WHEREAS, the City of Fort Worth (CITY) and Parsons
Water & Infrastructure, Inc., (ENGINEER) made and entered into
City Secretary Contract No. 43923, (the CONTRACT) which was
authorized by MC CeJ25877 on the 25th day of September, 2012
in the amount of $ 3 91, 4 5 3. 0 0; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Little Fossil Creek Interceptor Improvements at Various
.Locations; and
WHEREAS, it has become necessary to execute Amendment
No.1 to the CONTRACT to include an increased scope of work and
revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRAC T :
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
February 8, 2013, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals
$206,797.00.
2
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer f o r (All work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $598 , 250 .00 .
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
RECL1VED JUt4 on 3 21fl3
f eie'r.-'
CDI.,Cr
OFFICIAL RECORfr
CITY SECRETARY
F7 WUR'a TX
P1XECUTBD and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE:
r
S. Frank Crumb, Pspa
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
fl1A1/I/L# 14) HA- I( vtf1
Douglas Wrialacke KyYte A elle rniks,,c
Assistant City Attorney
ATT:hST
4,
Mary J. K
City Secr
*1.7itrAS
Page -2
ENGINEER
Parsons Water & Infrastructure, Inc;
David
Vice
Irvine
DATE:
"
iSTO 1:80
47 Ase "Pe
O
\%Tei t) 2)
41/613 4(
SI I B
M&C: C1=26229
Date: May 7, 2013
ooaoteAr
�!
eavi.
ear-
Pt -
OFFICIAL RECORD
CITY SECRETARY
GT. WORTN, T7(
1301 West PGB Highway, Suite 3504 Richardson, Texas 75080 • (972) 244-6000 • Fax: (972) 244,6077 • www.parsons.com
February 8, 2013
Mr. Robert Sauceda
City of Port Worth Water Department
311 West loth street
Fort Worth, TX 76102
Subject Little Fossil Creek Interceptor Rehabilitation Project, Contract No. 43923,
Amendment 1 for Additional Services
Dear Mr. Sauceda:
Parsons offers additional Professional Engineering Services for the above referenced project.
The additional services entail design of 6,738 linear feet (LE) of sanitary sewer replacement or
rehabilitation. This Engineering Services Contract Amendment includes a detailed scope of
additional services attached to this letter. Parsons proposes to provide the attached scope of
services for the lump sum fee of $206 797.00. Attachment B with the fee breakdown is also
attached. All additional services proposed will be performed in accordance with the original
contract dated November 28, 2012.
Summary of Contract Fee for Contract No. 43923
Original Contract Amount
Proposed Amendment No. 1
Revised Contract Amount
$391,453.00
$206.797.00
$598,250.00
If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of
the terms of this document. If you have any questions, please call me at 972-244-6043.
Sincerely,
Stephanie Bache, P.E.
Project Manager
Parsons Water & Infrastructure
P
Task No.
Task Description
Rate
1.0 Project Management
1.1 Communications and Reporting
1.1.1 Pre -Design Coordination Meeting
1.1.2 Design Submittal Review Meetings
1.1.4 Prepare Baseline Schedule
Prepare Monthly Progress Reports with
1.1.5 Schedule
1.1.6 Prepare Monthly MWBE Reports
1.2 QA/QC
2.0 Conceptual Design (30-Percent)
2.1 Data Collection
Identify Rehabilitation and Replacement
2.2 Options
2.3 Conceptual Design Report
2.4 Construction Estimate
3.0 Preliminary Design (60 Percent)
3.1 Preliminary Design Package
3.1.1 Cover Sheet
3.1.2 Project Control Sheet
3.1.3 Overall Project Easement Layout Sheet
3.1.4 Overall Layout sheet
3.1.5 Plan and Profile Sheets (9 sheets)
3.1.6 Abondonment Sheet
3.1.8 Notes and Detail Sheets (1 number)
3.2 Geotechnicallnvestigation
3.3 Constructability Review
3.4 Utility Clearance
3.5 Traffic Control Plan (1 sheet)
3.6 SWPPP
3.7 Cost Estimate
3.8 Attend one public meeting
4.0 Final Design
Final Draft (90%) Construction Plans and
4.1 Specifications
4.2 Final (100%) Plans and Specifications
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWTR Official Release Date: 5.15.2012
Parsons Level of Effort Estimate
Little Fossil Creek
June 2012
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Little Fossil Creek Interceptor Rehabilitation Amendment No. 1
City Project No. 01960
Labor (hours)
Technical Project Project CADD/GIS Project Total Labor Subconsultant
Advisor Manager Engineer Controls Cost
$246.89 $159.24 $79.86 $110.50 $112.54
20 0 0 0 0
0
0
0
20
0
0
0
0
0
0
0
6 56 68 40
4 8
2 16 20 20
2 16 40 20
2 20
17 63 112 136
2
2 2
2 2
2 4
4 40 60 100
1 2 8
1 2 8 8
1 2
2 4 2
1 4
12 10
4 20
8
6 36 48 56
24 40 40
4 8 16
Expense
MWBE Non-MWBE
$4,938 $640 $0
$0
$0
$0
$0 $640
0 $0
$4,938
0 $20,249 $6,115 $0
$1,276 $650
$6,849 $2,295
$8,446 $3,170
$3,679
0 $38,202 $26,855 $0
$0
$221
$381
$381
$602
$23,199 $13,225
$1,449
$2,088
$565 $12,510
$1,290
$479
$2,063
$2,234
$3,249 $1,120
$0
0 $17,235 $8,990 $0
$11,930 $4,535
$3,538 $3,085
Total Expense Task Sub Total
Travel Reproduction Cost
$0
$0
$0
$200
$640
$0
$0
$0
$640
$0
$6,315
$650
$2,295
$3,170
$0
$0 $400 $27,255
$0
$0
$0
$0
$0
$13,225
$0
$0
$12,510
$0
$0
$0
$0
$1,120
$0
$0 $600 $9,590
$4,535
$3,085
$5,578
$0
$0
$0
$640
$0
$26,564
$1,926
$9,144
$11,616
$3,679
$65,457
$0
$221
$381
$381
$602
$36,424
$1,449
$2,088
$13,075
$1,290
$479
$2,063
$2,234
$4,369
$0
$26,825
$16,465
$6,623
Parsons Level of Effort Estimate
Little Fossil Creek
June 2012
4.3 Construction Estimates (90% and 100%) 2 8 $1,768 $1,370 $1,370 $3,138
5.0 Meter Design (1 Meter Station) 4 22 32 44 0 $11,908 $0 $0 $0 $600 $600 $12,508
5.1 Conceptual Design (30%) and Cost Estimate 1 8 16 4 $3,241 $50 $3,241
5.2 Preliminary Design (60%) and Cost Estimate 1 8 8 16 $3,928 $50 $3,928
Final Draft (90%) Construction Plans and
5.3 Specifications and Cost Estimate 1 4 8 16 $3,291 $50 $3,291
Final (100%) Plans and Specifications and
5.4 Cost Estimate 1 2 0 8 $1,449 $50 $1,449
6.0 Bid Phase 3 16 24 22 0 $7,636 $1,890 $0 $0 $0 $1,890 $9,526
6.1 Bid Support $0
6.2.2 Upload Documents to Buzzsaw 2 $160 $0 $160
Sell Contract Documents and Maintain Plan
6.1.2 Holders List 2 2 $478 $0 $478
6.1.3 Attend Pre -Bid Meeting 2 $318
6.1.4 Issue Addenda 1 2 8 6 $1,867 $890 $890 $2,757
6.1.5 Attend Bid Opening. 2 $318 $0 $318
6.1.6 Tabulate Bids and Recommend Award 4 4 $956 $0 $956
6.2 Conformed Drawings 2 4 8 16 $2,538 $1,000 $200 $200
7.0 Construction Phase Services 6 59 79 56 0 $23,373 $1,750 $0 $0 $200 $1,950 $25,323
7.1 Construction Support
7.1.1 Attend Preconstruction Conference 3 3 $717 $0 $717
Attend Public Meeting and Prepare
7.1.2 Handouts 4 8 16 $3,044 $0 $3,044
7.1.3 Attend Site Visits 2 8 20 $3,365 $0 $3,365
7.1.4 Respond to RFI's 2 16 16 $4,319 $0 $4,319
7.1.5 Respond to Submittals 2 16 16 $4,319
7.2 Attend Final Walk 4 4 $956 $0 $0 $ $956
$956
7.3 Record Drawings/As Built 8 12 40 $6,652 $1,750 $1,750 $8,402
8.0 ROW/Easement Services 0 2 0 0 0 $318 $400 $0 $0 $0 $400 $718
8.1 Right -of -Entry / Easement Documents 2 $318 $400 $400 $718
9.0 Survey 0 2 2 4 0 $920 $33,690 $0 $0 $0 $33,690 $34,610
9.1 Design Survey 2 2 4 $920 $33,690 $920
10.0 Permitting 0 8 40 6 0 $5,131 $0 $0 $0 $200 $200 $5,331
10.1 TxDOT 8 40 6 $5,131 $0 $5,131
10.2 Railroad 0 0 0 $0 $0 $0
Totals 62 264 405 364 0 $129,912 $80,330 $0 $0 $2,200 $82,530 $212,442
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWTR Official Release Date: 5.15.2012
I Water Line Footage
I Sewer Line Footage
(A)
(B)
(C)
Description
Conceptual Design (30%)
Preliminary Design (60%)
Final Design (10%)
Survey
Special Services
Subtotal
Total
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWTR Official Release Date: 5.15.2012
Total Fee
Survey Fee
Total Fee (-) survey Fee
Water Fee (0% of C)
$0.00
WP
31
32
33
51
Water
$0.00
$0.00
$0.00
$0.00
6,738
6,738
Parsons Level of Effort Estimate
Little Fossil Creek
June 2012
100%
0%
100%
$220,475
-$33,690
$186,785
Sewer Fee (100% of C)
$186,785.00
Sewer I
$56,036.00 I
$112,071.00 I
$18,679.00
$33,690.00
$0.00 $220,476.00
$220,476.0 )
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
10% Sub Markup
MWBE Participation
Total Project Cost
1,095
$129,912
$82,530
$80,330
$0
$8,033
36.4%
$220,475.00
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 5/7/2013 - Ordinance No. 20732-05-2013
F.-rMil.
DATE: Tuesday, May 07, 2013
LOG NAME: 6OLFM292VARA1-PARSONS
S UBJECT:
REFERENCE NO.: **C-26229
Authorize Execution of Amendment No. 1 in the Amount of $206,797.00 to City Secretary Contract No.
43923 with Parsons Water & Infrastructure, Inc., for Little Fossil Creek Interceptor Improvements at Various
Locations Within the Little Fossil Creek Drainage Basin for a Revised Contract in the Amount of
$598,250.00, Provide for Project Management, Real Property Acquisition and Utility Coordination Costs for
a Project Total in the Amount of $618,250.00 and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 2
and 4)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer in the amount of $206,797.00 from the Water and Sewer Operating Fund to the
S ewer Capital Projects Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund in the amount of $206,797.00; and
3. Authorize the execution of Amendment No. 1 to City Secretary Contract No. 43923 with Parsons Water
& Infrastructure, Inc., in the amount of $206,797.00 for sewer main design as part of the Little Fossil Creek
Interceptor Improvements at various locations within the Little Fossil Creek drainage basin
DISCUSSION:
On September 25 2012, (M&C C-25877) the City Council authorized an Engineering Agreement with
Parsons Water & Infrastructure, Inc., in the amount of $391,453.00 for Little Fossil Creek Interceptor
Improvements at various locations within the Little Fossil Creek Drainage Basin.
The original design provided for the replacement of the severely deteriorated portions of the City s sanitary
sewer Main 292 located at various points along Little Fossil Creek. As design has proceeded, Staff has
determined that additional sanitary sewer mains located immediately downstream of two original project
locations are undersized, severely deteriorated and in need of replacement.
Parsons Water & Infrastructure, Inc., proposes to perform the additional design work for a lump sum fee of
$206,797 00 for a Revised Contract in the amount of $598 250.00. Staff considers this fee to be fair and
reasonable for the scope of services proposed.
M/WBE Office: Parsons Water & Infrastructure, Inc., is in compliance with the City's M/WBE Ordinance by
committing to 32 percent M/WBE participation on this Amendment No. 1 The City's M/WBE goal on this
Amendment is 20 percent.
Logname: 6OLFM292VARA1-PARSONS Page 1 of 2
In addition to the contract amount, $20,000.00 is required for project management, real property
acquisition and utility coordination.
The project is located in COUNCIL DISTRICTS 2 and 4.
FISCAL INFORMATION / CERTIFICATION.
The Financial Management Services Director certifies that upon approval of the above recommendations,
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Sewer Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers
1&2)P258 476045 7011701960ZZ
2)P258 511010 701170196030
2)P258 531200 701170196031
2)P258 531200 701170196032
2)P258 531200 701170196033
2)P258 531200 701170196051
2)P258 531350 701170196042
2)P258 531350 701170196073
FROM Fund/Account/Centers
$226.797.00 1) PE45 538040 0709020
$15,000.00 3) P258 531200 701170196031
$51.932.00 3) P258 531200 701170196032
$103,864.00 3) P258 531200 701170196033
$17.311.00 3)P258 531200 701170196051
$33.690.00
$2, 500.00
$2.500.00
CERTIFICATIONS:
Submitted for City Manager's Office bv:
Originating Department Head:
Additional Information Contact:
Fernando Costa (6122)
S. Frank Crumb (8207)
Roberto Sauceda (2387)
ATTACHMENTS
1. 6OLFM292VARA1-PARSONS COMPLIANCE.ndf (CFW Internal)
2. 6OLFM292VARA1 -PARSONS FAR pdf (CFW Internal)
3. 6OLFM292VARA1-PARSONS MAP.pdf (Public)
4. 6OLFM292VARA1 PARSONS A013.doc (Public)
5. PE45-538040 0709020.docx (CFW Internal)
$226.797.00
$51.932.00
$103.864.00
$17.311.00
$33.690.00
Logname: 6OLFM292VARAl-PARSONS Page 2 of 2