Loading...
HomeMy WebLinkAboutContract 42224-A1AMENDMENT NO 1 to AGREEMENT for ENGINEERING SERVICES for the GENDY STREET BEAUTIFICATION at WILL ROGERS MEMORIAL CENTER STATE OF TEXAS COUNTY OF TARRANT CITY SECRETARY CONTRACT NO. ¼/UZH —n WHEREAS, The City of Fort Worth and Dunaway Associates, L.P., a Texas Limited Partnership (Engineer) made and entered into City Secretary Contract No. 42224 (The Contract) which was administratively executed in the amount of $47,500.00 on the 2nd day of September, 2011; and WHEREAS, further amendment is necessary for additional Engineer's construction administration & construction staking services and reimbursable expenses for the Gendy Street Beautification Project at the Will Rogers Memorial Center (WRMC). NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 Article I, SCOPE OF SERVICES, of the Agreement is amended for additional services for construction administration, construction staking and reimbursable expenses as specified in the letter from the Engineer dated November 28, 2011, attached hereto as Attachment "A"; and made a part of this Agreement. 2. Article II, COMPENSATION, of the Agreement is amended for the total Agreement price of $93,500.00 for fees including not -to -exceed $1,000.00 for reimbursable expenses. 3 All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. w EXECUTED this the day ofLJ-9fl1 , 2012, in Fort Worth, Tarrant County, Texas. Dunaway As By: Br o: aca, P A soci4te, Senior Project Manager APPROVAL RECOMMENDED: RECORDED. By: ere APPR By: Dougla�/�. Wiersig, PE, Dire or Transportation & Public Work Dept. 0 FORM AND LEGALITY: Douglas W. Black Assistant City Attorney By: !Vary J . Ka City Secretary APPROVED: By: 513•••:w..04 Fernando Costa Assistant City Manager Cave IQ a) 04449 °QS M&C C-25479 (March 20. 2012)y Contract Authorization Date: OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX A77c t MCr4 Dunaway No. 2009128.004 November 28, 2011 Mr. Dalton Murayama City of Fort Worth 401 W, 13th Street Fort Worth, TX 76102 Reference: Proposal for Professional Civil Engineering and Surveying Services Gendy Street Beautification Dear Dalton: Dunaway Associates, L P. (Dunaway) is pleased to submit this proposal for professional civil engineering and land surveying services for Gendy Street Beautification. Based on conversations with you, we believe the following scope of services will meet your needs for this project: SCOPE OF WORK 1. Bid Phase Services — Dunaway will assist the City of Fort Worth with the bid process as follows: a. Dunaway will produce and deliver bid documents to the City of Fort Worth, assist in responding to questions and interpreting the bid documents. b. Dunaway will attend the contractor selection meeting and pre -bid and post -bid meetings. 2. Construction Administration — Dunaway will provide construction administration services as follows: a. Review and respond on City of Fort Worth's behalf for shop drawing submittals related to elements of the design for which Dunaway is responsible. b. Review and respond to written Requests for Information from City of Fort Worth's contractor regarding elements of the design for which Dunaway is responsible c. Make occasional site visits during construction for a cursory review of progress of construction. Please note that Dunaway does not provide construction inspection services. We recommend that City of Fort Worth retain a geotechnical engineer to provide inspection of private site improvements. d. Bi-weekly construction meetings during construction phase. e. Coordination with KH on water line (submittal, specifications, sequencing, bidding). f. Pre -construction meeting(s) for hardscape and water line (2 separate meetings). 550 Bailey Avenue, Suite 400 S Fort Woith, Texas 76107 S. Tel: 817.335.1121 S Fax: 817,335.7437 3 dunawayassoclates.com P roposal for Professional Civil Engineering and Land Surveying Services Gendy Street Beautification N ovember 28, 2011 P age 2 3. Construction Staking for Hardscape — Dunaway will provide on a one-time basis the following services: a. Mark curb and sidewalk cuts for paving demolition. b. Stake paving and sidewalks. c. Stake storm drain. d. Stake slotted drains. 4. Reimbursable Expenses Only those services specifically mentioned in the Scope of Work section are offered as part of this proposal. FEE Dunaway Associates, L.P. proposes to provide the above -described scope of work for a LUMP SUM fee of $ 46,000. Please find attached to this proposal our Standard Terms & Conditions for professional services, which is also part of this proposal. Bid Phase Services - $5 000 Construction Administration - $15,000 Construction Staking - $25,000 Reimbursable Expenses - $1,000 ADDITIONAL SERVICES (not included in proposal) The following is a list of some, but not necessarily all, of the services that can be useful or required for a project of this type. The listed services have not been included in this proposal. Dunaway can provide or sub -consult many of these services if desired by City of Fort Worth. If City of Fort Worth determines any of these services is desired, Dunaway can either amend this proposal to incorporate the desired service or services or recommend other actions to cover the needs as expressed. 1. Flood studies for changes to FEMA flood maps. 2. Phase 1 and Phase 2 Environmental Site Assessments. 3. Wetlands delineations and Section 404 permitting through the US Army Corps of Engineers. 4. Structural design of retaining walls. 5. Design of franchise utilities (gas, electric, telephone and cable TV) will be conducted by the franchise utility companies. Usually, each franchise utility company will provide its own design. If desired, Dunaway will show the conduit for each of these on our drawings provided that the size, number and material for each conduit is provided to Dunaway by the utility company. 550 Bailey Avenue, Suite 400 4 Fort Worth, Texas 76107 4 Tel: 817,33511121 4 Fox: 8171335, 7437 4 dunawayassoclates.com a Te Brq Asso Proposal for Professional Civil Engineering and Land Surveying Services Gendy Street Beautification November 28, 2011 Page 3 6. Redesign efforts related to site plan or building footprint changes after significant design efforts have begun are not included. 7. Boundary surveys and as -built surveys and/or easements by separate instrument. 8. Soil Investigation/Laboratory Testing: Dunaway recommends that City of Fort Worth retain an independent laboratory for use in any testing required during the design phase, i.e., for density approval in the street rights -of -way, and for any site excavation and embankment that might be required for this project. 9. Construction inspection services are not included. Dunaway does not provide construction inspection services. Normally, we recommend that City of Fort Worth retain a geotechnical engineering consultant to provide construction inspection services for private improvements. If this proposal meets with your approval, please sign below and return one copy to our office as our notice to proceed. We appreciate the opportunity to assist you with this project and look forward to its success Respectfully sub r itted, Agreed & Accepted DUNAW S/ �� -°S•IATES, L.P., r� d ' artnershi 1 p ,ly A t Manager ris H. Wilde P E , LEED AP® Principal/Director of Private Sector Services cc: James Horner Attachments BIB.mlb 2009128.004_Prop1_CFW_Gendy Street Revised_2011-1128 CITY OF FORT WORTH By: Name: Dalton Muravama Title: Project Manager Date: 550 Bailey Avenue, Suite 400 Fort Worth, Texas 76107 S Tel: 817.335.1121 3 Fox: 817.335.7437 S dunowoyossociates,com M&C Review Page 1 of 3 IL COUNCIL ACTION: Approved on 3/20/2012 Official site of the City of Foit Worth, Texas FORT WORTI I CONTINUED FROM A PREVIOUS WEEK DATE• 3/6/2012 REFERENCE C-25479 LOG NAME• 20WRMCGENDYENHANCEMENTS NO.. CODE• C TYPE: NON- PUBLIC NO CONSENT HEARING: SUBJECT: Authorize Execution of a Construction Contract with Standard Parking Corporation d/b/a SP Plus in the Amount of $1,766,535.59 and Authorize Amendment No. 1 to City Secretary Contract No. 42224 for Construction Administration Services in the Amount of $46,000.00 with Dunaway Associates, LP, for the Landscaping, Paving, and Pedestrian Enhancements to Serve the Gendy Street Phase II Project at Will Rogers Memorial Center (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a construction contract with Standard Parking Corporation d/b/a SP Plus, in the amount of $1,766,535.59 including $78,471.82 in allocation allowance; and 2. Authorize Amendment No. 1 to City Secretary Contract No. 42224 for construction administration services in the amount of $46,000 00 with Dunaway Associates, LP, for the landscaping, paving and Pedestrian Enhancements to serve the Gendy Street Phase II Project at Will Rogers Memorial Center. DISCUSSION: This Mayor and Council Communication is to award the construction contract and to authorize Amendment No. 1 for construction administration services for the Gendy Street Phase II Project with funding from C200 the 2004 CIP Street Improvements Fund, and remaining funds in P249, the Western Heritage Parking Garage Fund. On September 2, 2011, a contract was administratively awarded to Dunaway Associates LP, in the amount of $47,500 00 to revise and resubmit construction documents and submit Texas Department of Licensing and Regulation Review for the Gendy Street Beautification at Will Rogers Memorial Complex. This Amendment No. 1 is for construction administration services in the amount of $46,000.00. City Staff considers this fee to be fair and reasonable for this scope of services proposed The Request for Competitive Sealed Proposals was advertised in the Fort Worth Star-Telearam on October 13, 2011 and October 20, 2011 Eight firms submitted proposals on November 17, 2011 and four of the eight firms submitted the required Post Bid -Pre Award documents on November 28, 2011. The following four proposals (including add Alternate Nos. 1 and 2) were received: httn://anns.cfwnet.ora/council nacket/mc review.asp?ID=16477&councildate=3/20/2012 4/5/2012 M&C Review Page 3 of 3 ATTACHMENTS 20WRMC Gandy Location Mao.odf Dalton Murayama (8088) http://apps.cfwnet.org/council_packet/mc_review.asp7ID=16477&councildate=3/20/2012 4/5/2012