Loading...
HomeMy WebLinkAboutContract 42224-A3 (2)AMENDMENT NO 3 to AGREEMENT for ENGINEERING SERVICES for the GENDY STREET BEAUTIFICATION at WILL ROGERS MEMORIAL CENTER STATE OF TEXAS COUNTY OF TARRANT CITY SECRETARY CONTRACT NO. L-JZIZLJ--11-3 5 WHEREAS, The City of Fort Worth and Dunaway Associates, L.P., a Texas Limited Partnership (Engineer) made and entered into City Secretary Contract No. 42224 (The Contract) which was administratively executed in the amount of $47,500.00 on the 2nd day of September, 2011; and Amendment No.1 in the amount of $46,000.00 was approved by City Council M&C C-25479 on March 20, 2012 & Amendment No.2 in the amount of $9,250.00 was administratively executed to provide construction administration services and construction drawings for the parking booth equipment, respectively; and WHEREAS, further amendment is necessary for additional Engineer's construction drawings services for the Gendy Street Beautification Project at the Will Rogers Memorial Center (WRMC). NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 Article I, SCOPE OF SERVICES, of the Agreement is amended for additional services for construction drawings by $7,500.00 as specified in the letter from the Engineer dated May 18, 2012, attached hereto as Attachment "A"; and made a part of this Agreement. 2. Article II, COMPENSATION, of the Agreement is amended for the total Agreement price of $110,250.00 for fees including not -to -exceed $1,000.00 for reimbursable expenses. 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the I day of 1L / , 2012, in Fort Worth, Tarrant County, Texas. Y a Dunaway As By: Broo, .' gdca, P Associate, Seniop/Project Manager APPROVED: By: Fernando Costa Assistant City Manager APPROVAL R =S OMMENDED: RECORDED: By: 607 Douglsig, PE, Director Transp • ' • & Public Works Dept. APPROVAS.TO FORM AND LEGALITY: By: tOr By: ary J. KaypEf City Secretary M&C (Not Required) Contract Authorization Douglas W. Black Date: Assistant City Attorney WRMC Gendy Street Beautification Project Dunaway Associates, LP 07-1 / 1 2 Al 0• 20 IN OFFICIAL REV CITY SECRETAR1 FT. WORTH, TX °°o0oo Page 1 of 1 June 2012 erriMini tvinl Dunaway No. 2009128.004 May 18, 2012 Mr. James Horner Assistant Facilities & Public Events Director City of Fort Worth Public Events Department 1201 Houston Street Fort Worth, Texas 76102 Reference: Proposal for Professional Civil Engineering and Surveying Services Gendy Street Beautification Dear Mr. Horner: Dunaway Associates, L.P. (Dunaway) have a contract in place to complete the Gendy Street Beautification Project to serve WRMC. Services were authorized in a contract signed and dated September 2, 2011. The following additional task will be added to our proposal: o Addition of Baird Hampton Brown's electrical drawings for the Will Rogers Memorial Center Gendy Street Beautification Light Plan Construction Drawings to show the relocation of existing street lighting to correspond with the relocation of driveway entries and booths. $7,500 The additional effort will be a lump sum fee of $7,500. The current contract amount of $102,750 will have a revised amount of $110,250. Please feel free to contact me should you have any questions or comments. Sincerely, DUNAWAY ASSOCIATES, L.P., a Texas limited partnership Jeffrey S. Taylor, P.E. Project Manager B000109 Cover Letter Add Services_2012-0327 OFFICIAL RECUS SW CITY SECRETARY hn d-o 40RTH, TX rrll A _ n. 'i_ All/1 - (-'_-J. ll7_1L T_.._._ '7/ 1fl el7 flee 11/11 - - r...•.• Al7 fldr)C 7A7a.•.•.t•a...a..n.�ntr.4