HomeMy WebLinkAboutContract 42225COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 'T
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: Adventist Health System/Sunbelt Inc.
Authorized Signatory: Kenneth A. Finch
Title: Chief Executive Officer
Project Name: Huguley Memorial Addition
Project Location: NEC Old FM 1187 & Medpark
Additional Streets: N/A
Plat Case No.: FS-011-040 Plat Name: Huguley Memorial Addition
Mapsco: 119K
Council District: 8 City Project No: 01747
To be completed by staff
Received bit � V kt'Li t
CFA:2011-019 DOE: 6688
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
1
Date:
09-02-11 P12:44 OUT
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement (`CFA') as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A)
Sewer (A-1) X, Paving (B) Storm Drain (B-1) X Street
Lights & Signs (C) _____.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries. death or damages are
caused, in whole or in part, by the alleged negligence of the City of
Combined CFA final Sept 12, 2008 4
Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
5
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12, 2008 6
Cost Summary Sheet
Project Name: Huguley Memorial Addition
CFA No.: 2011-019
DOE No.: 6688
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Sub -Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100%
ICompletion Agreement = 100% / Holds Plat
ICash Escrow Water/Sanitary Sewer= 125%
ICash Escrow Paving/Storm Drain = 125%
ILetter of Credit = 125% w/2yr expiration period
Developer's Cost
39,600.00
39,600.00
110,943.00
110, 943.00
150,543.00
792.00
792.00
1,584.00
4,437.72
2,218.86
6,656.58
8,240.58
Choice
Amount (ck one)
150,543.00
150,543.00
49, 500.00
138,678.75
188,178.75
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Deve per has
executed this instrument in quadruplicate, at Fort Worth, Texas this
of -' , 20
CITY OF FORT WORTH - Recommended by:
Water Department
/I
Wendy Chi-Babu&l, EMBA, P.E.
Development Engineering Manager
Ap i roved as to Form & Legality:
-.Marcia Wise Dv u, la. 5 w • Black
-ors Assistant City Attorney
ATTEST:
Marty Hendrix
City Secretary
ATTEST
Signature
(Print) Name:
Kee —coy -
not cNerc.\\1:11:11.141:1
I
Or/Di?6
-EfeCI
a t'j
dl ;Xi
Q
day
Transportation & Public Works Department
6,)
DouglW. Wiersig, P.E.
Director
Approved by City Manager's Office
efterasia
Fernando Costa
Assistant City Manager
0
o
�a
44N °°00000(3°
Mtill 7E%1t'fffea1th System/Sunbelt Inc.
NO M&C 1?..11Q0110,0 1
Si
Print Name: Kenneth - . Finch
Title: Chief Executive Officer
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Combined CFA final Sept 12, 2008
8
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C. Street Lights and Signs Improvements
Street Lights and Signs Estimate
m
n
n
►l
n
(Remainder of Page Intentionally Left Blank)
9
Circle L Construction, Inc
1604 Taylor Bridge Court
Burleson Texas 76028
817-295-0056 Main 24 hour service line
817-426-6937 Fax
Hug uley Memorial Plaza - Drainage Improvements
Storm Water Facilities
Item
1.
2.
3.
4,
5,
6
8.
City Sid #
Bid-0008D
Bid-00881
ad-00068
Bd-00069
Bd-00069
84-00094
Bd-00062
Bd-00372
Description
Remove E. 36' RCP
Instal 6'x5' Box Cu!vert
Instal 6'x5' Parralel Wing Wall
install 6'x5' Flared Wing Wall
install 6'x5Perim adiWar Wing Wall
Install Rod< Rip Rap < 18" Rock
Install Earthen Chanel
Trench Safety
Sanitary Sewer Facilities
Item City Bid # Description
1, Bid-00213 4' Diameter Manho'e (to 6 (eet)
2. Bid-00332 8" Sanitary Sewer Main - SDR 26
3. Bid-00372 Trench Safety
4, Bid-00217 Manhole -Vacuum Testing
5. Bid-00201 Post Construction Clean & TV
6. Bid -00214 4' Diameter Manhee Extra Depth
Sincr&y,.
Rict;ard L Van Weezel
' Vt4„
VP / Estimating
817-937-7192 Mobile
Quantity lint CostiLtnil Total
90 IF $ 38,89 $ 3,500,00
102 IF $ 284.11 $ 30,000 00
1 EA $ 5,000.00 $ 5,000.00
2 EA $ 5,000.00 S 10, X'0.00
1 EA $ 5,000.00 $ 5,000.00
400 SY $ 37.50 S 15,003,00
703 CY $ 57.04 S 40,100.00
192 EA $ 12.19 S 2,340.00
Total
110,843.00
Quantity Unit Cost,'Unit Total
4 EA $ 2,500.00 $ 10,000.00
640 LF $ 30.00 S 19,200.00
640 LF $ 5.00 $ 3,200.00
4 IS $ 200.00 $ 800,00
640 LF $ 6.25 $ 4,000.00
24 VF $ 100.00 S 2,400.00
Total S 39,600.00
$150,543 00
F.M. 1187
35W
35W
HUGULEY
HOSPITAL
S 1L L!d
4
0.O FM 1 87
FORT WORTH
SPINKS AIRPORT
Vl CINI T Y MAP
NOT TO SCALE
(MAPSCO GRID 119F)
E. RENDON CROVILEY
J
w 15541
r
(
Oa IS I
Fat ter
waNnY NAP
(MX70 SOLO
MAW / eetstr greet pas
IIM•MO�Ipaefifat a . 1st a Gases
iFv1Yr .wrr r ..,beaaaWest
IS M bM errant red to
tornabIalial off Cie Soo AS fit Mb AN
loiffffolio, boa woo Sotio••• / Of OW
Swett Is
plot Me art to es w
eaett M Ile inet rase 9e,al
r rte *Mar wet Melee flies
or w Sae Sew peek • lest •
as ON offiffelkw obi bPeamaobe
sett •Woar swMere gate
Is a. s towel w e .r Port rn
or Me w opt b minetow we Sp se Sr
• Its r q bent er,• M Ink er
✓ ow* hpsei rt NS w q q
Mbnee wRl or sea nepenthe
Ootts a soya/ w aawsnrbr raw o-
p•t� etsMeeel �M+rrlpelnwa,sallSIeteprb
—sweaa r etsbwarl aeerweaa nanIffiw w
Awalw psbal•e suet•! .r ftoarp
ormayr srArtr eS yatr
osort wneeaq et w7 M.e en ofp oweafw
Nona,
of wont
lest Its
riVaattpPot MS k w eras
nttMe sossoomoof
ffooffortolto blast Me
The blot _atilt aloolodM• armload
- w Awaal toe II• Mot
ge/aaw Ye -ass SONS t/ r w
'Ste fir ea At Mt des of ter
Maas• • Isleriethof Affair 90Pol►1
et sell _neo__soul Mw were
SOS psi` N ere.
• Dnewie Sint
AA St bake ,•lte early a wdnes she
Me gpaat 'wow) drop peel ~Is
uwett ides q SOS/ pal r its lurk
se MS ,she (0 flag Om • wee Sea
Mbit offigogobon Ms Mb OS set aoriffolff.
• Stew ai0'ory Os nt.
• n wof none Non
erMS-7-,moor , Me
▪ p was bet • a Ores 9Y�ay•*
be aaer_4 tee q peer a taut w
awn ewer s hoes art low r w era.
ASS IStollori
No senanctlet rat she &tend soltdo
Maw awc .IM.rt Me .aa
aped eI Me aMatr of Anae_t_S_
se Poe MMs M er to ran
SS MSS evinb•Wets
=os s Ivwbeasso
salttralaJ b Mtno at
prsnMW MINNOW Or ate) on !Moth b awanWt MM w
Ieee werYw • paaRM4 r
SS M Mods as es •
Seers r he (b Set fen w KO -
Jr et rota..
tart SietnSsflM•Wew•
aS. Ss antiWWW.. SrDonlan of fhb trownlffeso off woe
on ord setsdnatir at
ttet Os earl SI le
ASS by w SSW M son
vie
▪ deaaew qua {iy Putt a.
S me naeob'Men
arltars,t Wan Sett aa-Ar
garb_ r so" Irvp,sa grapey
sere map t► Me Sown Seeps
M NtheR �� saleibaa
W as sat awl
team eve w ey rt wWM
rSy fee Me popper r boa*. es
ewesarw sr* Pp a set son
w Itnp'w• a rebay
aMMn It taw for wrhe a*r
bet oast wet asaa be Sias De
CV of lit OS Not ist kW, W.
ony Sep' islis Is lie
aeon se el IS teasainws. se tee
toes rope Ma d. * M.
array woo a ► way
w
akealw, root ter sheen e w
NRB SURVEYING
PA Mt 4,Se
snsrCIOIN MCC 76007
017-504-W027
tait 017-406-$4X1
— as
vas n Wad St
in DEng
10. mQar = SEC
A N Oy1T10" ( LOT 1
c s norm If 00.
D NWOW" I an'
Nip rec
M WI fMit Jo
S Wet t t Beres'
ROOD
P pas t IS(Want!
At few � � � T'i�L-��- S
INAW ASS
O - at Ns
i
_ wJ
Pt
nMa tn
1r r 1r ®,af gRAJ
No sat fA/ M oral trar OF
a.9•�M, weSr anowtoto OA reMr
eeataS pro Se onnoSo rM Mr s_
non an en 1St r,ab• r PMp
Chore e . On et Atrt - M M 'SW Its
Silnietbi
Mr peawtAMrennorrssMwea M
soffeat w I st_tnNOral So osr pffItor/ r
MS WOW rasa M any hM
SS• W* a Mai S Men b ell rM r r
pie N pare Ssa • owniessue ewe w
SMSM Pane 'ay Oergeent asp
� M__ssasst are as M N atlr.
pews, sP wwwwis et � p
pray ter n Ye s IteD'_.it
ohneffor
as c aPrholo t a se* be •are a
raelterehr Wa note S Ws; -M4e
sae Msws4 rest, set WIN Win
See Wan solt awn or w
Ieterla awl* Mt Ot of Fog wM
r_ /e Wean d.rgr wI ben inn sit
r r awe peMnwa et Me Seethe r note
as at AS gr Ma,--
OWNE({/DSVRLOPEt
NNEWST HEALTH Seta SL EtT INC
O. 00X FORT Stilt )X I tO
sr ,
111111111
EOr 1. afar 1
SAASAl SO MET
ILO KC
ra I}n.raa'
,d/ar. Mt4.77
1 era w n.x°
LD HIGHWAY NO. 1187
Tit RAT SS IOW MPS N ACM
gQinegrirDC 6 LY
,YL1all atria
an an
70111 inn W r
tap. a pt1
0
' r Sa L
yptl
Se
�y6
ad Ih IC ear at afar
IA Sus
It -
Y as
/ Ioara
— ram»
=WOWS W
Io 17727
100
a
si
20O
La ,. fOmt I
aaalrar ar qq-�N ISM
ONMT A aft WW1
300
e a um
SCALE 1.6100.
STALE Or M S 1
NNd7V or SST
nEf ALL LO/ 6r tea PRISONS That ASS tram AehnvSsba6 It 4/44s /bp 4 ' lass, PA,Ytat b
err/ r M bbaaaN er,aM not play to rt
Oeoe*Mw Sr a SOI ee bar r SS SOW h Me Dow a Sets sown AMbwt Mat 1401. C1y r lit MMp
knot Carty, ewe• sate tract • pores of OW Baal boat r gat Ieewd h OS b Mir• /Mop
.a e.,vsae.t .t NAh tat t r. s SOW men h Si em gays Jw Di0 SS Rest
Caabt Ts owl MIN atse pstlryy Owed a Mare
flt*C at en a -cut Mun•i a M SSA M of OM 144say Me. UST (100' M%M-ally), mat a -it new Sr M
Southwest . . of tat Let I. teat I. IM S Ow Len SS en Askrbe to M C!y of Port Mal aoei/N to
M not teenaad In Cobbs, A. Se 11921. PAN laid• Tenet Crib Ts
MINCE M STOIC IS ago M /A•n err SI at ttlray No. I nil, SIX fit to a Ii' ace set at M
hsaaMe of Me Meth M of aW Of rrrad Ala III7 at M fat II,. of Ibabsl OM Or hp.e a ore
seewrtt Matte/ It Aecast Pb W lJ7aN, Cos* ORS set Twit Cb..4 Tara
That M wvflt M. Wet M fist it of one Spit an AMID Mt t e ly Act it
net S W4JbY D 51747 Nat to n 1b. Ion set
TECE $ mole V. at Ian hat poi. ga !past Iw AOMr at w AbNiet airy of sow Let I. Wa t I,
• abh OV Cons A0I11e1. and o to h et Mas4 hr to M POM O aeaen ewe arrtep SO1 are of
kon
01X. TN EFOK WWII ALL Id Sr illy PRCEaS
Tan Awnalt IIIegI $flvSSMC Sr, eNN' by N Inv M .ndnap d gray aawbt West Os MA* adopt
MO pot r M MSS eared teal pmpty -
LOT I. BLOM
1R.00A[V SOW RAM
OW Or MC ni
WANT =NW, Tali
ar as Mny !alma to w Oka/ sat tee_. Me ten wed aww.b abaw brn.
foeerb4 Mb De_ of JOl I.
it Dann Oo
STAVE Or =AS 1
cougar or yawl
scow IC M w ngen aepret a Is Ir moo** Send Oat D,eaaae an AMar /Wee
wedaad b is nen al lo Mawr M We puss
h oo e M Can One ! - 4N MbwieR,
rMeM Motet Iaepeaee et aosrMYw6wa apuet an h M weeny
OW Mr NY lwc AM a Or once on Ws M _If te JOII.
Marty AS SUS el Tile
FORT WORTH
at, Plan Cnntmiai z
City of Fort Worth, Texas
Vile pat b veld N nlallt IRS 00 days ear dote of
a�la
PM Apse& Doe'
Br
M-
F1rLL PLAT
Lot 1, Mock 1
HuGULLY 110NORIAL PLAZA,
A11 ADDITION TO TRt an OP PORT to TAfl4Nr
COWIE =AR
BaTRO 5t01 ACRES OP LAND IMAM IN Mr
ORRIN a STOW SURVILY, asr. pa 1401. AND BnMG
VOLUME 1
PORTION OF 9OLes a PA1� Seim
oat hn n-417be mnww a
nYWWWIILtimL,IWIdIWWWILdu14W114xWIW'.pw/.119IYLdIXWIi
a
fI IVLIWu1111WWA,INtailWi
uA I IWIL ualiiLWILbYdI IYLJ,I
11W4YIIIId1141YUW'1I1N4u
•
`IYIIpiiliIIIII,W4WLLuUS1161LWW44YLVOYYY1W'IIIIWIYdIWuuWILIItl11 hipauIIL
<--8" SANITARY SEWER
36,
OLD FM 1187
666
N
SCALE: 1 "-100'
�--<FfTURE--B-"-- SANITARY SEWER.
MH
r
EXHIBIT 'A-1
SANITARY SEWER
FOR
HUGULEY MEMORIAL PLAZA
ROCK
RIP -RAP
687
CONCRETE
RIP -RAP
-3-6'X5' BOX
CULVERTS,
WING WALLS
CONCRETE
RIP -RAP
N
SCALE: 1"= 20'
EXHIBIT 'B-1)
STORM DRAIN
FOR
HUGULEY MEMORIAL PLAZA
'Citir
�, , i ,
•
0
a
6i'
f . o. '.1,
-• .._._�1, a -a •���
�. • • h _-__ t�••
v
SCA
N
=100'
EXHIBIT 'B-2'
DRAINAGE CHANNEL
FOR
HUGULEY MEMORIAL PLAZA