Loading...
HomeMy WebLinkAboutContract 44117 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. t'/Lj) 1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: CRC McPherson 35, LP Address, State, Zip Code: 5950 Berkshire Ln., Suite 900 1 Dallas, TX 75225 Phone, E-Mail: (214) 855-1200 I jm11extongroup.com Authorized Signatory/Title: J. Michael Lengen, Managing Member Project Name: Garden Acres Project Location: NWC of McPherson & I11-3 5 W Plat Case No.: FS-012-103 Plat Name: McPherson Plaza Addition Mapsco: 119A Council District: 6 City Project No: 01990 CFA: 2012-081 DOE: 6920 To be completed by staff Received by: Date: FFPICIAL RECOGB i cTY SECRETARY ET. WORTHS TX I 01-23-13 P03:36 IN NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X z Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C)_ E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's Insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DhVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries. death or damages are caused, rn whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Project Name: Garden Acres CFA No.: 2012-081 Cost Summary Sheet DOE No.: 6920 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat ICash Escrow Water/Sanitary Sewer= 125% (Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period 28,975.00 32,035.00 61,010.00 50,180.00 2,020.00 52,200.00 113,210.00 1,220.20 1,220.20 2,440.40 2,088.00 1,044.00 3,132.00 5,572.40 Choice Amount (ck one) 113,210.00 113,210.00 1 76,262.50 65,250.00 141,512.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has exec ted this instrument in quadruplicate, at Fort Worth, Texas this r) 47 day of ,20 ). CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi abulal, EMBA, P.E. Developme t Engineering Manager Approved cis to Fonn & Legality: A‘I: IP Wvar ug . � .Black Assistant City Attorney M&C No. of Date: ATTEST: Mary J. Kays City Secretary ATTEST: (Print) Name: Transportation & Public Works Department . Li1/4-)� Douglas(. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager .4„„tattrtiti stoner itMl>, 0 0 a //r7,00 0 0 0 ei � o o0 A l�� Ashley Waits Commission Expires l -09-2 0 t 5 113hi.ey utYkie-k • Print Name: Title: • CITY SECRETARY ptWORTH,TX 00 40 0 o ls% 0 o e*Igi r li 4trs, o04Uo0Qaa nkoi 41. titettlia1/4> CRC McPherson, 35, LP By: Cole Realty Capital, LLC Its general partner \ j`‘nature 14 111( C4171 /C5AX.re 1441 j/KF rtA17 191.3 �l'1C-c/ OaJ r� Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate V' a a a m Ei n (Remainder of Page Intentionally Left Blank) EXHIBIT 'A' EX. 8" Pv& w_L. APPROX. 90' WEST BILSKY BAY DR. (PRIVATE) REPUBLIC DEER CREEK ADDITION BLOCK 1 STA. 0+05, W.L. "A" INSTALL: 1-45' BEND (RT.) W/ BLOCKING 1-CLEANING WYE REMOVE CLEANING PIG N: 6903354.07 E: 2331304.15 1 Lott 10600 Bllsky Bay Dr. Republic Deer Creek Ohwc LP 600 Congress Ave., Sulte 200 Austin, Tx 78701-3236 15' PERMANENT UTILITY EASEMENT } 1+00 PROPOSED 10" W.L. "A" STA. 0+26, W.L. "A" INSTALL: 1-45" BEND (LT.) W/ BLOCKING N: 6903339.53 E: 2331319.30 L 15' PERMANENTS WATER LINE EASEMENT (PERPtAT) 1 7.5 (TYP.) -f McPHERSON PLAZA ADDITION BLOCK 1 STA. 0+00. W.L. "A" REMOVE EX. 8" PLUG CONN. TO EX. 8" W.L. INSTALL: 1-8" SOLID SLEEVE 1-10" X 8" REDUCER N: 6903353.97 E: 2331299.15 Lot 2B 140 McPherson Blvd. Gc McPherson 35 LP 8333 Douglas Ave., Suite 1260 Dallas, Tx 75225-5896 2+00 15 PERMANENT -� SANITARY SEWER EASEMENT (PER PLAT) PROP. 8" S 5. (SEE SHT.7) PROP CONC PAVING L (SEE SMT. 9) 3I00 Lot 2D 15' PERMANENT — DRAINAGE EASEMENT Lot 2C Lot 2A EX. 29" SD STA. 4+72.75., W.L. "A" CONN. TO EX. 8" W.L. INSTALL: 1-11.25" BEND (RT.) W/ BLOCKING 1-10" X 8" REDUCER 1-8" SOLID SLEEVE INSERT CLEANING PIG N: 6903348.64 E: 2331765.96 4+00 PROPOSED 10" W.L. "A" MUTUAL ACCESS EASEMENT (PER PLAT) PROP, CONC. PAVING (SEESHT. 9) NOTES I. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO CONSTRUCTION. 0 20 90 60 GRAPHIC SCALE IN FEET WARNING The Contractor shall make all necessary provisions for the support, Protection, relocation, and temporary relocation of all utilities, structures and utility poles bolt above and below ground during construction. The Contractor Is liable for all damages done as a result of his operations NO ADDITIONAL COMPENSATION WILL BE ALLOWED. The companies listed below are known to have facilities within the Oryry of Fart Worth, Texas area, The Contractor shalt contact the fallowing offices at (east 98 hours prior to excavating at this location. CRY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS (817) 871-8100 CITY OF FORT WORTH WATER DEPARTMENT (817) 871-8296 MEMBERS OF DIG-TESS (800) 39+8377 AT&T CHARTER COMMUNICATIONS COSERV MCI WORLDCOM MILLENNIUM TELCOM SOUTHWESTERN BELL TELEPHONE COMPANY TRECOUNTY ELECTRIC COOP TXU GAS & ELECTRIC VERIZON The Contractor shall verity the elevation, configuration, and ongulotion of existing utility lines prior to construction. Such vedllcauon shall be considered a subsidlary cold of construction. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. CONTROL DATA CONBtOL POINT No. 500 CONTROL POINT No. 501 "X" CUT IN CURB N = 6902959.18 E 2331308.26 ELEV. = 706.33 "X' CUT IN CURB N = 6903037.51 E = 2330953,93 ELEV. = 707.32 :OFW OASEMAP NOS.: 2059-336 MAPSCO NOS.: 119A in I 5 I z 4I C 2 GJ DESCRIPTION DATE CITY OF FORT WORTH TEXAS TRANSPORTATION AND PUBLIC WORKS DEPT. D.O.E. NO. 6920 CITY PROJECT NO. 01990 TPW PROJECT NO. (JU(%-XXXIL`0(-%UC(%X%%X)O(X WATER PROJECT NO. P265-6061501990-00 SEWER PROJECT NO. P275-7061301990XX FILE N0. GARDEN ACRES (McPHERSON PLAZA ADDITION, LOT 2, BLOCK I ) 10" WATER - LINE A (STA. 0+00 TO STA. 4+72.75) DESIGNED: BEL DRAWN: BEL EBG ENGINEERING, LLC 3950 FOSSIL CREEK BLVD., SUITE 204 FORT WORTH, TX 76137 TEXAS FIRM REG. NO. 12218 CHECKED: JWB APPROVED: ANW DATE SHEET NOV, C 2012 J EBG JOB NO. 1203. u. 2 c EXHIBIT Al Lot 1 _00 M Pherson Blvd. Md -Fre Ix LP 31018], Suite 1400 Dallas, Tx 75234-2773 w` CONTROL POINT No. 501 N . 6903037.51 E = 2330953.93 ELEV. = 70732 1 I I I I 1— Q I I Lam IX.8"W.L._ _ _I 7.5' (PP.)] 0+00 • _ EX.8"SS EX.24"SO EX. 16"W.L McPHERSON PLAZA ADDITION BLOCK 1 ATA 0+00.0n LINE A CORE & CONN. TO EX. SSMH BEGIN PROP. 8" 55 N: 6903028.52 E: 2331301.69 CONTROL POINT No. 500 N m 6902959.1s E ® 2331308.26 ELEV.. 70633 MePHERSON PLAZA ADDITION BLOCK 1 15' PERMANENT SANITARY SEWER EASEMENT (PER PLAT) Lot 2A Lot 20 110 McPherson Blvd. Crc McPherson 35 LP 8333 Douglas Ave, Suite 1260 Dallas, Tx 75225-5896 4+00 7.5 (3YP,) i t Lot 2B 140 McPherson Blvd. Crc McPherson 35 LP 8333 Douglas Ave., Sul+ 1260 Dallas, Tx 75225-5896 15' PERMANENT SANITARY SEWER FAFFMENT PROP. 21" RCP SD (PER PLAT) / 10' PERMANENT (SEE SHT. 9) DRAINAGE EASEMENT (+00 2+00 �\ / (PER PLAT) ' - J� Y EX. 30" SD MATCH LINE STA. 3+00 SEE SIIEET 7 ----CMS -----•-- MOM -r •-•------- STA. 2+33.70, LINE A CONST. STD. 4' DIA SSMH W/ WATERTIGHT INSERT. N: 6903034.02 E: 2331535.33 15' PERMANENT ri-SANITARY SEWER EASEMENT tot 2A (PER PLAT) PROP. CONC. PAVING / (SEE SHT. 9) MUTUAL ACCESS EASEMENT (PER PLAT) EX. GAS 15' PERMANENT —1-1 WATER LINE EASEMENT (PER PLAT) PROP. 10" W.L (SEE SHT. 5) STA. 5+62. LINE A CONSf. STD. 4' DIA. SSMH W/ CONC. COLLAR AND WATERTIGHT INSERT. N: 6903362.25 E: 2331528.69 Ltt 2C 5+00 �-- 15 PERMANENT UTILITY EASEMENT J L REPUBLIC DEER CREEK ADDITION BLOCK 1 L-- 1S' PERMANENT DRAINAGE EASEMENT Lot 1 10600 Bllsky Bay Dr. Republic Deer Creek Ohwc LP 60D Congress Ave., Suite 200 Austin, Tx 78701-3236 Lot 20 EX. GAS McPHERSON BLVD. (EX. CONCRETE PAVEMENT) EX. 16" W.L. 0 20 40 60 GRAPHIC SCALE IN FEET NOTES 1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO CONSTRUCTION. 0 20 90 60 .--- GRAPHIC SCALE IN FEET WARNING The relocation, andr tempol rary rke elocation o l all utilities, structures rovisions for pand utllrltryy ppoles both above and below ground during construction. The Contractor is liable for all damages done as a result of his operations. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. The companies listed below are known to have facilities within the ay of Fort Worth, Texas area. The Contractor shall contact the following offices at least AB hours prior to excavating at this location CITY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS (817) 871-8100 CITY OF FORT WORTH WATER DEPARTMENT (817) 871.8296 MEMBERS OF DIG-TESS (800) 344-8377 AT&T CHARTER COMMUNICATIONS COSERV MCI WORLDCOM MIN FNNIUM TELCOM SOUTHWESTERN BELL TELEPHONE COMPANY TRI{AUNTY ELECTRIC COOP TXU GAS & ELECTRIC VERI2ON The Contractor shall verity the elevation, configuration, and onqutohon of alseng utility lines prior to conntruceon. Such verification shall be coreidered a subsidiary cost of construction. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. CONTROL DATA CONTROL POINT No. 500 CONTROL POINT No. 501 "X" CUT IN CURB N - 6902959.18 E = 2331308.26 ELEV... 706.33 "X" CUT IN CURB N = 6903037.51 E m 2330953.93 ELEV. ® 707.32 "OFW BASEMAP NOS.: 2054.336 MAPSCO NOS.: 119A DESCRIPTION DATE BY CITY OF FORT WORTH TEXAS TRANSPORTATION AND PUBLIC WORKS DEPT. D.O.E. NO. 6920 CITY PROJECT NO. 01990 TPW PROJECT NO. O30(-IO0000(-X)IX030IXI0000( WATER PROJECT NO. P265-6061501990-00 SEWER PROJECT NO. P275.7061301990XX FILE NO. GARDEN ACRES ( McPHERSON PLAZA ADDITION, LOT 2, BLOCK I ) 8" SAN. SEWER - LINE A (STA. 0+00 TO STA. 3+00) DESIGNED: BEL DRAWN: BEL EBG ENGINEERING, LLC 3950 FOSSIL CREEK BLVD., SUITE 204 FORT WORTH, TX 76137 TEXAS FIRM REG, NO. 12218 CHECKED: JWB APPROVED: ANW DATE NOV. 2012 SHEET 6 6920 Fii F NO EBG JOB NO. 12031 0- of OF WATER SANITARY SRNFR ANO PAVING IMPROVEMENTS TO SERVE EXHIBIT 'B' STRIPE PROPOSED DRIVE ENTRANCE FOR RIGHT -TURN IN & RIGHT -TURN OUT SAWCUT AND REMOVE 83 LF EX. CONC. CURB AND GUTTER g V) LINE A PROP. 8" S.S. (SEE SHT. 6) II i L4 0 25`r- Lot 2B 140 McPherson Blvd. Crc McPherson 35 LP 8333 Douglas Ave., Suite 1260 Dallas, Tx 75225-5896 PROP. 20 LF - 24" RCP SD Col 1.0 % CONN. TO EX. 24" STUB -OUT PLUG END 20' R. I Icil + 5 � ex 'I I ' ec yak 10' PERMANENT — 1 -►1 - : „a DRAINAGE EASEMENT w (PER PLAT) . I I r EX. 21" SD I Li 2 25 (TYP.) EX= • . $D PROP. 10' SD SUMP INLET "BY OTHERS" 35' R. 25' (TYP.) LINE A PROP. 8" S.S, (SEE SHT. 7) I LINE A PROP. 10" W.L (SEE SHT. 5) 15' PERMANENT—)-- I r UTILITY EASEMENT 1 151 PERMANENT--W WATER LINE EASEMENT (PER PLAT) 15' PERMANENT SANITARY SEWER EASEMENT .IL (PER PLAT) MUTUAL ACCESS EASEMENT (PER PLAT) SAWCUT AND REMOVE 75 LF EX. CONC CURB AND GUTTER 7 7I-Ji'--- 1 1 25' W (FRO 230, IX. C Aoffrif / INI GE RD ) LEGEND 15' PERMANENT WATER EASEMENT (INSTRUMENT NO. D208121759) SAWCUT AND REMOVE 75 LF EX. CONC. CURB AND GUTTER 25' PROPOSED 6" 3,600pN REINFORCED CONCRETE PAVEMENT WITH a3 BARS 18" O.C.E.W. PROPOSED 6" INTEGRAL CONCRETE CURB PROPOSED EDGE OF CONCRETE PAVEMENT FUTURE CONCRETE CURB BY OTHERS 25 25R.- - OHE NOTES 1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO CONSTRUCTION. WARNING The Contractor shall make all necessary provIslons for the support, protection, rebmdon, and temporary relocallon of all utilities, structures and utility poles both above and below ground during construction. The Contractor Is liable for all damages done as a result of his operations. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. The companies Ilsted below are known to have facilities within the Oty of Fort Worth, Texas area. The Contractor shall contact the following offices at least 48 hours prior to excavating at this location. [CRY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS (817) 871-8100 CITY OF FORT WORTH WATER DEPARTMENT (817) 871-5296 MEMBERS OF DIG -TES$ (800) 344-5377 AMT [CHARTER COMMUNICATIONS COSERV MCI WORLDCOM IMILLENNIUM TELCOM SOUTHWESTERN BELL TELEPHONE COMPANY TRI-COUNTY ELECTRIC COOP TAU GAS & ELECTRIC VERQON The Contractor shall verify the elevation, configuration, and onquleton of ex}rting utlllry lines odor to construction. Such verlficaUon shall be corcAdered a subsidiary cost of camtrucfon. NO ADDITIONAL COMPENSATION WILL BE ALLOWED, • CONTROL DATA CONTROL POINT No. 500 CONTROL POINT No. 501 "X" CUT IN CURB N = 690295918 E m 2331305.26 ELEV. = 706.33 "Jr CUT IN CURB N m 6903037.51 E ® 2330953.93 ELEV... 70732 COFW BASEMAP NOS.: 2051-336 MAPSCO NOS.: 119A DESCRIPTION 3 1- C DATE BY g CITY OF FORT WORTH TEXAS s TRANSPORTATION AND PUBLIC WORKS DEPT. `c 2 D.O.E. NO. 6920 CITY PROJECT NO. 01990 TPW PROJECT NO. CXXWXIDU.'%l(-)OOc' 0000000( WATER PROJECT NO, P265-6061501990-00 SEWER PROJECT NO. P275-7061301990XX FILE NO. GARDEN ACRES ( McPHERSON PLAZA ADDITION, LOT 2. BLOCK t DESIGNED: BEL DRAWN: BEL a 2 v u PAVING PLAN E EBG ENGINEERING, LLC 3950 FOSSIL CREEK BLVD., SUITE 204 FORT WORTH, TX 76137 L TEXAS FIRM REG. NO. 12218 CHECKED: JWB I DATE APPROVED: ANW 2012 SHEET g 9 a EBG JOB NO. 1203. EXHIBIT'B1' i 1 I PROP. 20 LF - 24" RCP SD @ 1.0 CONN. TO EX. 24" STUB -OUT PLUG END 111111111 NOTES 1. BUILDINGS AND STRUCTURES SHOWN EXISTED AT THE TIME OF FIELD SURVEYS. CONTRACTOR SHALL VERIFY THESE LOCATIONS PRIOR TO CONSTRUCTION. WARNING The Contractor shall make all necessary provisions for the support, protection, relaaUon, and temporary relocation a( all utilities, structures and utility poles both above and below ground during construction. The Contraaor Is liable for all damages done as a result of his operations. NO ADOITONAL COMPENSATION WILL BE ALLOWED. The companies listed below are known to have facilities within the OW of Fort Worth, Texas area The Contractor shall contact the following offices at least 18 hours prior to excavating at this location. ICRY OF FORT WORTH TRANSPORTATION & PUBLIC WORKS (817) 871-8100 CITY OF FORT WORTH WATER DEPARTMENT (817) 871-8296 IMMEMTBERS OF DIG-TESS (800) 344-8377 'CHARTER COMMUNICATIONS COSERV WORLO !MIILLLENNIUM TTELCOM SOUTHWESTERN BELL TELEPHONE COMPANY TRI-COUNTY ELECTRIC COOP TXU GAS & ELECTRIC VERIZON The Contractor shall orgy the elevation, configuration, and ongulatlon of existing utility lines p or to construction, Such verification shall be considered a subsidiary cost of construction. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. • • CONTROL DATA CONTROL POINT No. 500 CONTROL POINT No. 501 "X" CUT IN CURB N ® 6902959.1E E m 2331308.26 ELEV. = 706.33 "X" CUT IN CURB N m 6903037.51 E = 2330953.93 ELEV.. 707.32 :OFW BASEMAP NOS.: 2054-336 MAPSCO NOS.: 119A DESCRIPTION DATE BY CITY OF FORT WORTH TEXAS TRANSPORTATION AND PUBLIC WORKS DEPT. D.O.E. NO. 6920 CITY PROJECT NO. 01990 TPW PROJECT NO. CXXX-%XXX%X-)O %XX) (X WATER PROJECT NO. P265-6051501990-00 SEWER PROJECT NO. P275-7061301990)0( FILE NO. GARDEN ACRES ( MCPHERSON PLAZA ADDITION, LOT 2. BLOCK I DESIGNED: BEL BEL DRAWN: PAVING PLAN EBG ENGINEERING, LLC 3950 FOSSIL CREEK BLVD., SUITE 204 FORT WORTH, TX 76137 TEXAS FIRM REG. NO. 12218 CHECKED: 7WB APPROVED: ANW DATE SHEET NOV. (T 2012 7 EBG JOB NO. 1203 UNIT PRICE BID Bidlist Item No. Description SECTION 00 42 43 PROPOSAL FORM Project Item Information Water 1 3305.0109 Trench Safety (Water) 2 3311.0001 Ductile Iron Water Fittings 3 3311.0341 10" Water Pipe 4 3312.0103 Connection to Existing 8" Water Main Sanitary Sewer 1 3301.0002 Post -CCTV Inspection 2 3301.0101 Manhole Vacuum Testing 3 3305.0109 Trench Safety (sanitary sewer) 4 3305.0112 Concrete Collar 5 3305.0113 Clay Dams 6 3331.4115 8" Sewer Pipe 7 3339.1001 4' Manhole Storm 1 3305.0109 Trench Safety (storm) 2 3341.0205 24" RCP, Class III 1 2 3 4 5 6 7 8 9 Paving 0241.1300 3123.0101 3211.0400 3211.0501 3213.0102 3213.0401 3213.0700 3216.0101 3471.0001 Remove Conc Curb&Gutter Unclassified Excavation Lime 6" Lime Treatment 6" Conc. Pvint. 6" Concrete Driveway Joint Sealant 6" Conc Curb and Gutter Traffic Control Specification Section No. 33 11 11 33 11 10, 33 11 12 33 12 25 33 01 31 33 01 30 33 05 17 33 05 15 33 11 10, 33 31 12, 33 31 20 33 39 10, 33 39 20 02 41 15 31 23 16 32 11 29 32 11 29 32 13 20 32 13 73 32 16 13 34 71 13 00 42 43 BID PROPOSAL Pagel of Bidder's Application Unit of Bid Quantity Measure LF TON LF EA LF EA LF EA LF LF EA LF EA LF LF CY TN SY SY SF LF LF MO 475 1.5 475 2 565 2 565 2 2 565 2 20 20 240 5 20 415 460 3,720 100 390 0.5 Bidder's Proposal Unit Price $1.00 $5,000.00 $40.00 $1,000.00 Total $3.00 $250.00 $1.00 $750.00 $500.00 $35.00 $3,500.00 Total $1.00 $100.00 Total $10.00 $25.00 $150.00 $2.00 $35.00 $5.00 $0.75 $20.00 $2,500.00 Total Grand Total: Bid Value $475 $7,500 $19,000 $2,000 $28,975.00 $1,695 $500 $565 $1,500 $1,000 $19,775 $7,000 $32,035.00 $20.00 $2,000.00 $2,020.00 $2,400.00 $125.00 $3,000.00 $830.00 $16,100.00 $18,600.00 $75.00 $7,800.00 $1,250.00 $50,180.00 $113,210.00 CITY OF FORT 1VORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 00 42 43_Bid Proposal Workbook