Loading...
HomeMy WebLinkAboutContract 42166CITY SECRETARY C GF1f IF FORT WOR T H9 T UMNT AC'�� NQ I S .T „ G`kThDANIU AGREEMENT Ifr'*R ';G`A G IIVI NERilkl a RELATED DESIGN SE VIIC This AGREEMENT is between the City of Fort Worth, a horneorulo municipal corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and MWH Americas, Inc., (the "ENGINEER"), for a PROJECT generally described as: Design Services for Water and Sanitary Sewer Replacement Contract 2009, WSM-J. Aultello op e of S2 Moc 0s A. The Scope of Services is set forth in Attachment A. A� sicle U A. The ENGINEER's compensation is set forth in Attachment B. Ardclio 111111 Terms of Payment Payments to the ENGINE I R will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGRI .FMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 1 of 15 08-25-1 '1 All:32 IN aIffir OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 2 of 15 D Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities including, but not limited to all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 3 of 15 (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. Minority and Woman Business Enterprise (M/WBE) Participation In accord with City of Fort Worth Ordinance No. 15530, as amended, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its accepted written commitment to M/WBE participation. Any misrepresentation of facts (other than a negligent City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 4 of 15 misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit it shall apply separately to this PROJECT or location. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 5 of 15 insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b Business Auto — the ENGINEER shall maintain business auto liability and, if necessary commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto', including owned, hired and non -owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non -owned is acceptable. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease with $500,000 00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — the ENGINEER shall maintain professional liability a claims -made policy, with a minimum of $1,000,000.00 per claim and aggregate The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 6 of 15 (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. a Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing if coverage is not provided on a first -dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. is City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 7 of 15 Lines of coverage, other than Professional Liability, underwritten on a claims -made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. 0 Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 8 of 15 its own cost and expense. However, if design changes are required due to the changes in the permitting authorities` published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMQ Official Release Date: 5.19.2010 Page 9 of 15 D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors, F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV E regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 10 of 15 Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. 1. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5,19.2010 Page 11 of 15 A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5,19.2010 Page 12 of 15 E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act of negligence intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER s agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 13 of 15 J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI B , VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 14 of 15 U cil 7 VIII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGRI FIVIEN T , supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A e Scope of Services Attachment B m Compensation Attachment C Amendments to Standard Agreement for Engineering Services Attachment D o Project Schedule Attachment E o Location Map Executed this the Ali ST: Marty Hendrix City Secretary rj ,r AZira•-‘sr*.. --f!4 • a r.4%,„ iha O wC eA c day of 11\---kik% 00,0000„, &KN? 0 v-----7-os 04 OA '1°00000Q° al 441-ttiallteisSe VL.D AS TO FORM AND LEGALITY Assistant ATTEST: ty Attorney City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date:. 5.19.2010 Pale 15 of 15 ,2011. CITY OF FORT WORTH By: anson.04Q- Fernando Costa Assistant City Manager APP r 9V L 7 = M . DED S. Frank Crumb, P.E. Director, Water Department ° ----,- MWH Americas, Inc. C 14Z-rY‘r. tna R. CkeS \ Zir Qr \Lz2,„.&) \.) e eco C -P Raymond G. Hartley, P.E. Vice President - SE Divisional Director BY: 19I 11 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 ATTACHMENT A Scope for Engineering Desian Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the Work to be performed and address the needs of the Project. Street Meadowbrook From Beach to Tandy Reroute 3324 Meadowbrook Avenue Reroute 3325 Meadowbrook Avenue Tandy Avenue from View Street to Lancaster Alley between View St and Meadowbrook Dr, east of Tandy Ave. Alley between View St and Meadowbrook Dr, west of Tandy Ave. (abandon) Alley between Meadowbrook Dr and Purington Ave (abandon) Reroute 2408 Tandy Avenue Reroute 2508 Tandy Avenue Sycamore Terrace From Vickery Blvd to S. Dead End Water Council and District Sewer Map No. Water Sanitary Sewer Existing Proposed Size Replacement (in) Size (in.) Length Lateral or Existing (ft) Main Size (in.) Proposed Replacement size (in.) 2042-360 6 8 3,800 - - 8 2042-360 City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 1 of 17 2,6,8 8 8 1,800 M-58B 4 4 Length (ft) 195 4 250 4 150 6,8 8 551 M-58 8 8 522 M-58A 8 - 118 L-2206 6 100 1,426 L-2839 4 4 4 4 6 100 100 8 651 7,026 2,737 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design (30%) Task 3. Preliminary Design (60%) Task 4. Final Design (90%) and Construction (100%) Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9: Permitting TASK 1. DESIGN MANAGEMENT ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall • Manage change and communicate effectively, • Coordinate internally and externally as needed, and • Proactively address issues with the CITY's Project Manager and others as necessary to make progress on the Work. 1.1. Managing the Team • Lead, manage and direct design team activities, • Ensure quality control is practiced in performance of the Work, • Communicate internally among team members, and • Task and allocate team resources. 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives and ensure economical and functional designs that meet CITY requirements. • Conduct a review meeting with the CITY at the end of the preliminary design (60%) phase (assume 1 meeting only). • Prepare and submit a baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 2 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department • Complete Monthly MWWBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the design of the work. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • 7 MWBE reports will be prepared. • 1 meeting with city staff will be attended. • 7 monthly water department progress reports will be prepared. • 7 monthly project schedule updates will be prepared. DELIVERABLES A. One meeting summary with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly MWWBE Report Form and Final Summary Payment Report Form TASK 2. CONCEPTUAL DESIGN (30%) The Conceptual Design shall be submitted to the CITY per the approved Project Schedule. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 3 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 The purpose of the Conceptual Design is for the ENGINEER to • Study the project, • Identify and develop alternatives that enhance the system, • Present (through the defined deliverables) these alternatives to the CITY, • Recommend the alternatives that successfully addresses the design problem, and • Obtain the CITY's endorsement of this concept. The ENGINEER will develop the Conceptual Design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. (NOT INCLUDED IN THIS CONTRACT) • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. (NOT INCLUDED IN THIS CONTRACT) 2.2. Geotechnical Investigations (NOT INCLUDED IN THIS CONTRACT) • ENGINEER shall advise the CITY of test borings and other subsurface investigations that may be needed for the project. If the CITY determines that such borings or investigations are needed then the ENGINEER shall work with the CITY and CITY's geotechnical consultant to develop specifications for such a testing program The cost of such testing will be paid for by the CITY. 2.3 Subsurface Utility Engineering (NOT INCLUDED IN THIS CONTRACT) 2.4 The Conceptual Design Package shall include the following: • Cover Sheet, • Graphic exhibits and a written summary of alternative design concepts considered, strengths and weaknesses of each alternative, and the rationale for selecting the recommended design concept, and • Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. 2.5 Project Decision Log (NOT INCLUDED IN THIS CONTRACT) City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 4 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 • Documentation of key design decisions. 2.6 Construction Estimate (NOT INCLUDED IN THIS CONTRACT) • Estimate of probable construction cost. ASSUMPTIONS 0 Geotechnical borings are expected for this project. • 2 copies of the Conceptual Design (30%) package will be delivered. Report shall be letter sized and comb- bound with a clear plastic cover Drawings will be 11" x 17' size fold outs bound in the report. • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • The ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. (NOT INCLUDED IN THIS CONTRACT) • The ENGINEER shall not proceed with Preliminary Design (60%) activities without obtaining written approval by the CITY of the Conceptual Design (30%) package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60%) Preliminary plans and specifications shall be submitted to the CITY per the approved Project Schedule. The ENGINEER will develop the Preliminary Design of the infrastructure as follows. 3.1. Development of the Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • A Project Control Sheet, showing all Control Points, used or set while gathering data, generally on a scale of not less than 1.400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X Y and Z coordinates in an identified coordinate system, and a referred bearing base. The Z coordinate shall be indicated on a City Datum only; descriptive location (i.e. set in the centerline of the inlet in the south curb line of North Side Drive at the east end of radius at the southeast corner of North Side Drive and North Main Street). • Overall project easement layout sheet(s) with property owner information. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 5 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 • Overall project water and sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvements, existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvements, existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and sanitary sewer abandonment sheets. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Benchmarks per 1,000 ft of each plan and profile sheet with a minimum of two. • Bearings given on all proposed centerlines or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets that show the following: proposed water and/or sanitary sewer plans and profiles including the recommended pipe size(s), fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal descriptions (Lot Nos., Block Nos., and Addition Names) with property ownership shall be provided in the plan view. • The ENGINEER shall make provisions for reconnecting all identifiable water and wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easements. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation shall be designed and submitted for construction. During the design survey if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during the design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE) investigation has been performed The Level A SUE will be performed (1) by the ENGINEER if included in the fee proposals or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect In all options the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 6 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide a map showing the location of new manhole construction at the end of existing sewer segments 90° bends and tee connections. Site survey or specific design plans for manhole construction is not included as part of the project scope. The Contract Documents shall specify that it is the Contractor's responsibility to coordinate utility location, i.e. manhole construction. • The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY s specifications. These may included connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project trenchless details and special service lateral reconnections. 3.2. Geotechnical Investigations (NOT INCLUDED IN THIS CONTRACT) • Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions shall be performed. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. 3.3. Constructability Review • Prior to the 60% review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department and other CITY departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that may have an impact on or influence the project. (NOT INCLUDED IN THIS CONTRACT) The ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities and where known and possible, consider potential future utilities in the design. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Buzzsaw for forwarding to all utility companies that have facilities within the limits of the project. The DWF files shall be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as 'Typicals' on the CITY s Buzzsaw website. The 'Typicals" need not be sealed individually if included in the sealed Contract Documents. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 7 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. 3.6. Storm Water Pollution Prevention Plan (NOT INCLUDED IN THIS CONTRACT) • For projects that disturb an area greater than one (1) acre, the ENGINEER will prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the project for use by the Contractor during construction. The ENGINEER will prepare the drawings and details for the proposed SWPPP improvements that the Contractor will use during construction. The Contractor will be responsible for filing of the SWPPP with the appropriate regulatory agencies. 3.7 Project Decision Log (NOT INCLUDED IN THIS CONTRACT) • Documentation of key design decisions. 3.8 Construction Estimate • Estimate of probable construction cost. ASSUMPTIONS • 0 public meeting(s) will be conducted or attended by the Engineer during the preliminary design phase. • 0 borings at an average bore depth of N/A feet each will be provided. • Traffic Control 'Typicals" will be utilized to the extent possible. It is assumed an additional 3 project specific traffic control sheets will be developed for construction near Meadowbrook Drive, Harwood Street (fire station) and Lancaster Avenue. • 1 set of 11" X 17" size plans will be delivered to the City for the Constructability Review. • 2 sets of 22' X 34" size plans will be delivered to the City for the • Preliminary Design (60%). 2 sets of specifications will be delivered to the City for the Preliminary Design (60%). • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications, if needed. • 0 sets of 22' X34' size drawings will be delivered to the City for Utility Clearance. • The ENGINEER shall not proceed with Final Design (90%) activities without obtaining written approval by the CITY of the Preliminary Design (60%) package. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 8 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM J CITY PROJECT NO.: 01473 DELIVERABLES A. Preliminary Design (60%) package; plans and specifications B. Utility Clearance plans (NOT INCLUDED IN THIS CONTRACT) C. Traffic Control Plan D. Storm Water Pollution Prevention Plan (NOT INCLUDED IN THIS CONTRACT) E. Estimate of probable construction cost F. Database listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90%) AND CONSTRUCTION (100%) Upon approval of the Preliminary Design (60%) package, the ENGINEER will prepare the Final Design (90%) package and Construction (100%) Documents as follows: • The Final Design (90%) plans and specifications shall be submitted to the CITY per the approved Project Schedule. • Following a Final Design (90%) plan review by the CITY, the ENGINEER shall submit Construction (100%) Documents to the CITY per the approved Project Schedule Each plan sheet shall be stamped, dated and signed by the ENGINEER registered in the State of Texas. • The ENGINEER shall submit an estimate of probable construction cost with both the Final Design (90%) and Construction (100%) Documents packages. These estimates shall ONLY use standard CITY bid items. ASSUMPTIONS • 2 sets of 11" X 17' size drawings, 1 set of 22' X 34" size drawings and 1 set of specifications will be delivered to the City for the Final Design (90%) package. • A DWF file for the Final Design (90%) package created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • 1 set of 22" X 34" size drawings and 1 set of specifications will be delivered to the City for the Construction (100%) Documents package. • The ENGINEER shall submit an estimate of probable construction cost for both the Final Design (90%) and Construction (100%) Documents packages. • A DWF file for the Construction (100%) Documents package created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 9 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 • Estimated number of plan sheets (reference below table). Sheet Sheet Title No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cover Sheet Legend and General Notes Overall Layout and Project Controls Water— Meadowbrook Drive (8" PP) Sheet I Water— Meadowbrook Drive (8" PP) Sheet II Water— Meadowbrook Drive (8" PP) Sheet III Water— Meadowbrook Drive (8" PP) Sheet IV Water —Tandy Avenue (8" PP) Sheet I Water — Tandy Avenue (8" PP) Sheet II Water— Sycamore Terrace (8" PP) Sheet I Water — Sycamore Terrace (8" PP) Sheet II Sanitary Sewer — Sycamore Terrace (8" P&P) Sanitary Sewer — Meadowbrook Drive and Tandy Avenue (8" P&P) Sheet I Sanitary Sewer — Meadowbrook Drive and Tandy Avenue (8" P&P) Sheet II Sanitary Sewer — Meadowbrook Drive and Tandy Avenue (8" P&P) Sheet III Water Crossing Details Demolition Plan General Details I General Details II Traffic Control Plan Sheet — Meadowbrook Drive / Harwood Street Traffic Control Plan Sheet — Lancaster Avenue/Tandy Avenue Traffic Control Plan Sheet — Lancaster Avenue/Meadowbrook Drive Traffic Control Plan Sheet — Typical (per FWWD) Traffic Control Plan Sheet — Typical (per FWWD) Traffic Control Plan Details DELIVERABLES A. Final Design (90%) package; plans and specifications B. Construction (100%) Documents; plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original mylar cover sheet for the signatures of authorized CITY officials. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 10 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 TASK 5 BID PHASE SERVICES ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload the Contract Documents (Specifications) to the designated project folder in Buzzsaw in .DOC format for access to potential bidders. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • The ENGINEER shall upload the Contract Documents (Plans) to the designated project folder in Buzzsaw in two formats, .PDF and .DWF files. The .PDF file will consist of one file that includes the plan set in its entirety. The .DWF files will consist of individual files, one file per plan sheet and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell the Contract Documents; Plans and Specifications, and maintain a plan holders list in the designated project folder in Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information The procedures shall include a log of all significant bidders questions and requests and the responses thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests in the form of addenda. The ENGINEER shall upload all approved addenda to the designated project folder in Buzzsaw and mail addenda to all plan holders (NOT INCLUDED IN THIS CONTRACT). • Attend the prebid conference in support of the CITY (NOT INCLUDED IN THIS CONTRACT). • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors and suppliers. • When substitution prior to award of contracts is allowed in the Contract Documents the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by the bidders. • Attend the bid opening in support of the CITY. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 11 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 • Tabulate and review all bids received for the construction project, assist the CITY in evaluating the bids and recommend award of the contract. A copy of the Bid Tabulation is to be uploaded to project's Bid Responses folder on Buzzsaw • Incorporate all addenda into the Contract Documents and issue conformed sets. 5.2 Mylar Drawings • The ENGINEER shall submit a set of sealed, conformed mylar drawings for record storage • Record Drawings shall also be submitted (NOT INCLUDED IN THIS CONTRACT) in both Adobe Acrobat PDF (version 6.0 or higher) format and DWF format on CD or DVD. There shall be one (1) PDF file and one (1) DWF file for the Transportation and Public Works (TPW) Department plan set and a separate PDF and DWF file for the Water Department plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Sinaular PDF and DWF files for each plan sheet will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW filename example — "W-1956_org47.pdf' where "W-1956" is the assigned file number obtained from the CITY, "_org" designates the file is of an original plan set, "47" shall be the total number of sheets in the file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water (and Sanitary Sewer) filename example — "X-35667_org36.pdf' where X-35667' is the assigned file number obtained from the CITY, '_org" designates the file is of an original plan set, "36" shall be the total number of sheets in the file. Example: X-12755_orgl8.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Buzzsaw. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number 817.392.8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • 45 sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to plan viewing rooms. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 12 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 2 sets of 11 "X17" size and 4 sets of 22"X34" size construction plans (conformed, if applicable) and 1 set of specifications (conformed, if applicable) will be delivered to the CITY. • PDF and DWF files will be uploaded to the designated project folder in Buzzsaw. • 1 set of 22"X34" construction mylar plans (conformed, if applicable) will be delivered to the CITY. • Engineer to provide probable construction costs per plan sheet in Excel format. (NOT INCLUDED IN THIS CONTRACT) DELIVERABLES A. Addenda B. Bid Tabulations C. Recommendation of Contract Award D. Construction Documents; Plans and Specifications (conformed, if applicable) E. Conformed Mylar Plans (NOT INCLUDED IN THIS CONTRACT) TASK 6. CONSTRUCTION PHASE SERVICES (NOT INCLUDED IN THIS CONTRACT) The ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the preconstruction conference the ENGINEER shall provide project exhibits and attend a public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at the onset of construction activities to observe and report on the Contractor's progress. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of the Contract Documents, review Change Orders and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final" project walkthrough and assist with preparation of final punch list. ASSUMPTIONS • 0 Request(s) for Information (RFIs) are assumed. • 0 Change Orders are assumed. DELIVERABLES City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 13 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 A. Public Meeting Exhibits B. Response(s) to Contractor's RFIs C. Review of Change Orders D. Review of Shop Drawings E. Final Punch List Items F. Record Drawings TASK 7. ROW/EASEMENT SERVICES The ENGINEER will support and perform activities related to ROW and land as follows per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine right-of-way and easement needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required for construction of the project. • The ENGINEER shall submit the right-of-way and/or easement documents to the CITY's Project Manager for real property acquisition. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. 7.3. Temporary and/or Permanent Right -of -Entry Preparation and Submittal • Prior to construction, the ENGINEER shall prepare and submit temporary right - of -entry documents for landowners to the CITY's Project Manager for real property acquisition It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement shall be required to enter private property. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • 4 Right-of-way and permanent and/or temporary easement documents will be necessary. 4 Temporary and/or permanent right -of -entry documents will be necessary. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 14 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 • Research and mapping of right-of-way includes review of property/right-of-way records on current Internet -based Tarrant Appraisal District (TAD) information available at the start of the project and available on -the -ground property site information (i.e., iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings easement vacations and abandonments right-of-way vacations and street closures. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right -of -Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES The ENGINEER will provide survey support as follows. 8.1. Design Survey 6 The ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by the ENGINEER in the design and preparation of the plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plans. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet showing all Control Points, used or set while gathering data on a scale, generally, of not less than 1:400. The following information about each Control Point: a. Identified (Example: CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. The Z coordinate shall be provided on the CITY Datum only. c. Descriptive Location (Example: set in the centerline of the inlet in the south curb line of North Side Drive at the east end of radius at the southeast corner of North Side Drive and North Main Street). Coordinates on all P.C. s, P.T.'s, P.I 's, manholes, valves, etc., in the same coordinate system as the Control Points. No less than two horizontal benchmarks per line or location. Bearings given on all proposed centerlines or baselines. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 15 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM•J CITY PROJECT NO.: 01473 Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right -of -Entry Preparation and Submittal (THIS PORTION OF THE PROJECT SCOPE IS INCLUDED AS PART OF TASK 7 3.) • Prior to entering private property, the ENGINEER shall prepare and submit Temporary Right -of -Entry for landowners to the CITYs Project Manager. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • Topographic survey at intersections will include no more than 100 feet in each direction. DELIVERABLES A. Copies of field survey data and notes; signed and sealed by a licensed surveyor. B. Plan drawing of the project layout with dimensions and a coordinate list. TASK 9. PERMITTING The ENGINEER will provide required and completed TxDOT permit applications to the City's Project Manager for submittal to TxDOT. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 16 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009, WSM-J CITY PROJECT NO.: 01473 ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES The CITY and the ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above However, the ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right -of -entries. • Services related to the development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction management and inspection services. • Monthly progress meetings. • Additional site visits during construction phase. • Design phase public meetings. • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to submitting for permits other than TxDOT (i.e. railroad, etc.). • Services related to Subsurface Utility Engineering Levels A, B, C or D. • Services related to survey construction staking. • Services related to acquiring real property including, but not limited to easements, right- of-way, and/or temporary right -of -entries. • Services to support prepare, document, bring, defend or assist in litigation undertaken or defended by the CITY. • Construction shop drawing review, samples and other submittals submitted by the contractor. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. • Preparation for and attendance at a prebid conference. • Response(s) to prebid conference. • Development of conformed drawings. • Development of record drawings. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 17 of 17 ATTACHMENT B COMPENSATION Design Services for Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project No. 01473 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $159,793.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor, materials, supplies and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II — Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in Item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. IV. Summary of Total Project Fees Prime Consultant MWH Americas, Inc. M/WBE Sub -Consultants Multatech Gorrondona and Associates Salcedo TOTAL P rimary Responsibility Design Engineer P reliminary Engineering S urvey (Meadowbrook) S urvey (Sycamore Terrace) Project Number and Name Water and Sanitary Sewer Replacement Contract 2009, WSM-J, City Project No. 01473 City M/WBE Goal = 17% Consultant Committed Goal = 20% City of Fort Worth, Texas Attachment B PMO Official Release Date: 05.19.2010 Page 1 of 2 Fee Amount ($) $109,112 $8,357 $35,884 $6,400 $159,753 Percent (%) 68.3% 5.2% 22.5% 4.0% 100.0% Total Fee M/WBE Fee M/WBE % $159,753 $50,641 31.7% B-1 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 3 of 5 Professional Services Payment Request Project Manager: 1 Project: 'Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project #: 101473 City Sec Number: Purchase Order: Company Name: Consultant's PM: Vendor Invoice #: Payment Request #: From Date: To Date: Invoice Date: 1 MWH Americas, Inc. Robert M. Johnson, PE Draft Submittal 11-May-11 Email: Office Address: Telephone: Fax: EXHIBIT B-1 Summary Consultant Instructions: Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buzzsaw and add your invoice to the Consultant folder within the Project's folder. Robert.M.JohnsonOus.mwhalobal.com 7557 Rambler Road, Suite 440, Dallas, TX 75231 214.346.4305 1214,360.9963 I LOCK UNLOCK Agreement Amendment Agreed Amount Completed Percent ($) Invoiced Remaining Sheet FAC and Work Type Description Amount Amount to Date Amount Completed Previously Current Invoice Balance Water Invoice Water $115,050.96 $0.00 $115,050.96 $0.00 $0.00 $0.00 $115,050.96 Sewer Invoice Sewer $44,742.04 $0.00 $44,742.04 $0.00 $0.00 $0.00 $44,742.04 Totals This Payment Request: $159,793.00 S0.00 $159,793.00 $0.00 $0.00 $0.00 S159,793.00 Overall Percentage Complete: o.o% Professional Services Payment Request Project Manager: 0 EXHIBIT B-1A Project: Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project #: 01473 Work Type Desc: WATER Consultant Instructions: F/AXC: P253-60x170xxxx31,32,33,51 City Sec Number: 0 Fill in green cells including Percent Completed and Invoiced Previously Quanitics. Purchase Order: 0 When your Invoice is complete, save and close, start Buzzsaw and add your invoice to the Consultant folder within the Project's folder. Company Name: MWH Americas, Inc. Consultant's PM: Robert M. Johnson, PE Email: Robert .M Johnsonnus mwholobal corn Vendor Invoice #: 0 Office Address: 7557 Rambler Road, Suite 440, Dallas, TX 75231 Payment Request #: Draft Submittal Telephone: 214.346.4305 From Date: 0-Jan-00 Fax: 214.360.9963 To Date: 0-Jan-00 Invoice Date: 5/11/2011 Pay Items Description 31 - Conceptual Design 32 - Preliminary Design 33 - Final Design 51 - Preliminary Survey Amendment Amendment Agreement Completed Agreement Amount Number Amount Amount to Date Amount $25,381.94 $25,381.94 $0.00 $50,763.89 $50,763.89 $0.00 $8,460.65 S8,460.65 $0.00 $30,444.48 $30,444.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals This Unit: $115,050.96 Percent Completed $0.00 $115,050 96 $0 00 0.0% Overall Percentage Complete: o o% ($) Invoiced Remaining Previously Current Invoice Balance $0.00 $25,381.94 $0.00 S50,763.89 $0.00 $8,460.65 $0.00 $30,444.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 S0 00 $0.00 $115,050.96 EXHIBIT B-1 B Professional Services Payment Request Project Manager: 0 Project: Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project #: 01473 Work Type Desc: SEWER Consultant Instructions: F/A/C: P258-70x170xxxx31,32,33,51 City Sec Number: #REF! Fill in green cells including Percent Completed and Invoiced Previously Quanities. Purchase Order: #REF! When your Invoice is complete, save and close, start Buzzsaw and add your invoice to the Consultant folder within the Project's folder. Company Name: MWH Americas, Inc. Consultant's PM: Robert M. Johnson, PE Email: Robes ohnsonaus.mwhalobal.com Vendor Invoice #: 0 Office Address: 7557 Rambler Road, Suite 440, Dallas, TX 75231 Payment Request #: Draft Submittal Telephone: 214.346,4305 From Date: 0-Jan-00 Fax: 214.360.9963 To Date: 0-Jan-00 Invoice Date: 5/11/2011 Pay Items Description 31 - Conceptual Design 32 - Preliminary Design 33 - Final Design 51 - Preliminary Survey Amendment Amendment Agreement Completed Agreement Amount Number Amount Amount to Date Amount $9,870.76 $9,870.76 $0.00 $19,741.51 $19,741.51 $0.00 $3,290.25 $3,290.25 $0.00 $11,839.52 $11,839.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals This Unit: $44.742 04 $0 00 Percent Completed ($) Invoiced Remaining Previously Current Invoice Balance $0.00 $9,870.76 $0.00 $19,741.51 $0.00 $3,290.25 $0.00 $11,839.52 $0.00 $0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $44.742 04 $0 00 0 0% $0 00 $0 00 $44.742 04 Overall Percentage Complete: o o% EXHIBIT "B-2" ENGINEER LEVEL OF EFFORT (Supplement to Attachment B) Insert level of effort following this page. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 4 of 5 Task No. Task Description I QC Reviewer Rate' $210 1.0 Design (Proleet) Management 17 1.1 Managing the Team 1.1.q 1.1. OAIQC 12 Communications and Reporting 1.2.11 Pre -Design Coordination Meeting Design Submittal Review meeting Prepare Baseline Schedule Prepare Monthly Progress Reports with Schedule 12.61 Prepare Monthly MWBE Reports 44-7 Invoicing 2.0 Conceptual Design (30%) 2.1 Data Collection 22 2,3 2.4 Conceptual Design Drawings 2,6 2,6 3.0 PreliminaryDeslan (60%1 3.1 Preliminary Plans and Specifications 3,2 Geotephnipatinvestipations 3.3 Constructability Review 3,4 Utility -Clearance 3.5 Traffic Control Plan 36 SWPPP &7 3.8 Construction Estimate 4.0 Final Destan (90%).and Construction 1100%) 4.1 Final Design (90%) Plans and Specifications 4.2 Construction (100%) Plans and Specifications as 4.4 Construction Estimates (90% and 100%) 5.0 Bid Phase 5.1 Bid Support 5.1.1 Sell Contract Documents and Maintain Plan Holders List 5.1.2 Issue Addenda 6.14. 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 5.2 Issue Conformed Contract Drawings 6,0 64 &4T1 Atten4AubueMeetine sa W 1.2. 1.2. 1.2. City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 16 Project Manager $165 15 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project No. 01473 Labor (hours) ECostngp� eer Estimator CARD Scheduler Total Labor 5925 $205 $150 $140 32 0 0 28 $13,965 2 4 2 4 8 16 2 8 3 12 64 4 24 3 8 40 7 13 94 4 8 80 2 2 1 2 12 1 2 6 13 76 4 8 48 2 4 24 12 16 0 40 0 40 4 92 80 12 4 12 72 48 24 1 4 12 0 3 38 16 2 8 4 1 8 2 0 0 0 8 0 4 4 $3.360 $375 $830 $2,510 $5,560 $1.330 Subconsultant MWBE No 30 Eroense Travel n-MWBE £o ' So $16t610 $8,357 $0 $3,660 $685 $12,950 $7,672 $29)985 $0 $24,160 $750 $3,840 $1.235 $2%165 $0 $15,360 $7,680 $3,125 $6,445 $0 $2,000 $1.930 $500 $1,165 $850 SO $0 $0 $0 $0 $0 $0 Total Expense Task Sub Total Reproduction Cost $0 $110 $100 $10 $45 $40 $5 $55 $30 $25 $1400 $1,400 $0 $0 $0 $0 $0 $0 $0 $81467 $785 $7,682 $45 $40 $5 $0 $0 $55 $30 $25 $0 $1,400 $1,400 $0 $0 $0 $0 $13,965 $3,360 $375 $830 $2,510 $5,560 $1,330 $25,077 $4,445 $20,632 $30,030 $24.200 $755 $3,840 $1,235 $26,220 $15,390 $7,705 $3,125 $7,845 $3,400 $1,930 $500 $1,165 $850 1 of 2 Task No. Task Description 6-1,G 6:8 Record-Drawixgs 7.0 ROW/Easement Services 7.1 RigMof-Way Research 7.2 Right-of-Way/Easement Preparation and Submittal 7.3 Temporary Right -of -Entry Preparation and Submittal 8.0 Survey 8.1 Design Survey 8.2 Temporary Right -of -Entry Submittal 83 Construction -Survey 9.0 04 0,2 03 9.4 9:6 9-6 8,2 Permitting SWPPP Eavirenmentl-Sewiers Flosdelain-Serviees TxDOT Railroad Description Conceptual Design (30%) Preliminary Design (60%) Final Design (10%) Preliminary Survey Subtotal Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project No. 01473 Labor (hours) OC Project Protect Estimator CADD Scheduler Reviewer Manaper Englrber gate $210 $165 $125 $205 $150 $140 0 0 0 8 36 4 4 16 4 16 4 24 4 24 2 16 2 16 Totals 33 70 1 Water Line Footage 1 Sewer Line Footage (A) (B) (C) Total Fee Survey Fee Total Fee (-) survey Fee Water Fee (72% of C) $64,606.46 WP 31 32 33 51 Water $25,381.94 $50,763.89 $8,460.65 $30.444.48 O 0 0 0 0 0 O 0 0 380 15 212 7,0261 Ill 2,7371 9,7631 $115.050.961 $159,793.00 72% 28% 100% $159,793 -$42,284 $117,509 Sewer Fee (28% of C) 532,902.52 Sewer I $9,870.76 I $19,741.51 I $3,290.25 $11,839.52 $44,742.04 I Total Labor Cost Expense Subconsultant Travel MWSE Non-MWBE $5t820 $0 $0 $500 $2,660 $2,660 $3,660 $42.284 SO $3,660 $42,284 $0 $2.330 $0 $0 $2.330 25 $104,BU0 SSUb41 $U SO S0 Total Expense Task Sub Total ReprJaluction Cost $30 $30 'S0 $0 $0 $0 $0 $0 $0 54%314 $42,314 $O SO $0 $0 $0 S5,t820 $500 $2,660 $2,660 $45,,974 $45_974 $0 $2,330 $2.330 SU 31,b4U Sb2,2111 $Tb1,2bl Project summary Total Hours] Labor I Total Expense) MWBE Subconsultantj Non-MWBE Subconsultant 1 5% Sub Markup MWBE Parbappanon IRA Project Cost 739 $104,980 $52,281 $50,641 $0 $2,,532 31.7% $15a,i93 2 of 2 Task No. 1.0 Task Desc Total Expense Task Sub Total Auction Cost Design (Project) Management $0 1.1 Managing the Team 1.1.1 Internal Team Meetings 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeti 1.2.2 1.2.3 Design Submittal Review meet 1.2.4 Prepare Baseline Schedule 1.2.5 Prepare Monthly Progress Rep 1.2.6 Prepare Monthly MWBE Repot 1.2.7 tnvOEcing Conceptual Design (30%) Data Collection Oeotechnical Investigations 2.0 2.1 2.2 2.3 2.4 2.5 2.6 3.0 3.1 3.2 3.3 3.4 3.5 3,6 3.7 3.8 4.0 4.1 4.2 4.3 4.4 5.0 5.1 5.1.1 5.1.2 54,3 5.1.4 5.1.5 5.2 6.1 644 6.1.3 6.1.4 615 110 100 Conceptual Design Drawings ;10 P roject Decision Log Construction Estimate P reliminary Design (60%) ;45 P reliminary Plans and Specificath40 gations Constructability Review $5 Utility Clearance Traffic Control Plan sP P roject Decision Log Construction Estimate Final Design ,90%) and Constr155 Final Design (o%) Plans and 5 30 Construction (100%)Plans and `, 25 P roject Decision Logs-{90%-and-- Construction Estimates (90% an( Bid Phase ,400 Bid Support Sell Contract Documents and 1,400 Issue Addenda Attend Pre Bid Conference Attend Bid Opening Tabulate Bids and Recommen Issue Conformed Contract brawl Construction Support Attend Preconstruction Confer Attend Public Meeting Project Site Visits Submittal Review Requests for Information/Char City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 $0 $0 $0 $0 $0 $0 $0 $8,467 $785 $7,682 $45 $40 $5 $0 $0 $55 $30 $25 $0 $1,400 $1,400 $0 $0 $0 $0 $13,965 $3,360 $375 $830 $2,510 $5,560 $1,330 $26,077 $4,445 $20,632 $30,030 $24,200 $755 $3,840 $1,235 $26,220 $15,390 $7,705 $3,125 $7,845 $3,400 $1,930 $500 $1,165 $850 1of2 Task No. Task Desc Total Expense Auction Cost Task Sub Total 6.1.6 Final Walk Through and Punch 6.2 maser ROW/Easement Services 7.1 Right -of -Way Research 7.2 Right-of-Way/Easement Preparat 7.3 Temporary Right -of -Entry Prepay Survey $30 8.1 Design Survey S30 8.2 Temporary Right -of -Entry Submit 7.0 8.0 9.0 9.1 9.2 9.3 9.4 9.5 9.7 Permitting SWPPP Floo ervice: ITxDO cicia44-8 !Railroad ITDLR $0 $0 1,640 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 $0 $0 $0 $0 $0 $0 $42,314 $42,314 $0 $0 $0 $52,281 $0 $0 $5,820 $500 $2,660 $2,660 $45,974 $45,974 $0 $2,330 $2,330 $157,261 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Jon-MWBE Subconsultant 5% Sub Markup MWBE Participation Dotal Project Cost Descript Conceptual Des Preliminary Des Final Design Preliminary Subtot Total 739 $104,980 $52,281 $50,641 $0 $2,532 31.7% $159,793 2of2 EXHIBIT "B-3' ENGINEER OPINION OF PROBABLE CONSTRUCTION COST (Supplement to Attachment B) Insert opinion of probable construction cost following this page. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 5 of 5 EXHIBIT B-3 (EXAMPLE - FOR REFERENCES PURPOSES ONLY) WATER LINE IMPROVEMENTS (SUMMARY) Bld Item No. 00501 00618 OO'516 00568 00717 00749 00745 00751 00546 00 548 O055O 00758 00762 00547 00372 00430 0il442 00 4-43 O0768 00837 00839 00147 001137 0011,00 O'1i13Y C'€scrlptton Unit PIS ssu re-12 In.::h - Install . PLF PIS-Pr=-sau r8- . Inch -. Install (PVC) LF Pi -Prs su rs-5 Inch - Install i PVC-.) LF Pipe Fittings- Than 16 I rr_: h - Install TON Valve- 12 In•sh-Gate- 'rr'k^V arve-, Box Install EACH Valve-8 In•_h-Gate-•h�-'.fare'..Box - Install EACH Inch -Gat-- '.a• arr'e, Bo: - Install EACH gate -- RN nl'_'. G• EACH Flro H:r''J rant - Install EACH Fire H'»1 rant-BarriI & Stan Extension - Install VF Meter Box ()Lass '.A'-- Illstoll iP•=•rreth'�'IGne'r EACH Water -Ser,' Ice-1 Inch - Install LF Water Ser,.'Ice-1 Inch -Tap to Mal install EACH Fire H',»Jrant - Remove & Sarti'a:lG EACH Trench Sate—.1— System 5 Foot Depth - Install LF PLY,'ni.nt-2 Inch Mln':xw''r1ati' -- r;Asi'hatt R :o.lr Bev on'd the- Trench Width') Pair emtrnt-2 Inch H MA.0 on 6 Inch Flex Baal - LF Pac,.'sn1 nt-2 Inch Min HNI.AC on 17 Concrete Bass i Str.-02'8i - Install LF Water Service-2 Inch -Tern Doran' -- Install LS C� .ncruti-Ty ps B - Install C Y ',1':•ncr6t6-T., p E - Install CY Topsoil - Install C V Grans -.Sod Install {.ter' Storm Water Pollution Pr•.',,.•=ntk n Plan:- than 1 Ac LS big nal- I rairlc •.:• Tnrrol - Pr' ti'l.j' . - install L. . Ware r Sub -Total 1' "'-� Contingency. Water Total Unit 40.00 $ 4.000.00 $ 9.500.00 $ 1.000.00 r $ 800.0 $ 300.00 $ j r i00.fI $ • 00.0 $ 2"f10-00 $ 20.0.' $ 400.O':' $ 300.0r r $ 2.00 PROJECT P r I c _+ •:0 U AN T FT Y TOTAL. b`J.u' ' 4, .0 l.Db.:'t0' r iu 45.0' i 6,550 0 294,75000 21;0 $ 10,.4,X.r,0 5.'�+ $ 23.600.010 1 $ 37,500.00 13 $ 18,0rY1 rr0 12 $ 91,600.00 t $ 8 ,100!00 12 $ 36 ,O.O0.00 24 $ 7,2�y�.C'0 24 $ 46,81-11.00 .155 $ 143 , i r' r00 fj4 $ 93,6'X'.rr0 7 $ 2,10 00.00 4.,6.50 $ 9,3'X'.0o $ 8.0" 3, 50 0 $ 28,O00.0O $ 9.00 6,2;13 $ 62,037.00 i A.7R1 $ 263,430_00 t $ 20 ,000f-10 10 $ 1500.00 10 1500.00 5 $ 956.25 170 $ 1 530.00 1 ,0i_rti,00 i f �1Idyirjj uII $ 1,399,753 $ 139,980 $ 1,539,733 SANITARY SEW ER IMPROVEMENTS ,:SUMMARY Bid ire rn Ne.. O 0222 00.22s O 0350 urt.42s4. 00355 00961 00358 00208 00211 00212 00213 00214 OCri 98 O 0217 00218 00442 00443 00430 00344 00372 00201 00202 00542 00147 001,37 00493 001337 00839 Descil btlan Pipe-6 non 10 2 inch-Eniargement-HoPE InalaJi itte-- ad Adjusin-pent ior- PIO& Heriab F1p-o-Sewer-8 Inch-SOF:26 iAl Depths) - inelali .aloyer-tiereice-4 incn install Sewer Service-4 Inch Sennoe Tep - Sewer Servic*-4 Inch Tap lo HOPE v Pine Sewer Service-4 Inch-21May' Clean Out - instal Manhole - Remarwe marricge-raint & !manor Pro teawe coaling ires1all t.actwum--..+11:UILJNiu I Li dill - I kilP.JY* 401 Iclj •- Marla I P.lanhole-Sid 4 F1 C.Larnq.M. 6 Ft Depttru -lnslaii utannole-PI 4 I -I. 1....tarn-Aa0ea IJE13131 il.031" 13 1-11......eptri. - install Collar-Hanhota--32 Inch-Frarne & Cover - irta1all MannOle-Vacuum Taal Services P.lanhole-Walerllohl inseri - install Pan:a-nem-2 mon 1-imA0 on 6 non Rex Bacr-- Ternporarf - Instal Pawernerri-2 Inch Min 1-11.4A,C on 2:27 C.:oncre1e Base •;Str.-025:,• Install Pariernerr1-2 Inch Min Overlay - .:Asphalt Paint Repair Beyort:1 the Trench wiciUii Cts-b-Lrb & Gutter as directed by InsG•eclor - Replace Trench Salely Sysiern 5 Fact Depth - irexail inateiion Peel:bons1rucr1bn Cleardrpg & TV - Sb..M I nspeallo Pr-econsiruclion C le aninp & TV - Slud Dehole-12ccplaralore cawation SILKIj Tcpscii ina.iaIi 16 incries:• Gras-s-Soci Install crusried urnestone -ror piac. pia_c-ernent Install Concrete -Time B Ccticrete-Tepe E Unit LE LI- LF Li - EACH EACH EACH EACH VF EACH EACH VF EACH LA cH EACH LF LF SY LF LF LF LF EACH SY CY CY CY Unit Price S S S S 75.00 76.UU 45.00 30.00 S50.00 750.00 ""0.00 500.00 16500 2,50 a o C. 2,50000 160.00 200.00 200.0C. 7 5. ‚DC' • 7.00 $ 30.00 • 8.00 • 3C'.00 • 2.00 • 2.00 S 3.00 $ 1 .03 0.0 0 • 17.00 9.00 S 30.0C. 150.00 15C'.00 Slorm Water Pollution Frewention Ran:, than 1 Ac 00100 SWPPP - lislali LS S 20.000.00 01189 signal -Traffic C-ontrol Oestpn & Praikle, ••- Instal L $20,000.00 Sanitary Sewer Sub -Total 10% Contingency Sanitary Sewer Total PROJECT QUANTf 1.002 $ 4c• $ 9,775 $ 121 3 12 $ 1c? $ 22 S E. 3 25 45 $ 15 $ 47 $ 2E, 4 ,ogr s 5,74 $ 6.622 s a:77 3: 1 0, 777 3 10.7,77 10,777 $ 15 172 $ 1,07C• 10 4 io $ 10 3 $ 15 3 S TOTAL 75,150 . 0,0 U 42'9 87 5 1 63,250 9.000 4-9.250 16.000 15.840 5.000 1 12.500 2.400 14.100 9 .40 0 3.525 40.34 1 99 66 0 „160 9.30 21,554 21554 a2.2:31 1.000 3.02e. 9,630 20C' 1.500 1.500 20,030 20. 00 0 1,394,143 139.410 1.533.S53. ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Water and Sanitary Sewer Replacement Contract 2009, WSM-J City Project No. 01473 No changes to the Standard Agreement City of Fort Worth, Texas Attachment C PMO Release Date: 05,19.2010 Page 1 of l 01473 -FTW W W W Replacement Contact 2009, WSM-J Baseline Ft Worth.1.1 Managing the Team p 1.1.2 I QAIOC Ft Worth.1.2 Communications and Reporting 1.2.1 Pie -Design Coordination Meeting 1.2.3 Design Submittal Review Meeting 1.2.4 Prepare Baseline Schedule 1.2.5 Prepare Monthly Progress Reports with Schedule 1.2.6 Prepare Monthly MWBE Reports Ft Worth.2.1 Data Collecgon 2.1.1 I Data Collection Ft Worth.2.4 Conceptual Design Drawing* 2.4.1 I Conceptual Design Drawings 2A2 Ft Worth Review Ft Worth.3.1 PrelimMary Plans and Specifications 3.1.1 160% Plans & Specifications Ft Worth.3.3 ConstructaWBty Review r__ - 3.3.1 rConstructabiltiy Review Ft Worth.3.8 Traffic Control Plan 3.5.1 Traffic Control Plan Ft Worth.3.8 Construction Estimate 3.8.1 60% Estimate of Probable Construction Cost Ft Worth.3.9 Ft Worth Review 3.9.1 Ft Worth Revi Ft Worth.4.1 Final Design (90%) Plans and Specifications 4.1.1 190% Plans & Specifications Ft WorthA2 Construction (100%) Plans and Specifications 4.2.1 100% Plans & Specifications Ft WorthA.4 Construction Estimates (90% and 100%) 4.4.1 90% & 100% Estimate of Probable Construction Cost Ft worth.4.s Ft Worth Review 4.5.1 4.52 FtWorth.5.1 5.1.1 5.1.2 5.1.4 5.1.5 Ft Worth32 5.2.1 90% Ft Worth Review 100% Ft Worth Review Bid Support Sell Contract Documents & Maintain Plan Holders List Issue Addenda Attend Bid Opening Tabulate Bids & Recommend Award Issue Conformed Contract Documents Issue Conformed Contract Documents 92.0d 14Jun-11 92.0d 14Jun-11 163.0d ` 13Jun-11 1.0d 1.0d 5.0d 162.0d 162.0d 13Jun-11' 14Jun-11 14Jun-11 14Jun-11 14Jun-11 5.Odr 13Jun•11 5.Od 13Jun•11' 15.od1 20-JJun-11 15.0d 20Jun-11 5.0d 20Jun-11 35.0d 112Jul-11 35.0dI 12Jul-11 5.0dJ 25-Aug-11 5.0d 125-Atg-11 5.0dt 25-Aug-11 5.0d 25-Aug-11 2.0dl30-Aug-11 2.od 30-Aug-11 10.OdI 01Sep-11 10.0d 01Sep-11 20.0d, 01-Sep-11 20.0d 01Sep-11 10.0d 23Sep-11 10.od 23Sep-11 5.0d 07-Oct-11 5.0d 07-Oct-11 15.0dI 30-Sep-11 10.0d 1 30-Sep-11 10.0d 07-Oct-11 26.0d 14-Oct-11 20.0d 14-Oct-11 3.Od 11-Nov-11 Current Bar Labels inn Actual Work Project Baseline • Remaining Work Critical Remaining Work ♦ • Milestone City of Fo 21-0d-11 21.Oct-11 00-Feb-12 13Jun-11 14Jun-11 20Jun-11 06-Feb-12 06-Feb-12 17Jun-11 17-Jun-11 11JmF11 11Jul-11 24Jun-11 29-Aug-11 29-Aug-11 31-A g-11 31-Aug-11 31-Aw-11 31-Aug-11 131dwg-11 31-Aug-11 15Sep-11 15 ^ p-1 29Sep-11 29Sep-11 06-Oct-11 06-Oct-11 13-Oct-11 13-Oct-11 20-Oct-11 13Aet-11 20-Oct-11 8-Nov-11 10-Nov-11 15-Nov-11 1.0d 16-Nov-11 16-Nov-11 2.0d 17-Nov-11 18-Nov-11 5.0d 21-Nov-11 129-Nov-11 5.0d 21-Nov-11 129-Nov-11 ♦ Baseline Milestone Worth $13,965.00 $13,965.00 som $0.00 $0.00 $0.00 60.00 $0.00 $25,495.00 $25,495.00 $0.00 $0.00 $0.00 $30.030.00 $30.030.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.001 $0.001 $0.00 $26220.00 $26,220.00 $.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,845.00 $7,845.00 $0.00 $0.00 $0.00 $0.00 $0.00 '1 17-Jun-11 Page 1 of 2 IT ASK fitter. All Activities 11-May-11 11:0C 21-Oct-11 06-Feb-12 06-Feb-12 ♦� 15-S p-11 29See-11 os-Oct-1 13-0c(-11 13-Oct-11 20-Oct-11 10-Now11 15-Nov-11 16-Nov-11 18-Nov-11 MIMMI 29-Nov-11 0 Primavera Systems, Inc. '01473 - FTW W W W Replacement Contract 2009, WSMJ Baseline Ft Worth.7.1 Right -of -Way Research 7.1.1 I ROW Research Ft Worth.7.2 Right-ofWay I Easement Preparation and Submittal 72.1 ROW/Easement Preparation & Submittal Ft Worth.7.3 Temporary Right -or -Entry Preparation and Submittal 7.3.1 Temporary ROE Preparation & Submittal Ft Worth.8.1 Design Survey 8.1.1 Field Survey Ft Worth.9A TxDOT 9.4.1 5 IxOOT NMI Current Bar Labels ISM Actual Work Project Baseline • Ott Remaining Work Critical Remaining Work • • Milestone 5.0d 20Jun-11 5.0d 120Jun-11 5.0d 274un-11 5.0d 27Jun-11 5.od1 05Ju1.11 5.0d 05Jul-11 City of Fort Worth 24-Jun-11 24Jun-11 01Jul11 01Jul-11 11Juki1 11Jul-11 30.0d) 13Jun-11 25Jul-11 30.od 13Jun-11 25Jul-11 5.0d 20Jun-11 24Jun-1 5.Od� 20Jun-11 24Jun-11 • Baseline Milestone $5,820.00 $5,820.00 $0.00 $0.00 $0.00 $48,088.00 $48,088.00 $2,330.00 $2,330.00 Page 2 of 2 • Z un•11 '$ 01Jul-11 11-May-11 11:0C 01 •® 11Jul-i1 ►� 24Jun-11 5Jul-11 TASK filter. All Activities ® Primavera Systems, Inc. 01473 - FTVV W WW Replacement Contract 2009, WSM-J Baseline i'&ctivity I I Activity Nal ne "q ����I .P IILL_I_11•1A01i I" 11-May-11 11:0d 2012 Ft Worth 01473 - FTW W & WW Replacement C Ft Worth.1 Design (Project) Management Ft Worth.1.1 Managing the Team 1.1.2 QA/QC Ft Worth.1.2 Communications and Reporting 1.2.1 1.2.3 1.2.4 1.2.5 1.2.6 Pre -Design Coordination Meeting Design Submittal Review Meeting Prepare Baseline Schedule Prepare Monthly Progress Reports with Schedule Prepare Monthly MWBE Reports Ft INIMW.2 Conceptual Design (30%) Ft Worth.2.1 Data Collection 2.1.1 Data Collection Ft Worth.2.4 Conceptual Design Drawings 2.4.1 Conceptual Design Drawings 2.4.2 Ft Worth Review Ft Worth.3 Preliminary Design (60%) Ft Worth.3.1 Preliminary Plans and Specifications 3.1.1 60% Plans & Specifications Ft Worth.3.3 Constructability Review 3.3.1 Constructability Review Ft Worth.3.5 Traffic Control Plan 3.5.1 Traffic Control Plan Ft Worth.3.8 Construction Estimate 3.8.1 60% Estimate of Probable Construction Cost Ft Worth.3.9 Ft Worth Review 3.9.1 Ft Worth Review Ft Worth.4 Final Design (90%) and Construction 90% Ft Worth Review 13-Oct-11 100% Ft Worth Review 20-Oct-11 Ft Worth.5 Bid Phase Mar Ft Worth.5.1 Bid Support 5.1.1 Sell Contract Documents & Maintain Plan Holders LIE Q4 21=Oct-11 I • Q1 • • 06-Feb-12 06-Feb-12 • • • -11 Oct-11 Ft Worth.4.1 Final Design (90%) Plans and Specifications 4.1.1 90% Plans & Specifications Ft Worth.4.2 Construction (100%) Plans and Specifications 4.2.1 100% Plans & Specifications Ft Worth.4.4 Construction Estimates (90% and 100%) 4.4.1 90% & 100% Estimate of Probable Construction Cosi13-Oct-11 Ft Worth.4.5 Ft Worth Review 4.5.1 4.5.2 5.1.2 ! Issue Addenda 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids & Recommend Award Ft Worth.5.2 Issue Conformed Contract Documents 5.2.1 Issue Conformed Contract Documents Current Bar Labels Remaining Work 1 Actual Work Critical Remaining Work 0 • 10-Nov;11 15-Nov-11 16-Nov-11 18-Nov-11 • 29-Nov-11 • • • • • • • • • Primavera Systems, Inc. '01473 - ?TAN W WW Replacement Contract 2009, WSM-J Baseline Activity ID 11-May-11 11:0C Activity Name 2012 Ft Worth.7 ROW/Easement Services Ft Worth.7.1 Right -of -Way Research 7.1.1 ROW Research Ft Worth.7.2 Right -of -Way / Easement Preparation and Sub 7.2.1 ROW/Easement Preparation & Submittal Ft Worth.7.3 Temporary Right -of -Entry Preparation and Sul 7.3.1 Temporary ROE Preparation & Submittal Ft Worth.8 Survey Ft Worth.8.1 Design Survey 8.1.1 Field Survey FkWorth.9 Permitting Ft Worth.9.4 TxDOT 9.4.1 TxDOT e Current Bar Labels Remaining Work f Actual Work Critical Remaining Work 0 Pr O Mi Q4 I Q1 Primavera Systems, Inc. Attachment Water and Sanitary Sewer Replacement Contract 2009, WSM- N 1,500 VICKERY City Project No. 01473 0 I I I L-I_LSL.;� /111 III /llllllll PROJECT LOCATION P7." IP .1)04-\ H mm 1,500 Feet IIII11 1II1111 FORT WORTH HMI � �I IIIIIIIIIIIIIIIIIIIIII pI WILIKINSONI I I I I 11 al I I I LHJIIIIHIII MEADOWBROOF( !1 Paikir I I ri I III h PU616, TOki 1 HFIH!II, II 1111 II 1111 PROJECT LOCATION II IIIIl11II i- i i I i i ILi'i i HUH rHII I 1611111111 1 u i /HSli'il IIIIIII 1 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/2/2011 - Ordinance No. 19818-08-2011 DATE: Tuesday, August 02, 2011 REFERENCE NO.: **C-25086 LOG NAME: 6009WSMJ-MWH SUBJECT: Authorize Execution of an Engineering Agreement in the Amount of $159,793.00 with MWH Americas, Inc., for Water and Sewer Replacement Contract 2009, WSM-J on Meadowbrook Dnve and Sycamore Terrace and Adopt Appropriation Ordinance (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $176,793.00 from the Water and Sewer Operating Fund in the amounts of $126,051.00 to the Water Capital Projects Fund and $50,742.00 to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund by the amount of $126,051.00 and the Sewer Capital Projects Fund by the amount of $50 742.00 from available funds; and 3. Authorize execution of a contract in the amount of $159,793.00 with MWH Americas, Inc., for Water and Sewer Replacement Contract 2009, WSM-J on Meadowbrook Drive and Sycamore Terrace. DISCUSSION: This project consists of the preparation of plans and specifications for the replacement of the deteriorated water and sanitary sewer mains located on Meadowbrook Drive (Beach Street to Tandy Avenue) and Sycamore Terrace (Vickery Boulevard to Dead-end). MWH Americas, Inc., proposes to perform the design work for a lump sum fee of $159,793.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. MWH Americas, Inc , is in compliance with City's M/WBE ordinance by committing to 32 percent M/WBE participation. The City's goal on this project is 17 percent. In addition to the contract amount, $17,000.00 (Water: $11,000.00; Sewer: $6,000.00) is required for project management, real property acquisition and utility coordination. The project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION / CERTIFICATION. The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. FUND CENTERS: 1 &2) P253 476045 6081701473ZZ 1&21P258 476045 7081701473ZZ 2)P253 511010 608170147330 2) P253 531200 608170147331 2)P253 531200 608170147332 2)P253 531200 608170147333 2)P253 531200 608170147351 2)P253 531350 608170147342 2)P253 531350 608170147373 2)P258 531200 708170147331 2)P258 531200 708170147332 2)P258 531200 708170147333 2)P258 531200 708170147351 2)P258 531350 708170147342 2) P258 531350 708170147373 21P258 511010 708170147330 CERTIFICATIONS: Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: $126,051.00 $50.742.00 $8.000.00 $25.382.00 $50.764.00 $8,461.00 $30,444.00 $2.000.00 $1.000.00 $9.871.00 $19.742.00 $3.290.00 $11.839.00 $2,000.00 $1.000.00 $3.000.00 FROM Fund/Account/Centers 1) PE45 538040 1) PE45 538040 3)P253 531200 3)P253 531200 3)P253 531200 3)P253 531200 3)P258 531200 3) P258 531200 3)P258 531200 3)P258 531200 0609020 0709020 608170147331 608170147332 608170147333 608170147351 708170147331 708170147332 708170147333 708170147351 Fernando Costa (6122) S. Frank Crumb (8207) Roberto Sauceda (2387) ATTACHMENTS 1. 6009WSMJ-MWH AON.doc (Public) 2. 6009WSMJ-MWH MAP 01.pdf (Public) 3. 6009WSMJ-MWH MAP 02.odf (Public) 4. 6009WSMJ-MWH MWBE Contract Compliance.pdf (CFW Internal) 5. 6009WSMJ-MWH Sewer FAR (2).Ddf (CFW Internal) 6. 6009WSMJ-MWH Water FAR.pdf (CFW Internal) 7. Accounting info.doc (CFW Internal) 8. PE45 538040-0609020.doc (CFW Internal) 9. PE45-538040 0709020.doc (CFW Internal) $126.051.00 $50.742.00 $25.382.00 $50.764.00 $8,461.00 $30.444.00 $9.871.00 $19.742.00 $3.290.00 $11.839.00