Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 42060-A1
AMENDMENT No. 1 TO CITY SECRETARY CONTRACT WHEREAS, the City DPW, Inc., (ENGINEER) Contract No. 42060, (the 24967 ©n the 14th day of and '{: l iu Ufv f `fir n of Fort Worth (CITY) and Bury+Partners p made and entered into City Secretary CONTRACT) which was authorized by M&C C3 June, 2011 in the amount of $115,089.00; WHER AAS , the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 78; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. DQW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1e Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 10, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 2 4 , 9 6 0. 0 0 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $140,049.00. 3 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICYAP3 RECORD CITY SECRETARY FT. WORTH, TX Page -1 EXEC WED and EFFECTIsn signer for., balot-y. APPROVED: City of Fort WO th Fernandes Cos4;;La, ta Assistant City Manager DATE: J94041e, APPR9VAL REC S. Frank D$�'ectc3r, Crumb, P.E. Water Department APPROVED TO FORM Ann LEGALITY: Douglas W. AssistantBlack k c3� City Attorney ATTEST: /r Mary J. er City Secretary ry as of ci3c,-, ash pcifb z1 ),) rOs••44 etoloottowark4 ' c 8o PA10° Promo 04' o. ao Y jxj o X4 o0000- st 43) reXNS'e Page es the date last written by a ENGINEER Bn +Partners-DF'Pi e/04 Len � �N U /� anus: P.E. Senior Vice President DATE: M&C. a j) /14 /i ? Date: N/A N/A a OFFICU RECORD CITY SECRET/VW • Aiury+Par tners Via Hand Delivery July 10, 2012 CSF R0105265-30001#1 Roberto C. Sauceda Project Manager Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Proposal for Additional Engineering and Surveying Services Fort Worth Sanitary Sewer Rehabilitation Contract No. 78 BPI PROJECT # R0105265-30001 Dear Mr. Sauceda, Bury + Partners-DFW, Inc. requests your consideration for additional services provided for this project to date: Change to Contract Amount Based on Services not Included in Original Scope: A breakdown of engineering and surveying costs incurred is listed below: • Preliminary tasks prior to the Notice to Proceed o Preliminary line exhibits prepared as requested by Susan Schwinger o Two meetings with Susan Schwinger to address design concerns o Additional Fee: $6,800 • L07296 & L07297 - Country Club area - around tennis courts BURY+PARTNERS 5310 Harvest Hill Road, Suite 100 Dallas, TX 75230 TEL (972) 991-001 1 FAX (972) 991-0278 www.burypartners.com Austin 0 Dallas ® Houston a San Antonio ® Temple, Texas TBPE No. F-1048 Bury Par o Changed to CIPP from the original design crossing under the tennis courts ■ Full plans were complete for the design crossing under the tennis courts o Additional topographic survey was performed for the original design reroute near the driving range o Additional Fee: $1,960 survey & $4,240 engineering = $6,200 • L07297 thru L07300 - `Horseshoe' Area o Due to input from field meeting with property owners the design was changed to CIPP per City request o Additional field meeting on 2-8-12 for golf course and landowners at L07300 o Additional Fee: $5,520 • Change line L07298 to pipe burst rather than cure in place o Additional Fee: $640 • Change alignment for L02259 o Additional Fee: $1, 960 survey & $1,280 engineering = $3,240 • Temporary Right -of -Entry Exhibits o Additional Fee: $2,560 Additional Fee Requested: $24,960.00 The original contract amount was $115,089.00, and Amendment No. 1 is for $24,960.00. The revised contract amount is $140,049.00. PTury Partners These services will be performed as additional services in accordance with the terms and conditions of the Professional Services Agreement for this project. If the proposal is acceptable please sign in the space provided. Sincerely, Len McManus, P.E. Director of Public Works / Senior Vice President LM/sn Agreed and Accepted: Fort Worth Water Department Signature: (Authorized Representative) Printed Name: Title: Date: