Loading...
HomeMy WebLinkAboutContract 42085-A1CITY SEC yf 1 `� fit. coNTRACT k3(I))r. PAYMIMMIWT. No01 TO CITY SECRETARY CONTRACT Moo 42085 WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc . , (ENGINEER) made and entered into City Secretary Contract No. 42085, (the CONTRACT) which was authorized by M&C C-24988 on the 12 day of July, 2011 in the amount of $ 293,525.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Hubbard Heights Storm Drainage Improvements Project; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly author i zed representatives, which amends the CONTRACT: ay0-ar 1 r1 r the e f r� l l n w i r rr agreement, 1�11 1 `J 1 1 LJ VV 111y Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 04, 2012, a copy of which is attached hereto and incorporated herein.: The cost to City for the additional design services to be performed by Engineer totals $88,200.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $381L,725.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 OFFICIAL RECORD CITY MILITARY FT. WORTII, TX ,A10:j8 IN EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth 45Amk.44, Fernando Costa Assistant City Manager DATE: ENGINEER CUM SmJ t, Inc Douglgs Varner, P.E. Vice President DATE : ' L itS 70,4 APPRI.AL RECOMMENDED: __ l� Douglas i Wiersig, P.E. Director, Transportation ubl i c Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Douglas W. Black Assistant City Attorney ATTEST: Mary J er City e retary 40,04„-„,,,44 Ar���pappppp�� yYA JAI Psoroopict, AS City of Fort Worth Professional Services Agreement Amendment Template PM0 Official Release 8/1/2012 Page 2 of 3 ZY6 Date: 1 f • (3 OFFICIAL RECORD CITY UCRETARY FT0 WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 42085 Amendment No. 1 Department Fund -Account -Center T/PW Stormwater P227 531200 2092801603 30 Total: City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Amount $88,200.00 $88,200.00 100 Throckmorton Street, Suite 600 Fort Worth, Texas 76102 tel: +1 817 332-8727 fax: +1 817 820-0450 cdmsmith.com December 4, 2012 Mr. Vibhuti Pandey, PhD, P.E. Project Manager Stormwater - Transportation & Public Works 900 Monroe Street, Suite 500 Fort Worth, Texas 76102 Subject: Hubbard Heights Storm Drain Improvements Project City Secretary Contract No. 42085 M&C C-24988, July 12, 2011 Engineering Services Scope and Fee Amendment Proposal Dear Mr. Pandey: Following submission of the 30% design drawings and report, the City of Fort Worth suggested that CDM Smith consider changes to the extent of the project limits. The goals of the changes were to optimize the capture of stormwater runoff by extending the proposed storm drain improvements. CDM Smith considered the changes to the existing improvements and prepared a memorandum with recommendations for changes to meet the City's goals. This memorandum outlined the potential improvements of the revised alignment, and also documented additional survey, easements and SUE needs if the City decided to pursue the modified project extents. CDM Smith met with the City to discuss the recommendations, and the City requested that CDM Smith proceed with the work. At the meeting the City also requested that CDM Smith perform an analysis to determine the houses that will be protected from flooding by the proposed storm drain improvements. This will require analysis beyond what CDM Smith is under contract to perform to size the proposed improvements. CDM Smith has worked with Marshall Lancaster and Associates (MLA) and The Rios Group to develop a scope and fee proposal for the additional survey, easements and SUE work that are required for the increased project area. These items are further discussed below: Level of Service Analysis. The original engineering was fee based on performing hydrology and hydraulic analysis to size the storm drain improvements. The project team completed this analysis of the original 30% design alignment, and then modified the calculations to reflect the recommended revised alignment. Performing a level of service analysis requires engineering effort beyond what was scoped in the original contract. CDM Srnith proposes to WATER + ENVIRONMENT + TRANSPORTATION + ENERGY + FACILITIES Mit Mr. Vibhuti Pandey, PhD, P.E. December 4, 2012 Page 2 include three subtasks to the 3.7 Preliminary Design (60%) task to incorporate this work into the contract. Right-of-Way/Easements. MLA established right-of-way boundaries based on the original 30% design alignment. Extending the project boundary will require that MLA establish additional right-of-way boundaries along James Street, Cantrell Street, Fuller Avenue, Felix Street, Boyce Avenue and Spurgeon Street. MLA will require additional temporary right of entry coordination to complete the survey, since the recommended improvements will cross several private properties. It is also anticipated that additional permanent and temporary easements will be required. CDM Smith proposes to modify Task 7.2 and 7.3 to incorporate this work into the contract. Survey. Increasing the boundary of the project area will require approximately 4,460 linear feet of additional street and adjacent property survey along James Street, Gambrell Street, Fuller Avenue, Felix Street, Boyce Avenue and Spurgeon Street. CDM Smith proposes to modify Task 8 to incorporate this work into the contract. Additional Services. The original contract included three subtasks for meeting with property owners and stakeholders, facilitating additional meetings as requested by the City, and preparing exhibits and sketches. During the 30% design work, the design team was asked to coordinate with the Federal agency owning the property to the south of Fuller Avenue. The City directed CDM Smith to utilize the Task 10 budget for these meetings and for any other meetings needed to coordinate improvements on the federally -owned property. CDM Smith proposes to modify this task to include two meetings with the Fort Worth Federal Center and one meeting with the TCEQ. Additional Engineering Fee Request We project the following additional work required to complete the design of the revised storm drain alignment. 1. Preliminary Design (60-Percent). As previously discussed, additional effort beyond what is needed to size the pipes will be required to perform the hydrologic and hydraulic analysis to determine the level of service provided by the storm drain improvements. This effort is divided into three subtasks and the labor costs are as follows: Task 3.7.1 Subwatershed Delineation Task3.7 2 Hydrologic & Hydraulic Evaluations Task 3.7.3 Level of Service Assessment Total $ 3,280 $15,460 $ 5,760 $ 24,500 re) CDR,' Mr. Vibhuti Pandey, PhD, P.E. December 4, 2012 Page 3 2. Right Of Way/Easement Services. As previously discussed, additional right-of-way documentation, right of entry coordination and additional easements will be needed along James Street, Ganlbrell Street, Fuller Avenue, Felix Street, Boyce Avenue and Spurgeon Street. This effort would amend the existing 7.2 and 7.3 subtasks as follows: Task 7.1 Right -of -Way Research - CDM Smith Task 7.1 Right -of -Way Research - MLA Task 7.2 Right-of-Way/Easements - CDM Smith Task 7.2 Right-of-Way/Easements - MLA Task 7.3 Temporary Right of Entry Coordination $ 1,380 $ 6,000 $ 3,640 $ 5,100 $ 5,680 Total $21,800 3. Survey. Additional topographic and SUE survey will be needed along James Street, Gambrel! Street, Fuller Avenue, Felix Street, Boyce Avenue and Spurgeon Street to accommodate the revised alignment. This effort would amend the existing 8.1 subtask as follows: Task 8.1 Survey 8z SUE Coordination - CDM Smith $ 5,640 Task 8.1 Survey - MLA $17,000 Task 8.1 SUE - The Rios Group $12,500 Total $35,140 4. Additional Services. As previously discussed, CDM Smith has agreed to provide additional meetings with the Fort Worth Federal Center and the TCEQ. This effort would amend the existing 10.1 subtask as follows: Task 10.1 Coordination w/State & Federal Agencies $ 6,760 Total $ 6,760 The total engineering costs associated with the services described above is $88,200. Therefore, we request an amendment to our contract to increase the upper limit by $88,200 to $381,725. As part of this amendment, CDM Smith commits to an additional M/WBE participation of $40,600, which equals 46% of the total amendment amount. Smit Mr. Vibhuti Pandey, PhD, P.E. December 4, 2012 Page 4 If this amendment request is acceptable to the City we will prepare an amendment to our contract for execution. Please contact me if you have any questions or comments. Sincerely, Kent Riker, P.E. CDM Smith TBPE Firm Registration No. F-3043 File: 0515-84191 City of Forth Worth, Texas Hubbard Heights Storm Drain Improvements, City Project No. 01603, Amendment 1 Task October 30, 2012 Professio al Services Fee Description Project Project Project Staff Total Labor Director Manager Engineer Engineer CADD Administrative Hours Costs Expenses Outside $220 $160 $140 $100 $100 $50 Description Professionals Total 1 3.0 Preliminary Design f60-Percent) 3.7.1 Subwatershed Delineation 2 4 24 0 0 30 $3.280 $3.280 3.7.2 HydroloS �is and Hydraulic Evaluations 16 35 80 0 0 131 $15\460 $15,460 3.7.3 Level of Service Assessment 4 8 40 0 0 52 $5, 760 $5, 760 7.0 ROW/Easement Services 7.1 Ri ht-of-Way Research 2 4 4 0 2 12 $1,380 $6.000 $7,380 7.2 Right-of-Way/Easement Preparation and Submittal 2 8 16 0 12 38 $3,640 $5,100 $8, 740 7.3 Temporary Right of Entry Submittal 2 4 8 0 80 94 $5, 680 $5.680 8.0 Survey 8.1 Survey 4 12 0 4 2 22 $2,820 $17,000 $19,820 8.1 Subsurface Utility Engineering 4 12 0 4 2 22 $2,820 $12, 500 $15,320 10.0 Additional Services 10.1 Coordination with State and Federal Agencies 12 16 24 0 4 56 $6, 760 $6, 760 Total 0 36 87 172 8 98 401 $47,600 $0 $40,600 $88,200 M&C Review Page 1 of 2 CITY COUNCIL AGENDA R i i if lidiWil}htk i#.khW Lj Witt[ rusM z u.k /411h { dv## FURT Woii 1 COUNCIL ACTION: Approved on 2/5/2013 DATE: 2/5/2013 REFERENCE NO.: -Myr 2OSW HUBBARD HEIGHTS **C-26086 LOG NAME: DRAINAGE IMPROVEMENTS AMENDI CODE: C TYPE: CONSENT PUHLIC NO HEARING., SUBJECT: Authorize Amendment No. 1 to City Secretary Contract No. 42085, an Engineering Agreement with CDM Smith Inc., in the Amount of $88,200.00 for Additional Engineering Analyses for the Hubbard Heights Storm Drainage Improvements Project, Bringing the Total Contract Amount to $381,725.00 (COUNCIL DISTRICT 9) RFCOMR1FNDATION: It is recommended that the City Council authorize Amendment No. 1 to City Secretary Contract No. 42085, an Engineering Agreement with CDM Smith Inc., in the amount of $88,200.00 for additional engineering analyses for the Hubbard Heights Storm Drainage Improvements Project, bringing the total contract amount to $381,725.00. DISCUSSION: The engineering services recommended by this Mayor and Council Communication will provide for additional design, survey, subsurface utility engineering and easement documents needed for the Hubbard Heights Storm Drainage Improvements Project. After the initial drainage study, it was determined that the project limits should be extended, resulting in the need for additional analyses. The original engineering Agreement with CDM, now known as CDM Smith Inc., (City Secretary Contract No. 42085) was approved by Council on July 12, 2011, in the amount of $293,525.00. This amendment will bring the total contract amount to $381,725.00. CDM Smith, Inc., proposes to perform the above services for a lump sum fee of $88,200.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. CDM Smith, Inc., is in compliance with the City's M/WBE Ordinance by committing to 32 percent M/WBE participation on this Amendment No. 1. The City's M/WBE goal on this amendment is 32 p ercent. This project is located in COUNCIL DISTRICT 9, Mapsco 90L and 90M. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P227 531200 209280160330 $88.200.00 http://fortworthtexas.gov/council_packet/mc_review.asp?ID=17977&councildate=2/5/2013 2/6/2013 M&C Review Page 2 of 2 Submitted for pity Manager's Office by: Fernando Costa (6122) Originating Denartment Head: Douglas W. Wiersig (7801) Additional Information Contact: Vibhuti Pandey (2424) ATTACHMENTS 01603 Hubbard Heiahts Mao.odf http://fortworthtexas.gov/council_packet/mc_review.asp?ID=17977&councildate=2/5/2013 2/6/2013 ID Task Name y ' March i 1_2/10 12/17 2/24 ; 3/3 13/10 1 a NTP for Amendment No. 1 2 F 3.0 Preliminary Design (60%) 3 15 3.1 Preliminary Design Drawings 4 3.2 Geotechnical Investigation/Pavement Design 5 ; 3.3 Constructability Review 6 3.4 Public Meeting 7 I® 3.5 Utility Clearance 8 s 3.6 Traffic Control Plan 9 1 3.7 Hydraulic Analysis 10 1 COFW Review 11 12 ; 4.0 Final Design (90%) and Final Construction Documents (100%) 13 4.1 Final Design 14 Ja 4.2 COFW Review 15 i 4.3 Final Documents 16 17 7.0 ROW/Easement Services 18 f 7.1 Right -of -Way Search 19 i 7.2 Right-of-Way/Easement Preparation and Submittal 20 7.3 Temporary Right of Entry Coordination 21 22 23 —1 8.0 Survey 8.1 Additional Survey & SUE Field Data 24 9.0 Permitting 25 : 9.1 Storm Water Pollution Prevention Plan 26 27 , 10.0 Additional Services 28 10.1 Coordination with State & Federal Agencies Project: Hubbard Heights Schedule - C Date: Thu 2/7/13 Task Split 2/18 April i May ;June 3/17 i 3/24 1 3/31 i 4/7 i 4/14 1 4/21 14/28 1 5/5 15/12 5/19 5/26 1 6/2 i 6/9 ■ 11 .I ■I I11.1iiS I it Progress Milestone • 6/16 111111=1.11111111117 ISIENN July i Auqust i September ;October 6/23 1 6/30 1 7/7 7/14 7/21 7/28 L 8/4 8/11 1 8/18 18/25 I 9/1 9/8 i 9/15 9/22 9/29 i 10/6 110/13 10/20 1 Summary v External Tasks Project Summary Extemal Milestone Deadline Page 1