Loading...
HomeMy WebLinkAboutContract 44155-CO7 (2)FORT WORTH® City of Foul Worth `aaaltpir Change Ordwv Request Project Name North Beach Street from Vista Meadows to south of Shiver e Client Project ##(s)j 01292 / I&D& _g ,7 1 Project Description J1 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor Mario Sinacola & Sons Excavating, Inc. City Project Mgr.J Michael Weiss, P.E. Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date ?Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPUU $4,738,543.04 $577,120.30 i i UVater Change Order # I 7 SOCRETPRI CONTRACT Ma, City Sec # I 44155 i City Inspector I Tom Miller $0.00 $524,400.00 5,6bS.d4 $524,460.00 $434.57 $5,316,097.91 $189,456.96 $0.00 $434.57 $0.00 $524,400.00 Date I 1 /9/2015 Sewer Totals $0.00 $4,738,543.04 $1,101,520.30 $0.00 $5,840,063.34 $0.00 $434,57 $0.00 $5,840,497.91 $o.00=1 .. I O 1 t. $0.00 CHANGE OIDEFS to DATE (INCLUDING T[IIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AIUIOUNT (ORIGINAL CONTRACT COST + 25%) $189,456.96 $434.57 23.26% $5,923,178.80 Contract Tittle (CD) 730 45 -330 445 60 505 JUSTIFICATION (REASONS) FOR CHANGE ORDER Replace trees along the S bound side of Beach, just S of Alta Vista. The existing trees were in conflict with proposed grading. Contractor will provide and install 15, 4" caliper, Live Oak trees with irrigation. Some sidewalk was moved to back of curb wich requires a different design. Re -mobilization of several crews, and additional rent on plant site, due to water line work. Deduction of part of storm line FB and corresponding paving work. Deduction of sidewalk in areas that wil::tu,evelopment. Correction for 2' of hand rail that was added to the wrong item in CO#2. �a Mary J. Kayser9... ' Se Ch 0- er- o U°n<101) 0 0 ° ° TEX1 eM ?,y RECORD �CRETARY � in WAIN, TX J It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change---8 :r Contractor's Company Name Mano Sinacola & Sons Excavating, Inc. M&C Number Contractor (Name) n± Manager I Council Action Of required) M&C Date Approved Date FORT WORTH City of Fort Worth Change Order Additions Project Name I North Beach Street from Vista Meadows to south of Shiver Client Project # I 01292 Project Description I I EIV1 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor Mario Sinacola & Sons Excavating, Inc. City Project Mgr. I Michael Weiss, P.E. DESCNIP I IUN b' Sidewalk Adjacent to Curb Sidewaik/Wall Adjacent to Curb 4" Cal Trees W/ Irrigation Rolled Sod Traffic Barrels Pothole Utilities Additional Work Shiver Concrete Plant Mobilization Paving Crew Mobilization Lime Crew Mobilization Excavation Crew Mobilization Pipe Crew Mobilization Plant Site Rental WZPM 4" Construct Detours TXDOT 508 Re -Mobilization Striping Sub Re -Mobilization Klutz Re -Align Signal Heads 24" RCP Class III Install 39" RCP Plug Adjustments Shiver Signal Concrete Collar/Apron Signal Ped Service PED RAIL (TY PR2) TxDOT 450 (CULVERT Change Order # City Inspector ADDITIONS DEPI 1 PVV TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW 7 Tom Miller I City Sec # I 44155 Date I 1/9/2015 city Unit Unit Cost /,/bb.UU SF $/.UU 1,025.00 SF $60.10 15.00 EA $4,000.00 6,500.00 SY $2.50 7,000.00 LF $2.20 1.00 LS $3,475.80 1.00 LS $34,067.00 1.00 LS $13,801.53 1.00 LS $17,010.49 1.00 LS $18,633.10 1.00 LS $8,123.44 1.00 LS $11,422.29 1.00 LS $18,000.00 13,895.00 LF $0.76 1,355.00 SY $70.00 8.00 EA $1,250.00 1.00 EA $4,500.00 1.00 LS $2,300.00 189.05 LF $69.00 1.00 EA $1,800.00 1.00 LS $4,068.47 4.00 EA $2,300.00 1.00 EA $1,900.00 2.00 LF $90.00 I otal $b4,292.UU $61,6U2.bU $60,000.00 $16,250.00 $15,400.00 $3,4/b.80 $34 06T.00 $13,801.53 $17,010.49 U87633J0 $8-T23.44 $1-1422.29 $18,00-.00 $10,560.20 $94;850.0- $10,000.00 $4,500 00 $2;300.00 13,044.45 $1,8UU.UU 4,068.4T $9,2O0.00 $1;900.00 $180.00 Change Order Additions Page 1 of 2 TPW Water Sewer Sub Total Additions $484,481.27 $0.00 $0.00 $484,481.27 Change Order Additions Page 2 of 2 FORT WORTH City of Fort Worth Change Order Deletions Project Name ' North Beach Street from Vista Meadows to south of Shiver Client Project # 1 01292 Project Description 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road I I EM Contractor Mario Sinacola & Sons Excavating, Inc. City Project Mgr. 1 Michael Weiss, P.E. Change Order # 7 City Inspector I Tom Miller City Sec # I 44155 Date I 1/9/2015 DELETIONS UESCNIF' I ION DEP I Qty Unit Unit Cost - I otal 11" Concrete Paving I NVV 943.53 SY $40.0U $3/,/41.20 Hydromulch Seeding TPW 6,500.00 SY $0.44 $2,660.00 4" Conc Sidewalk TPW 7,235.00 SF $3.50 $25,322.50 Concrete retaining wall W/ Sidewalk TPW 2,520.00. SF $55.00 $138,600.00 Jack/Bore 21" RCP TPW 320.00 LF $515.00 $164,800.00 Jack/Bore 39" RCP. TPW 50.00 LF $700.00 $35,000.00 Ped Rail TxDot 450 Sidewalk TPW 232.00 LF $135.00 $31,32U.UU Large Stone Riprap, dry TPW 300.00 CY $80.00 $24;000.00 39" RCP Class III TPW 47.00 LF $125.00 $5,875.00 36" RCP Class III TPW 31.00 LF $98.00 $3 038.00 30" RCP Class III TPW 25.00 LF $84.00 $2,100.00 21" RCP Class III TPW 206.00 LF $65.00 $13,390.09 Change Order Deletions Page 1 of 2 TPW $484,046.70 Water $0.00 Sewer $0.00 Sub Total Deletions $484,046.70 Change Order Deletions Page 2 of 2 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO co # Previous Change Orders DATE Total AMOUNT Total $0.00 • go.00 I