HomeMy WebLinkAboutContract 43630COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § City Secretary Contract No. LI WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Cassco Development Company Inc. Address, State, Zip Code: 4200 South Hulen St., Suite 614/Fort Worth, TX 76109 Phone, E-Mail: (817)73 1-7396/paxton@casscoland.com Authorized Signatory/Title: Paxton Motheral, Vice President Project Name: Clearfork Main Street Phase 5 Project Location: South of Edwards Ranch Rd., West of Bryant -Irvin Rd. Plat Case No.: FP-012-015 Plat Name: Edwards Ranch Clearfork Addition Mapsco: 74Z, 75W Council District: 3 City Project No: 01844 CFA: 2012-026 DOE: 6779 To be completed b staff • Received by: C_1 ORA( j±--- Date: OFFICIAL RECORD CITY SECRETARY FT. WORTN, TX ia NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) `X_, Paving (B) _X_, Storm Drain (B-1) _X_, Street Lights & Signs (C) X Combined CFA final Sept 12, 2008 2 E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following* i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by Combined CFA final Sept 12, 2008 4 any persons (including death) or to any property, resulting from or in connection with the construction, design, perfoinuance or completion of any work to be perfon ned by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, In whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part. by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stolui drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. Combined CFA final Sept 12, 2008 6 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Clearfork Main Street Ph. 5 CFA No.: 2012-026 DOE No.: 6779 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ exhibit is required to support the Developer's Cost $ $ 258, 561.00 64, 083.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period 322,644.00 $ $ 728,218.75 310,218.00 59,964.60 $ 1,098,401.35 1,421,045.35 $ 6,452.88 $ 6,452.88 $ 12,905.76 $ 41,537.47 $ 20,768.74 $ 2,398.58 $ 490.00 $ 65,194.79 $ 78,100.55 Choice Amount (ck one) $ 1,421,045.35 $ 1,421,045.35 $ 403, 305.00 $ 1,373,001.69 $ 1,776,306.69 Combined CFA final Sept 12, 2008 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed th' instrument in quadruplicate, at Fort Worth, Texas this 1 2J44 day of AsIC , 20 v CITY OF FORT WORTH - Recommended by: Water Department („‘ Wendy Chi-B�bulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. VA - Date: ATTEST: Mary J. Kayst) City Secretary ATTEST: Signature (Print) Name: Fernando Costa Assistant City Manager rEufl„ratk Transportation & Public Works Department tAi Dough) W. Wiersig, P.E. Director Approved by City Manager's Office 4 )20 ‘:Lss 4 - 4Q to �O o° tizolVia. Atet.cs,•4• v t'p00000° Cassco Development Co., Inc. 9 Signature Print Name: Paxton Motheral Title: Vice President OFFICIAL RECORD CITY SECRETARY PT. WORTh, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements C Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate n r C n (Remainder of Page Intentionally Left Blank) Combined CFA final Sept 12, 2008 10 iACOBS-ENGINEERING GROUP IN,C: -777 MAIN STREET, FORT: WORTH,-: TEXAS 76102 PHONE NO. (817) 735-6000 CLEARFORK MAIN STREET PHASE 5 May 18, 2012 Revised August 6, 2012 WATER DISTRIBUTION SYSTEM ITEM# DESCRIPTION 1 16" PVC Water Main by Open Cut 2 16" Poly -wrapped Ductile Iron Pipe 3 30" Steel Coated Casing Pipe (Open Cut) 4 16" Gate Valve & Vault 5 2" Combination Air & Vacuum Release Valve and Vault 6 4" Blow Off Valve 7 Std. Fire Hydrant Assembly 8 Connect to Existing 16" Water Line 9 Cast Iron Fittings 10 Trench Safety 11 System Testing 12 Installation & Maintenance of Stormwater Management IWAL WATER DISTRIBUTION SYSTEM BID QTY UNIT 1,755 L.F. 475 L.F. 475 L.F. 3 EA. 2 EA. 1 EA. 2 EA. 1 EA. 1.70 TON 2,230 L.F. 2,230 L.F. 1 L.S. SANITARY SEWER COLLECTION SYSTEM ITEM# DESCRIPTION 1 8" SDR-26 PVC SS Main 2 8" SDR-26 PVC SS Main w/ Cement Stabilized Sand 3 6" SDR-26 PVC SS Main (Sewer Services) 4 6" SDR-26 PVC SS Main w/ Cement Stabilized Sand (Sewer Services) 5 4' Dia. Drop Manhole 6 4' Dia. Manhole 7 4' Dia. Drop Manhole Additional Depth 8 4' Dia Manhole Additional Depth 9 6" Sanitary Sewer Cleanout 10 Construct Inside Manhole Drop System within existing 6' dia. MH 11 Connect to Existing Manhole 12 Clay Dam 13 Trench Safety 14 ITV Inspection 15 Vacuum Test Manholes 16 Installation & Maintenance of Stormwater Management TOTAL SANITARY SEWER COLLECTION SYSTEM BID QTY 789 120 24 85 2 1 24 13 3 1 2 4 1,018 1,018 3 1 UNIT L.F. L.F. L.F. L.F. EA. EA. V.F. V.F. EA. EA. EA. EA. L.F. L.F. EA. L.S. PRICE $58.00 $66.00 $120.00 $11,000.00 $5,400.00 $6,800.00 $2,350.00 $1,000.00 $5,400.00 $1.00 $0.70 $2,000.00 PRICE $33.00 $43.00 $55.00 $68.00 $3,750.00 $3,350.00 $200.00 $200.00 $250.00 $1,700.00 $750.00 $150.00 $1.00 $1.00 $150.00 $500.00 AMOUNT $101,790.00 $31,350.00 $57,000.00 $33,000.00 $10,800.00 $6,800.00 $4,700.00 $1,000.00 $9,180.00 $2,230.00 $1,561.00 $2,000.00 $261,411.00 AMOUNT $26,037.00 $5,160.00 $1,320.00 $5,780.00 $7,500.00 $3,350.00 $4,800.00 $2,600.00 $750.00 $1,700.00 $1,500.00 $600.00 $1,018.00 $1,018.00 $450.00 $500.00 $64,083.00 • G:\JOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev:xls Page 1 JACOBS_ENGINEERING GROUP INC... • • - 777 MAIN STREET _FORT': WORTH,_ TEXAS 76102 ., .13171ONE NO ($17) 735=6000 CLEARFORK MAIN STREET PHASE 5 May 18,2012 Revised August 6, 2012 ITEM# DESCRIPTION 1 Unclassified Street Excavation/Misc. Grading 2 Import Material 3 6' Lime Stabilized Subgrade 4 Hydrated Lime (36 LBS/SY) 5 8", 4000 psi R.C. Street Pvmt 6 4" Asphaltic Concrete Pavement, TxDOT Type B 7 12" Asphaltic Concrete Pavement, TxDOT Type D 8 7" Concrete Curb 9 5 Ft. Wide Sidewalk 10 10 Ft. Wide Sidewalk 11 Sidewalk Ramp 12 Adiust Sanitary Sewer Manhole 13 Pavement Markings and Striping 14 Install End of Road Barricade 15 Construct Concrete Header 16 Installation & Maintenance of Stormwater Management TOTAL PAVING ITEM# DESCRIPTION 1 21" RCP - CLASS III 2 24" RCP - CLASS III 3 36" RCP - CLASS III 4 42" RCP - CLASS II I 5 48" RCP - CLASS III 6 54" RCP - CLASS III 7 Connect to Concrete Channel, Construct 54" Sloping Headwall 8 Connect to Concrete Channel, Construct 48" Sloping Headwall 9 Construct 48" Sloping Headwall 10 Std. 10' Curb Inlet 11 6' Square Manhole 12 5' Square Manhole 13 4' Square Manhole 14 5' x 5' Drop Inlet 15 4' x 4' Drop Inlet 16 1121'48" Rock Rip Rap 17 (Trench Safety 18 'Installation & Maintenance of Stormwater Management 1ITOTAL STORM DRAIN SYSTEM STREET LIGHTS IITEM# DESCRIPTION 1 Street Light, Pole, Base & Foundation 1 2 Street Light Conductors (3-#8, 1-#8G) in 2" Schedule 40 PVC 11TOTAL STREET LIGHTS IITEM# !DESCRIPTION 1 Street Signs (TOTAL STREET SIGNS STREET SIGNS PAVING BID QTY UNIT 10,500 C.Y. 2,100 C.Y. 10,760 S.Y. 194 TON 9,502 S.Y. 10,760 S.Y. 489 S.Y. 4,423 L.F. 22,115 S.F. 500 S.F. 1 EA. 2 EA 1 L.S. 1 EA 37 L.F. 11 L.S. STORM DRAIN SYSTEM BID QTY 272 136 92 298 599 540 1 1 1 8 2 1 1 1 3 170 1,937 1 BID QTY 8 2,332 UNIT L.F. L.F. L.F. L.F. L.F. L.F. EA. EA. EA. EA. EA. EA. EA. EA. EA. S.Y. L.F. L.S. UNIT EA. LF IBID QTY! 2FAIT PRICE $5.50 $3.60 $2.60 $158.00 $31.00 $18.75 $14.65 $1.25 $4.00 $4.00 $1,000.00 $550.00 $6,350.00 $925.00 $8.00 $5,000.00 PRICE $52.00 $58.00 $87.00 $112.00 $131.00 $162.00 $3,100.00 $3,000.00 $2,800.00 $3,000.00 $6,400.00 $4,600.00 $4,300.00 $4,300.00 $2,700.00 $56.00 $1.00 $2,400.00 PRICE $3,400.00 $14.05 PRICE $245.00 AMOUNT $57,750.00 $7,560.00 $27,976.00 $30,652.00 $294,562.00 $201,750.00 $7,163.85 $5,528.75 $88,460.00 $2,000.00 $1,000.00 $1,100.00 $6,350.00 $925.00 $296.00 $5,000.00 $738,073.60 1 AMOUNT $14,144.00 $7,888.00 $8,004.00 $33,376.00 $78,469.00 $87,480.00 $3,100.00 $3,000.00 $2,800.00 $24,000.00 $12,800.00 $4,600.00 $4,300.00 $4,300.00 $8,100.00 $9,520.00 $1,937.00 $2,400.00 $310,218.0011 AMOUNT $27,200.00 $32,764.60 $59,964.601 AMOUNT( $490.00 $490.001 GAJOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev.xls Page 2 ITEM# 1 WATER 2 SANITARY SEWER JISUBTOTAL FEES TOTAL FEES JAGOSS.,ENGINEER NG GROUP INCc ±-777 MAIN- STREET, FORT W0E11E-IV TEXAS ?$102 PHONE NO. _(817) 735-6000 CLEARFORK MAIN STREET PHASE 5 DESCRIPTION ITEM# DESCRIPTION 1 STREET PAVING 2 STORM DRAINAGE 3 [STREET LIGHTS SUBTOTAL FEES TOTAL FEES ITEM# (DESCRIPTION 1 [WATER 2 [SANITARY SEWER 3 [STREET PAVING 4 !STORM DRAINAGE 5 [STREET LIGHTS TOTAL CFA CONSTRUCTION `ITOTAL WATER/SEWER FEE f TOTAL PAVING/STORM DRAIN/LIGHTING FEE May 18, 2012 Revised August 6, 2012 FEE CALCULATION WATER AND SANITARY SEWER FEE CALCULATION PAVING AND STORM DRAINAGE • CFA SUMMARY 2% INSPECTION AMOUNT FEE 2% TESTING FEE $261,411.00 $5,228.221 $5,228.22 $64,083.001_ $1,281.661 _ $1,281.66 $6,509.88 $6,509.88 1 $13,019.761 AMOUNT $738,073.60 $310,218.00 $59,964.601 4% INSPECTION FEE 2% TESTING FEE $29,522.941 $14,761.47 $12,408.721 $6,204.36 $2,398.581 $0.00 $44,330.25 $20,965.8 J $65,296.081 • TOTAL $261,411.00 1 $64,083.00 1 $738,073.60 $310,218.00 $59,964.60 $1,433,750.20 1 $13,019.76 II $65,296.0811 G:WOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev.xls Page 3 ,. ......_t � INTER$1 4ATE 4k . , ! ? A....�__ i jr...._... n7 ,. �.j^... k K:1-/1:V '--i- ^ h L_....__�....._. S•s � �� �� L_.._..._... i:� L i / -51 \\,... Syr I 1 , •i tits LOCATION MAP CLEARFORK MAIN STREET PHASE 5 NOT TO SCALE CLEARFORK MAIN STREET PHASE 5 JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 1 OF 6 EDWARDS RANCH LID VOL 12915, PG. 394 D.R.T.C.T. EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. EDWARDS RANCH LTD VOL. 12915, PG. 394 D.R.T.C.T. CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL 4559. PG. 1 D.R.T.C.T. LEGEND PROPOSED WATER UNE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT PROPOSED BLOW OFF VALVE PROPOSED AIR RELEASE AND VACUUM VALVE EXISTING WATER UNE EXISTING GATE VALVE EXISTING FIRE HYDRANT —P1 t W w X SCALE 1 = 200' EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL 4559, PG. 1 D.R.T.C.T. WATER EXHIBIT A CLEARFORK MAIN STREET PHASE 5 JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 2 OF 6 EDWARDS RANCH LTD ) VOL 12915, PG. 394 ) i 1 3 ) PROPOSED SANITARY SEWER UNE 1 PROPOSED SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER PLUG EXISTING SANITARY SEWER i UNE EXISTING SANITARY SEWER MANHOLE 1 ) ) i EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. a• PVC SS SERVICE UNE WTM CLEANOUT 4 0#2 Ci- ,wa- o�%- EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. 6• PVC SS SERVICE UNE WITH CLEANOUT CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT N0. 1 VOL. 4559, PG. 1 D.R.T.C.T. LEGEND SERVICE UNE SS 3 4- mitt' he ry O Citti cc* cy SCALE 1" = 200' EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. 6• PVC SS SERVICE UNE WITH CLEANOUT 7 Sisk CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT N0. 1 VOL 4559, PG. 1 D.R.T.C.T. SANITARY SEWER EXHIBIT A-1 CLEARFORK MAIN STREET PHASE 5 JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 3 OF 6 EDWARDS RANCH LTD VOL 12915, PC. 394 D.R.T.C.T. 5g2 EDWARDS RANCH LTD VOL 12915, PG. 394 OR.T.C.T. EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.t.C.T. C EARFC K TRINITY RIVER TARRANT CCJNTY WATER CONTROL ,Sc IMPROVEMENT DISTRICT NO. 1 VOL 4559, PG. 1 D.R.T.C.T. LEGEND pIIIIIIIIIIIIIIIIIIIIIIII SIDEWALK RAMP 10' SDEWALK TO TRINITY TRAILS r PROPOSED EDGE OF ROAD PROPOSED TEMPORARY ASPHALT TURNAROUND PROPOSED 5' SIDEWALK EXISTING PROPERTY LINE CLEARFORK ► IN STREET rs o't SCALE 1 = 200' / EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. 5' SIDEWALK RUNS PARALLEL TO R.O.W. Pizafital 5' SIDEWALK RUNS PARALLEL TO R.O.W. CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL .Y IMPROVEMENT DISTRICT N0. 1 VOL 4559. PC. 1 D.R.T.C.T. PAVING EXHIBIT B CLEARFORK MAIN STREET PHASE 5 JACOBS* JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 4 OF 6 DROP INLET EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.LC.T. �•-�Sg�G.2 EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. 4'X4' DROP INLET EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. t CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL 4559. PG. 1 D.R.T.C.T. LEGEND PROPOSED STORM PROPOSED STORM PROPOSED STORM DRAIN SYSTEM DRAIN DROP INLET DRAIN MANHOLE PROPOSED SLOPING HEADWALL EXISTING STORM DRAIN SYSTEM . ALL STORM DRAIN INLET PIPES ARE 21" RCP UNLESS OTHERWISE NOTED. t. 4'X4' DROP INLET A 4'X4' ii DROP INLET 1D.%1NTo11' 1O' INLET SCALE 1 " = 200' EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL 4559. PG. 1 D.R.T.C.T. PUBLIC AND PRIVATE STORM DRAIN EXHIBIT B-1 CLEARFORK MAIN STREET PHASE 5 JACOBS® JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 5 OF 6 EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.7 EU ■ EDWARDS RANCH LTD VOL. 12915, PG. 394 D.R.T.C.T. EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL. 4559. PG. 1 D.R.T.C.T. LEGEND i PROPOSED UNDERGROUND ELECTRICAL CONDUIT PROPOSED PULL BOX PROPOSED UGHTPOLE EXISTING PROPERTY LINE SCALE 1" = 200' EDWARDS RANCH LTD VOL 12915, PG. 394 D.R.T.C.T. CLEARFORK MAIN _SIRE,' / I > o cot (Pen env CLEARFORK TRINITY RIVER TARRANT COUNTY WATER CONTROL & IMPROVEMENT DISTRICT NO. 1 VOL. 4559, PG. 1 O.R.T.C.T. STREET LIGHTS EXHIBIT C CLEARFORK MAIN STREET PHASE S JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 (817) 735-6000 PROJECT NO. WFXL5900 PAGE 6 OF 6