Loading...
HomeMy WebLinkAboutContract 42053-A1AMENDMENT No. 1 . •••I J SFCiARY CONTRACT NO. os".5- Pt 1 TO CITY SECRETARY CONTRACT WERIERFa the City of Fort Worth (CITY) and URS Corporation, (ENGINEER) R) made and entered into City Secretary Contract No. 42053, (the CONTRACT) which was authorized by WIC C=24875 on the 28th day of July, 2011 in the amount of $146,106.00; and vviftramm the CONTRACT involves engineering services for the following project: Water and sanitary Sewer Replacement Contract 2009, WSM= I; and WilliblIEFAig, it has become necessary to execute Amendment CONTRACT and revised fee. `ram Fi . ri r ci9 9 ri n bC9 c�aa�o increased scope of work NOW T111ill11i1 EFL E, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 20, 2012, a copy of which is aLtached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $6,955.40. 2. Article X I of the CONTRACT is amended to provide for an increase in the tree to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $153,061.40. Page =1 ;_1 OFFICIAL RECORD CITY SECRETARY rrsvvOgTh,TX 3 o All other provis 9 ons of the Contract, which are not expressly amended herein, shall remain in full forne and of ent EXECUTED and EFFECTIVE as of the date last wr i Mon by a signatory, below. APPROVED : City of Fort Worth c"-afrps-a,-,4 'ernando Costa Assistant City Manager DATE: shhz APPROVAL RECOMMENDED: ((An n \AAA yo, S. Frank Crumb, P.P. Director, Water Department APPROVED AS TO VORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: Mary J. Ky_s City Secretary ENGINEER URS Corn ration Martin Rodin, P.E. Vice President DATE: M&C: Date: /fAyq� �►�� :kit* 0 ao, nee° *S., Oeezi ° ta f ;fir. o r *t•a. %:\ 00 *4 41 461 0000000 t Z.Zat7r rl •11 (r t Hkrn s, `/ v`J�t'1k 9 ``,.s 1`I% (i\\1�1 vv ;k i/61 t, i1 Page -2- January 20, 2012 Mr. Rakesh Chaubey, PE Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Revised Request for Amendment No. 1 Water and Sanitary Sewer Replacement Contract 2009, WSM=I City Project No. 01472 URS Project No. 25334778 Dear Mr. Chaubey: This letter is in response to the City's request for additional surveying and engineering design services for the above referenced project. The services as described below for Amendment No. 1 (refer to attached Exhibit 1) are in addition to or modify our current scope of services. During the 30% Conceptual Plan Review meeting held on December 6, 2011, URS recommended the installation of approximately 550 feet of 80inch diameter water line in Brentwood Stair Road between the existing 12-inch water line in Weiler Boulevard and the proposed 8-inch water line in Jill Lane. The installation of this eight inch water line will create a loop in the existing water system and eliminate an approximate 1,200 foot long dead-end water main. A breakdown of URS' proposed fee for the above described additional engineering design services is provided below as well as the proposed fee for additional surveying and reproduction services to be provided by our subconsultants, ARS Engineers, Inc. and Arlington Blueline. URS CORPORATION -- ADDITIONAL ENGINEERING DESIGN SERVICES 1. Water Line Additional Engineering Design Services a. Additional Eight Inch Water Line in Brentwood Stair Road -- Provide engineering services for the design and preparation of one plan sheet (no profile required) for approximately 550 feet of 8a inch diameter water line from the existing 12-inch diameter water line in Weiler Boulevard east to the proposed 8-inch diameter water line in Jill Lane. Additional engineering design services also include an update of proj ect quantities and the opinion of probable construction cost. Additional Design Fee to design 550 LF of 8-inch water line $ 4,125.00 URS Corporation 1300 Summit Avenue, Suite 600 Fort Worth, TX 76102 Tel: 817.390.1000 Fax: 817.882.9462 www.urscorp.com U1RS Mr. Rakesh Chaubey, P.E. January 20, 2012 Page 2 of 3 b. Other Direct Costs Reproduction = (1 New Sheet)(14 Half -Size Sets)($1.00/Sheet) Reproduction = (1 New Sheet)(14 Full -Size Sets)($1.00/Sheet) Reproduction = (1 New Sheet)(3 Mylar Sets)($16.00/Sheet) Coordination w/ Subconsultant (Survey) _ (.1O)($2,474.0O) Coordination w/ Subconsultant (Reproduction) _ (.10)($30.00) Total Other Direct Costs SUBTOTAL — ADDITIONAL URS CORPORATION ENGINEERING DESIGN SERVICES ARS ENGINEERS, INC. — ADDITIONAL SURVEYING SERVICES 1, Water Line Additional Surveying Services alit 14.00 14.00 48.00 247.40 3.00 $ 4,451.40 a. Survey of Brentwood Stair Road — Services to be provided include a topographic survey of Brentwood Stair Road from Weiler Boulevard to Jill Lane. The additional survey services will be provided in accordance with scope of survey services as contained in the original contract. (See attached ARS Engineers Survey Cost Estimate) Surveying Fee for additional surveying services SUBTOTAL —ADDITIONAL ARS ENGINEERS, INC. SURVEYING SERVICES ARLIIVGTON BLUELINE —ADDITIONAL REPRODUCTION SERVICES a. Additional Construction Plans Reproduction Costs —The addition to the construction plans as discussed above will require 2 new sheets to be added to the plans. Reproduction = (1 New Sheet)(30 Sets)($1.00/Sheet) SUBTOTAL —ADDITIONAL ARLINGTON BLUELINE REPRODUCTION SERVICES $ 2,474.00 TOTAL FEE FOR ADDITIONAL SURVEYING, REPRODUCTION AND ENGINEERING DESIGN SERVICES I $ 2,474.00 $ 30.00 $ 30.00 $ 6,955.40 Mr. Rakesh Chaubey, P.E. January 20, 2012 Page 3 of 3 Summary o Amendment No. 1 The additional fees to provide the above mentioned additional services are as follows: Description Surveying Design Services Reproduction Total Fee Contract Summary Original Contract Amount Amendment No: 1 Total Revised Amount URS Fee $0.00 $4,375.40 $76.00 $4,451.40 ARS Engineers, Inc. (MIWBE) $2.474.00 $0.00 $0.00 $2,474.00 Arlington Blueline (MJWBE) $0.00 $0.00 $30.00 $30.00 (M/WBE) %* 100.00% 0.00% 39.47% 36.00% $ 146,106.00 — Approved 7/28/2011 $ 6,955.40 Requested herein $153,061.40 The total M/WBE fee participation for this project with Amendment No. 1 will be $37,609.00 ($35,105.00 + $2,504.00 = $37,609.00) or a total MJWBB percentage of 24.57%. This proposal assumes there will not be any new City standard drawings and/or details utilized for this project, there are no major utility conflicts, and a TxDOT permit will not be required. Please contact me if you have any questions regarding this contract amendment. Thank you for the opportunity to provide professional engineering and surveying services. Sincerely, URS CORPORATION C cliAncat Dough C. M i keworth, r.E. Sr. Project Manager c:Fie DCM:dcm