Loading...
HomeMy WebLinkAboutContract 42858-A1AMENDMENT No . 1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered Into City Secretary Contract No. 42858, (the CONTRACT) which was authorized by WIC C-25417 on the 24th day of January, 2012 in the amount of $320, 000 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Design Oversight and Project Management Services on North Tarrant Express Projects IH-820 from IHt=35 to Southwestern Railroad, and DART Railroad Crossing. WHEREAS, it has become necessary to execute Amendment No . 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 24, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $:172,000.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an anount of $492,000OO. OFFICIAL RECORD', CITY SECRETARY I, 1'30RTH, TX RECEIVED AUS 27 2013 All other provisions expressly amended herein, effect. of the Contract, which are not shall remain in full force and EXECUTED and EFFECTIVE as of the date last written by a signatory, below. AP PROVED : City of Fort Worth Fernando Costa Assistant City Manager DATE: RECOMMENDED: r �����'l� / demo 4 v - - S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: TVIA•tk,1/2 -lc --Douglas W Ri =r.k ENGINEER Kiml y- H rn and Associates, Inc., 3 Glenn Gary, P.E. Senior Vice -President DATE: fri t theite f7. /Pre fp— Assistant City Attorney ATTEST: K City Secretary 4 d1Ot2t � M&C: C-26361 Date: July 23, 2013 OFFICIAL RECORD MI11'M SECRETARY Ft WORT1p TX P wg I Kim ley -Horn and Associates, Inc. May 24, 2013 Mr. John Kasavich Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Design Oversight and Project Management Services on North Tarrant Express Projects IH-820 from IH-35 to Southwestern Railroad and Dart Railroad Crossing Amendment No. 1 KHA No. 061018101 Dear John' Kimley-Horn and Associates, Inc. is pleased to submit our Amendment No. 1 for the City s North Tarrant Express Project (IH-820). The fees for this amendment are not to exceed $172,000. The following table summarizes our recommended budget revisions and shows the revised contract amount: Description Pre -Engineering Conceptual Engineering Preliminary Construction Plans Final Construction Plans Pre -Construction Services Construction Phase Services Total Project Original Fee $0 $20,000 $0 Amend No. 1 $0 Revised Contract $0 $0 $20,000 $0 $0 $0 $0 $0 $0 $0 $0 t $300,000 $172,000 $472,000 $320,000 $172,000 $492,000 Kimley-Horn will subcontract a portion of these services to Lamb -Star Engineering, LLP, an M/WBE subconsultant. The amount we will be 1 TEL 817 335 8511 FAX 817 335 5070 Sidle 950 801 Cherry Street, Unit 11 Fort Worth, Terns 76102 KimleyHorn and Associates, Inc. Mr. John Kasavich, May 24, 2013, Page 2 subcontracting is $I 15,300. This represents an M/WBE participation percentage of 67.0% for these additional services. With these Additional Services, our revised contract amount will be $492,000. This will revise our total contract M/WBE participation to $248,600 (50.5%) The water and sewer design fees are as follows: Original Contract Amendment 1 Water Sanitary Sewer $ 160,000 $ 160,000 $ 86,000 $ 86,000 Total Project $ 246,000 $ 246,000 ,11,1,E II Iiiilli Total $ 320,000 $ 172,000 $ 492,000 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No. F-928 C Glenn A. Gary F.E. Si. Vice President GAG:rdo \WT\YFPOI\Data\Project FIV_Utilitiee106101 60901PPP\Amendment•2013\NrE Amendment I MWBE Ltr.doc KimleyHorn and Associates, Inc. May 24, 2013 Suite 950 801 Cherry Street, Unit 11 Fort Worth, Texas Mr. John Kasavich 78102 Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Design Oversight and Project Management Services on North Tarrant Express Projects IH-820 from IH-35 to Southwestern Railroad and Dart Railroad Crossing Amendment No. 1 KI-IA No. 061018101 Dear John: Kimley-Horn and Associates, Inc. has attached the additional scope of services for Amendment No. 1 of the City's North Tarrant Express (NTE) Project in Attachment A. The fees for this amendment as stated in Attachment B, is not to exceed $172,000, increasing the total not to exceed fee to $492,000. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No. F-928 Glenn A. Gary, P.E. Sr Vice President GAG:rdo Attachments: 1WWEP01\DnUV'rojrct1FRY_Utilitie006 1018090VPPPUmendment-2011WTE Arncmdment Isix 4 TEL 817 335 6511 FAX 817 335 5070 ATTACHMENT "A" Amendment 1 Scope for Engineering and Project Management Related Services for the North Tarrant Express Projects (IH-820) General Scope of Services The ENGINEER will perform its services as an amendment to the Contract Titled DESIGN OVERSIGHT AND PROJECT MANAGEMENT SERVICES ON NORTH TARRANT EXPRESS PROJECTS IH-820 FROM IH-35 to SOUTHWESTERN RAILROAD AND DART RAILROAD CROSSING dated February 6, 2012 pursuant to the requirements delineated with this attachment. OBJECTIVE The objective of this PROJECT is for the ENGINEER to provide the CITY with program management related services associated with the North Tarrant Express Segment 1 (IH- 820) Project. WORK TO BE PERFORMED TASK 1. PROGRAM MANAGEMENT SERVICES 1.1 Project Meetings: Attend meetings as directed by the CITY with CITY, project stakeholders, contractors, other consultants, and/or citizens 1.2 Plan Reviews: Review engineering plans provided by contractor or other engineers and provide CITY with comments and recommendations. 1.3 Coordination: Coordinate with CITY, project stakeholders, contractors, other consultants, and / or citizens regarding various engineering issues along the NTE corridor. 1.4 Construction Support Services: Provide Professional construction phase services for construction of the proposed project for the purpose of providing assistance to CITY during construction. The CITY will provide construction management services and inspection for the project. This scope of services does not include construction phase services related to inspections or testing, applications for payment, or determination of substantial completion and are considered Additional Services. The following services will be performed for the construction contract: A. Preconstruction Meeting: 1. Attend preconstruction conference as required. B. On -site Observation: ATTACHMENT "A" TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES (REV 03/25/2013) PAGE 1 OF 3 1. Provide on -site construction observation services during the construction phase. 2. Make visits as directed by CITY in order to observe the progress of the Work. 3. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER'S exercise of professional judgment. Based on information obtained during such visits and such observations, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep CITY informed of the general progress of the Work. The purpose of ENGINEER'S site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress supervise, direct or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor s failure to furnish and perform its work in accordance with the Contract Documents. C. Progress Meetings: Attend bi-weekly (2 per month for a period of 6 months) progress meetings. D. Shop drawing, samples and other submittals Review: 1. Review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. 2. Such review, approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs and shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors inconsistencies or omissions. 3. Log all shop drawings, samples and other submittals. ATTACHMENT "A" TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES (REV 03/25/2013) PAGE2OF3 E. Substitutions: 1. Evaluate and determine the acceptability of up to three (3) substitute or "or -equal" materials and equipment proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of the state or the CITY. F. Request for information (RFD): 1. Provide necessary interpretations and clarifications of contract documents and make recommendations as to the acceptability of the work. ENGINEER will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by CITY. G. Change Orders: (NOT USED) H. Final Project Walk Through: 1. Attend the "Final" project walk through and assist with preparation of final punch list. Attend final site visit to determine if the completed Work of Contractor is generally in accordance with the Contract Documents. 2. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 1.5 Invoices: Prepare monthly invoices to Bluebonnet Contractors, LLC for Reimbursement of CITY S Indirect Costs. Accounting information shall be provided to the ENGINEER by the CITY. 1.6 Perform Designs as directed by the CITY. 1.7 Other Services as directed by the CITY. ATTACHMENT "A' TO STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES (REV 03/25/2013) PAGE 3 OF 3 ATTACHMENT "B" Compensation I. Professional Engineering Services For all additional professional engineering services included as described in ATTACHMENT "A," the CITY agrees to pay the ENGINEER on a cost plus maximum basis. The total amount of the contract will not be exceeded without a modification to this agreement. Recommend budgets are as follows: Task 1 — Program Management Services $ 172,000 TOTAL for this Amendment to be paid to the ENGINEER will not exceed $ 172,000 Original Contract Amount $ 320,000 TOTAL Compensation to be paid to the ENGINEER will not exceed $ 492,000 II. Basis for Compensation The CITY will compensate the ENGINEER for the various items listed above on a reimbursable basis, where the total contract amount may not be exceeded without an amendment. Labor fee included in the amendment will be billed at multiplier of 3.35 times the salary cost. Direct reimbursable expenses such as express delivery services, fees, air travel, subconsultant expenses, printing and other direct expenses will be billed at 1.10 times cost. Other expenses such as in-house duplicating, Local mileage, telephone calls facsimiles, postage, word processing and technical use of computers shall be included as part of the labor rate multiplier. Administrative time related to the project may be billed hourly. All permitting, application, and similar project fees that are not identified specifically in the scope of services shall be paid directly by the CITY. Fees will be invoiced monthly based on the actual amount of service performed and expenses incurred The ENGINEER will provide backup to the invoice that is a breakdown of the fees based on task and CITY department. Payment will be due within 25 days of your receipt of the invoice. EXHIBIT "B-1" M/WBE Summary Engineering and Project Management Related Services for the North Tarrant Express Projects (I11-820) Amendment 1 Task Description Task 1 — Program Management Services Total Project Fee $ 172,000 $ 172,000 M/WBE Subconsultant Services Lamb -Star Engineering, LP Total Total Contract Description Total Contract Amount Contract M/WBE Total M/WBE Percentage Original Contract $320,000 $ 1 80,000 56.3% MWBE (%) $ 115,300 $ 115,300 Construction Observation Amendment 1 $492,000 $248,600 50.5% (67.0%) Fee $ 115,300 $ 115,300 This attachment is provided for informational purposes only to show the projected plan to meet the M/WBE goal of 40% for this amendment. The actual dollars paid by the ENGINEER to M/WBE subconsultants may vary for each task as well as for each subconsultant. The subconsultants listed are those intended for use on this project, but the actual subconsultants used may vary. EXHIBIT "B-2" Profession Services Fee Summary — Amendment 1 Engineering and Project Management Related Services for the North Tarrant Express Projects (IH-820) A. SUMMARY OF TOTAL FEE Service Description Engineering Services Survey Fee Total Fee Water $86,000 $0 $86,000 B. BREAKDOWN OF WATER AND SEWER FEES (Less Survey Fees) Sewer $86,000 $0 $86,000 1. Total Water Fee (less Survey Fees) Breakdown by Concept, Preliminary and Final Design a. Concept (30%) b. Preliminary (60%) c. Final (10%) (Total Water Fee - Survey Fees) x (0.3) (Total Water Fee - Survey Fees) x (0.6) (Total Water Fee - Survey Fees) x (0.1) 2. Total Sewer Fee (less Survey Fees) Breakdown by Concept, Preliminary and Final Design a. Concept (30%) b. Preliminary (60%) c. Final (10%) (Total Sewer Fee - Survey Fees) x (0.3) (Total Sewer Fee - Survey Fees) x (0.6) (Total Sewer Fee - Survey Fees) x (0.1) Total $172,000 $0 $172,000 $25,800 $51,600 $8,600 $86,000 S25,800 $51,600 $8,600 $86,000 Task Task 1- Program Management Services Hours Fee P8 30 $6,800 EXHIBIT "B-3" Summary of Total Project Fees - Amendment 1 Labor Hours/ Subconsultant P6-P7 P4-P5 A2 Labor Fee KHA Expenses Expenses 60 240 15 345 $10,600 $26,100 $1,200 $44,700 $470 $115,300 10% Sub Fee Total Fee $11,530 $172,000 ATTACHMENT "C" Amendments to Standard Agreement No modifications to the Standard Agreement were necessary for this project. ATTACHMENT "D" Schedule The anticipated completion of the NTE Segment 1 water and sanitary sewer relocations is October 2013. The ENGINEER will provide our services within a reasonable length of time as expeditiously as practicable Upon receiving a work request from the CITY with a request for a schedule, the ENGINEER will prepare a schedule outlining the time required to complete the work request. M&C Review Page 1 of 2 UNCIL .'.G NDA Official site of the City of Fort Worth, Texas FORT WOasitires- RTt! COUNCIL ACTION: Approved on 7/23/2013 DATE: 7/23/2013 REFERENCE NO,: **C-26361 LOG NAME: 6ONTEA1-KHA CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 42858, an Engineering Agreement with Kimley-Horn and Associates, Inc., in the Amount of $172,000 00 for a Total Contract in the Amount of $492,000.00 for Design Oversight and Project Management Services on North Tarrant Express Projects IH-820 from IH- 35 to Southwestern Railroad and DART Railroad Crossing (COUNCIL DISTRICTS 2 and 4) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 1 to City Secretary Contract No. 42858, an Engineering Agreement with Kimsey -Horn and Associates Inc., in the amount of $172,000.00 for design oversight and project management services on North Tarrant Express Projects IH-820 from IH-35 to Southwestern Railroad and DART Railroad Crossing, thereby, increasing the contract in the amount of $492 000 00. DISCUSSION: On January 24, 2012, (M&C C-25417) the City Council authorized an Engineering Agreement with Kimley-Horn and Associates, Inc., in the amount of $320,000.00 for design oversight and project management services for North Tarrant Express. The addition of a new bridge and highway interchange at Riverside Drive and IH-820 to the North Tarrant Express (NTE) Projects by North Tarrant Express Mobility Partners, created additional conflicts with existing City water and sanitary sewer mains that require relocation. It is necessary to execute Amendment No. 1 to provide compensation for the necessary additional services including project management, design/as-built plan reviews coordination meetings, shop drawing reviews and construction inspection for the increased NTE project scope. Kimley-Horn and Associates, Inc proposes to provide the additional services for a lump sum fee in the amount of $172,000.00. Staff considers this fee to be fair and reasonable for the scope of services provided. M/WBE Office - Kimley-Horn and Associates, Inc , agrees to maintain its initial M/WBE commitment of 40 percent that it made on the original Agreement and extend and maintain that same M/WBE commitment of 40 percent to this first amendment. Therefore Kimley-Horn and Associates, Inc., remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICTS 2 and 4, Mapsco 49C, 49G, 49H, 50E and 51E. FISCAL INFORMATION/CERTIFICATION: http://Www. t brt:vorthgov.orglcouncil_packet mc_review.asp?1ll=18648&councildate=7/23/... 8/9/2013 M&C Review Page 2 of 2 The Financial Management Services Director certifies that funds are available in the current capital budgets as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P265 531200 602170179931 $25,800.00 P265 531200 602170179932 $51,600.00 P265 531200 602170179933 $8,600.00 P275 531200 702170179931 $25,800.00 P275 531200 702170179932 $51,600.00 P275 531200 702170179933 $8,600.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Deuartment Head: S. Frank Crumb (8207) Additional Information Contact: John R. Kasavich (8480) ATTACHMENTS 60NTEA1-KHA MAP.odf h`tp:// Aiw.w.fortworthgov.orgicourncii_packei/mc_review.asp?Ill=18648&councildate=7/23/... 8/9/2013