HomeMy WebLinkAboutContract 51936-A1 AL202 AMENDMENT No.1
t5iZ�0R NM TO CITY SECRETARY CONTRACT No. 51936 CSC No.51936-Al
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 51936, (the
CONTRACT) which was authorized by M&C C-28980 on the 15th day of January,
2019 in the amount of $148, 000 .00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
River Trails Park to River Legacy Park Trail Project; and
WHEREAS, it has become necessary to execute Amendment No. l to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
survey and design services specified in a proposal dated June 5, 2020, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $98, 695. 00. (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $246, 695. 00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
City of Fort Worth
Professional Services Agreement Amendment Template fFT.
FiC' LRECORD
PMO Official Release 8/1/2012
Page,of ITY SECRETARY
` ORTH,TX
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
Cit./y, of Fort Worth Halff Associates Inc.
Valerie Washington(Jul 10,202013:05 CDT)
Valerie Washington Stephen Crawford
Assistant City Manager Vice President
DATE: Jul 10) 2020 DATE: Jul 10) 2020
APPROVAL RECOMMENDED:
Rc'l d zAp -
Richard Zavala(Jul 10,2020 11:32 CDT)
Richard Zavala
Director, Park & Recreation Department
APPROVED AS TO FORM AND LEGALITY: M&C:
GWAO�z Date: Jul 1012020
2M1f1.M-AbrM
Mack(Jul 10,202012:55 CDT)
Douglas W. Black
Assistant City Attorney
ATTEST. ' `
Ilii/�'
Mary J. Kayser • "
City Secretary n.J
im
J u l 10) 2020
OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth FT. WORTH,TX
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
FUNDING BREAKDOWN SHEET
City Secretary No. 51936
Amendment No. 1
Department FID Amount
Park &
Recreation 34018-0800450-5330500-101767-005030-- $98, 695 . 00
Dept.
Total : $98, 695 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
mom HALFF
mom
AMENDMENT 1
PHASE 2 OF THE TRINITY TRAILS EAST FORT WORTH EXTENSION
SCOPE OF WORK
SCOPE OF SERVICES
BASIC SERVICES
TASK 1—COORDINATION/MANAGEMENT/COMMUNICATION
ENGINEER shall perform the following tasks:
A) Attend one (1) project kick-off meeting(up to two-hour duration)with the CITY to review project
scope,schedule,deliverables,status reporting,communications,and expectations for the project.
TASK 2—DATA REVIEW/SITE VISIT/BASE MAP
ENGINEER shall perform the following tasks:
A) Provide permanent trail easement and temporary construction easement documents for the Ken
Allen tract
B) Prepare a project base map for the project design area utilizing ENGINEER's gathered relevant
project data.The project base map shall be suitable for use in both 22 inch x 34 inch (full size) and
11 inch x 17 inch (half size)format with black and white line work(and with full-color aerial photo
background which can be turned on or off as requested by CITY). The base map shall include, at
minimum,the following data for all areas within the project study area:
a. Existing photometric (LIDAR)topographic contours(2-foot contour interval)
b. Flood limits (location of FEMA 100-year floodplain and floodway)
c. Utilities (underground/at-grade/overhead, location, type, size, owner name and contact
information)
d. Property ownership (current owner name and contact information, TAD parcel number,
parcel size, assessed values of land and improvements)
e. Aerial photography(latest available color Google or other—Nearmap)
C) Visit the project site to observe and photographically document existing conditions as necessary
for completion of the project. Landscape Architect to identify any trees along proposed path that
need to be preserved and protected during construction or for trail re-routing purposes.
TASK 3—TRAIL DESIGN
ENGINEER shall perform the following tasks:
HALFF ASSOCIATES.INC.
1201 NOR I H BOWSER ROAD TEL (214)346-6200 W WW.HALFF.COM
RICHARDSON,TX 75081-2275 FAX(214)739-0095
■■■MEN H A L f Jane 5,2020
MENCity of Fort Worth
Page 2
A) Prepare design beyond Schematic(30%) design through final design and cost opinion documents
as described below for each of the identified task in PROJECT DESCRIPTION section. Design for
trail shall follow current AASHTO design standards unless directed otherwise by CITY
B) Ensure that all previously assigned schematic design trail study items are accomplished. Update
trail alignment based on CITY feedback and Challenges Memorandum prepared by Halff during
the Schematic Design phase.
C) Determine and illustrate, utilizing project study area base map background,trail routing options
that ENGINEER proposed to the CITY (including the existing trail previously constructed in
conjunction with Trinity Trails East Fort Worth Extension Phase 1). ENGINEER's proposed trail
route shall be based on ENGINEER's knowledge and experience,submitted schematic design, and
data including anticipated construction costs, environmental/historic/cultural/wildlife resource
impacts, and required property/easement acquisitions.
TASK 4—60%CONSTRUCTION DOCUMENTS
ENGINEER shall perform the following tasks:
A) Prepare and submit 60%design/construction documents for the trail to the CITY for review.These
documents shall incorporate CITY comments and input from the previous review of project data
and existing site conditions.
B) The design/construction documents shall plan and instruct the installation of the trail, as based
on the approved Schematic Design plans. Design will include civil engineering design, landscape
architecture design, and structural design for pedestrian bridge components and any retaining
walls that may be needed, based on final schematic alignment
C) Preliminary 60%design/construction documents as part of this amendment will be developed for
initial feedback, but a complete deliverable will not be prepared:
a. Design/construction plans
L No technical specifications will be prepared under this scope
ii. No detailed opinion of probable costs will be prepared under this scope
D) Halff will provide a digital submittal of the preliminary 60% design/construction documents to
complete the scope of work for this amendment. Halff will attend one meeting with the City, if
needed.
Note: Trail improvements will follow applicable AASHTO and City of Fort Worth standards and details,
unless directed otherwise. Park Facility Standards will be provided by the CITY. All other required
standards will need to be researched,verified, and acquired separately.
SPECIAL SERVICES
TASK 10—TOPOG RAPH IC SURVEY
A) ENGINEER shall provide additional topographic surveys for re-aligned trail segment through the
Ken Allen property
MEN
020
MENHA L F F ry June s Worth
City of Fort Worth
■■■ Page 3
PROJECT SCHEDULE
Halff Associates will work closely with the Client on the project schedule for completion of the scope of
work,which is anticipated to be 90 calendar days from notice-to-proceed (approximately 10 months).
BASIS OF COMPENSATION
A. Basic Services:
The basis of compensation for Basic Services shall be as follows:
TASK 1—COORDINATION/MANAGEMENT/COMMUNICATION
1. Kick-off Meeting S 2,190
Subtotal $2,190
TASK 2—DATA REVIEW/SITE VISIT/BASE MAP
1. Easement Preparation
a. Subconsultant—Easement Preparation—Ken Allen tract $17,500
2. Project Basemap $ 3,390
3. Project Site Visit/Tree Identification 2,720
Subtotal $23,610
TASK 3—TRAIL DESIGN
1. Update trail alignment based on feedback&challenges $ 4,050
2. Trail routing options 4,050
Subtotal $ 8,100
TASK 4—60%CONSTRUCTION DOCUMENTS
1. Preliminary 60%Construction Documents $57,095
Subtotal $57,095
TOTAL—BASIC SERVICES $90,995
B. Special Services:
The basis of compensation for Special Services shall be as follows:
TASK 10—TOPOGRAPHIC SURVEY
1. Additional Topographic Surveys—Ken Allen tract 7,700
Subtotal $ 7,700
TOTAL—SPECIAL SERVICES $ 7,700
GRAND TOTAL $98,695
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Name of Employee
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
r 07r"COAL RECORD
1
017 SECRETARY
Fl.f.m WORTH,TX
i�
H
V
0 �
a
>
z
w o >
r
m O
IL v,
w —
w •� o
Q mCD
c
G > a E
Z w E
m U
O cn s
= O w
O2H i> > o
W Z °� � .L m � �
0 VW � a ~ � � � o
m Z 2 ' a p 'cn •L Oz
Q N
� m c
_ � 0
p N
Z
J Z H W U V c >+ E
W }.
� a � � w Uc
02 Q z z °' >, a)
O � �
°� E
a tm a= O v
U ♦�♦ o '(n 0 N N
U U
0 L N U m
H w o m •Q '�
ca
Z C� L = O m O N
O Q t„ z .L
H
N �
cm
a�
'U) a
cm E
w U CO
m C
U N 00 +�+ O E
'O 'U O bF} E 'm t N C a)
L N iF L +•+ •C ) O a)� a m N p Q � 3 p m
SO
4-O L d 't� QCL
V U N p m E N N
o Q 0O E 'CL a Q
QL
U) 0 E ai r 'O tm C '� R m
p +r �, L (D C� — 2 (n o
CD p m a J
Z! H U. G �CL
m t