HomeMy WebLinkAboutContract 44224 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No.
I�IZZ�I
1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: First Texas Homes, Inc.
Address, State, Zip Code: 500 Crescent Ct., Suite 350 I Dallas, TX 75201
Phone, E-Mail: (214) 613 -3 400
Authorized Signatory/Title: Keith Hardesty, President
Project Name: Presidio West Phase III
Project Location: Amaranth Dr. & Senita Cactus St.
Plat Case No.: FP-012-04e Plat Name: Presidio West
Mapsco: 20V
CFA: 2013-004 DOE: 6980
To be completed by staff.•
Received i by: l AA �.r
RECEIVED FEB 29
Council District: 7
1
City Project No: 02053
Date: I \ c I � a
OFFICIAL RECORD
CRY SECRETARY
Ft WORTH, fl'
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) Xz
Sewer (A-1) X, Paving (B) X, Storm Dram (B-1) X , Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be perfoiined by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence off'
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused. in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Project Name: Presidio West Phase III
CFA No.: 2013-004
Cost Summary Sheet
DOE No.: 6980
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $
2. Sewer Construction $
Water and Sewer Construction Total $
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
(Bond = 100%
'Completion Agreement = 100% / Holds Plat
'Cash Escrow Water/Sanitary Sewer= 125%
'Cash Escrow Paving/Storm Drain = 125%
'Letter of Credit = 125% w/2yr expiration period
130,985.40
106,032.00
237,017.40
335,336.65
107,942.50
41,193.94
484,473.09
721,490.49
4,740.35
4,740.35
9,480.70
17,731.17
8,865.58
1,647.76
1,250.00
29,494.51
38,975.20
Amount
721,490.49
721,490.49
296,271.75
605,591.36
901,863.11
Choice
(ck one)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed is
instrument in at Fort Worth, Texas this r � � day of Qi-', ibe
quadruplicate,
,20j .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-B
Development
Transportation & Public Works Department
i I(,%.),
bulal, EMBA, P.E.
ngineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No.
Date:
ATTEST:
Mary J. Kay
City Secretary
ATTEST:
Signature
(Print) Name: s -o(.c.
9
I
Douglas Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
First Texas Homes
L. _ _ ..,....„....ier
Print Name:
Title:
Signature
11A14-'
j_ko/NAt
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
rs
rs
rs
rs
(Remainder of Page Intentionally Left Blank)
I:\SLD\WFXK3903\700 CADD\702 Civil\Exhibits\PW3CFA.dwg, 12/14/2012 9:43 AM, Turner, Nathan
31VOS Oi ION
c.
HARMON ROAD
RE
en aidj
FM 156
'Ou
AI
0O
m
00
BLUR M J
o
IF8 W
---20
DATURAL DRIV1
12n
MARION DALE & DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
IW")
4air" i
I-- I 21 20
N.m
3I.C1--- - - _ _
X I IYYN Y41
19
18
17
2 I FIDDLENECK STREET
Ia
a
20 19 18 17 16
lo
11
10 I _
21 22 23
9
8
8" W-17
7 6
LEGEND
24
16 15
15
25
MAKIPOSA LANE
5
PROPOSED WATER LINE
PROPOSED GATE VALVE [<'
PROPOSED FIRE HYDRANT
4
EXISTING WATER LINE — — — —
EXISTING GATE VALVE — —x— —
EXISTING FIRE HYDRANT — —1 — —
LIMITS OF PROJECT
PROPOSED WATER LINES ARE 8" UNLESS
OTHERWISE INDICATED
3
26
i
PRESI
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
14 13
8" W-'1'I "
14
13
12
12 11
16 EST - �i
11
10
9
8
10
SCALE:1" = 150'
16
FIRST TEXAS HOMES
15 CC# D210260522
0.P.R.T.C.T
WATER
EXHIBIT 'A'
PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
JACOBS ENGINEER NG GROUP IN
777 MAIN STREET, FORT WORTH, TEXAS 76102
PHONE NO (817) 735-6000
PRESIDIO WEST PHASE III
February 8, 2013
WATER DISTRIBUTION SYSTEM
BIDQTY
ITEM# DESCRIPTION PG. 3 TOTAL UNIT PRICE AMOUNT
1 8" PVC Water Main by Open Cut 2959 2,959 L.F. $16.60 $49,119.40
2 8" Gate Valve & Vault 10 10 EA. $1,100.00 $11,000.00
3 Std. Fire Hydrant Assembly 5 5 EA. $2,800.00 $14,000.00
4 1" Copper Service 1679 1,679 L.F. $6.00 $10,074.00
5 Meter Box "Type A" 63 63 EA. $130.00 $8,190.00
6 1" Tap to Main 63 63 EA. $400.00 $25,200.00
7 Poly Pig 3 3 EA. $100.00 $300.00
8 Connect to Existing 8" Water Line 3 3 EA. $600.00 $1,800.00
9 Trench Safety 2959 2,959 L.F. $0.10 $295.90
10 Cast Iron Fittings 1.65 1.65 TON $3,650.00 $6,022.50
11 Complete Testing (Including Geotech) 2959 2,959 L.F. $0.40 $1,183.60
12 City Bond for All Water/Sewer Improvements 1 1 L.S. $3,800.00 $3,800.00
ITOTAL WATER DISTRIBUTION SYSTEM $130,985.40
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 1
I:\SLD\WFXK3903\700 CADD\702 Civil\Exhibits\PW3CFA.dwg, 12/14/2012 9:44 AM, Turner, Nathan
i
MARION DALE & DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
11YtN \Y41
4
H I 21 20 19 18 17 16 15 14 13 12 11 10
3 I -
FIDDLENECK STREET -•a 8' SS-6
2 Imp t a
1 i
c11
1 20 19 18 17 16 15 14 13 12
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
VYrN
DATURAL
DRIVE
12
11
10
9
8
I I
(
rn 21 22 23 24
in 1
8- SS-5 MAKIPOSA LANE O
-.c
7
LEGEND
PROPOSED SANITARY SEWER
PROPOSED MANHOLE
EXISTING SANITARY SEWER
EXISTING MANHOLE
LIMITS OF PROJECT
6 5 4
PROPOSED SEWER LINES ARE 8"
UNLESS OTHERWISE INDICATED
0 i
s--
0
3
10
9
8
7
16
FIRST TEXAS HOMES
15 CC# D210260522
0.P.R.T.C.T
14
25 26
28
RESIDIO Wg.s
SCALE:1" = 150'
WASTEWATER
EXHIBIT 'A-1'
PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
ITEM# DESCRIPTION
1 8" SDR-35 PVC SS Main
2 8" SDR-26 PVC SS Main
3 4' Diameter Manhole
4 Extra Vertical Depth on Manhole (>6')
5 Clay Dam
{ 6 Cement Stabilized Backfill
{ 7 4" Sanitary Sewer Service (SDR-35)
8 4" Sanitary Sewer Service (SDR-26)
9 Sewer Main Tap for Service
10 Connect to Existing Sanitary Sewer
{ 11 Trench Safety
{ 12 Vacuum Test for Manhole
13 4" Sanitary Sewer Cleanout
{ 14 TV Inspection of Sanitary Sewer
(TOTAL SANITARY SEWER COLLECTION SYSTEM
: JACOBS:ENGINEERING:GROUP'ING
777 .MAIN S`t'REET,'' FORT WORTH, TEXAS:
PHONE N4 (�817j 735=6000%
PRESIDIO WEST PHASE III
February 8, 2013
SANITARY SEWER COLLECTION SYSTEM
BID QTY BID QTY BID QTY
PG.4 PG.5 PG.6
1235 1115
20 60
TOTAL
2,350
80
10 10
9 1 10
2 2 4
20 60 80
748 748
995 995
64 64
2 2
1255 1175 2,430
10 10
64 64
1255 1175 2,430
UNIT
L.F.
L.F.
EA.
L.F.
EA.
L.F.
L.F.
L.F.
EA.
EA.
L.F.
EA.
EA.
L.F.
PRICE
$20.50
$22.50
$2,040.00
$100.00
$250.00
$10.00
$3.00
$3.20
$270.00
$500.00
$1.00
$100.00
$40.00
$1.30
AMOUNT
$48,175.00
$1,800.00
$20,400.00
$1,000.00
$1,000.00
$800.00
$2,244.00
$3,184.00
$17,280.00
$1,000.00
$2,430.00
$1,000.00
$2,560.00
$3,159.00
$106,032.00
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 2
0
0
t
0
z
E
d
N
O
N
Y
DATURAL
DRIVE
12
11
10
9
8
MARION DALE 8c DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
4
F— 21 20
Cr.
2
m
VY-
IlYfN
19
18
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
0.
17 16 15 14 13
12
urrlv
11
10
7/FIDDLENL6'K 'STREET �s , .......... .. .....
20
21
7
19
22
6
18
23
5
10
17
4
Ol
6
v
0U
r7
i
LEGEND
-5 PROPOSED 29'BB
ROADWAY/50'ROW
N
• PROPOSED 4'SIDEWALK
a (BY HOMEBUILDER)
0
O
0
• PROPOSED ADA RAMPS
2. (BY DEVELOPER)
LLIMITS OF PROJECT
cn
24
16
25
15
26
14
PRESI le V'
/PHASE
13
12
11
10
16
FIRST TEXAS HOMES
15 CC# D210260522
O.P.R.T.C.T
SCALE:1" = 150'
PAVING
EXHIBIT 'B'
PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
J'ACOBS:ENGINEE:RING GROUP INC.
77T MAIN.:.STREET, :FORT:: WORTH ':TEXAS: 76102?
PHONE NO_(817);735, 6000:::.
PRESIDIO WEST PHASE III
February 8, 2013
PAVING
BID QTY BID QTY BID QTY BID QTY BID QTY PG.
ITEM# DESCRIPTION PG. 19 PG. 20 PG. 21 PG. 22 23 TOTAL UNIT PRICE AMOUNT
1 6" RC Street Pavement w/7" Curb 2409 1738 1970 2259 846 9,222 S.Y. $28.50 $262,827.00
2 6" Lime Stabilized Subgrade 2570 1852 2106 2409 894 9,831 S.Y. $2.15 $21,136.65
3 Hydrated Lime (32#/SY) 41 30 34 39 14 157 TON $135.00 $21,195.00
4 ADA Sidewalk Ramp 4 2 2 2 0 10 EA. $1,250.00 $12,500.00
5 Remove &Relocate Existing EOR Barricade 1 1 1 3 EA. $1,500.00 $4,500.00
6 Standard EOR Barricade 1 1 EA. $1,500.00 $1,500.00
7 Install Header 29 29 29 29 116 L.F. $8.00 $928.00
8 12" Rock Rip Rap 31 31 62 S.Y. $75.00 $4,650.00
9 City Bond for Paving Improvement 1 1 L.S. $6,100.00 $6,100.00
1TOTAL PAVING $335,336.65
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls
Page 3
1
MARION DALE & DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
4
Iu)
3
2 IO2,
IJ
20 19 18 17
DATU RAL
DRIVE
12
>>
I I 21 22 23 24
11 (__ — — — —
p 24 I E MAKIPOSA LANE
1o( I - ._�,----- -
g I 7 6 5 4
I I
8 I
o)
1
6
nA 111,1-N �r41
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
urrN ,rALr
21 20 19 18 17 16 15 14 13 12 11 10
FIDDLENECK STREET
36"
16 15
LEGEND
PROPOSED STORM DRAIN LINE
PROPOSED INLET
PROPOSED MANHOLE
EXISTING STORM DRAIN LINE
LIMITS OF PROJECT
25 26
3
24"
14 13 12
28
EST\
11
10
9
8
\
7
16
FIRST TEXAS HOMES
15 CC# D210260522
0.P.R.T.C.T
14
SCALE:1 " = 150'
STORM DRAIN
EXHIBIT'B-1'
PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
JACOBS :ENGINEERING GROUP INC.
777_MAIN .'STREET, FORT WORTH, TEXAS. 76102
PHONE NO. (817) 735-6000
•
PRESIDIO WEST PHASE III
February 8, 2013
STORM DRAIN SYSTEM
BID QTY BID QTY BID QTY BID QTY BID QTY PG.
ITEM# DESCRIPTION PG. 24 PG. 25 PG. 26 PG. 27 28 TOTAL UNIT PRICE AMOUNT
1 21" RCP - CLASS III 23 30 20 70 143 L.F. $38.00 $5,434.00
2 24" RCP - CLASS III 30 384 414 L.F. $41.00 $16,974.00
3 36" RCP - CLASS III 384 227 611 L.F. $72.00 $43,992.00
4 39" RCP - CLASS III 131 6 137 L.F. $89.00 $12,193.00
5 Std. 10' Curb Inlet 2 4 6 EA. $2,500.00 $15,000.00
6 Std. 4'x4' Drop Inlet (including Rock Rip -Rap) 1 1 EA. $3,200.00 $3,200.001
7 Std. 5' Square Manhole 1 1 2 EA. $3,000.00 $6,000.001
8 Remove Existing Inlet & Apron to Connect to Existing 1 1 EA. $700.00 $700.001
9 Trench Safety 568 641 20 70 1,299 L.F. $0.50 $649.501
10 City Bond for Storm Drain Improvement 1 L.S. $3,800.00 $3,800.001
(TOTAL STORM DRAIN SYSTEM
$107,942.50j]
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 4
Turner, Nathan
MARION DALE & DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
4
LII I
20
J �
i I
3
II
isiri
D
O 2 I Ul
m21
I—
1 Qcn
I 20
I
DATURAL
DRIVE
1
11
10
9
8
_l
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
n - vrrA .1ro,,r
19 18 17 16 15 14 13 12 11 10
FIDDLENECK STREET
19 18 17 16 15 14 13 12
21 22 23 24
7
MAKIPOSA LANE
6
5
LEGEND
PROPOSED SINGLE STREET LIGHT •---•
EXISTING SINGLE STREET LIGHT 0
LIMITS OF PROJECT
11
10
9
1`1
I I
7\\
SCALE:1" = 150'
16
FIRST TEXAS HOMES
15 CC# D210260522
0.P.R.T.C.T
STREET LIGHTS
EXHIBIT 'a
PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
JACOBS ENGINEERING GROUP INC
77.7 MAIN STREET, ;FORT WORTH, TEXAS
PHONE.;NO,.(87 7) :735 6000
PRESIDIO WEST PHASE III
February 8, 2013
STREET LIGHTS
BID QTY
ITEM# DESCRIPTION PG. 26 UNIT PRICE AMOUNT
1 Conduit 1-1/4" 753 L.F. $6.52 $4,909.56
2 #10G Wire 753 L.F. $1.82 $1,370.46
3 #10 Wire 1,506 L.F. $1.82 $2,740.92
4 D25-6 Light Poles 11 EA. $1,258.00 $13,838.00
5 100W HPS Cobra Luminaire Type 11 EA. $207.00 $2,277.00
6 Type 4 Foundation 11 EA. $1,036.00 $11,396.00
7 Ground Box 7 EA. $666.00 $4,662.00
TOTAL STREET LIGHTS & SIGNS $41,193.94 1
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 5
0
0
Z
1-
a
ai
O
N
N
v
0 U
a.
co
0
0
0
0
i
0
0
01
O
J
MARION DALE & DORIS RETTIG
VOL. 9322, PG. 518
D.R.T.C.T.
4 I
W
w I
3
I 21
14_
"ren
20 19
EDWARD MCDONALD ETAL
VOL. 10865, PG. 1679
D.R.T.C.T.
O- vruv lrnLr
18 17 16 15 14 13 12 11 10
FIDDLENECK STREET
20 19 18 17 16 15 14 13 12
I
DATURAL DRIVE'
12 I
( I 21 22 23 24 25 26
I
11
10
9 ( 7
8
LEGEND
PROPOSED STREET SIGN
EXISTING STREET SIGN
LIMITS OF PROJECT
MAKIPOSA LANE
6 5 4
A
PRES910 VdEST — \
PHASE
9
SCALE:1" = 150'
16
FIRST TEXAS HOMES
15 CC# D210260522
0.P.R.T.C.T
STREET SIGNS
EXHIBIT 'C-1'
® PRESIDIO WEST
PHASE III
777 MAIN STREET
FORT WORTH, TX 76102
PHONE 817-735-6000
ITEM# DESCRIPTION
1 Stop/Street Name Signs
IITOTAL STREET LIGHTS & SIGNS
JACOB$ ENGINEERING GROUP.INC,
777 MAIN :STREET, ;FOR.' WORTH, TEXAS 76102
PHONE NO, (817) 735 6000
PRESIDIO WEST PHASE III
February 8, 2013
STREET LIGHTS
BID QTY UNIT PRICE AMOUNT
5 EA. $250.00 $1,250.00
$1,250.00I(
I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xis Page 6
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET, FORT WORTH, TEXAS 76102
PHONE NO. (817) 735-6000
PRESIDIO WEST PHASE III
ITEM#
1 WATER
2 SANITARY SEWER
SUBTOTAL FEES
TOTAL FEES
DESCRIPTION
ITEM# DESCRIPTION
1 STREET PAVING
2 STORM DRAINAGE
3 STREET LIGHTS
(SUBTOTAL FEES
(TOTAL FEES
ITEM# DESCRIPTION
1 STREET SIGNS
TOTAL FEES
ITEM# DESCRIPTION
1 WATER
2 SANITARY SEWER
3 STREET PAVING
4 STORM DRAINAGE
5 STREET LIGHTS
IITOTAL CFA CONSTRUCTION
IITOTAL WATER CONSTRUCTION FEE
IITOTAL TPW CONSTRUCTION FEE
February 8, 2013
FEE CALCULATION
WATER AND SANITARY SEWER
FEE CALCULATION
PAVING AND STORM DRAINAGE
AMOUNT
$130,985.40
$106,032.00
AMOUNT
$335,336.65
$107,942.50
$41,193.941
STREET SIGN INSTALLATION COST
AMOUNT
I $1,250.00
CFA SUMMARY
2% INSPECTION
FEE
$2,619.71
$2,120.64
$4,740.35
4% INSPECTION
FEE
$13,413.47
$4,317.70
$1,647.76
$19,378.92
2% TESTING FEE
$2,619.71
$2,120.64
$4,740.35I
$9,480.70 I
2% TESTING FEE
$6,706.73
$2,158.85
$0.00
$8,865.58
$28,244.51
$1,250.011
TOTAL
$130,985.40
$106,032.00
$335,336.65
$107,942.50
$41,193.94
$721,490.49
$9,480.70 iI
$29,494.51jj
I'\SLD\WFXK39n3\Fnn DISCIPI INF\A9n Sncrc\CFA\P1AIZ rpzi (:net Fc+fr„�+o ronl�n�nQ�_��n�i