HomeMy WebLinkAboutContract 43155-A1 (2)CON SECRETARY CONTRACT NO. AMENDMENT No. 1 TO CITY SECRETARY CONTRACT No. 43155 WHEREAS, the City of Fort Worth (CITY) and Hazen and Sawyer, (ENGINEER) made and entered into City Secretary Contract No. 43155, (the CONTRACT) which was authorized by M& C NO. C-25555 on the 10th day of April, 2012 in the amount of $353,263; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek WRF Gravity Belt Thickener Addition; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 18, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $128, 894 . (See Attached Funding Breakdown Sheet, Page -3- ) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $481,157. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 RECEIVED JAN 23 2014 OFFICIAL RECORD CITY SECRETARY '�• u. WORTH, TX City of Fort Worth Fernando Costa Assistant City Manager DATE: dZSAait APPROV / RECOMME DED : S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: liVlitaildUt -tsugla5 W. blame. {'1'yOnc(Ic Assistant City Attorney ATTEST: 6a y J City Se ay ret. ry City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 rn Kier* ENGINEER Hazen and Sawyer, P.C. Rod L. aylor; P.E. Vice President DATE: M&C: Date: FFICIAL RECORD CITY SECRETARY Ft WORTH, TX Department k FUNDING BREAKDOWN SHEET City Secrecaxy No. 43155 Amendment No. 1 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Fund'Account=Center Fr; re), 7053 0:.1)1g473c' Total: y OFFICIAL RECORD CITY SECRETARY t WORTH, TX Amount • ritAA $ciore•i- rot- • • EnvIstonm-e-nta1 Engineers & Sol esttists September 8, 201:3. Madets Rafatko,. P.E. City of Fort Wor(ti 1000. Throckm.orton Fort Worth,. DC 76102: Via:Village Creek W• F Gravity Belt Thickener Addition - Project : #01847 [7oar Madeteng: • Hazen and Sawyer, P.C. 500 West:7th-Street • Suite 702 Forth Worth, TX 76102 (817)'810-2630- (817)870-2680 Fax . t.# rci ed. &6.0 our t ts.-0-r=oposal for so-op:e,rn L e�ec a-r=nc r aoho-4 e f K tf ei V e cr e WifIr Groh- ThfcbnOt A*itSbri P iect :Arxrer tn:ent = = to coptiou-e.torwork.witii that .City :t roU9h poi $ ruetiz n Serniteo : aftxd proacetton of Standard 0 crating PrOcattures 1'15- r ORTie This. s :reV ed proposal ire .e :es cs—.Qmfi fnatEon: of ttio tw epe rate ftscroPes into: Qrte:5PQPiq and loci '-be: proposed -f e to revised StOpe is at tclie• r J. construction Rte! c; • • : l entscf r jY law this .eeiC t- E wnte.trat that .yot :h:aj ='_ 1 J%1e r' . e.. the atAri `r A, if yttt hM e any 4 Sfions=� !Weise do tith .:'-e tt s to : � e• 8:47 email -me at Manson- aid-Sawy corm Very trmly yours, H5 SAWS ' ', ✓':EN ♦ r.r •r r SA' J S K f 7 c‘ r f P'! lianson i e, Joy A.piate Mac f t e ts.. Scope - _F ee • sr • • • • • • • • • • :ing you Rear In a Cat- at i .74 1617`` i OFFICIAL RECORD CITY SECRETARY FT. WORTh, TX • • • 0910 ******* w W.ha en ndSa c ATTACHM rith\fi ATTACHMENT A DESIGN SERVICES FOR VILLAGE CREEK WRF GRAVITY ®ELT THICKENERADDITION CITY PROJECT NO. 01847 Chances and Amendments to Scooe for Enaineerina Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR VILLAGE CREEK WRF GRAVITY BELT THICKENER AL)DITION CITY PROJECT NO.: 01847 The scope set forth herein defines the changes and amendments to work to be performed by the ENGINEER in completing the project. These changes and amendments are for Task 6 and Task 10 only. All other tasks are unchanged from the original agreement. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED TASK 6. LIMITED CONSTRUCTION PHASE SFRe/ICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support o The ENGINEER shall attend the preconstruction conference. © The ENGINEER shall provide shop drawing review services. Shop drawing reviews will be coordinated through the ENGINEER and a log of the submittals will be maintained by the ENGINEER. The ENGINEER will respond to shop drawings within 30 days of receipt of shop drawing from the Contractor. The ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and, when requested by the City, make recommendations as to the acceptability of the work. The ENGINEER shall maintain a log of Contractor submitted RFI's and CO's. Following mobilization by the Contractor, the ENGINEER shall visit the project site weekly as construction proceeds to observe and report on progress and attend progress meetings conducted by CITY. It is anticipated that these visits will average 4 hours per visit and that they will occur four times a month over a &month period for a total of 20 visits. ® The ENGINEER shall perform periodic observations to include three site visits to observe and report on progress of the electrical and controls installation. It is anticipated that these visits will average 4 hours per visit. The ENGINEER shall provide review of vendor provided O&M Manuals for project relevance, completeness and accuracy. The ENGINEER shall coordinate review of the manuals received from the Contractor and maintain a log of the submittals. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 1 of 3 )FFICIAL RkiCORD CITY SECRE`ZI\131 FT. WORM, ?X ATTACHMENT A DESIGN SERVICES FOR VILLAGE CREEK WRF GRAVITY BELT THICKENER ADDITION CITY PROJECT N0. 01847 The ENGINF-ER shall provide assistance during startup to include one day during start-up of the gravity belt thickeners and one day during performance testing of the gravity belt thickener units. This assistance will include observing and reporting on the start-up processes directed by the Contractor and CITY and providing technical guidance to the CITY. o The ENGINEER shall attend the "Final" project walk through to be conducted by the CITY and/or Contractor. Based on the walk through, the ENGINEER shall provide to the CITY suggestions for inclusion in the punch list to be produced by the CITY. Additionally, the ENGINEER shall make a recommendation regarding Substantial Completion. o The ENGINEER shall prepare final Record Drawings based on Contractor/CITY generated redlines that will be provided to the ENGINEER by the CITY. The ENGINEER shall provide two fullksize (22" x 34") signed and sealed copies and one electronic PDF version of the drawings. Record Drawings will be provided within 30 days of receipt of all redlines from the CITY. TASK 7. STANDARD OPERATING PROCEDURES ENGINEER shall provide engineering services to prepare a set of Standard Operating Procedures to include the following: 0 A description of the equipment and basic processes associated with the Gravity Belt Thickeners. A description of the operational parameters and procedures used for starting, stopping and maintaining the Gravity Belt Thickener equipment. • Picture and graphical information to support the process descriptions. ® A section on general and specific troubleshooting for the Gravity Belt Thickener process. The ENGINEER shall provide one (1) electronic copy of the Draft Standard Operating Procedures. Based on CITY review comments, the ENGINEER shall prepare a final set of Standard Operating Procedures. ENGINEER shall deliver one (1) electronic copy in Word® format. ASSUMPTIONS 0 26 Shop drawings and 11 re -submittals. 10 RFI's. O 2 Change Orders. O 10 O&M Manuals. • 300 days of construction. ® Standard Operating Procedures will be drafted partially based on information provided from Manufacturer provided Operations and Maintenance Manuals. As a City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 2 of 3 '4=01CIAL RECORD; - kCRETARY r Wit: , c_=•-�.—- -4l% =—a:.'i ATTACHMENT A DESIGN SERVICES FOR VILLAGE CREEK WRF GRAVITY BELT THICKENER ADDITION CITY PROJECT NO.: 01847 result, timing for the draft procedures will be partially dependent on receipt of these manuals. DELIVERABLES 0 0 0 0 0 0 0 • Review of Shop lrawings/Updated Log of Shop Drawings submitted and reviewed. Response to Contractor's Request for Information/Updated log of RFI's submitted and reviewed. Review of Change Orders/Updated Log of Change Orders submitted and reviewed. Review of O&M Manuals/Updated log of O&M Manuals submitted and reviewed. Final Punch List items suggested. Record Drawings One (1) electronic copy of the Draft Standard Operating Procedures One (1) electronic copy of the Final Standard Operating Procedures TASK 10 ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF 8 FM/ICES CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: o Construction phase public meetings. O Review of construction payment applications. O Review of shutdown, tie-in, start-up, and training plans. O Review of schedules. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 3 of 3 OFFICIAL RECORD CITY SECRETARY u=`x,. FORTH, TX I. ATTACHMENT B COMPENSATION Design Services for Village Creek WRE Gravity Belt Thickener Addition City Project No.01847 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Category Rate for the ENGINEER's team member performing the work. Labor Category Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. ILabor Category Project Manager Project QC Technical Specialist Assistant Project Manager Project Engineer EIT CADD Admin 2012 Rate ($Ihour) 205 205 210 145 140 115 110 100 215 215 220 155 150 120 115 105 2014 225 225 230 160i oaa 160 125 120 110 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEFR plus a markup of ten percent (1O%). City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 1 of 4 OFFICIAL RECORD rATY SECRETARY B-1 „ ATTACHMENT B COMPENSATION Iv. Summary of Project Fees for Changes and Amendments to Scope i Firm I Primary Responsibility Prime Consultant Hazen and Sawyer PM, General Shop Drawing Review, RFI, Change Order Coordination, General Site Visits, O&M Manual Review Startup of GBT's and Punch list Proposed M/VVBE Sub°Consultanfs Gupta and Associates, Construction Services for Inc Electrical, Instrumentation and Controls NonaM/WBE Consultants Lockwood, Andrews and Newnam, Inc. Construction Services for Polymer Feed System • i tree Amount i 0/0 $95,143 73.8 $26991 20.9 $6760 52 Project Number & Name Total Fee M/WBE Fee M/WBE % Village Creek WRF Gravity Belt $128,894 $26,991 20.9% Thickener Addition d Construction Services City M/WBF Goal m 20.0% Consultant Committed Goal ra 20.0 % City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 3of4 OFFICIAL RECORD k6f1'YSECRETARY FT. WORTH, TX B-3 EXHIBIT "ea4" MGINEER INVOICE (supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 4 of 4 FFICIAL RECORD CITY SECRETARY ` F% wgRTM, TX Task No. Task Description kar: Project Mgr/QC Tina Hanson 64O.f'04:;,,I1i, ; 000 tl'ori?,Pf eps„S9V`vl ?',IIiir_`:(d "i14 ProJec anagement (10 months) 6.1 Construction Support 6.1.1 Attend Preconstructlon Conference Submittal Review (26 SD's, 10 8.1.2 O&M's) 6.1.2.1 Submittal Coordlnatlon Request for Information/Change 6.1.3 Order Review$10 RFI's, 2 CO's) 6,1.3.1 RFI/CO Coordlnatlon 6.1.4 Protect Site Visits (20 site visits) 6.1.5 Periodic Observations (20 site visits) Assistance During Start-up 6.1.6 (3 site visits) Final Walk Through and Punch List 6.1,7 (1 slte visit) 6.2 Record Drawn�%QC1r e elop iFMtCg 7.1 Draft Standard Operating Procedure 7.2 Final Standard Operating Procedure ,24 IRI F. 13 rrn rmn I 11ill.:im11IYN.digii Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Amendment 1 to Village Creek WRF Gravity Belt Thickener Addition City Protect No. 01847 Labor (hours) Asat. Project Project Engineer Manager Matt Van CADD Tracey Horne l Long Fred Holmes Total Labor MWBE Sub - Cost consultants iP�J r� �f•�4 ' t4f.+Y ry Nsy •+)• u(1 •t'il,W,ir.;YS:lir.3���= ,+{, j+.!V es 4 185 54 20 18 80 18 6 16 y� !..V�i' "i, fi016/.h ( t I•,, 6 H I I . t(rr 'I �' !di ',.,AI/1*ilI gjWAI: Non-MWBE Expense Subconsultant Reproduction Total Expense Task MBWE 1 Shipping Cost Subtotal 5% MarkUp GAI LAN MWBE Non-MWBE Total ' - .. _ i•_ _ _}{ ��::.;..�::'i..�L�d�•+.. n.:. [d 144:f'1Mln..i�. 1 6i1:•,IN �C . L4J1.-_L� 'Y:ny - �: 1' •I • '� r. 8`99. 8•• t, . S• 68 7 2 .80� :I•. � S �p .. L. $ ') �:x:$. � •. ,.i��.•.. S 4 36•'S91 21' 9 • h!M' { h >' , . + t ..,,:.:: 1 �-� •�. , � . f tii;>,i4.{li s tt .++.+51 �7 9 '.; •:1�6, ..I:�it 1 e•89 �_ .. �S:123;A84 $0 $0 ;25 $o $o +t ����.b 1i +I $A s� , . 3Q 1��.f��Q80 , r+I y;;iII 516,957 $3,380 $16,957 $3,380''; .1"I't j"'r''' ri71 $2,340 fjfz ' �,2 a�, `� 40 $3,612 $3,812 $0 yl l� ,:[a +� •' • 12 ;r tl ,, ,t '.$'I�.4,2 so $o ilV33'ire'' � •� il:1 + a14,a0 1i:iiiSI81.00 $1,605 $1,805 50 ,l$<b,j..,1, �0� $0 $0 r< .t� >$0 fist 1�0�4 3;020 $803 $803 $0 $4 014 $3 380 I.$4�014 $3 380 � •t.i$... 5.00 4 �At .Vu.ti.,"I•��n�i10 '.i.LtG•.�:e'�...al{1�.s ��.nUL: ..�'.Q L.,f,p, ..J,3./ v p S tO " `` , ifOtothligt 499e. WARKd j t6t) Iit'� I i(!l )2; 4.O 'n!1 i,:IcMikit36; • 9 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultan( Non-MWBE Subconsultan( 5% Sub Markup MWBE Participation Total Project Cost ;4i10 `i4.•;};•,c; ...::6'''.'i, .. .$5 4110 LdJ 1$4r 11 eg ,..,...Iyl•tl.lui1' .8 ti`...,•I.aakli12• '8B4 61,Y?kBA �� ''�! Ir,i,.!!s li... ; �b d�l:;u,• �c�y 608 $90,615 $38`591 $28`b91 $6`760 $1 `688 20.% H&S Fee $128,894 $95,143 1 of 1 M&C Review Page 1 of 1 CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas FORT WORT!' r COUNCIL ACTION: Approved on 1/7/2014 60VCWRF GRAVITY BELT DATE: 1/7/2014 REFERENCE **C-26624 LOG NAME: THICKENER CM NO.: AMENDMENT 1 CODE: C SUBJECT: PUBLIC HEARING: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 43155, an Engineering Agreement with Hazen and Sawyer, PC, in the Amount of $128,894.00 for a Total Revised Contract in the Amount of $481,157.00 for the Village Creek WRF Gravity Belt Thickener Addition Design (COUNCIL DISTRICT 5) TYPE: CONSENT NO RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1 to City Secretary Contract No. 43155, an Engineering Agreement with Hazen and Sawyer, PC, in the amount of $128,894.00 for the Village Creek WRF Gravity Belt Thickener Addition Design, thereby increasing the contract amount to $481,157.00. DISCUSSION: On April 10, 2012, (M&C C-25555), the City Council authorized an Engineering Agreement with Hazen and Sawyer, PC, in the amount of $352,263.00 for the Village Creek WRF Gravity Belt Thickener Addition Design. This contract provided for the preparation of plans and specifications for the installation of a third gravity belt thickener and upgraded polymer system. Amendment No. 1 is for Engineering to provide Construction Management Services and the preparation of Standard Operating Procedures for the new gravity belt thickener and polymer systems. M/WBE Office - Hazen and Sawyer, PC, is in compliance with the City's M/WBE Ordinance by committing to an additional 21 percent M/VVBE participation on this Amendment No. 1. The City's goal on this amendment is 19 percent. This project is located in COUNCIL DISTRICT 5, Mapsco 68N, and serves all Council Districts. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P275 531200 705300184730 $128,894.00 Submitted for Citv Manager's Office bv: Originating Department Head: Additional Information Contact: ATTACHMENTS Fernando Costa (6122) S. Frank Crumb (8207) Seiavash Mie (8404) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=19319&councildate=1/7/2014 1/10/2014 M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORTWORTII COUNCIL ACTION: Approved on 4/10/2012 REFERENCE 6OVCWRF GRAVITY BELT OATH 4/10/2012 ** C-25555 LOG NAfUlF•. NO.: THICKENER ADDITION CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of an Engineering Agreement with Hazen and Sawyer, P.0 , in the Amount of $352,236.00 for the Design of the Village Creek Water Reclamation Facility Gravity Belt Thickener Addition (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of an engineering Agreement with Hazen and Sawyer, P.C., in the amount of $352,236.00 for the design of the Village Creek Water Reclamation Facility Gravity Belt Thickener Addition. DISCUSSION: The Village Creek Water Reclamation Facility Gravity Belt Thickener System (GBT) was designed to support the High Rate Clarification System by removal of solids from the wastewater for processing into biosolids for beneficial reuse. The plant staff has requested that a third GBT be added and modifications made to increase the efficiency of processing solids from the normal wastewater treatment process. The project consists of a study to determine the optimum chemical requirements for processing the other normally produced sludges with GBTs and the installation of an additional GBT in the GBT Building at the Village Creek Water Reclamation Facility with all required modifications and additions to process other normally produced sludges with GBT. Hazen and Sawyer, P.C., proposes to perform this work for a fee not to exceed $352,236.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. Hazen and Sawyer, P C., is in compliance with the City's M/WBE Ordinance by committing to a 22 percent M/WBE participation. The City's goal on this project is 20 percent. In addition to the contract amount, $50,000.00 is required for project management by the Water Department. This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P275 531200 705300184730 $352,236.00 Submitted for City Manager's Office by: Fernando Costa (6122) http://apps.cfwnet.org/council_packet/mc review.asp?ID=16517&councildate=4/ 10/2012 1 / 10/2014 M&C Review Page 2 of 2 Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Seiavash Mir (8404) ATTACHMENTS VC WVVTP LocationMap.pdf http://apps.cfwnet.org/council packet/mc_review. asp?ID=16517&councildate=4/1 0/2012 1 / 10/2014