Loading...
HomeMy WebLinkAboutContract 43971COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. Li 59 el l WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: CT MGT VALLEY RIDGE, LLC Address, State, Zip Code: 1221 N I-35 E, Suite 200 1 Carrollton, TX 75006 Phone, E-Mail: (469) 892-7200 1 mehrdad@centurionamerican.com Authorized Signatory/Title: Mehrdad Moayedi, Member/Manager Project Name: Valley Ridge Phase 2 Project Location: 12550 Old Denton Rd. Plat Case No.: FP-012-010 Plat Name: Valley Ridge Phase 2 Mapsco: 22A CFA: 2012-072 To be complete • s y taff.• Received by: DOE: 6841 12 _12-1 2 P Council District: 2 City Project No: 01903 OFFICIAL RECORD CITY SECRETARY 1 NOW, '1'HLREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. 1'he following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) _X , Paving (B) X , Storm Drain (B-1) X_, Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond m the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perfommn the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, stoiin drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting 1'he submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a forte to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows. i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. 1'he City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. the City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name. Valley Ridge Phase 2 CFA No.: 2012-072 DOE No.: 6841 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 250,105.10 2. Sewer Construction $ 137,187.90 Water and Sewer Construction Total $ 387,293.00 B. TPW Construction 1. Street $ 747,493.65 2. Storm Drain $ 121,296.40 3. Street Lights Installed by Developer $ 42,000.00 TPW Construction Cost Total $ 910,790.05 Total Construction Cost (excluding the fees): $ 1,298,083.05 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 7,745.86 D. Water/Sewer Material Testing Fee (2%) $ 7,745.86 Sub -Total for Water Construction Fees $ 15,491.72 E TPW Inspection Fee (4%) $ 34,751.60 F. TPW Material Testing (2%) $ 17,375.80 G. Street Light inspsection Cost $ 1,680.00 H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 53,807.40 Total Construction Fees: $ 69,299.12 Financial Guarantee Options, choose one Amount 'Bond = 100% $ 1,298,083.05 'Completion Agreement = 100% / Holds Plat $ 1,298,083.05 'Cash Escrow Water/Sanitary Sewer= 125% $ 484,116.25 'Cash Escrow Paving/Storm Drain = 125% $ 1,138,487.56 'Letter of Credit = 125% w/2yr expiration period $ 1,622,603.81 Choice (ck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Dev per has execut this instrument in quadruplicate, at Fort Worth, Texas this ) day of : __ i 20 CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-B bulal, EMBA, P.E. Developme Engineering Manager Approved as to Form & Legality: Douglas. Black Assistant City Attorney M&C No. 1Li k- Date: ATTEST: Miry Kayie City Secreta ATTEST: Transportation & Public Works Department 13.1,J 4/ Douglas Wiersig, P.E. Directo Approved by City Manager's Office credegish Fernando Costa Assistant City Manager CTMGT Valley Ridge, LLC By: Centamtar Terras, LLC its Manager WILA a Llama/ i,Ltei 0 \ Signature Signature (Print) Name: 9 Print Name Title: Signature y Mavich OFFICIAL RECORD CITY SEC9tE'fARY �T, V�ARiH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Included v U rz z rs a a x Agreement Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Dram Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) KELLER , ILKS GOLDS IITRIANGE 20t2-1F2 B.CHMAKK: ®c® /m1® fl1 Clry Or !Mt r Wc)ur.HMlll:l'Mp0.r1V) U141 ON 1•35 NORTH 001;ND SCRVICCROAD.IR.MILC MAW. 2Z1142AM T11C4C(0:'DDRIOt;CST4TCiiIC,�IIM'iTini.IIOr WM1111 n S01,11 Or KCLLCR 114SLCTR04DO\nIC CAST NM CtiRO LI\C Or Ti1C \ORnIDOL'\V SCRVICC mug 1�IA R LET,S TIIC CCVTCR OrT IIY r(1110 I' 1�Lcr, Rcr ru;stl l� nlcrnr nrnnD r DumDnlcr+cc orcl;RD 00401 LL6VA'1'IDt; .7tlN.7NM1 MART 111,1111011 VICINITY MAP N.T.S. ENGINEERINGCONCEPTS & DESIGN, L.P. ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR, STE 200, WYLIE, TX 75098 972-941-8400 FAX 972-941-8401 WWW,ECDLP.COM VICINITY MAP VALLEY RIDGE, PHASE 2 CITY OF FORT WORTH, TEXAS 1 T.W. azicuo DA.W. MEN T-200' OGLE w :9 I CONNECT TO EX. 12' WATER FH • W 1 CONNECT EX. 12' WA 2012-11-27, 03100PM � 1f-27,1M2 M4 11119131021 CONNECT TO V /—EX. 8' WATER CA �---- SS ..3 BLKCHMARK: /I II— SS ..� (" 111' (>,• 1'S• , ) 1,Ia1 • (‘11 IJ13 L b � .1(111 >I1LC SOUTH or KCLLCR 11ASLCT ROAD.40ISO TIIor TIIC SECOND BRIDGE.. STATC111GIRCAY 170. SOUTH Or KCLLCR IIASLCTR04D0\THE CAST CURD LILAC OF TUC NORTH DOLNDSCRVICC ROAD INT1IC CENTER orAI•'LOW POI \T INLET. SET rL1:S11 1N TIIC TOP Or CURB 1' BEHIND THE r CCOfCURB LLLVA'1'ION - 708.7146 SS ..8 SS..3 8"f SS ..3 a .1- A FH • 3 FH /49/ • 1 • • • • • • • • • / / / / • • 1� n CONNECT TO EX. 8' WATER ENGINEERINI3GON EPTS & DESIGN, L.P. ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR. STE 200, WYLIE, TX 75098 972-941-8400 FAX: 972-941-8401 WWW.ECDLP.COM 1 , CONNECT TO EX. 8' WATER) a �FH 1• z ' N .•`• 1 1 r• 1 1 1 1 1 1 I I 1. 1 1• `' > O o 1 ...0 \ Q) v0 o • •• •11 • 1 1 • I 1 I t/ / • I !. • • �I • 1 .• .21 ,. • • T I • • • • 0' 1 r (1' • • r. • • It -� II 1 EXHIBIT A WATER IMPROVEMENTS VALLEY 3IDGE, PHASE 2 CITY OF FORT WORTH, TEXAS i NGIN[ERINDCUNCEPTS Client: Project Name: Project No.: Date: Centurian American Valley Ridge Estates - Phase 2 6401 15-Nov-12 Lots: 94 Acres: 38.1 Density: 2.47 Contractor Proposal for Construction ECD Item # On -Site Item Description 3.A.1.8 3.A.1.12 3.E.1.8 3.E.1.12 3 E 1.12.PR 3.F.1. 3.F.3. 3.F.4.4 3.G.1.la 3.G.2. ,3.G.3. 3.G.5. Water - PVC - Class 150 - 8" Water - PVC - Class 150 - 12" Water - Valves - Gate - 8" Water - Valves - Gate - 12" Water - Valves - Gate - 12" Pressure Reducing with Vault Water - Fittings - Cast Iron Fittings Water - Fittings - Fire Hydrant Assembly Water - Fittings - Misc. Valves - 2" Blow Off Valve Water - General - Services - 3/" with Meter Box Water - General - Pressure Test & Disinfection Water - General - Trench Safety (water) Water - General - Remove Plug & Connect to Existing Water & DESIGN, L.P. 201 Windco Circle, Suite Wylie, Texas 75098 (972) 941-8400 (972) 941-8401 Fax Quantity 4,229.00 LF 911.00 LF 15.00 EA 2.00 EA 1.00 EA 3.00 TON 6.00 EA 1.00 EA 94.00 EA 1.00 LS 5,140.00 LF 5.00 EA Water Total I Kart Construction Co. Unit Price $17.15 $34.25 $1,206.00 $2,184.00 $26,516.00 $2,538.00 $3,117.00 $1,935.00 $642.00 $3,339.00 $0.60 $476.00 Total Cost $72,527.35 $31,201.75 $18,090.00 $4,368.00 $26,516.00 $7,614.00 $18,702.00 $1,935.00 $60,348.00 $3,339.00 $3,084.00 $2,380.00 $250,105.10 2012-11-13 Cost Estimate -Phase 2.xlsx on Water Page 1 of 1 Printed on 11/26/2012 @ 10:06 AM :1 T.W. 1-200 ATP 06401 MIOJECT MH� MH 2012—ff-27, 03010PM PIRRIED 1F-27,1M2 AM CZ Ca (1 CONNECT TO 9 EX 8' SAN SEW LINE D a • 44.1 co al BLNCHMARK: 1 �MH \-MH 3'„ASS LINE G A it S SS LINE H SS �- sp'a SS LINE A \-MH oro?voilmiNwaiIN:Nive SOI:TII or KLLLCR 11ASLCT ROAD.41VYSC)u 711or TIIC SECOND DRIDGC. STATE IIIGII\‘•AY 170. SOUTH or KCLLCR 11ASLCTROAD ONT11CLAST CURD LI\L of TI1C YORTII DOUND SERVICE ROAD IN TIIC CENTER or .A I0' LOW POINT INLET. SET rLusl l IN TI ICTOPOr CURD I' DLIl1�DTHE rut o CURD LLLVA'I'ION - 7O11.71i6 CONNECT TO EX 8' SAN SEW LINE A If 7 8' �Sj-INE G . - `- MH MH 8' s4SSe LINE"\-- \-MH�MH MH t3 MH ENGINEERINGO NEEPTS & DESIGN, L.P. ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR, STE 200, WYLIE, TX 75098 972-941-8400 FAX: 972-941-8401 WWW.ECDLP.COM co_ `am � J 1-^ l� AMMO / MH .71 la / / / / / / / / / / / ,/ / / / / / / / / / / / / / / / / / / / / // / / MH /• ' ! 1 1 11 l . \ 4 ., • • • EXHIBIT A—i SEWER IMPROVEMENTS VALLEY RIDGE, PHASE 2 CITY OF FART WORTH, TEXAS ENDIN[[RINI3CUNCEPTS Client: • Project Name: Project No.: Date: Centurian American Valley Ridge Estates - Phase 2 6401 15-Nov-12 Lots: 94 Acres: 38.1 Density: 2.47 Contractor P ECD Item # 4.A.26.8. 4.A.E.8.12. 4.C.1.4.1. 4.D.2.4 4.F.1. 4.F.3. 4.F.4. 4.G.1.1 4.E.1. 4 E.3. roposal for Construction On -Site Item Description Sewer - PVC - SDR-26 - 8" Sewer - PVC - Extra Depth - 8" - 10'-12' Sewer - Manholes & Junction Boxes - Circular - 4' Dia - Standard Sewer - Fittings - Laterals - 4" Sewer - General - Pressure Test Sewer - General - Trench Safety (san. swr.) Sewer - General - Television Inspection Sewer - Miscellaneous - Connections - Existing Sanitary Sewer Sewer - Backfill - Cement Stabilized Bedding Sewer - Backfill - Clay Dam & DESIGN, L.P. 201 Windco Circle, Suite Wylie, Texas 75098 (972) 941-8400 (972) 941-8401 Fax Quantity 3,794.00 LF 180.00 LF 13.00 EA 94.00 EA 1.00 LS 3,794.00 LF 3,794.00 LF 2.00 EA 50.00 LF 10.00 EA Sanitary Sewer Total I Kart Construction Co. Unit Price $15.65 $21.20 $2,165.00 $342.00 $2,019.00 $0.60 $1.60 $251.00 $43.70 $65.00 I 1 $137,187.90 Total Cost $59,376.10 $3,816.00 $28,145.00 $32,148.00 $2,019.00 $2,276.40 $6,070.40 $502.00 $2,185.00 $650.00 2012-11-13 Cost Estimate -Phase 2.xlsx on Sanitary Page 1of1 Printed on 11/26/2012 @ 10:05 AM •1 :1 i T.W. articam MEN DALw. 1'-200' SCALE awl PROJECT 1 m 202-11-27, 1334541.4 M PIENTED 20 V-27,142 AM fI a AO— 13LrCHNMARK: ?!1 Cfl'Y ()I' I'OR I' wr)R I•H NMOrl'N11?N I NO 1)141 ON I-35 NORTII DO1; D SCR VICE ROAD.1.0—N11LE SOUTII or KLLLCR IIASLLT ROAD.41rYSOlTIlOT TIIL SECOND BRIDGE.. STATE MUM' AY 170. SOUTII or KELLER 11ASLCTROADOX THE CAST CURB LILAC or THE \ORTI1BOl:7DSERVICE. ROAD IN T11C CENTER Of 4IlYLOW POINT INLET. SET T'LUS111NTUC TOP OI'CURD 1' DCIINND TI IC i ACL Oi ct:RD L' LL•' VA I I Or - 70x.7x6 ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR. STE 200, WYLIE, TX 75098 972-941-8400 FAX: 972-941-8401 WWW.ECDLP.COM • • • • • • • • • • • • • • ,' • • • • • • • • • a VAS MOM 4•4,4• PIC =Mt T' Cp IIAICTII 7•41A411 PIC 02CIRTt PY CiIflMCTT#1 ♦' 1110114.K P CDITA1LTSR 4°EIEVAKBYIOC PALMS DMm I= 111Nr WY CINTINCYCIlt D m r ENGINEERINGCONCEPTS E)(HIBIT C & DESIGN, �.P. STREET LIGHT & SIGN IMPROVEMENTS VALLEY RIDGE, PHASE 2 CITY OF FORT WORTH, TEXAS •• • I !NDINEERINI3IDUNt1EPTS Client: Project Name: Project No.: Date: Centurian American Valley Ridge Estates - Phase 2 6401 15-Nov-12 Lots: 94 Acres: 38.1 Density: 2.47 Contractor Proposal for Construction ECD Item # 6.A.1.6.40. 6.A.1.7.40. 6.A.3.44 6.A.3.S-BFR 6.C.6. 6.C.8. 6.C.LM. 6.E.2. 6.B.1.TB.8. 6.G. 66.H. 6.F.4. 6.F.3. 6.F.2. 6.I.1.2 6.I.2.2 6.I.2.3 6.J.1. On -Site Item Description Paving - Concrete - Streets - 6" - 4000 psi Paving - Concrete - Streets - 7" - 4000psi Paving - Concrete - Sidewalks/Ramps - 4" x 4' Paving - Concrete - Sidewalks/Ramps - Barrier Free Ramp - Single Paving - Subgrade Prep - 6" (33#/SY = 8.00%) Paving - Subgrade Prep - 8" ('14#/SY = 7.33%) Paving - Subgrade Prep - Lime Material Paving - Connections - Connect to Existing Street Header Paving - Asphalt - Streets - HMAC - TxDOT Type B' - 8" Paving - Signage Paving - Pavement Markings Paving - Removals - Sawcut and Remove Exis. Curb and Gutter Paving - Removals - Sawcut & Remove Exist. Concrete Pvm't. Paving - Removals - Remove Existing Asphalt Pavement Paving - Miscellaneous - Curbs - Construct Separate Curb & Gutter Paving - Miscellaneous - Sleeves - 2" Schedule 40 PVC Irrigation Sleeve Paving - Miscellaneous - Sleeves - 3" Schedule 40 PVC Irrigation Sleeve Paving - Traffic Control - Management (Installation, Maintenance, Reset, & Removal) Payment & Performance Bonds Maintenance Bond . • & DESIGN, L.P. 201 Windco Circle, Suite Wylie, Texas 75098 (972) 941-8400 (972) 941-8401 Fax Quantity 14,481.00 SY 3,421.00 SY 9,600.00 SF 16.00 EA 15,657.00 SY 3,662.00 SY 339.00 TON 143.00 LF 268.00 SY 1.00 LS 1.00 LS 436.00 LF 416.00 SY 906.00 SY 185.00 LF 75.00 LF 180.00 LF 1.00 LS 1.00 LS 1.00 LS Paving Total Miscellaneous Total Grand Total Paving Construction Cost THB Construction, LLC Unit Price $30.00 $33.00 $3.04 $854.00 $1.95 $2.95 $165.00 $20.00 $1.00 $2,700.00 $35.00 $10.00 $6.00 $5.00 $10.00 $15.00 $18.00 $2,495.89 $17,042.29 $17,051.42 1 $713,399.94 $34,093.71 Total Cost $434,430.00 $112,893.00 $29,184.00 $13,664.00 $30,531.15 $10,802.90 $55,935.00 $2,860.00 $268.00 $2,700.00 $35.00 $4,360.00 $2,496.00 $4,530.00 $1,850.00 $1,125.00 $3,240.00 $2,495.89 $17,042.29 $17,051.42 $747,493.65 2012-11-13 Cost Estimate -Phase 2.xLsx on Paving Page 1 of 1 Printed on 11/26/2012 @ 10:03 AM D.LW. MTN T-200' SCALE 00401 mama - 1 2 1241-27, 03401M1 T 2O f1-27,1142 AM V 4 BLNCHMARK; +l 1 se CID 1 wr n1r>11: MI?N I. NO, 17141 7\�1•JS .�C) (`711 DOtr'D CRVI('CROAD. IA —MILE SOUTII or KCLLER IIASLET ROAD.41),YSO1T11or TI1E SECOND DRIDGC. STATC 111G11\VAY 170. SOUTII Of KELLER IIASLCTROAD ONT11EEAST CURD LINE, or TIM NORTH BOUND SERVICE ROAD IN TIIC CENTER or.A I0'LOW POINT INLET. SET rLUS11 IN TTIETOPOf CURD I' DC11IND THE f.4CC Of CURD LLL•' VA I'ION - 7(1H.716 CONNECT TO EX STORM LINE D 5x5 SQUARE MANHOLE 10' C I 20' CI 0 ENGINEERINGCONCEPTS & DESIGN, L.P. ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR, STE 200, WYLIE, TX 75098 972-941-8400 FAX: 972-941-8401 WWW.ECDLP.COM 1 \ • • n • • • • 10' C I t1 / C '.1 /• r • r \ \ • • • __ LINE H \\ I• 1,1 r1r \ • .11110, EXHIBIT B-1 STORM IMPROVEMENTS VALLEY 3IDGE, PHASE 2 CITY OF FORT WORTH, TEXAS :1 AGINEERINuCONCEPTS Client: Project Name: Project No.: Date: Centurian American Valley Ridge Estates - Phase 2 6401 15-Nov-12 Lots: 94 Acres: 38.1 Density: 2.47 Contractor Proposal for Construction ECD Item # 2.A.3.21 2.A.3.24 2.A.3.27 2.A.3.36 2.A.3.42 2.A.3.48 2.E.2.5 2.F.1.10 2.F.1.15 2.F.1.20 2.G.1.B.24.ED 2.G.1.B.42.ED 2. G.1. C.48. . 2.H.1. 2.H.3.A.12. 2.I.1.B . ,2.H.7. 2.I.10. 2.J.4.24 Storm Storm Storm Storm Storm Storm Storm Storm Storm Storm 'Storm Storm Storm Storm Storm Storm Storm Storm Storm 1 On -Site Item Description - RCP - Class III-21" - RCP - Class III -24" - RCP - Class 11l-27" - RCP - Class III - 36" - RCP - Class III - 42" - RCP - Class IlI-48" - Manholes & Junction Boxes - Square - 5' x 5' - Inlets - Standard Curb - 10' - Inlets - Standard Curb - 15' - Inlets - Standard Curb - 20' - Headwalls - Type B = TxDOT (FW) - 24" - with Energy Dissipators - Headwalls - Type B = TxDOT (FW) - 42" - with Energy Dissipators - Headwalls - Type C - 48" - General - Factory Wye Connection - General - Type A Rock Rip -Rap - 6"-12" Dia - 12" Thick - Miscellaneous - Connections - To Existing RCP - General - Trench Safety - Miscellaneous - Rock Excavation - Removals - Headwalls - 24" • & DESIGN, L.P. 201 Windco Circle, Suite Wylie, Texas 75098 (972) 941-8400 (972) 941-8401 Fax Quantity 292.00 LF 207.00 LF 394.00 LF 59.00 LF 164.00 LF 47.00 LF 1.00 EA 5.00 EA 2.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 5.00 EA 100.00 SY 1.00 EA 1,163.00 LF 1.00 LS 1.00 EA Storm Total Kart Construction Co. Unit Price Total Cost $32.15 $37.85 $42.90 $67.55 $90.80 $108.80 $4,788.00 $2,870.00 $3,632.00 $5,239.00 $1,882.00 $2,757.00 $2,531.00 $155.00 $28.25 $446.00 $0.60 $19,464.00 $162.00 $121,296.40 $9,387.80 $7,834.95 $16,902.60 $3,985.45 $14,891.20 $5,113.60 $4,788.00 $14,350.00 $7,264.00 $5,239.00 $1,882.00 $2,757.00 $2,531.00 $775.00 $2,825.00 $446.00 $697.80 $19,464.00 $162.00 2012-11-13 Cost Estimate -Phase 2.xlsx on Storm Page lofl Printed on 11/26/2012 @ 10:08 AM T.W. D.J.W. MEN T-200' BCALZ 00401 2012-11-27, 031IPM > 22012-11-27,1142 AM • a BENCHMARK: U\� I.33 �fi)R?A I �(71� �' � 1 )4D, l IL SIILC SOUTII Of KCLLCR IIASLCT ROAD. I(YYS01711or TI1C SECOND BRIDGE. STATE IMAM AY 17(1. SOUTII or KCLLCR II.ASLCTROAD ONTIMCAST CURD LINO or THE NoRT11BOUND SERVICE ROAD IN TI]C CENTER or A I(YLOW POINT INLET. SET rLUSl1 I\TIICTOPorCURB 1' D EI IIND T11E rACC or CURD LLL\'A'I'ION - 708.786 ENGINEERINGCONCEPT3 ENGINEERING / PROJECT MANAGEMENT / CONSTRUCTION SERVICES - FIRM REG. #F-001145 201 WINDCO CIR, STE 200, WYLIE, TX 75098 972-941-8400 FAX: 972-941-8401 WWW.ECDLP.COM / 1 / , ''/ ;' /, / / / / / \• MOW is.s• maw -0 E z a1C MCC LAIR ♦ norms >l ungr moon rnecT i*: t11 t I; /t i „ 1. 1 EXHIBIT C STREET LIGHT & SIGN IMPROVEMENTS VALLEY RIDGE, PHASE 2 CITY OF FORT WORTH, TEXAS NGINEERINBCUNCEPT3 Client: " Project Name: Project No.: Date: Centurian American Valley Ridge Estates - Phase 2 6401 15-Nov-12 Lots: 94 Acres: 38.1 Density: 2.47 Contractor Proposal for Construction ECD Item # On -Site Item Description Street Light Materials & Installation Street Signs - Materials & Installation & DESIGN, L.P. 201 Windco Circle, Suite Wylie, Texas 75098 (972) 941-8400 (972) 941-8401 Fax Quantity 15.00 EA 8.00 EA Street Light & Street Sign Total I THB Construction, LLC Unit Price $2,800.00 $245.00 Total Cost $42,000.00 $1,960.00 $43,960.00 2012-11-13 Cost Estimate -Phase 2.xlsx on St Light -Sign Page 1 of 1 Printed on 11/27/2012 @ 2:48 PM