HomeMy WebLinkAboutContract 42055COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § City Secretary Contract No. q')-0 WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Eagle-SWS, Inc. Authorized Signatory: Robert Coston Title: Chief Financial Officer/Secretary Project Name: Eagle SWS Environmental Sewer Improvement Project Location: Quails Nest Drive & Heritage Trace Parkway Additional Streets: N/A Plat Case No.: N/A Plat Name: N/A Mapsco: 20Z To be completed bt staff* Received by: ( CFA: 2011-022 DOE: 6661 • Council District: 7 City Project No: 01720 Date: � I 70 I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facihties ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement (`CFA ) as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) , Sewer (A-1) X , Paving (B) , Storm Drain (B-1) _, Street Lights & Signs (C) E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such zniuries, death or damages are caused. in whole or in Hart, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or danaazes are caused. in whole or in part, by the allezed negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name. Eagle SWS Environmental Sewer Improvement CFA No.: 2011-022 DOE No.: 6661 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1, Water Construction $ 2. Sewer Construction $ 47,295.50 Water and Sewer Construction Total $ 47,295.50 B. TPW Construction 1. Street $ 2. Storm Drain $ TPW Construction Cost Sub -Total $ Total Construction Cost (excluding the fees): $ 47,295.50 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 945.91 D. Water/Sewer Material Testing Fee (2%) $ 945.91 Sub -Total for Water Construction Fees $ 1,891,82 E. TPW Inspection Fee (4%) $ F. TPW Material Testing (2%) $ G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ - Sub -Total for TPW Construction Fees $ - Total Construction Fees: $ 1,891.82 Choice Financial Guarantee Options, choose one Amount (ck one) (Bond = 100% $ 47,295.50 !Completion Agreement = 100%/ Holds Plat $ 47,295,50 'Cash Escrow Water/Sanitary Sewer=125% $ 59,119.38 X !Cash Escrow Paving/Storm Drain r= 125% $ - 'Letter of Credit = 125% w/2vr expiration period $ 59,119.38 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said D veloper has d--6) executed this instrument in quadruplicate, at Fort Worth, Texas this day of , 20 1,,c CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Douglas W. Wiersig, P.E. Transportation & Public Works Department Development Engineering Manager Director Approved as to Form & Legality: 1 i,et‘ei I cei7 "ai'cia Wise zgi Sr. Assistant City Attorney tht Hendrix City Secretary ATTEST Signa (Print) Name: B ran J. Cross 009 0 11 74 oaoo.gtv * j� 44 Approved by City Manager's Office is7frrsars.4 Fernando Costa Assistant City Manager a 0� ° VP 0 o0pi a • e 0 A 0 IS Pi o o ri = 0 0 k*), 0 0000 Y 00 41zik;,A�1rte • Eagle-SWS, Inc. Signature Print Name: Robert Coston Title: Chief Financial Officer/Secretary OFFICIAL RECORD CITY SECRETARY FT, WORTH, TX 4- :x NO Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate NI II n (Remainder of Page Intentionally Left Blank) 9 -U L HARMON %o tn PROJECT LOCATION Z 0 QUAIESNEST-- Q \PRAIRIE VIE4/ ! ROAD LOCATION MAP 'EAGLE SWS" WELCH ENGINEERING, INC. CONSUL TING ENGINEERS (# F-1859) N.T.S. D.O.E. NO: 6661 FILE NO: X-21512 SANITARY SEWER NO: P275-707130172083 CITY PROJECT NO: 01720 1 { s SCALE: 1"=200' PUBLIC SEWER ESM'T 100% DEVELOPER'S COST 8" SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES EXHIBIT "A-1" "EAGLE SWS" WELCH ENGINEERING, INC. CONSUL T/NG ENG/VEERS (j/ F-1859) • D.O.E. NO: 6661 FILE NO: X-21512 SANITARY SEWER NO: P275-707130172083 CITY PROJECT NO: 01720 • 1r • • PART B - PROPOSAL (This proposal must not be removed from this book of Contract Documents.) TO: EAGLE SWS 9204 Hwy 287 NW Fort Worth, Texas 76131 FROM: (Address) FOR EAGLE SWS Sewer Project No. P275-707130172083 DOE: 6661 File: N/A X-21512 City Project: 01720 Pursuant to the foregoing "Notice to Bidders," the undersigned Bidder, having thoroughly examined the plans, specifications, and the site, understands the amount of work to be done and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete the work as provided in the Plans and Specifications, and subject to the inspection and approval of the Director, Water Department of the City of Fort Worth Contractor must be pre -qualified in accordance with the Water Departments requirements. Upon acceptance of this proposal, the bidder is bound to execute a contract and furnish Performance and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums to -wit: For all bid items contractor must complete the following "City Approved Method and Product" foinni on back of this proposal. Proposal B-1 EAGLE SWS Sewer Project No. P275-707130172083 DOE: 6661, File: N/A X-21512, City Project 01720 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 1. BID 00350 533 LF 'Pipe — Sewer — 8 Inch — SDR26 (All Depths) — Install Fifty -Six Dollars No Cents 2. BID 00841 20 LF *Pipe — Sewer — 8 Inch — SDR26 w/2-Sack concrete (All Depths) ' Install, per linear foot 3. BID 00213 4. BID 00214 Eighty -Eight Dollars No Cents 3 EA Manhole - Std 4' Diam. - (to 6' Depth) — Install, per each Twenty -Eight Hundred No Dollars Cents 5 VF Manhole - Std 4' Diam. - Added Depth (Over 6' Depth) — Install, per vertical foot Two Hundred Dollars No Cents 5. BID 00217 3 EA Manhole- Vacuum Test ' Install, per each 6. BID 00335 One Hundred Fifty No Dollars Cents 1 EA *Pipe — Sewer — 8 Inch — SDR26 (All Depths) —' Install, Plug Six Hundred Dollars No Cents UNIT AMOUNT PRICE BID $56.00 $29,848.00 $88.00 $1,760.00 $2,800.00 $8,400.00 $200.00 $1,000.00 $150.00 $450.00 $600.00 $600.00 Proposal B-2 PAY BID APPROX. ITEM ITEM NO. QUANTITY Furnish and Install complete in place, 7. BID 00201 EAGLE SWS Sewer Project No. P275-707130172083 DOE: 6661, File: N/A X-21512, City Project 01720 DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS including all appurtenant work, the following items: 517 LF Inspection - Post Construction Cleaning & TV i• Study, per linear foot 8. BID 00202 3 EA 9. BID 00372 One No Dollars Cents Manhole — Air & Mandrel Test — Services, per each One Fifty Dollars Cents 517 LF Trench Safety System (5' Depth) and greater Install, per linear foot 10. BID 00837 2 CY 11. BID 00839 2 CY 12. BID 00326 2 CY One Dollars No Cents Concrete -Type B — Install, per cubic yard One Hundred Twenty No Dollars Cents Concrete -Type E — Install, per cubic yard One Hundred No Dollars Cents Crushed Limestone — Install, per cubic yard Thirty -Five No Dollars Cents UNIT PRICE $1.00 $1.50 $1.50 $120.00 $100.00 $35.00 AMOUNT BID $517.00 $ 775.50 $ 517.00 $ 240.00 $200.00 $70.00 Proposal B-3 PAY ITEM BID ITEM NO. APPROX. QUANTITY Furnish and Install complete in place, 13. BID 00840 2 CY 14. BID 00442 15. BID 00068 EAGLE SWS Sewer Project No. P275-707130172083 DOE• 6661, File: N/A X-21512, City Project 01720 DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS including all appurtenant work, the following items: Ballast Stone — Install, per cubic yard Fifty -Five No Dollars Cents 14 SY Pavement — 3" Gravel Drive with minimum'/4" Diameter rock Install, per square yard Twenty -Two No Dollars Cents 500 LF Erosion Control (Silt Fence) ' Install, per linear foot 16. BID 00100 1 LS Total Amount Two No Dollars Cents Storm Water Pollution Prevention Maintenance - Service- linear sum Fifteen Hundred No Dollars Cents $ 47,295.50 UNIT PRICE $55.00 $22.00 $2.00 $1,500.00 AMOUNT BID $110.00 $308.00 $1,000.00 $1,500.00 Proposal B-4 BUSINESS ORGANIZATIONS INQi"RY - VIEW ENTITY • Page 1 of 1 TEXASECRETARY of STATE HOPE ANDRADE UCC I Business Organizations I Trademarks Notary Account I Help/Fees Briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY Filing Number: Original Date of Filing: Formation Date: Tax ID: Name: Address: Fictitious Name: Jurisdiction: Foreign Formation Date: REGISTERED AGENT Last Update November 8, 2010 November 8, 2010 November 8, 2010 801193483 Entity Type: Foreign For -Profit Corporation November 12, 2009 Entity Status: In existence N/A 1263 6045 812 FEIN: Progressive Environmental Services, Inc. 2211 Saint Andrews Blvd. Panama City, FL 32405 USA Eagle-SWS, Inc. DE, USA October 22, 2008 FILING HISTORY Name J ROBERT COSTON HARRY MARSH Order I I Return to Search NAMES Title P ASSUMED MANAGEMENT NAMES CHIEF EXECUTIVE OFFICER VICE PRESIDENT Address 2211 ST ANDREWS PANAMA CITY, FL 2211 ST ANDREWS PANAMA CITY, FL 2211 ST ANDREWS PANAMA CITY, FL Instructions: To place an order for additional information about a filing press the 'Order' button. ASSOCIATED ENTITIES BLVD 32405 USA BLVD 32405 USA BLVD 32405 USA 1 https://direct.sos.state.tx.us/corp inquiry/corp_inquiry-entity.asp?spage=mgmt&: Spagefrom=& : S filing_nu... 05/13/2011 Page 1 of 1 Chakrathouk, Manivanh From: Knight, Jana Sent: Thursday, July 28, 2011 8:59 AM To: Chakrathouk, Manivanh Subject: RE: Contract: Eagle SWS, Inc Hi Monni, This contract is only for sewer improvements. Doug Wiersig is not required to sign it. I should have marked N/A in his signature block. Thanks, Jana Knig}-t City of Fort Worth ( Community Facilities Administration 1000 Throckmorton Street ( Fort Worth, TX 76102 Phone: (817)392-2025 ( E-mail: Lana.knight@fortvvorthgov.org From: Chakrathouk, Manivanh Sent: Thursday, July 28, 2011 8:48 AM To: Knight, Jana Subject Contract: Eagle SWS, Inc Hi Jana, This contract is missing Douglas W. Wiersig P.E. signature so please stop by the City Secretary's Office and pick this contract to obtain his signature. Thank you, note e‘etebtatha Administrative Technician City Secretary Office 11000 Throckmorton St. I Ft Worth, TX. 76102 0: 817-392-6090 E:\4anivanh.Chakrathouk(Wfortworthgov.org 7/28/2011