONDUIT
n
"eft-
;T--3-
-G-
UT
GAS Mt`(,:/
G
INTERIM
REVIEW
DOCUMENTS
MAN
GRAPHIC SCALE
0 20 40
( IN FEET )
1 Inch s 20 8.
Legend
-SS- - SANITARY SEWER LINE
$ SANITARY MANHOLE
-VI( EXIST. WATER UNE
PROP. WATER UNE
PROP. WATER VALVE
Utility Plan Notes
1. THE HORIZONTAL AND VERTICAL LOCATION OF MISTING
SUBSURFACE UTU11E5 HAVE BEEN DETERMINED FROM DATA
RECORDED BY OTHERS. IT WALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO PROTECT NJ. EXISTING U1UTIES WTHIN THE
AREA OF CONSTRUCTION. CONTRACTOR SHALL VERIFY SZE AND
LOCATION OF ALL UTUTES PRIOR TO CONSTRUCTION.
2. AU_ WATER AND SANITARY SEWER PIPES MUST BE INSTALLED
AND TESTED ACCORDING TO TEXAS COMMISSION ON
ENVIRONMENTAL OUAUTY (TCEO).
3. CONTRACTOR SHALL VERIFY ALL EXISTING SANITARY SEWER
FLOW UNES BEFORE BEGINNING CONSTRUCTION.
PROPERTY UNE PUBLIC RIGHT OF WAYS. EASEMENTS. USING
TOPOGRAPHIC SURVEY AND LOCATION OF PHYSICAL FEATURES
WERE OBTAINED FROM A BOUNDARY/TOPOGRAPHIC SURVEY
PERFORMED BY JAMES L BRITTAIN DATED JULY 21. 2010.
5. SANITARY SEWER MANHOLES MUST BE COATED VAIN INTERNAL
CORROSION PROTECTION MEETING CITY OF FORT WORTH
STANDARDS PRIOR TO PLACING THE MANHOLE IN SERVICE
RfNGHMARK:
1. CONTROL. POINT T-40 & PROJECT
BENCHMARK 'If CUT IN SIDEWALK
N: 6961010.74997 E 2327856.43129 EL 618.13
2. CONTROL POINT T-41 & PROJECT
BENCHMARK he OJT IN SIDEWALK
N: 69608118.62979 E Z327641.56907 EL 618.86
3. CONTROL POINT T-37 & PRO.ECT
BENCHMARK 'X CUT IN SIDEWALK
N: 6960767.44636 E 2327998.84673 EL 614.28
4. CONTROL POINT T-36 & PRO.ECT
BENCHMARK 'X' CUT IN SIDEWALK
N: 6960671.57648 E: 2327693.22185 EU 615.79
TARRANT COUNTY CIVIL
COURTS BUILDING
EXHIBIT "A" - WATER PLAN
ORTWORfH
DESIGNED:
SUBMITTED:
DESIGtt CB
DRAWN: IS
CHECKED: ..0
ASTR46I1ITANIUADALLAS,UP
IMrnrnw bl
MTO
Salt
111.1114011901
RECOMMENDED:
DESIGN ENGINEER
a1:ALL PHO.RLI NU. SHEET
OEC DAIt. 20ll 0.0.E / 6714
006
UNIT 1: WATER
Furnish and install, including all appurtenant work, complete in place, the following items:
CPMS RECORD APPROX. UNITS
NUMBER QTY.
1
10 LF
2 1
3 145
4 1
5 20
6 91
7 2
8 1
9 1
Updated: 8/30/2010
EA
LF
TON
LF
LF
EA
EA
EA
CPMS NAME
Description of Items with Bid Prices Written in
Words
Remove 8" Water Line
Per Linear Foot
Dollars and Cents
Salvage 8" Water Valve
Per Each
Dollars and Cents
Trench Safety
Per Linear Foot
Dollars and Cents
Ductile Iron Water Fittings
Per Ton
Dollars and Cents
4" PVC Water Pipe
Per Linear Foot
Dollars and Cents
6" PVC Water Pipe
Per Linear Foot
Dollars and Cents
8"x6" Tapping Sleeve & Valve
Per Each
Dollars and Cents
3" Water Meter w/Vault
Per Each
Dollars and Cents
8"x4" Tapping Sleeve & Valve
Per Each
Dollars and Cents
UNIT
PRICE
$600
$2,200
$6
$6,000
$35
$40
$10,900
$15,500
$10,800
TOTAL AMOUNT
$6,000
$2,200
$870
$6,000
$700
$3640
$21,800
$15,500
$10,800
—4 Of I
ELEV. COMSAT - 614.00*
I F.L. 6' (FINE SVC.) — 611.60
•
•
/ a,
w
bum
00 0
cz
KgF
VM „tV„ 118IHX3
a
5D
sti
AWAIT WAWAS
SD SD SD SD
CALHOUNSTREET
�?w F�{}I R' k IFNAr,Ct-i GR 45 w
iys RE5 u\T
!)
LTf
N 30'26'24'W
w i i w yL—w v, g
✓ti t v
V/ Y/
200.00.
0
j IMSTALL 45' 6' YtRL OENO (P`l.)
STA. 0+59.30 LINE '1Y-3'
EXIST. TRAFf1C SIGNAL CONDUIT
4
w
x2
eI
ei
3 F.L. 6' (M)= 612.49
^ F.L 6' (OAF) 61239
Z
v
A
3Nn H31YM'dONd
J
1,.
F4.6y Th
Y/ w
1
r
CL
ra
1_
.f
5
STA. 0409 LRLE
PROP. OtDC. FACE
STA. 0+00 LINE 'SS-1.
INSTALL 4.0' 01A SSW
1EfoST. TRAFf1C SGNAL CONDUIT
UNIT II SEWER
Furnish and install, including all appurtenant work, complete in place, the following items*
CPMS RECORD APPROX.
NUMBER QTY.
1
2
3
Updated: 8/30/2010
UNITS CPMS NAME
Description of Items with Bid Prices Written in
Words
1 EA Manhole Vacuum Testing
Per Each
Dollars and Cents
EA 4' Manhole
Per Each
Dollars and Cents
4 VF Internal Manhole Corrosion Protection
Per Vertical Linear Foot
Dollars and Cents
UNIT
PRICE
$250
$6,200
$400
TOTAL AMOUNT
$250
$6,200
$1,600
UNIT IV: DRAINAGE
Furnish and install, including all appurtenant work, complete in place, the following items•
CPMS RECORD APPROX. UNITS CPMS NAME UNIT TOTAL
NUMBER QTY. Description of Items with Bid Prices Written in PRICE AMOUNT
Words
1 30 LF 4" PVC Sewer Pipe, 0' to 6' (Misc. Only)
Per Linear Foot $60 $1,800
Dollars and Cents
Updated: 8/30/2010
._.._ _._ VWTPAY Z WCA :777
CONSTRUCT CONC. CURB & CUTTER
0
CONSTRUCT CONC. CURB R GUTTER
1 I I
BOLLARDS (TYP.) - SEE SHEET 11.01
W
RESET SALVAGED B
2" MORTAR
0
O
CON` CT C IC. CURB & GUTTER
O
N
CONSTRUCT CONC. CURB & GUTTER
II I
i e
par: 4-n
rLP/OM T-41
;CONSTRUCT TYPE 'A'
BARRIER -FREE RAMP
E. SELKN.4PST.
'iw,rr00640 a mr CONDUIT
CONSTRUCT CONCRETE SIDEWALK AS PER
CITY OF FORT WORTH STANDARDS
r
17014AL POLt
CONSTRUCT CONC. CURB & GUTTER
J
(CONSTRUCT S EWALK FLUME
AS PER ETAIL 02/028
A
CONSTRUCT TYPE "A" BARRIER -FREE RAMP (TW.)
CONSTRUCT CONC. CURB & CUTTER
^....--CP/OM 4-+0
PaN
DD
ilk
t
CONSTRUCT DRIVEWAY APPROACH AS
PER THE CITY OF FORT WORTH 'TYPICAL
STREET CONS1RUCRON DETAILS" (TIP)
savITAYZr,�LP"
�. WZ47C
k_
VHt`
y
--u
CONSRTUCT CONC.CURB& GUTTER
trsArKr
Sf
OPPICOMTC ~MT
CONSTRUCT MODIFIED TPE W BARRIER -FREE RAMP
CONST JCT SIDEWAU( FLUME
AS PE DETAIL 02/02B
flA
RAMC
UCH):
Ls/.CP/0M Ta7
INTERIM
REV W
DOCUMENTS
car wrap
ma on A
awl n4t4-41“
Legend
1..u.N.T
Pnt&S M
GRAPHIC SCALE
U 20
( IN FEET )
1 Inch a 20ft
GRANITE PAVERS AS PER SHEET 034
HEAVY DUTY PAVEMENT AS PER
DETAIL 01/032 SCORED IN 4X4' GRID
AS PER SHEET 031
CONC. SIDEWALK PAVEMENT AS PER
SHEET L201 AND SCORED IN 4'X4'
GRID AS PER SHEET 031
CITY OF FORT W01R114 STANDARD
DRIVEWAY APPROACH AS PER
SHEET 027 AND SCORED IN 4'X4 GRID
A5 PER SHEET 031
CITY OF FORT WORTH STANDARD
HMAC RESURFACING -2" OVERLAY
(TYPE "D" ASPHALT)
CITY OF FORT WORTH STANDARD
HMAC PAVEMENT TRENCH REPAIR
RFNCHMARIC
1. CONTROL POINT T-40 & PROJECT
BENCHMARK "X" CUT IN SIDEWALK
N: 6961010.74997 E 2327856.43129 EL 616.13
2. CCNRRO. PONT T-41 & PROJECT
BENCHMARK "X" CUT IN SIDEWALK
N: 6960889.62979 E 2327641.56907 D. 618.56
3. CONTROL POINT T-37 A: PROJECT
BENCHMARK "X CUT IN SIDEWALK
N: 6960767.44636 E 2327998.84673 EL: 614.26
4. CONTROL POINT T-36 & PROJECT
BENCHMARK "X" CUT IN SIDEWALK
N: 6960671.57848 E 2327693.22165 EL 615.79
TARRANT COUNTY CIVIL
COURTS BUILDING
EXHIBIT MB° - PAVING PLAN
ORTWO
-DESIGNED:
SUBMITTED:
DESCN: CB
DRAWN: IS
CHECKED: JD
NSTERUGUINTAN
rnIct d.cxlMt MYruvMTI:04711771
WARM
410110 MTh !Y1A16.17731 wtu!rw
RECOMMENDED:
DESCH ENGINEER
SCALE PROJECT NO. I SHEET
D.O.E.OECEMBFR 2D.O./ 6714 025
UNIT III PAVING
Furnish and install, including all appurtenant work, complete in place, the following items•
CPMS RECORD
NUMBER
1
2
3
4
5
6
7
8
10
11
APPROX. UNITS
QTY.
5350 SF
5
295
22
965
1120
1120
30
7700
682
EA
SF
SY
LF
SY
SY
LF
SF
SF
12 12 EA
13
14
15
16
17
18
Updated: 8/30/2010
2
1300
8
1
22
11
EA
SF
EA
EA
SY
EA
CPMS NAME
Description of Items with Bid Prices Written in
Words
Remove Sidewalk
Per Square Foot
Dollars and Cents
Remove ADA Ramp
Per Each
Dollars and Cents
Remove Conc Drive
Per Square Foot
Dollars and Cents
Remove Brick Pavement
Per Square Yard
Dollars and Cents
Remove Conc Curb & Gutter
Per Linear Foot
Dollars and Cents
2" Surface Milling
Per Square Yard
Dollars and Cents
2" Asphalt Pvmt. Type D
Per Square Yard
Dollars and Cents
4' Wide Asphalt Pvmt. Repair, Arterial
Per Linear Foot
Dollars and Cents
6" Conc. Sidewalk
Per Square Foot
Dollars and Cents
1-3/16" Granite Pavers
Per Square Foot
Dollars and Cents
12' Dia. Removable Aluminum Bollards
with Sleeves
Per Each
Dollars and Cents
3' Sidewalk Drainage Flume
Per Each
Dollars and Cents
6" Conc. Driveway
Per Square Foot
Dollars and Cents
4' Barrier Free Ramp, Type A
Per Each
Dollars and Cents
4' Barrier Free Ramp, Type H
Per Each
Dollars and Cents
Brick Pvmt.
Per Square Yard
Dollars and Cents
Plant 4 Dia. Tree
Per Each
UNIT
PRICE
$1
$300
$2.50'
$25
$11.75
$3.80
$12.60
$162.80
$7.20
$33.51
$1,337.50
$2,500
$10.95
$2,000
$3,500
$36
$700
TOTAL AMOUNT
$5,350
$1,500
$737.50
$550
$11,338.75
$4,256
$14,112
$4,884
$55,440
$22,853.82
$16,050
$5,000
$14,235
$16,000
$3,500
$792
$7,700
Dollars and Cents
19 965 LF 7"Conc. Curb & Gutter
Per Linear Foot
Dollars and Cents
20 570 LF 4" BRK Pvmt Marking Paint (W)
Per Linear Foot
Dollars and Cents
21 650 LF 12' SLD Pvmt. Marking Paint (W)
Per Linear Foot
Dollars and Cents
22 220 LF 18' SLD Pvmt. Marking Paint (W)
Per Linear Foot
Dollars and Cents
23 1 EA Salvage Exist. Light Pole & Fixture
Per Each
Dollars and Cents
24 1 EA Remove Exist Light Pole Foundation
Per Each
Dollars and Cents
Updated: 8/30/2010
$27.60
$1.09
$2.01
$3
$500
$523.75
$26,634
$621.30
$1,306.50
$660
$500
$523.75
rr
BLOCK 10
ON 1, TOWN OF FORT WORTH
OWNER: TARRANT .AUNTY
COLLEGE DISTRICT
CC' D207268224
•
Li
L!
U
J
BOLLARDS (TYP.)
SEE DETAIL 04/031-1
REMOVE EXIST. POLE AS
PER NOTE 7
INS
E, BELI!(NAP ST,
/BO'R,O,JW,/
JN*'1cF0UNC C.LEM.TM° CGNCUI(
-CP/BM T-41
U.'L ruc. UNN17C
N 59133'364E 2U0.00'
4 1 1 L 1 B
1``
D S 5733r38
•
E, WEATHERFORO St
/BOWi,O,ff:/
�
QI4"Ifrn6AL%'TI'll E
INSTALL ARCHITECTURE AREA LIGHTING SPECTRA
DOUBLE HOOD UGHT (MODEL SP1) 'DTH 10' POLE
(M00EL PR4-4R10) MP.)
..4alti c
41
te
/v Y iti.—CP/BM THO
I`
APINCOMTE _F
BLOCK 15
ORIGINAL TOWN OF
FORT WORTH
1� OWNER:
LHASE BANK OF TEXAS
1-�
EXIST. COBRA'HEAD STREET UCHT
INSTALL ARCHITECTURE ODEA LIGHTING SPECTRA
DOUBLE HOOD UCHT (MODEL SP1)
MTh 10' POLE
(MODEL PR4-4R10) (TYP.)
e I I
trrNVA:MMIL rM1MFCn,I L.M1C
BLOCK 23
REVIEW
DOCUMENTS
Patin
GRAPHIC SCALE
0 20 40
( IN FEET )
1 Inch is 20 ft.
Street Light Plan Notes
1. NEW Ott SIDEWALK DECORATIVE UGITING TO BE INSTALLED BY
CITY PRE -APPROVED UGHTING CONTRACTOR
DECORATIVE LIGHTING IS SPECTRA DOUBLE H000 UGHT (MODEL
SP1) NMI 10 FOOT POLE (MODEL PR4-4R10). REFER TO
DETAIL 01/029.
3. REFER TO DETAIL 01/02B FOR LIGHT POLE BASE
4. NON-STANDARD PEDESTRIAN POLES ARE PRIVATELY OWNED AND
MAINTAINED BY TARRANT COUNTY AND NOT BY THE CITY OF
FORT WORTH.
5. DECORATIVE UGHT POLES MUST HAVE A NON -REMOVABLE
METAL PLATE STAMPED PRIVATE UGHT OWNED BY TARRANT
COUNTY CIVIL COURTS BUILDING PERMANENTLY ATTACHED
ABOVE THE POLES LOWER ACCESS DOOR
6. PROPERTY UNE PUBLIC RICHT OF WAYS, EASEMENTS EXISTING
TOPOGRAPHIC SURVEY MD LOCATION OF PHYSICAL FEATURES
WERE OBTAINED FROM A BOUNDARY/TOPOGRAPHIC SURVEY
PERFORMED BY JAMES L BRITTAIN DATED JULY 21, 2010.
7. Dosium . REMOVE
CONDUIT A DRVBRE BACK TO NEAREST JUNCTION A -HEAD STREET UGHT TO BE PONT. DEUVER
POLE AND UGHT HEAD TO CFW.
•FNCHMARM
1. CONTROL POINT T-40 & PROJECT
BENCHMARK 'X' CUT IN SIDEWALK
N: 6961010.74997 E: 2327856.43129 EL 618.13
2. CONTROL POINT T-41 & PROJECT
BENCHMARK "C CUT IN SIDEWAU(
N: 696006662979 E 2327641,56907 EL 618.86
3. CONTROL POINT T-37 & PROJECT
BENCHMARK 'X CUT IN SIDEWALK
N: 6960757.44636 E 2327998.84873 EL: 814.28
4. CONTROL POINT T-38 & PROJECT
BENCHMARK 'X" CUT IN SIDEWALK
N: 6960671.57848 C: 2327693.22165 EL: 615.79
TARRANT COUNTY CIVIL
COURTS BUILDING
EXHIBIT "C" — STREET LIGHT PLAN
1'OR`T WORT�E
DESIGNED: "��
SUBMITTED
DESGN: CB
DRAWN: IS
CHECKED: ,D
4JUIXWANIUADALIAS,LIP
IaWIPMMMWQI MM{N.Y110/
aw
o'' u1 nwwmcDl,wP31011 w111M
RECOMMENDED:
DESIGN ENGINEER
SCALY VICO3LG 1 NO. SNLLT
DECEMBER 2011 D.QE / 8T4
011
1
1
vl
a
p.a NN ipefl+l. ' :2
same
a, a .1 aimta
WOO"
S nx
se ens
r
1
UNIT V: Signal Improvements
Furnish and install, including all appurtenant work, complete in place, the following items:
CPMS RECORD APPROX. UNITS
NUMBER QTY.
1 450 LF
2
3
4
900
480
LF
LF
900 LF
5 1 8 I EA
Updated: 8/30/2010
CPMS NAME
2" Conduit PVC, Sch.40 (T)
Per Linear Foot
Dollars and Cents
No 6 Insulated Elec. Condr
Per Linear Foot
Dollars and Cents
No. 8 Bare Elec. Condr.
Per Linear Foot
Dollars and Cents
Interconnect Cable — Installed Item
Supplied by City
Per Linear Foot
Dollars and Cents
Install Large Ground Boxes
UNIT TOTAL
PRICE AMOUNT
$3.45
$0.77
$0.55
$0.29
$340
$1,552.50
$693
$264
$261
$2,720