HomeMy WebLinkAboutContract 43944 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name:Reliable Commercial Construction, Inc. Address, State, Zip Code: 1903 Peyco Drive N. j Arlington, TX 76001 Phone, E-Mail: (817) 467-0779 j johnre1iab1epaving.com Authorized Signatory/Title: C.M. Long, President Project Name: All Storage Sycamore East Addition Project Location: 7601 S. Crowley Road Plat Case No.: N/A Plat Name: N/A Mapsco: 104G Council District: 6 City Project No: 01817 CFA: 2012-077 DOE: 6747 To be completed t staff*Received by: ,I( ift.t.db 11-30-12 PO4:27 IN 1 Date: i *01/ ?✓ OFFICIAL RECORD \ CITY SECRETARY vtW0RThTh NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A)._ ,Sewer (A-1) _X__, Paving (B) ._,_ Storm Drain (B-1) , Street Lights & Signs (C) . E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: All Storage Sycamore East Addition CFA No.: 2012-077 DOE No.: 6747 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 108,028.00 $ $ 108,028.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: $ IMF $ 108,028.00 2,160.56 2,160.56 4,321.12 $ 4,321.12 Choice Financial Guarantee Options, choose one Amount (ck one) Bond = 100% $ 108,028.00/ Completion Agreement = 100% / Holds Plat $ 108,028.00 Cash Escrow Water/Sanitary Sewer= 125% $ 135,035.00 Cash Escrow Paving/Storm Drain = 125% $ Letter of Credit = 125% w/2yr expiration period $ 135,035.00 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this 3 tr'J day of �.6(2,y , 20 CITY OF FORT WORTH - Recommended by: Water Department 7 Wendy ChJ-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. AVA. Date: ATTEST: ar`y J. Ka City Secreta ATTEST: Transportation & Public Works Department ‘•\ Douglas W. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager p.� �lppooOpo0Qy 000000Cs b 44 ?En ;rat" Reliable Paving, Inc. D.B.A. Reliable Commercial Construction, Inc. 9 ,Signatu Print Name: C Title: frt ktQ4i toe) OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements n Storm Drain Estimate n Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate AL n n ►1 ►1 n n (Remainder of Page Intentionally Left Blank) THE CITY OF FORT WORTH, TEXAS FORT WORTH PLANS FOR CONSTRUCTION OF 'Nor SANITARY SEWERTO SEREE) ILL STO J JJ\ SV CI C \ MO .JE E_ \ ST hair 1, B.L GG 1, di LL St-0RAGSSYCAMORE ar!ST RN THE CITY OF FORTWORTH TAR» °�� i COUNTY, TEX iS' �J .j_J.l.JJ.d.tJJ BETSEY PRICE MAYOR T. M. HIGGINS INTERIM CITY MANAGER DOUGLAS W. WIERSIG, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT S. FRANK CRUMB, P.E. DIRECTOR, WATER DEPARTMENT D.O.E. NO. 6747 WATER PROJECT NO. SEWERPROJECTNO. P275-7061301817-00 CITY PROJECT NO. 01817 h. K COyNTR" SIDE 1(2�\ I I 917f_RFIELD CREED IUTH PAR I TEHURST LOMA STA IW ROLE LL' LAUREL HILL - o KELTON 4' STAGECOACH NG FORK - CHOOL - NGS N Laurel Land Memariol Pork SYCAMORE STRIP AIRPORT HEIDLEBUR WHITTENBURG PANTE_c9 G WUR2BURG e MUG CANYON MANOR STEINBURG ANOR ANTE /C CAMS . o O witc!FS U F S LYRICK m ¢ PINEHUR5 ¢ c S S°CAM RE }4"„ SCHOOL :A CLARET SUNNY LOCATION MAP N.T.S. MAPSCO NO. 104-G COUNCIL DISTRICT 6 Il Hann" Par SHEFFIE AFTOi RE RED OWNER: DEVELOPER: PREPARED BY: rr mnrUP RAILHEAD TEXAS LP COY OUINE HA,MILTON DUFFY PC 81 4 AA0c»4CG GK30 1H1 S SHERMAN STREET 75081 8141 110 CITIES BLVD Vy$TANC. OKLAHOMA 73084 R..HAROSON. TEXAS 75081 NORM RICHLAND HILLS TEXAS 161151 MAd< ktcDOWELL 912-689-8440 KEITH M HAMILTON. PE 817-268-0408 rAX 817-284-8406 S HFFT I NOP I( COVER SHEET FINAL PLAT C1.07 UTILITY PLAN C1.02 SANITARY SERER PLAN AND PROFILE C1.03 SANITARY SEWER PLAN AND PROFILE C1.04 SANITARY SEWER PLAN AND PROFILE C1.05 SANITARY SEWER PLAN AND PROFILE C7.06 SANITARY SEWER NOTES C1.07 SANITARY SEWER DETAILS C1.08 EROSION CONTROL PLAN KKEI7H 4 HAMILTON . 87384 O3.4iCELLST.? 4SONeLf# J-st T7-- DATE DOUGLAS W. WIERSIG, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS RECOMMENDED PROJECT MANAGER DATE DATE A SOUPS 2012 X- DOE NO.874ThLE NO.O1817 W z 2 0 0110 12" DIA. SOR-26 PVC I SEWER PIPE CONSTRUCT STD. 4' DIA. SS MANHOLE RIM ELEV • 740.70 12' FL. (IN)43155 12' FL. (OUT)•731.45 E OF T. •. *!!1 *I KEITH M. HAMILTON 87384 i Q %DD).1/CEN SRO ,t t ti t ttki `AL ENGk0 �A ERTO/M b L UFFZ PC c ONSUL TING mwmu•eaempaw avn*.twamnu..a•11•eewMS•mn uToMWNKS n• mXVII•MI uisnc®atwafm PHONE M O2684408 FAX NO 2S44406 CONSTRUCT STO. 4' DIA. SS MANHOLE RIM ELEV • 740.00 12' FL. (IN)• 73113 12' FL. (OUT)•731.03 !1 1 112" DIA. SDR-26 PVa SEWER PIPE • ! i . 1 1 i i SCALE 1" • 100' 0 50 ZONE x 1 100 r— i i CONNECT TO EXISTING SS MANHOLE BY CORING 12' FL (IN)•730 43 8" FL. (OUT)•730.33 (VERIFY) ALL STORAGE SYCAMORE SEWER EAST COMMUNITY FACILITIES AGREEMENT FORT WORTH, TEXAS WASTEWATER PLAN - EXHIBIT A-1 SHEET 1 OF a 203-003 CFA SEWER 1.dgn 11/9/2012 12:47:33 PM Ili! I III Cr) N. r IL 0 0 CC >- -J 0 CC U 1 1 1 1 L r CONSTRUCT STD. 4' DIA. SS MANHOLE WITH 5 L.F STUB -OUT 0 0 50X TO NORTH W/ PLUG RIM ELEV.' 75105 8' FL (OUT)•742.99 �.,..�.. CONSTRUCT 62 L.F. OF ---m• - - 4' DIA PVC SS SERVICE " DIA. SDR-26 PVC 0 2.00X MINIMUM SEWER PIPE I CONNECT TO LIFT MANHOLE OLE FL.• 746.69 (VERIFY) —..—v14' SSNSERVICE 4" DIA. 4" FL. • 741.60 8" FL. •741.47 w i 1 1 t • CO 3/4 N�� Pas CONSTRUCT STD. 4' DIA. SS MANHOLE RIM ELEV. 740.85 8' FL. (IN)•733 40 8' FL. tOUT)•733.10 ., 1 LOT 1. BLOCK 1 CONSTRUCT STD. 4' DIA. SS MANHOLE RIM ELEV • 741.55 8' FL. (IN)•733.09 d8' FL. (OUT)•732.99 y re j8" DIA. SDR-26 PVC 1 J50 L.F. j I • SEWER PIPE 1-, CONCRE CONSTRUCT STD. 4' DIA. SS MANHOLE �y RIM ELEV • 745 00 H3110 ' pia' a HSMT WITH 20 L.F.8" DIA. STUB OUT TO WEST=-.-.-�� • a 'J- j — 8" FL. (IN) • 734.96 i — — i 8" FL. (OUT)•734.86 I 1 i* 5*• KEITH M. HAM i �:• 87384 ��; t. ',tOAF3/0EN St .•• •� gill MEI:rank° L U FYYPC� 1 I CONSUL TINO 71XA.Pail NaIt•D50 ava•w+ _ _W Tu.+masi .AAMS.• CONM •.7O•AAANAa. n4I Ja» auffi *Tx • NU.7II naaerm hiLd.1nA• TQn -1203-003 CFA SEWER 2.dgn 11/9/2012 12:47:50 PM a SCALE 1" - 100' 0 50 TE ENCASEMENT 12" DIA. SDR-26 PVC SEWER PIPE I CONSTRUCT STD. 4' DIA. SS MANHOLE RIM ELEV • 742.85 8' FL. (IN)•732.48 12" FL. (OUT)•732.38 w J U 2 ALL STORAGE SYCAMORE SEWER EAST COMMUNITY FACILITIES AGREEMENT FORT WORTH, TEXAS WASTEWATER PLAN — EXHIBIT A-2 100 SHEET 2 OP 2 PART B — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: Reliable Commercial Construction, Inc. 1903 Peyco Dr., N. Arlington, TX 76001 PROPOSAL FOR: All Storage Sycamore East Lot 1 Block 1, All Storage Sycamore East Addition Sanitary Sewer Improvements SEWER PROJECT NO. P275.7061301817-00 DOE NO 6747 CITY PROJECT NO. 01817 Includes the furnishing of' all materials, except materials specified to be furnished by the City, equipment and labor for the installation of SANITARY SEWER IMPROVEMENTS and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: ALL STORAGE SYCAMORE EAST ADDITION LOT 1, BLOCK 1 SANITARY SEWER IMPROVEMENTS Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Updated: 8/30/2010 UNIT I: SANITARY SEWER ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT CPMS Approx. Unit CPMS Name (Bid Item Unit Price Total Record Quantity Measurement Description) Amount Number Pipe-Sewer-12 Inch SDR35 BID-00259 877 LF (All Depths) - Install Thirty Nine Dollars & Cents per Linear Foot $ 39.00 $ 34,203.00 BID-000332 10 LF Pipe-Sewer-8 Inch Ductile Iron (All Depths) — Install Ninety Five Dollars & No Cents per Linear Foot $ 95.GG $ 950.00 BID-000351 870 LF Pipe-Sewer-8 Inch SDR35 (All Depths) — Install Thirty Seven Dollars & no Cents per Linear Foot $ 37-oo $ 32,190.00 BID-000213 7 EA Manhole-Std 4 Ft Diam-(to 6 Ft Depth) — Install Two Thousand Seven Hundred Dollars & No Cents per Each $ 2,700.00 $ 18,900.00 BID-000214 15 VF Manhole-Std 4 Ft Diam- Added Depth (over 6 Ft Depth) a Install One Hundred Fifty Dollars & No Cents per Vertical Ft. $ 150.00 BID-000354 7 LF Sewer Service-4 Inch — Install Twenty Dollars & No Cents per Linear Foot $ 20-00 $ 2,250.00 $ 140.00 Updated: 8/302010 70 LF Concrete Encase Sanitary Sewer Thirty No Dollars & Cents per Linear Foot $ 30.00 230 SY Remove and Replace Concrete Pavement (6" Thick w/ #3 Bars @ 18" ctrs.) Nineteen Dollars & Thirty Cents per SY 29 SY Remove and Replace Gravel Drive (6' thick) $ 2,100.00 $ 19.30 $ 4,439.00 Thirty Four Dollars & Fifty Cents per SY $ 34.50 483 SF Remove and Replace Concrete Walk (4" Thick w/ #3 Bars @ 18' ctrs.) Four Dollars & Forty Cents per SF $ 4.40 363 SF Concrete Walk (4" Thick w/ #3 Bars (% 18" ctrs.) $ 1,000.50 $ 2.125 20 Two Dollars & Ninety Cents per SF $ 2.90 $ 1,052.70 1 EA Core and Tie to existing Manhole Nine Hundred FiltyDollars & No Cents per Each BID-00217 7 EA Vacuum Test Manhole One Hundred Dollars & No Cents per Each BID-00201 1757 LF Inspection -Post Construction Cleaning & TV — Study $ 950.00 $ 950.00 $ 100.00 $ 700.00 TAN o Dollars & No Cents per Linear Foot $ 2.00 $ 3,514.00 Updated: 8/30/2010 BID-00372 1757 LF Trench Safety Two Dollars & No Cents per Linear Foot $ 2.00 TOTAL AMOUNT BID SANITARY SEWER $ 108,028.40 TOTAL AMOUNT BID SANITARY SEWER GRAND TOTAL AMOUNT BID PART B - PROPOSAL (Cont.) $ 3,514.00 $ 108,028.40 $ 108,028.40 After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within _ working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable :) A. The principal place of business of our company is in the State of • Updated: 8/30/2010