Loading...
HomeMy WebLinkAboutContract 43923-A1AMENDMENT No 0 TO CITY SECRETARY CONTRACT AM. CONTRA tWo i WHEREAS, the City of Fort Worth (CITY) and Parsons Water & Infrastructure, Inc., (ENGINEER) made and entered into City Secretary Contract No. 43923, (the CONTRACT) which was authorized by MC CeJ25877 on the 25th day of September, 2012 in the amount of $ 3 91, 4 5 3. 0 0; and WHEREAS, the CONTRACT involves engineering services for the following project: Little Fossil Creek Interceptor Improvements at Various .Locations; and WHEREAS, it has become necessary to execute Amendment No.1 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRAC T : 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 8, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $206,797.00. 2 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer f o r (All work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $598 , 250 .00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. RECL1VED JUt4 on 3 21fl3 f eie'r.-' CDI.,Cr OFFICIAL RECORfr CITY SECRETARY F7 WUR'a TX P1XECUTBD and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: r S. Frank Crumb, Pspa Director, Water Department APPROVED AS TO FORM AND LEGALITY: fl1A1/I/L# 14) HA- I( vtf1 Douglas Wrialacke KyYte A elle rniks,,c Assistant City Attorney ATT:hST 4, Mary J. K City Secr *1.7itrAS Page -2 ENGINEER Parsons Water & Infrastructure, Inc; David Vice Irvine DATE: " iSTO 1:80 47 Ase "Pe O \%Tei t) 2) 41/613 4( SI I B M&C: C1=26229 Date: May 7, 2013 ooaoteAr �! eavi. ear- Pt - OFFICIAL RECORD CITY SECRETARY GT. WORTN, T7( 1301 West PGB Highway, Suite 3504 Richardson, Texas 75080 • (972) 244-6000 • Fax: (972) 244,6077 • www.parsons.com February 8, 2013 Mr. Robert Sauceda City of Port Worth Water Department 311 West loth street Fort Worth, TX 76102 Subject Little Fossil Creek Interceptor Rehabilitation Project, Contract No. 43923, Amendment 1 for Additional Services Dear Mr. Sauceda: Parsons offers additional Professional Engineering Services for the above referenced project. The additional services entail design of 6,738 linear feet (LE) of sanitary sewer replacement or rehabilitation. This Engineering Services Contract Amendment includes a detailed scope of additional services attached to this letter. Parsons proposes to provide the attached scope of services for the lump sum fee of $206 797.00. Attachment B with the fee breakdown is also attached. All additional services proposed will be performed in accordance with the original contract dated November 28, 2012. Summary of Contract Fee for Contract No. 43923 Original Contract Amount Proposed Amendment No. 1 Revised Contract Amount $391,453.00 $206.797.00 $598,250.00 If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of the terms of this document. If you have any questions, please call me at 972-244-6043. Sincerely, Stephanie Bache, P.E. Project Manager Parsons Water & Infrastructure P Task No. Task Description Rate 1.0 Project Management 1.1 Communications and Reporting 1.1.1 Pre -Design Coordination Meeting 1.1.2 Design Submittal Review Meetings 1.1.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.1.5 Schedule 1.1.6 Prepare Monthly MWBE Reports 1.2 QA/QC 2.0 Conceptual Design (30-Percent) 2.1 Data Collection Identify Rehabilitation and Replacement 2.2 Options 2.3 Conceptual Design Report 2.4 Construction Estimate 3.0 Preliminary Design (60 Percent) 3.1 Preliminary Design Package 3.1.1 Cover Sheet 3.1.2 Project Control Sheet 3.1.3 Overall Project Easement Layout Sheet 3.1.4 Overall Layout sheet 3.1.5 Plan and Profile Sheets (9 sheets) 3.1.6 Abondonment Sheet 3.1.8 Notes and Detail Sheets (1 number) 3.2 Geotechnicallnvestigation 3.3 Constructability Review 3.4 Utility Clearance 3.5 Traffic Control Plan (1 sheet) 3.6 SWPPP 3.7 Cost Estimate 3.8 Attend one public meeting 4.0 Final Design Final Draft (90%) Construction Plans and 4.1 Specifications 4.2 Final (100%) Plans and Specifications City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 5.15.2012 Parsons Level of Effort Estimate Little Fossil Creek June 2012 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Little Fossil Creek Interceptor Rehabilitation Amendment No. 1 City Project No. 01960 Labor (hours) Technical Project Project CADD/GIS Project Total Labor Subconsultant Advisor Manager Engineer Controls Cost $246.89 $159.24 $79.86 $110.50 $112.54 20 0 0 0 0 0 0 0 20 0 0 0 0 0 0 0 6 56 68 40 4 8 2 16 20 20 2 16 40 20 2 20 17 63 112 136 2 2 2 2 2 2 4 4 40 60 100 1 2 8 1 2 8 8 1 2 2 4 2 1 4 12 10 4 20 8 6 36 48 56 24 40 40 4 8 16 Expense MWBE Non-MWBE $4,938 $640 $0 $0 $0 $0 $0 $640 0 $0 $4,938 0 $20,249 $6,115 $0 $1,276 $650 $6,849 $2,295 $8,446 $3,170 $3,679 0 $38,202 $26,855 $0 $0 $221 $381 $381 $602 $23,199 $13,225 $1,449 $2,088 $565 $12,510 $1,290 $479 $2,063 $2,234 $3,249 $1,120 $0 0 $17,235 $8,990 $0 $11,930 $4,535 $3,538 $3,085 Total Expense Task Sub Total Travel Reproduction Cost $0 $0 $0 $200 $640 $0 $0 $0 $640 $0 $6,315 $650 $2,295 $3,170 $0 $0 $400 $27,255 $0 $0 $0 $0 $0 $13,225 $0 $0 $12,510 $0 $0 $0 $0 $1,120 $0 $0 $600 $9,590 $4,535 $3,085 $5,578 $0 $0 $0 $640 $0 $26,564 $1,926 $9,144 $11,616 $3,679 $65,457 $0 $221 $381 $381 $602 $36,424 $1,449 $2,088 $13,075 $1,290 $479 $2,063 $2,234 $4,369 $0 $26,825 $16,465 $6,623 Parsons Level of Effort Estimate Little Fossil Creek June 2012 4.3 Construction Estimates (90% and 100%) 2 8 $1,768 $1,370 $1,370 $3,138 5.0 Meter Design (1 Meter Station) 4 22 32 44 0 $11,908 $0 $0 $0 $600 $600 $12,508 5.1 Conceptual Design (30%) and Cost Estimate 1 8 16 4 $3,241 $50 $3,241 5.2 Preliminary Design (60%) and Cost Estimate 1 8 8 16 $3,928 $50 $3,928 Final Draft (90%) Construction Plans and 5.3 Specifications and Cost Estimate 1 4 8 16 $3,291 $50 $3,291 Final (100%) Plans and Specifications and 5.4 Cost Estimate 1 2 0 8 $1,449 $50 $1,449 6.0 Bid Phase 3 16 24 22 0 $7,636 $1,890 $0 $0 $0 $1,890 $9,526 6.1 Bid Support $0 6.2.2 Upload Documents to Buzzsaw 2 $160 $0 $160 Sell Contract Documents and Maintain Plan 6.1.2 Holders List 2 2 $478 $0 $478 6.1.3 Attend Pre -Bid Meeting 2 $318 6.1.4 Issue Addenda 1 2 8 6 $1,867 $890 $890 $2,757 6.1.5 Attend Bid Opening. 2 $318 $0 $318 6.1.6 Tabulate Bids and Recommend Award 4 4 $956 $0 $956 6.2 Conformed Drawings 2 4 8 16 $2,538 $1,000 $200 $200 7.0 Construction Phase Services 6 59 79 56 0 $23,373 $1,750 $0 $0 $200 $1,950 $25,323 7.1 Construction Support 7.1.1 Attend Preconstruction Conference 3 3 $717 $0 $717 Attend Public Meeting and Prepare 7.1.2 Handouts 4 8 16 $3,044 $0 $3,044 7.1.3 Attend Site Visits 2 8 20 $3,365 $0 $3,365 7.1.4 Respond to RFI's 2 16 16 $4,319 $0 $4,319 7.1.5 Respond to Submittals 2 16 16 $4,319 7.2 Attend Final Walk 4 4 $956 $0 $0 $ $956 $956 7.3 Record Drawings/As Built 8 12 40 $6,652 $1,750 $1,750 $8,402 8.0 ROW/Easement Services 0 2 0 0 0 $318 $400 $0 $0 $0 $400 $718 8.1 Right -of -Entry / Easement Documents 2 $318 $400 $400 $718 9.0 Survey 0 2 2 4 0 $920 $33,690 $0 $0 $0 $33,690 $34,610 9.1 Design Survey 2 2 4 $920 $33,690 $920 10.0 Permitting 0 8 40 6 0 $5,131 $0 $0 $0 $200 $200 $5,331 10.1 TxDOT 8 40 6 $5,131 $0 $5,131 10.2 Railroad 0 0 0 $0 $0 $0 Totals 62 264 405 364 0 $129,912 $80,330 $0 $0 $2,200 $82,530 $212,442 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 5.15.2012 I Water Line Footage I Sewer Line Footage (A) (B) (C) Description Conceptual Design (30%) Preliminary Design (60%) Final Design (10%) Survey Special Services Subtotal Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 5.15.2012 Total Fee Survey Fee Total Fee (-) survey Fee Water Fee (0% of C) $0.00 WP 31 32 33 51 Water $0.00 $0.00 $0.00 $0.00 6,738 6,738 Parsons Level of Effort Estimate Little Fossil Creek June 2012 100% 0% 100% $220,475 -$33,690 $186,785 Sewer Fee (100% of C) $186,785.00 Sewer I $56,036.00 I $112,071.00 I $18,679.00 $33,690.00 $0.00 $220,476.00 $220,476.0 ) Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10% Sub Markup MWBE Participation Total Project Cost 1,095 $129,912 $82,530 $80,330 $0 $8,033 36.4% $220,475.00 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/7/2013 - Ordinance No. 20732-05-2013 F.-rMil. DATE: Tuesday, May 07, 2013 LOG NAME: 6OLFM292VARA1-PARSONS S UBJECT: REFERENCE NO.: **C-26229 Authorize Execution of Amendment No. 1 in the Amount of $206,797.00 to City Secretary Contract No. 43923 with Parsons Water & Infrastructure, Inc., for Little Fossil Creek Interceptor Improvements at Various Locations Within the Little Fossil Creek Drainage Basin for a Revised Contract in the Amount of $598,250.00, Provide for Project Management, Real Property Acquisition and Utility Coordination Costs for a Project Total in the Amount of $618,250.00 and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 2 and 4) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer in the amount of $206,797.00 from the Water and Sewer Operating Fund to the S ewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of $206,797.00; and 3. Authorize the execution of Amendment No. 1 to City Secretary Contract No. 43923 with Parsons Water & Infrastructure, Inc., in the amount of $206,797.00 for sewer main design as part of the Little Fossil Creek Interceptor Improvements at various locations within the Little Fossil Creek drainage basin DISCUSSION: On September 25 2012, (M&C C-25877) the City Council authorized an Engineering Agreement with Parsons Water & Infrastructure, Inc., in the amount of $391,453.00 for Little Fossil Creek Interceptor Improvements at various locations within the Little Fossil Creek Drainage Basin. The original design provided for the replacement of the severely deteriorated portions of the City s sanitary sewer Main 292 located at various points along Little Fossil Creek. As design has proceeded, Staff has determined that additional sanitary sewer mains located immediately downstream of two original project locations are undersized, severely deteriorated and in need of replacement. Parsons Water & Infrastructure, Inc., proposes to perform the additional design work for a lump sum fee of $206,797 00 for a Revised Contract in the amount of $598 250.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. M/WBE Office: Parsons Water & Infrastructure, Inc., is in compliance with the City's M/WBE Ordinance by committing to 32 percent M/WBE participation on this Amendment No. 1 The City's M/WBE goal on this Amendment is 20 percent. Logname: 6OLFM292VARA1-PARSONS Page 1 of 2 In addition to the contract amount, $20,000.00 is required for project management, real property acquisition and utility coordination. The project is located in COUNCIL DISTRICTS 2 and 4. FISCAL INFORMATION / CERTIFICATION. The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers 1&2)P258 476045 7011701960ZZ 2)P258 511010 701170196030 2)P258 531200 701170196031 2)P258 531200 701170196032 2)P258 531200 701170196033 2)P258 531200 701170196051 2)P258 531350 701170196042 2)P258 531350 701170196073 FROM Fund/Account/Centers $226.797.00 1) PE45 538040 0709020 $15,000.00 3) P258 531200 701170196031 $51.932.00 3) P258 531200 701170196032 $103,864.00 3) P258 531200 701170196033 $17.311.00 3)P258 531200 701170196051 $33.690.00 $2, 500.00 $2.500.00 CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: Fernando Costa (6122) S. Frank Crumb (8207) Roberto Sauceda (2387) ATTACHMENTS 1. 6OLFM292VARA1-PARSONS COMPLIANCE.ndf (CFW Internal) 2. 6OLFM292VARA1 -PARSONS FAR pdf (CFW Internal) 3. 6OLFM292VARA1-PARSONS MAP.pdf (Public) 4. 6OLFM292VARA1 PARSONS A013.doc (Public) 5. PE45-538040 0709020.docx (CFW Internal) $226.797.00 $51.932.00 $103.864.00 $17.311.00 $33.690.00 Logname: 6OLFM292VARAl-PARSONS Page 2 of 2