HomeMy WebLinkAboutContract 43630COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
Contract No. LI
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Cassco Development Company Inc.
Address, State, Zip Code: 4200 South Hulen St., Suite 614/Fort Worth, TX 76109
Phone, E-Mail: (817)73 1-7396/paxton@casscoland.com
Authorized Signatory/Title: Paxton Motheral, Vice President
Project Name: Clearfork Main Street Phase 5
Project Location: South of Edwards Ranch Rd., West of Bryant -Irvin Rd.
Plat Case No.: FP-012-015 Plat Name: Edwards Ranch Clearfork Addition
Mapsco: 74Z, 75W
Council District: 3 City Project No: 01844
CFA: 2012-026 DOE: 6779
To be completed b staff •
Received by: C_1 ORA( j±---
Date:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTN, TX
ia
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) `X_, Paving (B) _X_, Storm Drain (B-1) _X_, Street Lights &
Signs (C) X
Combined CFA final Sept 12, 2008 2
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following*
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
Combined CFA final Sept 12, 2008 4
any persons (including death) or to any property, resulting from or in
connection with the construction, design, perfoinuance or completion of any
work to be perfon ned by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, In whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part. by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stolui drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
Combined CFA final Sept 12, 2008 6
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Clearfork Main Street Ph. 5
CFA No.: 2012-026
DOE No.: 6779
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $
exhibit is required to support the
Developer's Cost
$
$
258, 561.00
64, 083.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
322,644.00
$
$
728,218.75
310,218.00
59,964.60
$
1,098,401.35
1,421,045.35
$ 6,452.88
$ 6,452.88
$ 12,905.76
$ 41,537.47
$ 20,768.74
$ 2,398.58
$ 490.00
$ 65,194.79
$ 78,100.55
Choice
Amount (ck one)
$ 1,421,045.35
$ 1,421,045.35
$ 403, 305.00
$ 1,373,001.69
$ 1,776,306.69
Combined CFA final Sept 12, 2008 8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed th'
instrument in quadruplicate, at Fort Worth, Texas this 1 2J44 day of AsIC
, 20 v
CITY OF FORT WORTH - Recommended by:
Water Department
(„‘
Wendy Chi-B�bulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. VA -
Date:
ATTEST:
Mary J. Kayst)
City Secretary
ATTEST:
Signature
(Print) Name:
Fernando Costa
Assistant City Manager
rEufl„ratk
Transportation & Public Works Department
tAi
Dough) W. Wiersig, P.E.
Director
Approved by City Manager's Office
4 )20 ‘:Lss
4 - 4Q
to �O
o°
tizolVia. Atet.cs,•4•
v
t'p00000°
Cassco Development Co., Inc.
9
Signature
Print Name: Paxton Motheral
Title: Vice President
OFFICIAL RECORD
CITY SECRETARY
PT. WORTh, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
C Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
n
r
C
n
(Remainder of Page Intentionally Left Blank)
Combined CFA final Sept 12, 2008 10
iACOBS-ENGINEERING GROUP IN,C:
-777 MAIN STREET, FORT: WORTH,-: TEXAS 76102
PHONE NO. (817) 735-6000
CLEARFORK MAIN STREET PHASE 5
May 18, 2012
Revised August 6, 2012
WATER DISTRIBUTION SYSTEM
ITEM# DESCRIPTION
1 16" PVC Water Main by Open Cut
2 16" Poly -wrapped Ductile Iron Pipe
3 30" Steel Coated Casing Pipe (Open Cut)
4 16" Gate Valve & Vault
5 2" Combination Air & Vacuum Release Valve and Vault
6 4" Blow Off Valve
7 Std. Fire Hydrant Assembly
8 Connect to Existing 16" Water Line
9 Cast Iron Fittings
10 Trench Safety
11 System Testing
12 Installation & Maintenance of Stormwater Management
IWAL WATER DISTRIBUTION SYSTEM
BID QTY UNIT
1,755 L.F.
475 L.F.
475 L.F.
3 EA.
2 EA.
1 EA.
2 EA.
1 EA.
1.70 TON
2,230 L.F.
2,230 L.F.
1 L.S.
SANITARY SEWER COLLECTION SYSTEM
ITEM# DESCRIPTION
1 8" SDR-26 PVC SS Main
2 8" SDR-26 PVC SS Main w/ Cement Stabilized Sand
3 6" SDR-26 PVC SS Main (Sewer Services)
4 6" SDR-26 PVC SS Main w/ Cement Stabilized Sand (Sewer Services)
5 4' Dia. Drop Manhole
6 4' Dia. Manhole
7 4' Dia. Drop Manhole Additional Depth
8 4' Dia Manhole Additional Depth
9 6" Sanitary Sewer Cleanout
10 Construct Inside Manhole Drop System within existing 6' dia. MH
11 Connect to Existing Manhole
12 Clay Dam
13 Trench Safety
14 ITV Inspection
15 Vacuum Test Manholes
16 Installation & Maintenance of Stormwater Management
TOTAL SANITARY SEWER COLLECTION SYSTEM
BID QTY
789
120
24
85
2
1
24
13
3
1
2
4
1,018
1,018
3
1
UNIT
L.F.
L.F.
L.F.
L.F.
EA.
EA.
V.F.
V.F.
EA.
EA.
EA.
EA.
L.F.
L.F.
EA.
L.S.
PRICE
$58.00
$66.00
$120.00
$11,000.00
$5,400.00
$6,800.00
$2,350.00
$1,000.00
$5,400.00
$1.00
$0.70
$2,000.00
PRICE
$33.00
$43.00
$55.00
$68.00
$3,750.00
$3,350.00
$200.00
$200.00
$250.00
$1,700.00
$750.00
$150.00
$1.00
$1.00
$150.00
$500.00
AMOUNT
$101,790.00
$31,350.00
$57,000.00
$33,000.00
$10,800.00
$6,800.00
$4,700.00
$1,000.00
$9,180.00
$2,230.00
$1,561.00
$2,000.00
$261,411.00
AMOUNT
$26,037.00
$5,160.00
$1,320.00
$5,780.00
$7,500.00
$3,350.00
$4,800.00
$2,600.00
$750.00
$1,700.00
$1,500.00
$600.00
$1,018.00
$1,018.00
$450.00
$500.00
$64,083.00
•
G:\JOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev:xls
Page 1
JACOBS_ENGINEERING GROUP INC... • • -
777 MAIN STREET _FORT': WORTH,_ TEXAS 76102 .,
.13171ONE NO ($17) 735=6000
CLEARFORK MAIN STREET PHASE 5
May 18,2012
Revised August 6, 2012
ITEM# DESCRIPTION
1 Unclassified Street Excavation/Misc. Grading
2 Import Material
3 6' Lime Stabilized Subgrade
4 Hydrated Lime (36 LBS/SY)
5 8", 4000 psi R.C. Street Pvmt
6 4" Asphaltic Concrete Pavement, TxDOT Type B
7 12" Asphaltic Concrete Pavement, TxDOT Type D
8 7" Concrete Curb
9 5 Ft. Wide Sidewalk
10 10 Ft. Wide Sidewalk
11 Sidewalk Ramp
12 Adiust Sanitary Sewer Manhole
13 Pavement Markings and Striping
14 Install End of Road Barricade
15 Construct Concrete Header
16 Installation & Maintenance of Stormwater Management
TOTAL PAVING
ITEM# DESCRIPTION
1 21" RCP - CLASS III
2 24" RCP - CLASS III
3 36" RCP - CLASS III
4 42" RCP - CLASS II I
5 48" RCP - CLASS III
6 54" RCP - CLASS III
7 Connect to Concrete Channel, Construct 54" Sloping Headwall
8 Connect to Concrete Channel, Construct 48" Sloping Headwall
9 Construct 48" Sloping Headwall
10 Std. 10' Curb Inlet
11 6' Square Manhole
12 5' Square Manhole
13 4' Square Manhole
14 5' x 5' Drop Inlet
15 4' x 4' Drop Inlet
16 1121'48" Rock Rip Rap
17 (Trench Safety
18 'Installation & Maintenance of Stormwater Management
1ITOTAL STORM DRAIN SYSTEM
STREET LIGHTS
IITEM# DESCRIPTION
1 Street Light, Pole, Base & Foundation
1 2 Street Light Conductors (3-#8, 1-#8G) in 2" Schedule 40 PVC
11TOTAL STREET LIGHTS
IITEM# !DESCRIPTION
1 Street Signs
(TOTAL STREET SIGNS
STREET SIGNS
PAVING
BID QTY UNIT
10,500 C.Y.
2,100 C.Y.
10,760 S.Y.
194 TON
9,502 S.Y.
10,760 S.Y.
489 S.Y.
4,423 L.F.
22,115 S.F.
500 S.F.
1 EA.
2 EA
1 L.S.
1 EA
37 L.F.
11 L.S.
STORM DRAIN SYSTEM
BID QTY
272
136
92
298
599
540
1
1
1
8
2
1
1
1
3
170
1,937
1
BID QTY
8
2,332
UNIT
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
EA.
EA.
EA.
EA.
EA.
EA.
EA.
EA.
EA.
S.Y.
L.F.
L.S.
UNIT
EA.
LF
IBID QTY! 2FAIT
PRICE
$5.50
$3.60
$2.60
$158.00
$31.00
$18.75
$14.65
$1.25
$4.00
$4.00
$1,000.00
$550.00
$6,350.00
$925.00
$8.00
$5,000.00
PRICE
$52.00
$58.00
$87.00
$112.00
$131.00
$162.00
$3,100.00
$3,000.00
$2,800.00
$3,000.00
$6,400.00
$4,600.00
$4,300.00
$4,300.00
$2,700.00
$56.00
$1.00
$2,400.00
PRICE
$3,400.00
$14.05
PRICE
$245.00
AMOUNT
$57,750.00
$7,560.00
$27,976.00
$30,652.00
$294,562.00
$201,750.00
$7,163.85
$5,528.75
$88,460.00
$2,000.00
$1,000.00
$1,100.00
$6,350.00
$925.00
$296.00
$5,000.00
$738,073.60 1
AMOUNT
$14,144.00
$7,888.00
$8,004.00
$33,376.00
$78,469.00
$87,480.00
$3,100.00
$3,000.00
$2,800.00
$24,000.00
$12,800.00
$4,600.00
$4,300.00
$4,300.00
$8,100.00
$9,520.00
$1,937.00
$2,400.00
$310,218.0011
AMOUNT
$27,200.00
$32,764.60
$59,964.601
AMOUNT(
$490.00
$490.001
GAJOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev.xls
Page 2
ITEM#
1 WATER
2 SANITARY SEWER
JISUBTOTAL FEES
TOTAL FEES
JAGOSS.,ENGINEER NG GROUP INCc
±-777 MAIN- STREET, FORT W0E11E-IV TEXAS ?$102
PHONE NO. _(817) 735-6000
CLEARFORK MAIN STREET PHASE 5
DESCRIPTION
ITEM# DESCRIPTION
1 STREET PAVING
2 STORM DRAINAGE
3 [STREET LIGHTS
SUBTOTAL FEES
TOTAL FEES
ITEM# (DESCRIPTION
1 [WATER
2 [SANITARY SEWER
3 [STREET PAVING
4 !STORM DRAINAGE
5 [STREET LIGHTS
TOTAL CFA CONSTRUCTION
`ITOTAL WATER/SEWER FEE
f TOTAL PAVING/STORM DRAIN/LIGHTING FEE
May 18, 2012
Revised August 6, 2012
FEE CALCULATION
WATER AND SANITARY SEWER
FEE CALCULATION
PAVING AND STORM DRAINAGE
•
CFA SUMMARY
2% INSPECTION
AMOUNT FEE 2% TESTING FEE
$261,411.00 $5,228.221 $5,228.22
$64,083.001_ $1,281.661 _ $1,281.66
$6,509.88 $6,509.88 1
$13,019.761
AMOUNT
$738,073.60
$310,218.00
$59,964.601
4% INSPECTION
FEE 2% TESTING FEE
$29,522.941 $14,761.47
$12,408.721 $6,204.36
$2,398.581 $0.00
$44,330.25 $20,965.8 J
$65,296.081
•
TOTAL
$261,411.00 1
$64,083.00 1
$738,073.60
$310,218.00
$59,964.60
$1,433,750.20 1
$13,019.76 II
$65,296.0811
G:WOB\WFXL5900\800 DELIVERABLES\820 Submittal\CFA\Phase 5\Clearfork Main Street Phase 5 CFA rev.xls
Page 3
,. ......_t � INTER$1 4ATE 4k . , ! ?
A....�__ i jr...._... n7 ,. �.j^...
k K:1-/1:V
'--i- ^ h
L_....__�....._. S•s � �� ��
L_.._..._... i:�
L
i /
-51
\\,... Syr
I 1 , •i
tits
LOCATION MAP
CLEARFORK MAIN STREET
PHASE 5
NOT TO SCALE
CLEARFORK MAIN STREET
PHASE 5
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 1 OF 6
EDWARDS RANCH LID
VOL 12915, PG. 394
D.R.T.C.T.
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
EDWARDS RANCH LTD
VOL. 12915, PG. 394
D.R.T.C.T.
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL 4559. PG. 1
D.R.T.C.T.
LEGEND
PROPOSED WATER UNE
PROPOSED GATE VALVE
PROPOSED FIRE HYDRANT
PROPOSED BLOW OFF VALVE
PROPOSED AIR RELEASE AND
VACUUM VALVE
EXISTING WATER UNE
EXISTING GATE VALVE
EXISTING FIRE HYDRANT
—P1
t
W
w X
SCALE 1 = 200'
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL 4559, PG. 1
D.R.T.C.T.
WATER
EXHIBIT A
CLEARFORK MAIN STREET
PHASE 5
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 2 OF 6
EDWARDS RANCH LTD
) VOL 12915, PG. 394
)
i
1
3
) PROPOSED SANITARY SEWER
UNE
1 PROPOSED SANITARY SEWER
MANHOLE
PROPOSED SANITARY SEWER
PLUG
EXISTING SANITARY SEWER
i UNE
EXISTING SANITARY SEWER
MANHOLE
1
)
)
i
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
a• PVC
SS SERVICE UNE
WTM CLEANOUT
4 0#2
Ci-
,wa- o�%-
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
6• PVC
SS SERVICE UNE
WITH CLEANOUT
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT N0. 1
VOL. 4559, PG. 1
D.R.T.C.T.
LEGEND
SERVICE UNE
SS
3
4- mitt'
he ry
O
Citti
cc* cy
SCALE 1" = 200'
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
6• PVC
SS SERVICE UNE
WITH CLEANOUT
7
Sisk
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT N0. 1
VOL 4559, PG. 1
D.R.T.C.T.
SANITARY SEWER
EXHIBIT A-1
CLEARFORK MAIN STREET
PHASE 5
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 3 OF 6
EDWARDS RANCH LTD
VOL 12915, PC. 394
D.R.T.C.T.
5g2
EDWARDS RANCH LTD
VOL 12915, PG. 394
OR.T.C.T.
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.t.C.T.
C EARFC K TRINITY RIVER
TARRANT CCJNTY WATER
CONTROL
,Sc IMPROVEMENT DISTRICT NO. 1
VOL 4559, PG. 1
D.R.T.C.T.
LEGEND
pIIIIIIIIIIIIIIIIIIIIIIII
SIDEWALK RAMP
10' SDEWALK TO
TRINITY TRAILS
r
PROPOSED EDGE OF ROAD
PROPOSED TEMPORARY ASPHALT
TURNAROUND
PROPOSED 5' SIDEWALK
EXISTING PROPERTY LINE
CLEARFORK ► IN STREET
rs
o't
SCALE 1 = 200'
/
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
5' SIDEWALK RUNS
PARALLEL TO R.O.W.
Pizafital
5' SIDEWALK RUNS
PARALLEL TO R.O.W.
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
.Y IMPROVEMENT DISTRICT N0. 1
VOL 4559. PC. 1
D.R.T.C.T.
PAVING
EXHIBIT B
CLEARFORK MAIN STREET
PHASE 5
JACOBS*
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 4 OF 6
DROP
INLET
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.LC.T.
�•-�Sg�G.2
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
4'X4'
DROP
INLET
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
t
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL 4559. PG. 1
D.R.T.C.T.
LEGEND
PROPOSED STORM
PROPOSED STORM
PROPOSED STORM
DRAIN SYSTEM
DRAIN DROP INLET
DRAIN MANHOLE
PROPOSED SLOPING HEADWALL
EXISTING STORM DRAIN SYSTEM .
ALL STORM DRAIN INLET PIPES ARE 21" RCP UNLESS
OTHERWISE NOTED.
t.
4'X4'
DROP
INLET
A 4'X4'
ii DROP
INLET
1D.%1NTo11'
1O' INLET
SCALE 1 " = 200'
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL 4559. PG. 1
D.R.T.C.T.
PUBLIC AND PRIVATE STORM DRAIN
EXHIBIT B-1
CLEARFORK MAIN STREET
PHASE 5
JACOBS®
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 5 OF 6
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.7
EU
■
EDWARDS RANCH LTD
VOL. 12915, PG. 394
D.R.T.C.T.
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL. 4559. PG. 1
D.R.T.C.T.
LEGEND
i
PROPOSED UNDERGROUND
ELECTRICAL CONDUIT
PROPOSED PULL BOX
PROPOSED UGHTPOLE
EXISTING PROPERTY LINE
SCALE 1" = 200'
EDWARDS RANCH LTD
VOL 12915, PG. 394
D.R.T.C.T.
CLEARFORK MAIN _SIRE,'
/
I
> o
cot
(Pen
env
CLEARFORK TRINITY RIVER
TARRANT COUNTY WATER
CONTROL
& IMPROVEMENT DISTRICT NO. 1
VOL. 4559, PG. 1
O.R.T.C.T.
STREET LIGHTS
EXHIBIT C
CLEARFORK MAIN STREET
PHASE S
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
(817) 735-6000
PROJECT NO. WFXL5900
PAGE 6 OF 6