HomeMy WebLinkAboutContract 42225COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 'T WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Adventist Health System/Sunbelt Inc. Authorized Signatory: Kenneth A. Finch Title: Chief Executive Officer Project Name: Huguley Memorial Addition Project Location: NEC Old FM 1187 & Medpark Additional Streets: N/A Plat Case No.: FS-011-040 Plat Name: Huguley Memorial Addition Mapsco: 119K Council District: 8 City Project No: 01747 To be completed by staff Received bit � V kt'Li t CFA:2011-019 DOE: 6688 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX 1 Date: 09-02-11 P12:44 OUT NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement (`CFA') as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) Sewer (A-1) X, Paving (B) Storm Drain (B-1) X Street Lights & Signs (C) _____. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Huguley Memorial Addition CFA No.: 2011-019 DOE No.: 6688 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one I Bond = 100% ICompletion Agreement = 100% / Holds Plat ICash Escrow Water/Sanitary Sewer= 125% ICash Escrow Paving/Storm Drain = 125% ILetter of Credit = 125% w/2yr expiration period Developer's Cost 39,600.00 39,600.00 110,943.00 110, 943.00 150,543.00 792.00 792.00 1,584.00 4,437.72 2,218.86 6,656.58 8,240.58 Choice Amount (ck one) 150,543.00 150,543.00 49, 500.00 138,678.75 188,178.75 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Deve per has executed this instrument in quadruplicate, at Fort Worth, Texas this of -' , 20 CITY OF FORT WORTH - Recommended by: Water Department /I Wendy Chi-Babu&l, EMBA, P.E. Development Engineering Manager Ap i roved as to Form & Legality: -.Marcia Wise Dv u, la. 5 w • Black -ors Assistant City Attorney ATTEST: Marty Hendrix City Secretary ATTEST Signature (Print) Name: Kee —coy - not cNerc.\\1:11:11.141:1 I Or/Di?6 -EfeCI a t'j dl ;Xi Q day Transportation & Public Works Department 6,) DouglW. Wiersig, P.E. Director Approved by City Manager's Office efterasia Fernando Costa Assistant City Manager 0 o �a 44N °°00000(3° Mtill 7E%1t'fffea1th System/Sunbelt Inc. NO M&C 1?..11Q0110,0 1 Si Print Name: Kenneth - . Finch Title: Chief Executive Officer OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C. Street Lights and Signs Improvements Street Lights and Signs Estimate m n n ►l n (Remainder of Page Intentionally Left Blank) 9 Circle L Construction, Inc 1604 Taylor Bridge Court Burleson Texas 76028 817-295-0056 Main 24 hour service line 817-426-6937 Fax Hug uley Memorial Plaza - Drainage Improvements Storm Water Facilities Item 1. 2. 3. 4, 5, 6 8. City Sid # Bid-0008D Bid-00881 ad-00068 Bd-00069 Bd-00069 84-00094 Bd-00062 Bd-00372 Description Remove E. 36' RCP Instal 6'x5' Box Cu!vert Instal 6'x5' Parralel Wing Wall install 6'x5' Flared Wing Wall install 6'x5Perim adiWar Wing Wall Install Rod< Rip Rap < 18" Rock Install Earthen Chanel Trench Safety Sanitary Sewer Facilities Item City Bid # Description 1, Bid-00213 4' Diameter Manho'e (to 6 (eet) 2. Bid-00332 8" Sanitary Sewer Main - SDR 26 3. Bid-00372 Trench Safety 4, Bid-00217 Manhole -Vacuum Testing 5. Bid-00201 Post Construction Clean & TV 6. Bid -00214 4' Diameter Manhee Extra Depth Sincr&y,. Rict;ard L Van Weezel ' Vt4„ VP / Estimating 817-937-7192 Mobile Quantity lint CostiLtnil Total 90 IF $ 38,89 $ 3,500,00 102 IF $ 284.11 $ 30,000 00 1 EA $ 5,000.00 $ 5,000.00 2 EA $ 5,000.00 S 10, X'0.00 1 EA $ 5,000.00 $ 5,000.00 400 SY $ 37.50 S 15,003,00 703 CY $ 57.04 S 40,100.00 192 EA $ 12.19 S 2,340.00 Total 110,843.00 Quantity Unit Cost,'Unit Total 4 EA $ 2,500.00 $ 10,000.00 640 LF $ 30.00 S 19,200.00 640 LF $ 5.00 $ 3,200.00 4 IS $ 200.00 $ 800,00 640 LF $ 6.25 $ 4,000.00 24 VF $ 100.00 S 2,400.00 Total S 39,600.00 $150,543 00 F.M. 1187 35W 35W HUGULEY HOSPITAL S 1L L!d 4 0.O FM 1 87 FORT WORTH SPINKS AIRPORT Vl CINI T Y MAP NOT TO SCALE (MAPSCO GRID 119F) E. RENDON CROVILEY J w 15541 r ( Oa IS I Fat ter waNnY NAP (MX70 SOLO MAW / eetstr greet pas IIM•MO�Ipaefifat a . 1st a Gases iFv1Yr .wrr r ..,beaaaWest IS M bM errant red to tornabIalial off Cie Soo AS fit Mb AN loiffffolio, boa woo Sotio••• / Of OW Swett Is plot Me art to es w eaett M Ile inet rase 9e,al r rte *Mar wet Melee flies or w Sae Sew peek • lest • as ON offiffelkw obi bPeamaobe sett •Woar swMere gate Is a. s towel w e .r Port rn or Me w opt b minetow we Sp se Sr • Its r q bent er,• M Ink er ✓ ow* hpsei rt NS w q q Mbnee wRl or sea nepenthe Ootts a soya/ w aawsnrbr raw o- p•t� etsMeeel �M+rrlpelnwa,sallSIeteprb —sweaa r etsbwarl aeerweaa nanIffiw w Awalw psbal•e suet•! .r ftoarp ormayr srArtr eS yatr osort wneeaq et w7 M.e en ofp oweafw Nona, of wont lest Its riVaattpPot MS k w eras nttMe sossoomoof ffooffortolto blast Me The blot _atilt aloolodM• armload - w Awaal toe II• Mot ge/aaw Ye -ass SONS t/ r w 'Ste fir ea At Mt des of ter Maas• • Isleriethof Affair 90Pol►1 et sell _neo__soul Mw were SOS psi` N ere. • Dnewie Sint AA St bake ,•lte early a wdnes she Me gpaat 'wow) drop peel ~Is uwett ides q SOS/ pal r its lurk se MS ,she (0 flag Om • wee Sea Mbit offigogobon Ms Mb OS set aoriffolff. • Stew ai0'ory Os nt. • n wof none Non erMS-7-,moor , Me ▪ p was bet • a Ores 9Y�ay•* be aaer_4 tee q peer a taut w awn ewer s hoes art low r w era. ASS IStollori No senanctlet rat she &tend soltdo Maw awc .IM.rt Me .aa aped eI Me aMatr of Anae_t_S_ se Poe MMs M er to ran SS MSS evinb•Wets =os s Ivwbeasso salttralaJ b Mtno at prsnMW MINNOW Or ate) on !Moth b awanWt MM w Ieee werYw • paaRM4 r SS M Mods as es • Seers r he (b Set fen w KO - Jr et rota.. tart SietnSsflM•Wew• aS. Ss antiWWW.. SrDonlan of fhb trownlffeso off woe on ord setsdnatir at ttet Os earl SI le ASS by w SSW M son vie ▪ deaaew qua {iy Putt a. S me naeob'Men arltars,t Wan Sett aa-Ar garb_ r so" Irvp,sa grapey sere map t► Me Sown Seeps M NtheR �� saleibaa W as sat awl team eve w ey rt wWM rSy fee Me popper r boa*. es ewesarw sr* Pp a set son w Itnp'w• a rebay aMMn It taw for wrhe a*r bet oast wet asaa be Sias De CV of lit OS Not ist kW, W. ony Sep' islis Is lie aeon se el IS teasainws. se tee toes rope Ma d. * M. array woo a ► way w akealw, root ter sheen e w NRB SURVEYING PA Mt 4,Se snsrCIOIN MCC 76007 017-504-W027 tait 017-406-$4X1 — as vas n Wad St in DEng 10. mQar = SEC A N Oy1T10" ( LOT 1 c s norm If 00. D NWOW" I an' Nip rec M WI fMit Jo S Wet t t Beres' ROOD P pas t IS(Want! At few � � � T'i�L-��- S INAW ASS O - at Ns i _ wJ Pt nMa tn 1r r 1r ®,af gRAJ No sat fA/ M oral trar OF a.9•�M, weSr anowtoto OA reMr eeataS pro Se onnoSo rM Mr s_ non an en 1St r,ab• r PMp Chore e . On et Atrt - M M 'SW Its Silnietbi Mr peawtAMrennorrssMwea M soffeat w I st_tnNOral So osr pffItor/ r MS WOW rasa M any hM SS• W* a Mai S Men b ell rM r r pie N pare Ssa • owniessue ewe w SMSM Pane 'ay Oergeent asp � M__ssasst are as M N atlr. pews, sP wwwwis et � p pray ter n Ye s IteD'_.it ohneffor as c aPrholo t a se* be •are a raelterehr Wa note S Ws; -M4e sae Msws4 rest, set WIN Win See Wan solt awn or w Ieterla awl* Mt Ot of Fog wM r_ /e Wean d.rgr wI ben inn sit r r awe peMnwa et Me Seethe r note as at AS gr Ma,-- OWNE({/DSVRLOPEt NNEWST HEALTH Seta SL EtT INC O. 00X FORT Stilt )X I tO sr , 111111111 EOr 1. afar 1 SAASAl SO MET ILO KC ra I}n.raa' ,d/ar. Mt4.77 1 era w n.x° LD HIGHWAY NO. 1187 Tit RAT SS IOW MPS N ACM gQinegrirDC 6 LY ,YL1all atria an an 70111 inn W r tap. a pt1 0 ' r Sa L yptl Se �y6 ad Ih IC ear at afar IA Sus It - Y as / Ioara — ram» =WOWS W Io 17727 100 a si 20O La ,. fOmt I aaalrar ar qq-�N ISM ONMT A aft WW1 300 e a um SCALE 1.6100. STALE Or M S 1 NNd7V or SST nEf ALL LO/ 6r tea PRISONS That ASS tram AehnvSsba6 It 4/44s /bp 4 ' lass, PA,Ytat b err/ r M bbaaaN er,aM not play to rt Oeoe*Mw Sr a SOI ee bar r SS SOW h Me Dow a Sets sown AMbwt Mat 1401. C1y r lit MMp knot Carty, ewe• sate tract • pores of OW Baal boat r gat Ieewd h OS b Mir• /Mop .a e.,vsae.t .t NAh tat t r. s SOW men h Si em gays Jw Di0 SS Rest Caabt Ts owl MIN atse pstlryy Owed a Mare flt*C at en a -cut Mun•i a M SSA M of OM 144say Me. UST (100' M%M-ally), mat a -it new Sr M Southwest . . of tat Let I. teat I. IM S Ow Len SS en Askrbe to M C!y of Port Mal aoei/N to M not teenaad In Cobbs, A. Se 11921. PAN laid• Tenet Crib Ts MINCE M STOIC IS ago M /A•n err SI at ttlray No. I nil, SIX fit to a Ii' ace set at M hsaaMe of Me Meth M of aW Of rrrad Ala III7 at M fat II,. of Ibabsl OM Or hp.e a ore seewrtt Matte/ It Aecast Pb W lJ7aN, Cos* ORS set Twit Cb..4 Tara That M wvflt M. Wet M fist it of one Spit an AMID Mt t e ly Act it net S W4JbY D 51747 Nat to n 1b. Ion set TECE $ mole V. at Ian hat poi. ga !past Iw AOMr at w AbNiet airy of sow Let I. Wa t I, • abh OV Cons A0I11e1. and o to h et Mas4 hr to M POM O aeaen ewe arrtep SO1 are of kon 01X. TN EFOK WWII ALL Id Sr illy PRCEaS Tan Awnalt IIIegI $flvSSMC Sr, eNN' by N Inv M .ndnap d gray aawbt West Os MA* adopt MO pot r M MSS eared teal pmpty - LOT I. BLOM 1R.00A[V SOW RAM OW Or MC ni WANT =NW, Tali ar as Mny !alma to w Oka/ sat tee_. Me ten wed aww.b abaw brn. foeerb4 Mb De_ of JOl I. it Dann Oo STAVE Or =AS 1 cougar or yawl scow IC M w ngen aepret a Is Ir moo** Send Oat D,eaaae an AMar /Wee wedaad b is nen al lo Mawr M We puss h oo e M Can One ! - 4N MbwieR, rMeM Motet Iaepeaee et aosrMYw6wa apuet an h M weeny OW Mr NY lwc AM a Or once on Ws M _If te JOII. Marty AS SUS el Tile FORT WORTH at, Plan Cnntmiai z City of Fort Worth, Texas Vile pat b veld N nlallt IRS 00 days ear dote of a�la PM Apse& Doe' Br M- F1rLL PLAT Lot 1, Mock 1 HuGULLY 110NORIAL PLAZA, A11 ADDITION TO TRt an OP PORT to TAfl4Nr COWIE =AR BaTRO 5t01 ACRES OP LAND IMAM IN Mr ORRIN a STOW SURVILY, asr. pa 1401. AND BnMG VOLUME 1 PORTION OF 9OLes a PA1� Seim oat hn n-417be mnww a nYWWWIILtimL,IWIdIWWWILdu14W114xWIW'.pw/.119IYLdIXWIi a fI IVLIWu1111WWA,INtailWi uA I IWIL ualiiLWILbYdI IYLJ,I 11W4YIIIId1141YUW'1I1N4u • `IYIIpiiliIIIII,W4WLLuUS1161LWW44YLVOYYY1W'IIIIWIYdIWuuWILIItl11 hipauIIL <--8" SANITARY SEWER 36, OLD FM 1187 666 N SCALE: 1 "-100' �--<FfTURE--B-"-- SANITARY SEWER. MH r EXHIBIT 'A-1 SANITARY SEWER FOR HUGULEY MEMORIAL PLAZA ROCK RIP -RAP 687 CONCRETE RIP -RAP -3-6'X5' BOX CULVERTS, WING WALLS CONCRETE RIP -RAP N SCALE: 1"= 20' EXHIBIT 'B-1) STORM DRAIN FOR HUGULEY MEMORIAL PLAZA 'Citir �, , i , • 0 a 6i' f . o. '.1, -• .._._�1, a -a •��� �. • • h _-__ t�•• v SCA N =100' EXHIBIT 'B-2' DRAINAGE CHANNEL FOR HUGULEY MEMORIAL PLAZA