Loading...
HomeMy WebLinkAboutContract 44224 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. I�IZZ�I 1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: First Texas Homes, Inc. Address, State, Zip Code: 500 Crescent Ct., Suite 350 I Dallas, TX 75201 Phone, E-Mail: (214) 613 -3 400 Authorized Signatory/Title: Keith Hardesty, President Project Name: Presidio West Phase III Project Location: Amaranth Dr. & Senita Cactus St. Plat Case No.: FP-012-04e Plat Name: Presidio West Mapsco: 20V CFA: 2013-004 DOE: 6980 To be completed by staff.• Received i by: l AA �.r RECEIVED FEB 29 Council District: 7 1 City Project No: 02053 Date: I \ c I � a OFFICIAL RECORD CRY SECRETARY Ft WORTH, fl' NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) Xz Sewer (A-1) X, Paving (B) X, Storm Dram (B-1) X , Street Lights & Signs (C) X . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be perfoiined by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence off' the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Project Name: Presidio West Phase III CFA No.: 2013-004 Cost Summary Sheet DOE No.: 6980 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 2. Sewer Construction $ Water and Sewer Construction Total $ B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one (Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period 130,985.40 106,032.00 237,017.40 335,336.65 107,942.50 41,193.94 484,473.09 721,490.49 4,740.35 4,740.35 9,480.70 17,731.17 8,865.58 1,647.76 1,250.00 29,494.51 38,975.20 Amount 721,490.49 721,490.49 296,271.75 605,591.36 901,863.11 Choice (ck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed is instrument in at Fort Worth, Texas this r � � day of Qi-', ibe quadruplicate, ,20j . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-B Development Transportation & Public Works Department i I(,%.), bulal, EMBA, P.E. ngineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. Date: ATTEST: Mary J. Kay City Secretary ATTEST: Signature (Print) Name: s -o(.c. 9 I Douglas Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager First Texas Homes L. _ _ ..,....„....ier Print Name: Title: Signature 11A14-' j_ko/NAt Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate rs rs rs rs (Remainder of Page Intentionally Left Blank) I:\SLD\WFXK3903\700 CADD\702 Civil\Exhibits\PW3CFA.dwg, 12/14/2012 9:43 AM, Turner, Nathan 31VOS Oi ION c. HARMON ROAD RE en aidj FM 156 'Ou AI 0O m 00 BLUR M J o IF8 W ---20 DATURAL DRIV1 12n MARION DALE & DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. IW") 4air" i I-- I 21 20 N.m 3I.C1--- - - _ _ X I IYYN Y41 19 18 17 2 I FIDDLENECK STREET Ia a 20 19 18 17 16 lo 11 10 I _ 21 22 23 9 8 8" W-17 7 6 LEGEND 24 16 15 15 25 MAKIPOSA LANE 5 PROPOSED WATER LINE PROPOSED GATE VALVE [<' PROPOSED FIRE HYDRANT 4 EXISTING WATER LINE — — — — EXISTING GATE VALVE — —x— — EXISTING FIRE HYDRANT — —1 — — LIMITS OF PROJECT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED 3 26 i PRESI EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. 14 13 8" W-'1'I " 14 13 12 12 11 16 EST - �i 11 10 9 8 10 SCALE:1" = 150' 16 FIRST TEXAS HOMES 15 CC# D210260522 0.P.R.T.C.T WATER EXHIBIT 'A' PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 JACOBS ENGINEER NG GROUP IN 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE NO (817) 735-6000 PRESIDIO WEST PHASE III February 8, 2013 WATER DISTRIBUTION SYSTEM BIDQTY ITEM# DESCRIPTION PG. 3 TOTAL UNIT PRICE AMOUNT 1 8" PVC Water Main by Open Cut 2959 2,959 L.F. $16.60 $49,119.40 2 8" Gate Valve & Vault 10 10 EA. $1,100.00 $11,000.00 3 Std. Fire Hydrant Assembly 5 5 EA. $2,800.00 $14,000.00 4 1" Copper Service 1679 1,679 L.F. $6.00 $10,074.00 5 Meter Box "Type A" 63 63 EA. $130.00 $8,190.00 6 1" Tap to Main 63 63 EA. $400.00 $25,200.00 7 Poly Pig 3 3 EA. $100.00 $300.00 8 Connect to Existing 8" Water Line 3 3 EA. $600.00 $1,800.00 9 Trench Safety 2959 2,959 L.F. $0.10 $295.90 10 Cast Iron Fittings 1.65 1.65 TON $3,650.00 $6,022.50 11 Complete Testing (Including Geotech) 2959 2,959 L.F. $0.40 $1,183.60 12 City Bond for All Water/Sewer Improvements 1 1 L.S. $3,800.00 $3,800.00 ITOTAL WATER DISTRIBUTION SYSTEM $130,985.40 I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 1 I:\SLD\WFXK3903\700 CADD\702 Civil\Exhibits\PW3CFA.dwg, 12/14/2012 9:44 AM, Turner, Nathan i MARION DALE & DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. 11YtN \Y41 4 H I 21 20 19 18 17 16 15 14 13 12 11 10 3 I - FIDDLENECK STREET -•a 8' SS-6 2 Imp t a 1 i c11 1 20 19 18 17 16 15 14 13 12 EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. VYrN DATURAL DRIVE 12 11 10 9 8 I I ( rn 21 22 23 24 in 1 8- SS-5 MAKIPOSA LANE O -.c 7 LEGEND PROPOSED SANITARY SEWER PROPOSED MANHOLE EXISTING SANITARY SEWER EXISTING MANHOLE LIMITS OF PROJECT 6 5 4 PROPOSED SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED 0 i s-- 0 3 10 9 8 7 16 FIRST TEXAS HOMES 15 CC# D210260522 0.P.R.T.C.T 14 25 26 28 RESIDIO Wg.s SCALE:1" = 150' WASTEWATER EXHIBIT 'A-1' PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 ITEM# DESCRIPTION 1 8" SDR-35 PVC SS Main 2 8" SDR-26 PVC SS Main 3 4' Diameter Manhole 4 Extra Vertical Depth on Manhole (>6') 5 Clay Dam { 6 Cement Stabilized Backfill { 7 4" Sanitary Sewer Service (SDR-35) 8 4" Sanitary Sewer Service (SDR-26) 9 Sewer Main Tap for Service 10 Connect to Existing Sanitary Sewer { 11 Trench Safety { 12 Vacuum Test for Manhole 13 4" Sanitary Sewer Cleanout { 14 TV Inspection of Sanitary Sewer (TOTAL SANITARY SEWER COLLECTION SYSTEM : JACOBS:ENGINEERING:GROUP'ING 777 .MAIN S`t'REET,'' FORT WORTH, TEXAS: PHONE N4 (�817j 735=6000% PRESIDIO WEST PHASE III February 8, 2013 SANITARY SEWER COLLECTION SYSTEM BID QTY BID QTY BID QTY PG.4 PG.5 PG.6 1235 1115 20 60 TOTAL 2,350 80 10 10 9 1 10 2 2 4 20 60 80 748 748 995 995 64 64 2 2 1255 1175 2,430 10 10 64 64 1255 1175 2,430 UNIT L.F. L.F. EA. L.F. EA. L.F. L.F. L.F. EA. EA. L.F. EA. EA. L.F. PRICE $20.50 $22.50 $2,040.00 $100.00 $250.00 $10.00 $3.00 $3.20 $270.00 $500.00 $1.00 $100.00 $40.00 $1.30 AMOUNT $48,175.00 $1,800.00 $20,400.00 $1,000.00 $1,000.00 $800.00 $2,244.00 $3,184.00 $17,280.00 $1,000.00 $2,430.00 $1,000.00 $2,560.00 $3,159.00 $106,032.00 I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 2 0 0 t 0 z E d N O N Y DATURAL DRIVE 12 11 10 9 8 MARION DALE 8c DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. 4 F— 21 20 Cr. 2 m VY- IlYfN 19 18 EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. 0. 17 16 15 14 13 12 urrlv 11 10 7/FIDDLENL6'K 'STREET �s , .......... .. ..... 20 21 7 19 22 6 18 23 5 10 17 4 Ol 6 v 0U r7 i LEGEND -5 PROPOSED 29'BB ROADWAY/50'ROW N • PROPOSED 4'SIDEWALK a (BY HOMEBUILDER) 0 O 0 • PROPOSED ADA RAMPS 2. (BY DEVELOPER) LLIMITS OF PROJECT cn 24 16 25 15 26 14 PRESI le V' /PHASE 13 12 11 10 16 FIRST TEXAS HOMES 15 CC# D210260522 O.P.R.T.C.T SCALE:1" = 150' PAVING EXHIBIT 'B' PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 J'ACOBS:ENGINEE:RING GROUP INC. 77T MAIN.:.STREET, :FORT:: WORTH ':TEXAS: 76102? PHONE NO_(817);735, 6000:::. PRESIDIO WEST PHASE III February 8, 2013 PAVING BID QTY BID QTY BID QTY BID QTY BID QTY PG. ITEM# DESCRIPTION PG. 19 PG. 20 PG. 21 PG. 22 23 TOTAL UNIT PRICE AMOUNT 1 6" RC Street Pavement w/7" Curb 2409 1738 1970 2259 846 9,222 S.Y. $28.50 $262,827.00 2 6" Lime Stabilized Subgrade 2570 1852 2106 2409 894 9,831 S.Y. $2.15 $21,136.65 3 Hydrated Lime (32#/SY) 41 30 34 39 14 157 TON $135.00 $21,195.00 4 ADA Sidewalk Ramp 4 2 2 2 0 10 EA. $1,250.00 $12,500.00 5 Remove &Relocate Existing EOR Barricade 1 1 1 3 EA. $1,500.00 $4,500.00 6 Standard EOR Barricade 1 1 EA. $1,500.00 $1,500.00 7 Install Header 29 29 29 29 116 L.F. $8.00 $928.00 8 12" Rock Rip Rap 31 31 62 S.Y. $75.00 $4,650.00 9 City Bond for Paving Improvement 1 1 L.S. $6,100.00 $6,100.00 1TOTAL PAVING $335,336.65 I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 3 1 MARION DALE & DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. 4 Iu) 3 2 IO2, IJ 20 19 18 17 DATU RAL DRIVE 12 >> I I 21 22 23 24 11 (__ — — — — p 24 I E MAKIPOSA LANE 1o( I - ._�,----- - g I 7 6 5 4 I I 8 I o) 1 6 nA 111,1-N �r41 EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. urrN ,rALr 21 20 19 18 17 16 15 14 13 12 11 10 FIDDLENECK STREET 36" 16 15 LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET PROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT 25 26 3 24" 14 13 12 28 EST\ 11 10 9 8 \ 7 16 FIRST TEXAS HOMES 15 CC# D210260522 0.P.R.T.C.T 14 SCALE:1 " = 150' STORM DRAIN EXHIBIT'B-1' PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 JACOBS :ENGINEERING GROUP INC. 777_MAIN .'STREET, FORT WORTH, TEXAS. 76102 PHONE NO. (817) 735-6000 • PRESIDIO WEST PHASE III February 8, 2013 STORM DRAIN SYSTEM BID QTY BID QTY BID QTY BID QTY BID QTY PG. ITEM# DESCRIPTION PG. 24 PG. 25 PG. 26 PG. 27 28 TOTAL UNIT PRICE AMOUNT 1 21" RCP - CLASS III 23 30 20 70 143 L.F. $38.00 $5,434.00 2 24" RCP - CLASS III 30 384 414 L.F. $41.00 $16,974.00 3 36" RCP - CLASS III 384 227 611 L.F. $72.00 $43,992.00 4 39" RCP - CLASS III 131 6 137 L.F. $89.00 $12,193.00 5 Std. 10' Curb Inlet 2 4 6 EA. $2,500.00 $15,000.00 6 Std. 4'x4' Drop Inlet (including Rock Rip -Rap) 1 1 EA. $3,200.00 $3,200.001 7 Std. 5' Square Manhole 1 1 2 EA. $3,000.00 $6,000.001 8 Remove Existing Inlet & Apron to Connect to Existing 1 1 EA. $700.00 $700.001 9 Trench Safety 568 641 20 70 1,299 L.F. $0.50 $649.501 10 City Bond for Storm Drain Improvement 1 L.S. $3,800.00 $3,800.001 (TOTAL STORM DRAIN SYSTEM $107,942.50j] I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 4 Turner, Nathan MARION DALE & DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. 4 LII I 20 J � i I 3 II isiri D O 2 I Ul m21 I— 1 Qcn I 20 I DATURAL DRIVE 1 11 10 9 8 _l EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. n - vrrA .1ro,,r 19 18 17 16 15 14 13 12 11 10 FIDDLENECK STREET 19 18 17 16 15 14 13 12 21 22 23 24 7 MAKIPOSA LANE 6 5 LEGEND PROPOSED SINGLE STREET LIGHT •---• EXISTING SINGLE STREET LIGHT 0 LIMITS OF PROJECT 11 10 9 1`1 I I 7\\ SCALE:1" = 150' 16 FIRST TEXAS HOMES 15 CC# D210260522 0.P.R.T.C.T STREET LIGHTS EXHIBIT 'a PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 JACOBS ENGINEERING GROUP INC 77.7 MAIN STREET, ;FORT WORTH, TEXAS PHONE.;NO,.(87 7) :735 6000 PRESIDIO WEST PHASE III February 8, 2013 STREET LIGHTS BID QTY ITEM# DESCRIPTION PG. 26 UNIT PRICE AMOUNT 1 Conduit 1-1/4" 753 L.F. $6.52 $4,909.56 2 #10G Wire 753 L.F. $1.82 $1,370.46 3 #10 Wire 1,506 L.F. $1.82 $2,740.92 4 D25-6 Light Poles 11 EA. $1,258.00 $13,838.00 5 100W HPS Cobra Luminaire Type 11 EA. $207.00 $2,277.00 6 Type 4 Foundation 11 EA. $1,036.00 $11,396.00 7 Ground Box 7 EA. $666.00 $4,662.00 TOTAL STREET LIGHTS & SIGNS $41,193.94 1 I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xls Page 5 0 0 Z 1- a ai O N N v 0 U a. co 0 0 0 0 i 0 0 01 O J MARION DALE & DORIS RETTIG VOL. 9322, PG. 518 D.R.T.C.T. 4 I W w I 3 I 21 14_ "ren 20 19 EDWARD MCDONALD ETAL VOL. 10865, PG. 1679 D.R.T.C.T. O- vruv lrnLr 18 17 16 15 14 13 12 11 10 FIDDLENECK STREET 20 19 18 17 16 15 14 13 12 I DATURAL DRIVE' 12 I ( I 21 22 23 24 25 26 I 11 10 9 ( 7 8 LEGEND PROPOSED STREET SIGN EXISTING STREET SIGN LIMITS OF PROJECT MAKIPOSA LANE 6 5 4 A PRES910 VdEST — \ PHASE 9 SCALE:1" = 150' 16 FIRST TEXAS HOMES 15 CC# D210260522 0.P.R.T.C.T STREET SIGNS EXHIBIT 'C-1' ® PRESIDIO WEST PHASE III 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 ITEM# DESCRIPTION 1 Stop/Street Name Signs IITOTAL STREET LIGHTS & SIGNS JACOB$ ENGINEERING GROUP.INC, 777 MAIN :STREET, ;FOR.' WORTH, TEXAS 76102 PHONE NO, (817) 735 6000 PRESIDIO WEST PHASE III February 8, 2013 STREET LIGHTS BID QTY UNIT PRICE AMOUNT 5 EA. $250.00 $1,250.00 $1,250.00I( I:\SLD\WFXK3903\600 DISCIPLINE\620 Specs\CFA\PW3 CFA Cost Estimate (20130208)-Final.xis Page 6 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE NO. (817) 735-6000 PRESIDIO WEST PHASE III ITEM# 1 WATER 2 SANITARY SEWER SUBTOTAL FEES TOTAL FEES DESCRIPTION ITEM# DESCRIPTION 1 STREET PAVING 2 STORM DRAINAGE 3 STREET LIGHTS (SUBTOTAL FEES (TOTAL FEES ITEM# DESCRIPTION 1 STREET SIGNS TOTAL FEES ITEM# DESCRIPTION 1 WATER 2 SANITARY SEWER 3 STREET PAVING 4 STORM DRAINAGE 5 STREET LIGHTS IITOTAL CFA CONSTRUCTION IITOTAL WATER CONSTRUCTION FEE IITOTAL TPW CONSTRUCTION FEE February 8, 2013 FEE CALCULATION WATER AND SANITARY SEWER FEE CALCULATION PAVING AND STORM DRAINAGE AMOUNT $130,985.40 $106,032.00 AMOUNT $335,336.65 $107,942.50 $41,193.941 STREET SIGN INSTALLATION COST AMOUNT I $1,250.00 CFA SUMMARY 2% INSPECTION FEE $2,619.71 $2,120.64 $4,740.35 4% INSPECTION FEE $13,413.47 $4,317.70 $1,647.76 $19,378.92 2% TESTING FEE $2,619.71 $2,120.64 $4,740.35I $9,480.70 I 2% TESTING FEE $6,706.73 $2,158.85 $0.00 $8,865.58 $28,244.51 $1,250.011 TOTAL $130,985.40 $106,032.00 $335,336.65 $107,942.50 $41,193.94 $721,490.49 $9,480.70 iI $29,494.51jj I'\SLD\WFXK39n3\Fnn DISCIPI INF\A9n Sncrc\CFA\P1AIZ rpzi (:net Fc+fr„�+o ronl�n�nQ�_��n�i