Loading...
HomeMy WebLinkAboutContract 43948 (2)FWINLIJ© WO (req from SGM): P c) 1 CCITY SECRETARY �'����n� A � FORT WORTH & WES7'ERI� �� �s �� �y� U U U V L� �. CONTRACT NO. CROSSING IMPROVEMENT AGREEMENT THIS AGREEMENT, made this 1st day of August, 2012 by and between FORT WORTH & WESTERN RAILROAD, ("Railroad"), and the CITY OF FORT WORTH of the state of TEXAS, ("the City"). WITNESSETH, RECITALS: The City has requested that the Railroad improve the existing crossing at Cranbury Cutoff (DOT 021071E) to which the Railroad is agreeable, but solely upon the terms and conditions hereinafter set forth. AGREEMENT: NOW THEREFORE, in consideration of the premises and of the promises and conditions set forth in this agreement, and the attached "EXHIBIT", the parties hereto agree as follows: 1. The Railroad shall, subject to the reimbursement provided for in this agreement, furnish all labor, materials, equipment and supervision for crossing upgrade including upgrading of certain portions of the active warning equipment, the addition of advanced traffic pre-emption, and re -drawing of the crossing plan set. 2. The City agrees to pay the entire cost which shall be payable upon Railroad notification to the City that the project is complete. The City's participation is limited to $196,202.86. Costs in excess of $196,202.86, if any, will require additional City authorization before payment can be made. . • IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date and year first herein above written. • FORT WORTH & WESTERN RAILROAD CITY OF FORT WORTH ATTEST Mary J. KaysSec ary -75-6/11 CONTRACT AUTHORIZATION APPROVED can - Fernando Costa, Assistant City Manager APPROVED AS TO FORM AND LEGALITY . APPROVAL RECOMMENDED ((.6 IL Douglas A. Black, Assistant City Attorney _ L: Li Douglas)W. Wiersig, P.E., D Public'WorksDepartment OFFICIAL RECORD tit,, 0000 icy kok) r IC S `cP allitninttet Date ctor, Transportation Date: Vigtfia•-• Chief Operer /21,4> Date //�Q�,Z Date 362 Date / 2 0 f t Reminder— City requires three originals and FWWR requires one. FT. WORTH, TX • 12--03- ., 2 A 1 1: 37 IN FWWR Crossing Construction Cost Estimate - Railroad Personnel Crossing: Granbury Cutoff in Fort Worth Location: MP 5.0, Dublin Sub, Fort Worth, TX Control it: N/A (city project, not TxDOT) D. Guido Chief Engineer 2/3/12 - site visit with RSI, CoFW 3/22/12 - 90% plan review, correspondence 7/30/12 - draft agreement, correspondence Invoice review (estimating 4 each invoices, 15 minutes each to review) Inspect construction, jobsite safety Final CoFW/RR inspection, acceptance 'Administrative Fee ($36.77/Invoice, one hour each, fiat rate) Federal mileage rate: $0.50 D Guido external rate: $224.99 Hours Labor Miles MI. cost 1.0 1.0 1.0 1.0 1.0 1.0 $224.99 $224.99 $224.99 $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $224.99 $224.99 $224.99 $147.08 31 $15.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 31 $15.50 31 $15.50 Labor Subtotal: Administrative Subtotal: Mileage Subtotal: FWWR Signal Locks: total estimate this project. RR tortes:( act/est? actual actual actual estimate estimate estimate estimate $1,349.94 $147.08 $46.50 $0.00 ' Railroad Signal International 5526 South 48th West Ave Tulsa. Oklahoma 74107 Phone: (918) 234-1522 fax: (918) 234-1529 www . railroadsionalinc.com CUSTOMER: PROJECT: LOCATION: CONTROL: FORC:F. ACCT I'RO.IEC"I' COST BRE.4I I)OWN • FT WORTH AND WESTERN RAILROAD FURNISH AND INSTALL FACTORY WIRED AND TESTED 11EA 6X6 CONTROL I IOIISE TRAFFIC PRE EMP NEW UNDERGROUND CABLES NEW 1.1 1) LIGHI'I IEADS ADDITIONAL ONF WAY I.IGHTHEADS ON CANT BORING FOlt TRAFFIC CONTROLLER ANI) UNDER ROADWAY GRANBURY RI) CUT OFF DO'I 021071E MP 5.00 FT WORTH TX I-XP-3R WITH AXD CARDS SSCCIII SOLID STATE CONTROLLER Wllil BACKUP I:VE?NT RECORDER MATIittIAI. FIELD CONSTRUCTION. F.NGINEERING:rEST1NG SHI PPINCi.EQUIPMENT. OVIERtIII:Af). 'GRAVEL • TOTAL Cost OF PROJECT S 86,461.16 S 108,198.19 • ( S 194,659.34 NO 'I'RACKWORK NEEDED FOR SIGNAL OPERATION ('RICE FOB JOB SITE. PRICE DOES NOT INCLUDE ANY TAX OF ANY KIND, TI IIS QUOTATION IS VALID FOR A PERIOD 0E30 DAYS FKC)M DATE BELOW COST PLUS EST PER RSI/FWWR CONTRACT AGREEMENT RAILROAD SIGNAL INTL. ( 1 / EDDI E D. BURNS PRESIDENT , IrritovED PON APPROVED DATE: MAY 1 2012 DATE PREPARED RAILROAD SIGNAL INTERNATIONAL, LLC 15110 E. PINE STREET TULSA. OK. 74116 918-234-1522 918-234-1529 FAX COST BRECKDOWN 1 CUSTOMER: PROJECT: LOCATION: CONTROL• CSJ STP F7 WORTH AND WESTERN RAILROAD i FURNISH AND INSTALL FACTORY WIRED AND TESTED 1 EA 6X6 CONTF TRAFFIC PRE EMP NEW UNDERGROUND CABLES NEW LED LIGHTHEA CRANBURY RD CUT OFF DOT 021071E MP 5 00 FT WORTH TX HXP•3R WITH AXD CARDS SSCCIII SOLID STATE CONTROLLER Wilt 2 3 ENGINEERING: 4 SIGNAL DESIGN ENGINEER 5 SIGNAL CONSULTING FRA INSPECT 6 DRAFTING AUTOCAD 7 ENGINEERING ASST. 8 REPRODUCTION COSTS 9 ENGINEERING SUB -TOTAL ADMINISTRATIVE 10 11 CONSTRUCTION: 12 13 14 15 16 PURCHASING MATERIAL MGT, ADMINISTRATIVE PROJECT SCHEDULING PROJECT AUDIT (TULSA) CPA FIELD AUDIT ADMINISTRATIVE SUB -TOTAL SIGNAL LAYOUT SUPV/ TESTING SUPV BORING CREW FOREMAN • BORING LABOR SIGNAL CONSTRUCTION FOREMAN ASST LABOR CONSTRUCTION SIGNAL CUTOVER TESTING TECH SIGNAL CUTOVER LABOR 18 FIELD CONSTRUCTION SUB -TOTAL 40 41 SHOP LABOR SIGNAL ASSLY AND TESTING 42 WIRING TESTS # 1 (TULSA) 43 LABOR # 2 44 LABOR # 3 45 LABOR # 4 46 47 CONTROL CASE WIRING: 48 SHOP FOREMAN 49 WIREMAN # 1 50 WIREMAN # 2 51 WIRING SHOP SUB -TOTAL 52 53 54 55 LABOR SURCHARGE FOR COMPANY PAID BENEFITS: 56 WORKMENS COMPENSATION INSURANCE (TX) 57 TEMPORARY CONTRACT LABOR 58 59 TOTAL LABOR 60 61 62 EQUIPMENT COSTS: 63 64 2006 INTERNATIONAL BOOM TRUCK 65 303 CAT MINI EXCAVATOR 66 EQUIPMENT RENTAL EXPENSES 67 SIGNAL CREW PICKUP 3/4 TON SIGNAL LAYOUT SUPV VEHICLE SIGNAL CUTOVER TECH VEHICLE 69 BORING TRUCK 70 BORING UNIT AND TRAILER RAIL GRINDER 71 EXCAVATOR TRAILER 72 GOOSENECK TRAILER 73 JACK HAMMER ATTACHMENT 74 TOTAL EQUIPMENT COSTS 75 76 LABOR HRS. Reg. Hours 24 3 40 0 1 6 16 16 0 0 24 24 24 12 360 0 36 16 16 16 16 36 55 # OF DAYS 5 14 1 14 3 0 5 5 2 14 PAY RATE Per Hour • $ 45.00 $ 100.00 $ 21.00 $ 16.00 $ 175.00 21 17.5 17 60 65 $ 75.00 $ 18.00 • $ 18.00 $ 45.00 S 18.00 $ 35.00 $ 18.00 S 18 14 13 12 21.00 16.00 S PER DAY $407 $235 $900 $113 575 575 S310 S850 535 $45 $55 $35 $ 2,395,00 678.00 • $ 10,332_00 S • TOTAL DUE $ 1,080.00 $ 300.00 $ 840.00 $ S 175.00 126.00 280.00 272.00 $ 1,800.00 $ 432.00 $ 432.00 $ 540.00 $ 6,480.00 S $ 648.00 $ $ 288.00 224.00 208.00 192.00 756.00 880.00 2,548.00 Sub -Total $ 15,953.00 28.00% $ 41466.84 8.04% $ 1.641.76 $ - $ 22,061.60 5 21035.00 S 3,290.00 S 900.00 S 1.582.00 $ 225.00 $ S 1,550.00 5 4.250.00 S 70.00 $ 630.00 5 5 14.532.00 1 77 SUB CONTRACTORS: 78 79 80 81 82 83 84 85 86 B7 TOTAL SUS CONTRACTORS: 88 89 90 PARTS AND MATERIALS 92 SEE ATTACHED PARTS LIST W/COST 95 CRATING SHIPPING & HANDLING 96 97 98 TOTAL PARTS AND MATERIALS 99 100 101 OTHER COSTS: 102 103 104 POWER TAP ROAD BORING MATERIALS DRESS ROCK 20 TONS FILL DIRT CONCRETE (CANT FOUNDATIONS) TRAFFIC CONTROL EXPENSE FLAGGERS ON SITE MATERIALS STORGE SUB CONTRACT FLAGGERS & UTILIES LOC 2.00% INBOUND FREIGHT TULSA MOBILIZATION EXPENSE (EQUIPMENT-PERSONEL TULSA-DFW ) SUBSISTENCE ALLOWANCES BORING CREW SUBSISTENCE ALLOWANCES CUTOVER CREW 106 SUBSISTENCE ALLOWANCES SIGNAL CREW AIRFARES RENTAUPRN CAR MILEAGE 107 MGMT TRAVEL EXPENSE 108 ON SITE MEETING EXPENSE 109 BID OR EST. EXPENSE 110 SHIPPING COMMON CARRIER (TULSA-DFW ) 111 SHIPPING OUR TRUCK 112 113 TOTAL OTHER COSTS 114 115 116 G AND A ALLOCATION ON LABOR AND MAT. 117 CONTINGENCY 118 GENERAL LIABILITY INSURANCE 119 SUB TOTAL COST 121 BONDING EXPENSE FEE 122 SALES COMMISSION 123 FIXED FEE (PROFIT) 124 BANK INTEREST EXPENSE 125 TOTAL COST 126 • • 38.89% 0.00% 7.70% 0.00% 0.00% 12.00% 0.00% 300.00 800.00 4,200.00 8,300.00 84.765.84 1,695.32 86,461.16 600.00 1.600.00 600.00 4.800.00 400,00 150.00 150.00 900.00 9,200.00 39,828.87 7,001.03 184,384.65 10,274.70 194,669.34 Costumer. Project RAILROAD SIGNAL INTERNATIONAL MATERIAL LIST PETER SMITH- FOREST PARK FT WORTH AND WESTERN RAILROAD FURNISH AND INSTALL FACTORY WIRED AND TESTED 1 EA 6X6 CONTROL HOUSE TRAFFIC PRE EMP NEW UNDERGROUND CABLES NEW LED LIGHTHEADS CRANBURY RD CUT OFF DOT 021071E MP 5.00 FT WORTH TX HXP-3R WITH AXD CARDS SSCCII! SOLID STATE CONTROLLER WITH BACKUP IOTY ( UNIT I VENDOR I PART NUMBER HOUSE I 1 EA RSI 1 1 EA Graybar 1 3 EA VELCORP 1 1 EA RSt 1 1 SET (zoom 1250 FT GETS 1250 FT GETS 1 1 EA GRAINGER I 1 1 'EA GRAINGER 1 2 I EA BAES I 2 1 EA BAES 1 2 I EA RSI 1 4 1 EA NORBERG I 4 1 EA NORBERG 1 1 I EA SAES 1 6 1 EA SAES 1 6 I EA SAES 1 1 1 EA IGraybar 2 IEA I1 w1r1 .2 EA Ii 7. 12 1 2 I1 2 "ji7AL4 EA IRSI EA EA IBAES EA i VIUYluia SIGNALS -GATES -CANTS 0 0 0 0 0 0 0 0 0 0 2 0 0 16 1 0 0 2 0 I 6 1 2 1 2 I 2 1 0 I EA WCH EA RSI EA (RSI EA RSI EA RSI EA NEG EA RSI EA RSI EA RSI EA RSI EA RSI EA RSI EA RSI EA 1RSI EA (1R31 EA (RSI EA (RSI EA RSI 1 EA IGSI EA IGSI EA lAltied EA IGSI EA 1RSi EA IRSI FOUNDATIONS RSI.6X8 ' 00116M100 I IL-LC2NB IRSI.589' (DOT sign 13830.05 14105-01 12E340 11HKL5 1205149 110267 IRS( 777777? ITI-2222G ITI.1515G 1EMT150 148953 13/4 SOEEZE EMT 194085349 1MNS5 228 LP 1205047 11 5 ZINC CON 1 110561-51 IRSI 3597-13 t-011 RSI 777?7 RSI-541A RSI 7777? RSI 72777 RSI 7777 RSI 77777 RSI-G WEIGHT • RSI-RPL24' GCW-LED12' RSI.1 WAYG" RSI-2WAVG RSI-2WAYC GCW-0207 SK•1000•B 9298-1120 NTE5340 EB-3.360.5 RS'•Xsign I 0 I EA (American Conc1BNRR•02 I ' 0 EA IRS( RSI-CF01 MAJOR ELECTRONICS 1 1 EA Gi TS I 2 I EA I SAFTRAN IARRUS • I DESCRIPTION 16' X 6' aluminum signal rouse, 2 DOOR Square D Load Center 100 AMP (MUST BE ORDERED WIPN 00C20u100S Cover) (Power et( Iights/MAINT CALL LIGHT (PRE EMP BOX MOUNTED OUTSIDE 'DOT Sign and decals (Tower & Case Wire #10 (Tower & Case Wire #16 Dayton Attic Fan Thermostat 80.140 Degrees Attic Fan Exhaust Cenirkuaal Vent Fan=16" Wall Receptacles NEMA L5.15R Wail Plug NEMA L5-15P 19" Equipment Rack Pandull 2-1/4"t2.1/4"x6' 6" Pandua 1.1/25x1-1l2"x6' 6' PIPE 1 1/2" CONDUIT SET SCREW 3/4" CONNECTOR METALLIC (N28272) SQUEEZE CONNECTOR 3/4" (N20422) Hoffman Box (16"X16"X6") I S 4' BASE STRIP FLUORESCENT(T-8 bulbs) W/Ptastic Cover 1 S I4f1 Fttiorescent lights IZINC EMT CONNECTOR 1 ire (CAT N234•DC2) es172966I FLEXIBLE CONDUIT 318" ALUM LIv, 1111111YL1 /1111.1 V V11UJL 111111LV 1 L11 II... JUIJ IBattery Tray IUNIT. COST. I EXT. COST. • • Model 3597 Gate Mechanism with maintenance switch no head $ GATE MECH Torque wrench KIT I $ Canlilever-GATE COMBO Signal Mast & Walkway 20' I S 15-6X5 Gate Signal Mast 1 $ I5_ Split base Junction Boy I $ I High Wind Bracket wf hardware for 5" masi I $ !Gate Hubs I S Counterweight anus (2 leh & 2 right hand supports) 1 $ Gate Weiaht Stud Plate W/Rachet washer 1 $ IGate Weights 58 Ibs 1 $ Galo wire and mounting hardware I $ ICanliiever WIRING HARNESS 1 S (Rodent Plate 1 $ 12" LED Flashing tight unit w/alum 20" background and Hood, a $ Junction Box Lightarm assembly 1-Way for CANT signal I $ Junction Box Lightarm assembly 2-Way for gate signal. 1 $ Junction Box LigMarm assembly 2-Way for cantilever walkway IS Highway crossing gate arm. High Intensity reflective tape $ Adjustable 26' Ft. lenglhwith Aluminum sleeve, and complete hardware. Gate Keeper 4" LED gale lights wlhardware. Tip Diode for LED gate tights. Electronic Highway Crossing Belt RR crossing extruded sign High intensay wimounttnp hardward $ (Mounting bracket for R154 sign 1 $ Concrete pre-caS1 pate foundation 1 5 ICantitever Foundation LEAVE IN PLACE METAL FORMS 1 S IHXP-3R W'.TFI RMM IDK 8 RSi r1AITH 4 EACH AXD CAROS'i 5 !EVENT RECORDER SYSTEM• I $ 8.989.00 $ 242 00 $ 32.00 S 18250 $ 144.00 $ 0.63 S 0.55 $ 29.50 $ 161.98 $ 1241 $ 13.12 $ 216.80 $ 22.80 S 19.57 $ 9.60 S 0,23 $ 0.37 I $ 35 49 1 $ 7.98 1 S 27.00 1 $ 1.59 1 $ 0.43 1 $ 66.50 I $ 110.00 1 $ 4.353.00 $ 232.00 S 11.435.00 S 242.00 $ 442,00 $ 114.00 $ 162.00 S 386.00 1 $ 85.00 S 110.00 S 28.00 S 97.00 S 46.00 1 $ 3180DI $ 398.00 I $ 460.00 1 $ 460.00 I $ 680.00 1,100.001 $ 49.001 $ 60.001 $ 205.00 $ 183.00 $ 42.00 $ 610.00 I $ 1.530.013 1 $ 20.678.n 1 2.161 00 1 $ 8.989 oot 242.00I 96.00 182.50 144.OD1 157.50 137.50 29.50 161.98I 24.82 26.24 433.60 91.20 78.28 9.60 1.39 2.22 35 49 15.96 54.00 3 18 0.86 66.50 220 00 56.001 5,056.00 395.00 ;.360.80 • 294.00 120.60 410.00 366.00! 26.878.801 A.322.ati 2 EA 2 EA 2 EA 1 EA 2 EA 2 EA EA 1 EA 1 EA 1 J EA 6 I EA 4 1 EA 2 EA 7 EA 1 I EA 2 I EA 2 1 EA 2 1 EA 1 EA 2 EA 2 EA 1 BOX 1 BOX SAFTRAN ALSTOM ASL RSI GRS GETS RSI RSI NRS NRS NRS us$ USS NRS RSI RSI RSI Allied RSI RSI RSI BRADY BRADY 2 EA ALLIED 8 EA ALLIED 12 1 EA ALLIED 6 1 EA ALLIED 8 1 EA (ALLIED CABLE 1300 ! FT GETS 450 FT GETS 1450. FT GETS 1 FT GETS 100 1 FT GRAYBAR 91165.1101 A62-262 10169 RSI 777777 032619-22X 250849.001 RSI.549 RSITP-02P2TP 18120-30 1551104 N451552.0201 N451552-0101 403768-CW ACSP•20 DCSP-10 5X824,5X852 lRSFCOP ILAP17 ILRP•60 IBPSPT-250.1-WT ICL-317-B19•BK 1809.0110 1850.0267 1809.0270 1809.0276 1809.0273 11094.02 1077.02 11023.05 11076-02 1 FIELD 1 f LOT RSI 2 EA GRAYBAR M0419 2 200 2 2 0 1 0 8 25 1 0 1 8 100 100 2 4 2 2 8 1 1 1 4 1 1 4 2 12 200 2 20 4 • EA RSI • JRSI.2337 EA SAFETRAN 1ELE983B EA RSI EA HOME DEPOT11447A CAN Motion Industr14205143 RSI Graybar 1PG1324BA18 RSI Gryaber 1PG3048BA18 EA GRAYBAR 19403511T EA Themrowsd 127-7000.00 SET Thermoweld IM-8600 EA RSI 1E0E3500 SET Themwweld IM-8609 EA Thermoweld IG21588 FT Themwweld ISBSBCINSUL FT Smart C. Irbt. BARE-CU 6 CO EA HOME DEPOT15405 EA HOME DEPOT EA HOME DEPOTJCTAP BOX HOME DEP011241694 KIT EA Shermoweld JSBSt1C EA Motion Indusdl AH20012 EA GRAYBAR 88254495 EA RSI 31/4N EA ERICO SBA2489 EA HARGER RBTC31164 EA'HOME DEPO11112HGF55 EA $RSI - FT IRS( 4REFLTAPE FT ICSC A16C9N1JNNA550 EA !HOME DEPO11306910 FT 'Dealers Eiectri4PVC200SCH80 EA 'Dealers Electn4PVFEL20090 SSCCIII CROSSING CONTROLER 20 AMP I 5 5000hm Neutral Relay 1Pre-emption) 1 $ Relay base 1 $ SSCCIII TRANSFER PANEL 1 S Relay testnut wrench 1 $ Frequency Selecledable Shun/FSS-18 1 $ SHUNT ENHANCHMENT PANEL I $ Track Surge Panel 13 Electronic Aulomatic Ba11ery Charger 40 amp Temperature cod $ Electronic Auiprnatic Battery Charger 20 amp Temperalure cod S ELM Exide Low Maintenance 340 AH S ARRESTOR $ EQUIZER $ ELM Exide Low Mainlenanoe 710 AH $ WAGO PANEL 13 IAC Surge Protector ! 3 IDC Surge Protector 1 $ IPOR Relay 8 Base AND RESISTOR ! $ (SIGNAL CUT OUT PANEL WITH LIGHT AND VOICE 1 $ Lamp Amster Panel I $ (Lamp Resistor panel I $ (WIRE MARKING SLEEVES I $ (LABELS 1 $ (GIN Relt I $ 'End Clip I S !Terminal Block ; 5 'Piug•In Bridge $ 'End Cover 1 $ 2C#6 TW PAIR track wire 1 S 70116 AWG underground cable S 7C#14 AWG underground cable I S 5C#6 AWG underground cable I S NUMBER 2 ALUM 3 COND WITH GROUND AWG undergro' S 'Tanning', Taps. Labels OAKUM5LBPKG TRACK JCT BOX !INSULATED TEST LINKS 'SHUNT COVER ENCLOSURE (Duct seal foam GREAT STUFF 1602 (Aluminum spray Paint [SMALL PULL BOX LARGE PULL BOX 5/8• x 8' copper Ground Rod 13/16' Dia. XS Slyle Joint head bond IRail head mold frames (Long welded Bondwire 1Webb of Rail mold frames Cadweld one shot 13/16" Bondslrand Insulated Bare 08 Cooper wire solid ground 13M TEMFLEX LINERLESS RUBBER SPLICING TAPE Electrteal Tape CautionTape-1000ft X 3" 1-Electrical Coaling TRACK CONNECTION KIT. EACH KIT INCLUDES: !Sleeves 3/18 FIELD MADE X 3/4' LONG Bootleg hose 3/4" 300 P81 $Hose Clamps 1' ONE HOLE STRAP (Hose Clamps nails IRETAINER CLIP (Bond Bootleg Track conector • Web ISlaples IS' Pipe (Bolard) WHITE REFEL TAPE FOR BOLARO 3 INCH 4" HDPE Conchal' / Pan07-170454.07 PVC Glue Ewe Gately brand 12 INCH PVC SCH 80 12 INCH 90 DEGREE SWEEPS • 'TOTAL 3,716 75 $ 740.00 5 100 00 $ 183.00 $ 47.00 $ 488.00 S 3.890.00 $ 490.00 $ 666.00 $ 466.00 $ 500.00 $ 22,00 22.00 645.00 146.90 141.00 141.00 S 40,001 S 485.00 ! $ 638.00 I $ 679.00 1 $ 365.00 1 5 48.16 I 5 11.50 1S 0.33 1 $ 1.33 13 5.24 1 $ 0.67 1 S 2.23 8.80 3.28 719 5.91 250.00 $ 27.85 S 187.00 S 2.15 1 S 90,001 $ 3.98 1 5 1.67 1 S 278.68 1 $ 873.53 I $ 14.74 I $ 4.25 1 $ 215.00 1 S 6.32 $ 250,001 $ 6251 $ 0.89 1 $ 0.35 2.95 1.96 7.98 6.95 45.00 • 55.00 2.90 3.62 $ 5 $ 376 S 0.57 1 $ 1 70 1 S 7 433 501 200.001 183.00I 94.00 976.00 • 49000 666.00 466.00 3.000.00 88.00 44.00 4,515 001 146 901 282.001 282.001 80.00$ 485.OU 1.276.00 1,358.00 365.00 48 16 23.00 2.64 15.96 31 441 5.361 669.001 3.960.00 1.476.00 -1 591.001 250.00 55 70 374.00 430.00 180.00 7.96 278.68 117.82 106.25 215.00 250.00 50.00 89.00 35.00 5.90 7.80 15.96 13.90 360.00 110.00 34.60 724.00 7.52 r 1.37 6.80 84 755.84 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/6/2012 DATE: Tuesday, November 06, 2012 LOG NAME: 20FWWRGRANBURYCUTOFF SUBJECT: REFERENCE NO.: **C-25947 Authorize Execution of an Agreement with the Fort Worth and Western Railroad Company for Railroad Signal Improvements at the Railroad Crossing Located at Granbury Cut -Off in the Amount of $196,202.86 (COUNCIL DISTRICT 6) RECOMMENDATION: It is recommended that the City Council authorize the execution of an Agreement with the Fort Worth and Western Railroad signal improvements at the railroad crossing located at Granbury Cut -Off in the amount of $1OP. ^r ? Rr, DISCUSSION: The Transportation and Public Works Department is scheduled to install a new traffic signal at the intersection or Granbury Road and Granbury Cut -Off. The new traffic signal is located near a Fort 'Worth and Western (FVVWR) railroad grade crossing. V requiring interconnection to the railroad crossing signal V The FWV' R completed a design and cost estimate for Upgrading their railroad signal to provide for this interconnect The railroad equipment upgrade: will nrnvide constant warning and Hower out indicators as required by the Train Horn Rule for quiet zone locations. v franhury Ci1t-(off Road is a planned TexRail crossing that will he made a quiet 7nne as part of the TexRail construction. The purpose of this iviayor and Council Cornrr unication is to facilitate- advance coordination and cnnreratinn with FWWR The FV VR upgrade is scheduled for rehrirary 701'3 and the traffic signal construction is scheduied for April 2013. The traffic signal and railroad crossing upgrade will he funded by 7004 CIP funds The Citv's cast portion for the railroad crossing upgrade is $ , 96,202.86. Thic prnio.^t is lor�ta:r in rri► Ri!'ti r ri--- 1 Rtr T r, FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are availahle in the current capital budget, as appropriated, of the Street Light and Signal improvements fund. FUND CENTERS: TO Fund/Account/Centers CERTirn.a- i iOiNS: FROM Fund/Account/Centers C^r1 c4i9nn 2n171n1Q3T7an $1AR 7132.RS Luwnarne: 2017w w«\TRMNnT TA T/.T ;TOFF r p,.u. 1 ..rn Submitted for Cily Manager's office„ y: Fernando Costa (0122) originating Department Head: Douglas W. Wiersig (?801) Additional Information Contact: Alonzo Linan (?801) ATTACHMENTS 1. 88. 20 FWWR Gran bury Cutoff,OCT 10-12-2012).docx (CFW Internal) 2. FWWR & Granbu[y Cut Off Rd M&C Map 2012 08 15.pdf (Public) Loorname:- ?OF WWRGR ATARI IRYCI TTOFF PacyP `7 nf')