HomeMy WebLinkAboutContract 44117 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. t'/Lj) 1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: CRC McPherson 35, LP
Address, State, Zip Code: 5950 Berkshire Ln., Suite 900 1 Dallas, TX 75225
Phone, E-Mail: (214) 855-1200 I jm11extongroup.com
Authorized Signatory/Title: J. Michael Lengen, Managing Member
Project Name: Garden Acres
Project Location: NWC of McPherson & I11-3 5 W
Plat Case No.: FS-012-103 Plat Name: McPherson Plaza Addition
Mapsco: 119A
Council District: 6 City Project No: 01990
CFA: 2012-081 DOE: 6920
To be completed by staff
Received by:
Date:
FFPICIAL RECOGB
i cTY SECRETARY
ET. WORTHS TX I
01-23-13 P03:36 IN
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X z
Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights &
Signs (C)_
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's Insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DhVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries. death or
damages are caused, rn whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants. or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused. in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Project Name: Garden Acres
CFA No.: 2012-081
Cost Summary Sheet
DOE No.: 6920
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
ICash Escrow Water/Sanitary Sewer= 125%
(Cash Escrow Paving/Storm Drain = 125%
'Letter of Credit = 125% w/2yr expiration period
28,975.00
32,035.00
61,010.00
50,180.00
2,020.00
52,200.00
113,210.00
1,220.20
1,220.20
2,440.40
2,088.00
1,044.00
3,132.00
5,572.40
Choice
Amount (ck one)
113,210.00
113,210.00 1
76,262.50
65,250.00
141,512.50
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has exec ted this
instrument in quadruplicate, at Fort Worth, Texas this r) 47 day of
,20 ).
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi abulal, EMBA, P.E.
Developme t Engineering Manager
Approved cis to Fonn & Legality:
A‘I: IP
Wvar
ug . � .Black
Assistant City Attorney
M&C No. of
Date:
ATTEST:
Mary J. Kays
City Secretary
ATTEST:
(Print) Name:
Transportation & Public Works Department
. Li1/4-)�
Douglas(. Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
.4„„tattrtiti
stoner itMl>,
0
0 a
//r7,00
0 0
0
ei
� o
o0
A l��
Ashley Waits
Commission Expires
l -09-2 0 t 5
113hi.ey utYkie-k
•
Print Name:
Title:
•
CITY SECRETARY
ptWORTH,TX
00 40
0
o
ls%
0
o
e*Igi
r li
4trs,
o04Uo0Qaa
nkoi
41. titettlia1/4>
CRC McPherson, 35, LP
By: Cole Realty Capital, LLC
Its general partner
\ j`‘nature
14 111( C4171 /C5AX.re
1441 j/KF rtA17 191.3
�l'1C-c/ OaJ r�
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
V'
a
a
a
m
Ei
n
(Remainder of Page Intentionally Left Blank)
EXHIBIT 'A'
EX. 8" Pv& w_L.
APPROX.
90' WEST
BILSKY BAY DR. (PRIVATE)
REPUBLIC DEER CREEK ADDITION
BLOCK 1
STA. 0+05, W.L. "A"
INSTALL:
1-45' BEND (RT.)
W/ BLOCKING
1-CLEANING WYE
REMOVE CLEANING PIG
N: 6903354.07
E: 2331304.15
1
Lott
10600 Bllsky Bay Dr.
Republic Deer Creek Ohwc LP
600 Congress Ave., Sulte 200
Austin, Tx 78701-3236
15' PERMANENT
UTILITY EASEMENT
} 1+00
PROPOSED 10" W.L. "A"
STA. 0+26, W.L. "A"
INSTALL:
1-45" BEND (LT.)
W/ BLOCKING
N: 6903339.53
E: 2331319.30
L
15' PERMANENTS
WATER LINE EASEMENT
(PERPtAT)
1
7.5 (TYP.) -f
McPHERSON PLAZA ADDITION
BLOCK 1
STA. 0+00. W.L. "A"
REMOVE EX. 8" PLUG
CONN. TO EX. 8" W.L.
INSTALL:
1-8" SOLID SLEEVE
1-10" X 8" REDUCER
N: 6903353.97
E: 2331299.15
Lot 2B
140 McPherson Blvd.
Gc McPherson 35 LP
8333 Douglas Ave., Suite 1260
Dallas, Tx 75225-5896
2+00
15 PERMANENT -�
SANITARY SEWER EASEMENT
(PER PLAT)
PROP. 8" S 5.
(SEE SHT.7)
PROP CONC PAVING
L (SEE SMT. 9)
3I00
Lot 2D
15' PERMANENT —
DRAINAGE EASEMENT
Lot 2C
Lot 2A
EX. 29" SD
STA. 4+72.75., W.L. "A"
CONN. TO EX. 8" W.L.
INSTALL:
1-11.25" BEND (RT.)
W/ BLOCKING
1-10" X 8" REDUCER
1-8" SOLID SLEEVE
INSERT CLEANING PIG
N: 6903348.64
E: 2331765.96
4+00
PROPOSED 10" W.L. "A"
MUTUAL ACCESS
EASEMENT
(PER PLAT)
PROP, CONC. PAVING
(SEESHT. 9)
NOTES
I. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD
SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO
CONSTRUCTION.
0 20 90 60
GRAPHIC SCALE IN FEET
WARNING
The Contractor shall make all necessary provisions for the support, Protection,
relocation, and temporary relocation of all utilities, structures and utility poles
bolt above and below ground during construction. The Contractor Is liable
for all damages done as a result of his operations
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
The companies listed below are known to have facilities within the Oryry of
Fart Worth, Texas area, The Contractor shalt contact the fallowing offices
at (east 98 hours prior to excavating at this location.
CRY OF FORT WORTH TRANSPORTATION
& PUBLIC WORKS (817) 871-8100
CITY OF FORT WORTH WATER DEPARTMENT (817) 871-8296
MEMBERS OF DIG-TESS (800) 39+8377
AT&T
CHARTER COMMUNICATIONS
COSERV
MCI WORLDCOM
MILLENNIUM TELCOM
SOUTHWESTERN BELL TELEPHONE COMPANY
TRECOUNTY ELECTRIC COOP
TXU GAS & ELECTRIC
VERIZON
The Contractor shall verity the elevation, configuration, and ongulotion of
existing utility lines prior to construction. Such vedllcauon shall be considered
a subsidlary cold of construction.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
CONTROL DATA
CONBtOL POINT No. 500 CONTROL POINT No. 501
"X" CUT IN CURB
N = 6902959.18
E 2331308.26
ELEV. = 706.33
"X' CUT IN CURB
N = 6903037.51
E = 2330953,93
ELEV. = 707.32
:OFW OASEMAP NOS.: 2059-336 MAPSCO NOS.: 119A
in I 5 I
z 4I
C
2
GJ
DESCRIPTION DATE
CITY OF FORT WORTH TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT.
D.O.E. NO. 6920
CITY PROJECT NO. 01990
TPW PROJECT NO. (JU(%-XXXIL`0(-%UC(%X%%X)O(X
WATER PROJECT NO. P265-6061501990-00
SEWER PROJECT NO. P275-7061301990XX
FILE N0.
GARDEN ACRES
(McPHERSON PLAZA ADDITION, LOT 2, BLOCK I )
10" WATER - LINE A
(STA. 0+00 TO STA. 4+72.75)
DESIGNED: BEL
DRAWN: BEL
EBG ENGINEERING, LLC
3950 FOSSIL CREEK BLVD., SUITE 204
FORT WORTH, TX 76137
TEXAS FIRM REG. NO. 12218
CHECKED: JWB
APPROVED: ANW
DATE SHEET
NOV, C
2012 J
EBG JOB NO. 1203.
u.
2
c
EXHIBIT Al
Lot 1
_00 M Pherson Blvd.
Md -Fre Ix LP
31018], Suite 1400
Dallas, Tx 75234-2773
w` CONTROL POINT No. 501
N . 6903037.51
E = 2330953.93
ELEV. = 70732
1
I
I
I
I
1—
Q
I I
Lam IX.8"W.L._ _ _I
7.5' (PP.)]
0+00 •
_ EX.8"SS
EX.24"SO
EX. 16"W.L
McPHERSON PLAZA ADDITION
BLOCK 1
ATA 0+00.0n LINE A
CORE & CONN. TO EX. SSMH
BEGIN PROP. 8" 55
N: 6903028.52
E: 2331301.69
CONTROL POINT No. 500
N m 6902959.1s
E ® 2331308.26
ELEV.. 70633
MePHERSON PLAZA ADDITION
BLOCK 1
15' PERMANENT
SANITARY SEWER EASEMENT
(PER PLAT)
Lot 2A
Lot 20
110 McPherson Blvd.
Crc McPherson 35 LP
8333 Douglas Ave, Suite 1260
Dallas, Tx 75225-5896
4+00
7.5 (3YP,) i
t
Lot 2B
140 McPherson Blvd.
Crc McPherson 35 LP
8333 Douglas Ave., Sul+ 1260
Dallas, Tx 75225-5896
15' PERMANENT
SANITARY SEWER FAFFMENT PROP. 21" RCP SD
(PER PLAT) / 10' PERMANENT
(SEE SHT. 9) DRAINAGE EASEMENT
(+00 2+00 �\ / (PER PLAT)
' - J� Y EX. 30" SD
MATCH LINE STA. 3+00
SEE SIIEET 7
----CMS
-----•-- MOM
-r •-•-------
STA. 2+33.70, LINE A
CONST. STD. 4' DIA SSMH
W/ WATERTIGHT INSERT.
N: 6903034.02
E: 2331535.33
15' PERMANENT
ri-SANITARY SEWER EASEMENT tot 2A
(PER PLAT)
PROP. CONC. PAVING
/ (SEE SHT. 9)
MUTUAL ACCESS
EASEMENT
(PER PLAT)
EX. GAS
15' PERMANENT —1-1
WATER LINE EASEMENT
(PER PLAT)
PROP. 10" W.L
(SEE SHT. 5)
STA. 5+62. LINE A
CONSf. STD. 4' DIA. SSMH
W/ CONC. COLLAR AND
WATERTIGHT INSERT.
N: 6903362.25
E: 2331528.69
Ltt 2C
5+00
�-- 15 PERMANENT
UTILITY EASEMENT
J
L
REPUBLIC DEER
CREEK ADDITION
BLOCK 1
L-- 1S' PERMANENT
DRAINAGE EASEMENT
Lot 1
10600 Bllsky Bay Dr.
Republic Deer Creek Ohwc LP
60D Congress Ave., Suite 200
Austin, Tx 78701-3236
Lot 20
EX. GAS
McPHERSON BLVD.
(EX. CONCRETE PAVEMENT)
EX. 16" W.L.
0 20 40 60
GRAPHIC SCALE IN FEET
NOTES
1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD
SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO
CONSTRUCTION.
0 20 90 60
.---
GRAPHIC SCALE IN FEET
WARNING
The relocation, andr tempol rary rke elocation o l all utilities, structures rovisions for pand utllrltryy ppoles
both above and below ground during construction. The Contractor is liable
for all damages done as a result of his operations.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
The companies listed below are known to have facilities within the ay of
Fort Worth, Texas area. The Contractor shall contact the following offices
at least AB hours prior to excavating at this location
CITY OF FORT WORTH TRANSPORTATION
& PUBLIC WORKS (817) 871-8100
CITY OF FORT WORTH WATER DEPARTMENT (817) 871.8296
MEMBERS OF DIG-TESS (800) 344-8377
AT&T
CHARTER COMMUNICATIONS
COSERV
MCI WORLDCOM
MIN FNNIUM TELCOM
SOUTHWESTERN BELL TELEPHONE COMPANY
TRI{AUNTY ELECTRIC COOP
TXU GAS & ELECTRIC
VERI2ON
The Contractor shall verity the elevation, configuration, and onqutohon of
alseng utility lines prior to conntruceon. Such verification shall be coreidered
a subsidiary cost of construction.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
CONTROL DATA
CONTROL POINT No. 500 CONTROL POINT No. 501
"X" CUT IN CURB
N - 6902959.18
E = 2331308.26
ELEV... 706.33
"X" CUT IN CURB
N = 6903037.51
E m 2330953.93
ELEV. ® 707.32
"OFW BASEMAP NOS.: 2054.336 MAPSCO NOS.: 119A
DESCRIPTION
DATE
BY
CITY OF FORT WORTH TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT.
D.O.E. NO. 6920
CITY PROJECT NO. 01990
TPW PROJECT NO. O30(-IO0000(-X)IX030IXI0000(
WATER PROJECT NO. P265-6061501990-00
SEWER PROJECT NO. P275.7061301990XX
FILE NO.
GARDEN ACRES
( McPHERSON PLAZA ADDITION, LOT 2, BLOCK I )
8" SAN. SEWER - LINE A
(STA. 0+00 TO STA. 3+00)
DESIGNED: BEL
DRAWN: BEL
EBG ENGINEERING, LLC
3950 FOSSIL CREEK BLVD., SUITE 204
FORT WORTH, TX 76137
TEXAS FIRM REG, NO. 12218
CHECKED: JWB
APPROVED: ANW
DATE
NOV.
2012
SHEET
6
6920 Fii F NO
EBG JOB NO. 12031
0-
of
OF WATER SANITARY SRNFR ANO PAVING IMPROVEMENTS TO SERVE
EXHIBIT 'B'
STRIPE PROPOSED
DRIVE ENTRANCE
FOR RIGHT -TURN IN
& RIGHT -TURN OUT
SAWCUT AND REMOVE
83 LF EX. CONC. CURB
AND GUTTER
g
V)
LINE A
PROP. 8" S.S.
(SEE SHT. 6)
II
i
L4 0
25`r-
Lot 2B
140 McPherson Blvd.
Crc McPherson 35 LP
8333 Douglas Ave., Suite 1260
Dallas, Tx 75225-5896
PROP. 20 LF - 24" RCP SD Col 1.0 %
CONN. TO EX. 24" STUB -OUT
PLUG END
20' R. I
Icil + 5
� ex
'I I '
ec
yak
10' PERMANENT — 1 -►1 - : „a
DRAINAGE EASEMENT w
(PER PLAT)
. I
I r EX. 21" SD
I
Li 2 25 (TYP.)
EX= •
. $D
PROP. 10' SD
SUMP INLET
"BY OTHERS"
35' R.
25'
(TYP.)
LINE A
PROP. 8" S.S,
(SEE SHT. 7)
I
LINE A
PROP. 10" W.L
(SEE SHT. 5)
15' PERMANENT—)-- I r
UTILITY EASEMENT 1
151 PERMANENT--W
WATER LINE EASEMENT
(PER PLAT)
15' PERMANENT
SANITARY SEWER EASEMENT
.IL (PER PLAT)
MUTUAL ACCESS
EASEMENT
(PER PLAT)
SAWCUT AND REMOVE
75 LF EX. CONC CURB
AND GUTTER
7 7I-Ji'---
1
1
25'
W (FRO
230,
IX. C Aoffrif / INI GE RD )
LEGEND
15' PERMANENT WATER EASEMENT
(INSTRUMENT NO. D208121759)
SAWCUT AND REMOVE
75 LF EX. CONC. CURB
AND GUTTER
25'
PROPOSED 6" 3,600pN
REINFORCED CONCRETE
PAVEMENT WITH a3
BARS 18" O.C.E.W.
PROPOSED 6" INTEGRAL
CONCRETE CURB
PROPOSED EDGE OF
CONCRETE PAVEMENT
FUTURE CONCRETE
CURB BY OTHERS
25
25R.-
- OHE
NOTES
1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD
SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO
CONSTRUCTION.
WARNING
The Contractor shall make all necessary provIslons for the support, protection,
rebmdon, and temporary relocallon of all utilities, structures and utility poles
both above and below ground during construction. The Contractor Is liable
for all damages done as a result of his operations.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
The companies Ilsted below are known to have facilities within the Oty of
Fort Worth, Texas area. The Contractor shall contact the following offices
at least 48 hours prior to excavating at this location.
[CRY OF FORT WORTH TRANSPORTATION
& PUBLIC WORKS (817) 871-8100
CITY OF FORT WORTH WATER DEPARTMENT (817) 871-5296
MEMBERS OF DIG -TES$ (800) 344-5377
AMT
[CHARTER COMMUNICATIONS
COSERV
MCI WORLDCOM
IMILLENNIUM TELCOM
SOUTHWESTERN BELL TELEPHONE COMPANY
TRI-COUNTY ELECTRIC COOP
TAU GAS & ELECTRIC
VERQON
The Contractor shall verify the elevation, configuration, and onquleton of
ex}rting utlllry lines odor to construction. Such verlficaUon shall be corcAdered
a subsidiary cost of camtrucfon.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED,
•
CONTROL DATA
CONTROL POINT No. 500 CONTROL POINT No. 501
"X" CUT IN CURB
N = 690295918
E m 2331305.26
ELEV. = 706.33
"Jr CUT IN CURB
N m 6903037.51
E ® 2330953.93
ELEV... 70732
COFW BASEMAP NOS.: 2051-336 MAPSCO NOS.: 119A
DESCRIPTION
3
1-
C
DATE BY g
CITY OF FORT WORTH TEXAS s
TRANSPORTATION AND PUBLIC WORKS DEPT. `c
2
D.O.E. NO. 6920
CITY PROJECT NO. 01990
TPW PROJECT NO. CXXWXIDU.'%l(-)OOc' 0000000(
WATER PROJECT NO, P265-6061501990-00
SEWER PROJECT NO. P275-7061301990XX
FILE NO.
GARDEN ACRES
( McPHERSON PLAZA ADDITION, LOT 2. BLOCK t
DESIGNED: BEL
DRAWN: BEL
a
2
v
u
PAVING PLAN
E
EBG ENGINEERING, LLC
3950 FOSSIL CREEK BLVD., SUITE 204
FORT WORTH, TX 76137 L
TEXAS FIRM REG. NO. 12218
CHECKED: JWB I DATE
APPROVED: ANW 2012
SHEET g
9 a
EBG JOB NO. 1203.
EXHIBIT'B1'
i
1
I
PROP. 20 LF - 24" RCP SD @ 1.0
CONN. TO EX. 24" STUB -OUT
PLUG END
111111111
NOTES
1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD
SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO
CONSTRUCTION.
WARNING
The Contractor shall make all necessary provisions for the support, protection,
relaaUon, and temporary relocation a( all utilities, structures and utility poles
both above and below ground during construction. The Contraaor Is liable
for all damages done as a result of his operations.
NO ADOITONAL COMPENSATION WILL BE ALLOWED.
The companies listed below are known to have facilities within the OW of
Fort Worth, Texas area The Contractor shall contact the following offices
at least 18 hours prior to excavating at this location.
ICRY OF FORT WORTH TRANSPORTATION
& PUBLIC WORKS (817) 871-8100
CITY OF FORT WORTH WATER DEPARTMENT (817) 871-8296
IMMEMTBERS OF DIG-TESS (800) 344-8377
'CHARTER COMMUNICATIONS
COSERV
WORLO
!MIILLLENNIUM TTELCOM
SOUTHWESTERN BELL TELEPHONE COMPANY
TRI-COUNTY ELECTRIC COOP
TXU GAS & ELECTRIC
VERIZON
The Contractor shall orgy the elevation, configuration, and ongulatlon of
existing utility lines p or to construction, Such verification shall be considered
a subsidiary cost of construction.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
•
•
CONTROL DATA
CONTROL POINT No. 500 CONTROL POINT No. 501
"X" CUT IN CURB
N ® 6902959.1E
E m 2331308.26
ELEV. = 706.33
"X" CUT IN CURB
N m 6903037.51
E = 2330953.93
ELEV.. 707.32
:OFW BASEMAP NOS.: 2054-336 MAPSCO NOS.: 119A
DESCRIPTION
DATE
BY
CITY OF FORT WORTH TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT.
D.O.E. NO. 6920
CITY PROJECT NO. 01990
TPW PROJECT NO. CXXX-%XXX%X-)O %XX) (X
WATER PROJECT NO. P265-6051501990-00
SEWER PROJECT NO. P275-7061301990)0(
FILE NO.
GARDEN ACRES
( MCPHERSON PLAZA ADDITION, LOT 2. BLOCK I
DESIGNED: BEL
BEL
DRAWN:
PAVING PLAN
EBG ENGINEERING, LLC
3950 FOSSIL CREEK BLVD., SUITE 204
FORT WORTH, TX 76137
TEXAS FIRM REG. NO. 12218
CHECKED: 7WB
APPROVED: ANW
DATE SHEET
NOV. (T
2012 7
EBG JOB NO. 1203
UNIT PRICE BID
Bidlist Item
No.
Description
SECTION 00 42 43
PROPOSAL FORM
Project Item Information
Water
1 3305.0109 Trench Safety (Water)
2 3311.0001 Ductile Iron Water Fittings
3 3311.0341 10" Water Pipe
4 3312.0103 Connection to Existing 8" Water Main
Sanitary Sewer
1 3301.0002 Post -CCTV Inspection
2 3301.0101 Manhole Vacuum Testing
3 3305.0109 Trench Safety (sanitary sewer)
4 3305.0112 Concrete Collar
5 3305.0113 Clay Dams
6 3331.4115 8" Sewer Pipe
7 3339.1001 4' Manhole
Storm
1 3305.0109 Trench Safety (storm)
2 3341.0205 24" RCP, Class III
1
2
3
4
5
6
7
8
9
Paving
0241.1300
3123.0101
3211.0400
3211.0501
3213.0102
3213.0401
3213.0700
3216.0101
3471.0001
Remove Conc Curb&Gutter
Unclassified Excavation
Lime
6" Lime Treatment
6" Conc. Pvint.
6" Concrete Driveway
Joint Sealant
6" Conc Curb and Gutter
Traffic Control
Specification Section No.
33 11 11
33 11 10, 33 11 12
33 12 25
33 01 31
33 01 30
33 05 17
33 05 15
33 11 10, 33 31 12, 33 31 20
33 39 10, 33 39 20
02 41 15
31 23 16
32 11 29
32 11 29
32 13 20
32 13 73
32 16 13
34 71 13
00 42 43
BID PROPOSAL
Pagel of
Bidder's Application
Unit of Bid Quantity
Measure
LF
TON
LF
EA
LF
EA
LF
EA
LF
LF
EA
LF
EA
LF
LF
CY
TN
SY
SY
SF
LF
LF
MO
475
1.5
475
2
565
2
565
2
2
565
2
20
20
240
5
20
415
460
3,720
100
390
0.5
Bidder's Proposal
Unit Price
$1.00
$5,000.00
$40.00
$1,000.00
Total
$3.00
$250.00
$1.00
$750.00
$500.00
$35.00
$3,500.00
Total
$1.00
$100.00
Total
$10.00
$25.00
$150.00
$2.00
$35.00
$5.00
$0.75
$20.00
$2,500.00
Total
Grand Total:
Bid Value
$475
$7,500
$19,000
$2,000
$28,975.00
$1,695
$500
$565
$1,500
$1,000
$19,775
$7,000
$32,035.00
$20.00
$2,000.00
$2,020.00
$2,400.00
$125.00
$3,000.00
$830.00
$16,100.00
$18,600.00
$75.00
$7,800.00
$1,250.00
$50,180.00
$113,210.00
CITY OF FORT 1VORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
00 42 43_Bid Proposal Workbook