Loading...
HomeMy WebLinkAboutContract 44177 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. L` L"1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: D.R. Horton — Texas, Ltd. Address, State, Zip Code: 6751 North Freeway I Fort Worth, TX 76131 Phone, E-Mail: (817) 230-0800 I dallen@drhorton.com Authorized Signatory & Title: Don E. Allen, Assistant Secretary Project Name: Tehama Ridge Phase V-C Project Location: Golden Triangle & Misty Redwood Trail Plat Case No.: FP-012-027 Plat Name: Tehama Ridge Addition Mapsco: 21N & 21P CFA: 2012-078 DOE: 6893 To be completed ' y staff.• Received by: Council District: 2 City Project No: 01970 Date: k)c)--SH RACIAL RECORD MTV SECRETARY yfoirriii TX --J2 n 1.58 IN NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X_, Sewer (A-1) __X, Paving (B) _X, Storm Drain (B-1) X, Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be Installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Project Name: Tehama Ridge Ph. V-C Cost Summary Sheet CFA No.: 2012-078 DOE No.: 6893 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one I Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% ICash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period Developer's Cost $ 115,728.00 70,766.00 $ 186,494.00 $ $ $ 236,954.50 21,125.00 27,916.00 $ 285,995.50 $ 472,489.50 $ $ $ $ $ 3,729.88 3,729.88 7,459.76 10,323.18 5,161.59 1,116.64 980.00 17,581.41 25,041.17 Amount 472,489.50 472,489.50 233,117.50 357,494.38 590,611.88 Choice (ck one IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in at Fort Worth, Texas this 2.2'` day of 3'4 & VA R-'/ quadruplicate, ,20 13 . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Bfibulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Assistant City Attorney M&C No. �,// Date: ATT Mafy J. Kayser City Secretary ATTEST: \_ /le Of A 1 Signature (Print) Name: 7-Et y dE Transportation & Public Works Department Douglas Director 1 a Lir Wiersig, P.E. Approved by City Manager's Office Fernando Costa Assistant City Manager reff0P sr 41,zsi lib tEXIJf D.R. Horton — Texas, Ltd. 9 Signature Print Name: Don E. Allen Title: Assistant Secretary 1�- OFFICIAL RECORD ry SECRETARY f WORT ` 7,"> J Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water hnprovements Water Estimate Exhibit A-1: Sewer hnprovements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate a Wr m IV Nr (Remainder of Page Intentionally Left Blank) 1TOTAL WATER DISTRIBUTION SYSTEM JACO'BS EN'GINEERING'GROUP INC,'' 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE N0. (817) 735 6000 TEHAMA RIDGE PHASE VC January 4, 2013 WATER DISTRIBUTION SYSTEM BID QTY ITEM# DESCRIPTION PG. 3 TOTAL UNIT PRICE AMOUNT 1 8" PVC Water Main by Open Cut 1561 1,561 L.F. $34.00 $53,074.00 2 8" Gate Valve & Vault 2 2 EA. $1,000.00 $2,000.00 3 Std. Fire Hydrant Assembly 4 4 EA. $3,200.00 $12,800.00 4 1" Copper Service 1618 1,618 L.F. $9.50 $15,371.00 5 1" Tap to Main 59 59 EA. $200.00 $11,800.00 6 Meter Box "Type A" 59 59 EA. $50.00 $2,950.00 7 Poly Pig 4 4 EA. $500.00 $2,000.00 8 Connect to Existing 8" Water Line 3 3 EA. $850.00 $2,550.00 9 Trench Safety 1561 1,561 L.F. $1.00 $1,561.00 10 Cast Iron Fittings 1.20 1.20 TON $5,000.00 $6,000.00 11 Complete Testing (Including Geotech) 1561 1,561 L.F. $2.00 $3,122.00 12 City Bond for All Water/Sewe Improvements 1 1 L.S. $2,500.00 $2,500.00 $115,728.00 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205).XLS Page 1 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE NO (817)'735 6000 TEHAMA RIDGE PHASE VC ITEM# DESCRIPTION 1 8" SDR-26 PVC SS Main 2 4' Diameter Manhole 3 Extra Vertical Depth on Manhole (>6') 4 4" Sanitary Sewer Service (SDR-35) 5 4" Sanitary Sewer Service (SDR-26) 6 Sewer Main Tap for Service 7 Connect to Existing Sanitary Sewer 8 Abandon Existing Service 9 Shortening of Existing Services 10 lTrench Safety January 4, 2013 SANITARY SEWER COLLECTION SYSTEM BID QTY PG. 4 TOTAL UNIT PRICE AMOUNT 721 721 L.F. $42.00 $30,282.00 3 3 EA. $3,200.00 $9,600.00 10 10 V.F. $175.00 $1,750.00I 345 345 L.F. $8.00 $2,760.00I 804 804 L.F. $10.00 $8,040.00 36 36 EA. $200.00 $7,200.00 3 3 EA. $1,200.00 $3,600.00 3 3 EA. $500.00 $1,500.00 3 3 EA. $300.00 $900.00 721 721 L.F. $2.00 $1,442.00 11 Vacuum Test for Manhole 3 3 EA. $100.00 $300.00 12 4" Sanitary Sewer Cleanout 39 39 EA. $50.00 $1,950.00 1 13 TV Inspection of Sanitary Sewer 721 721 L.F. $2.00 $1,442.00 (TOTAL SANITARY SEWER COLLECTION SYSTEM $70,766.00 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205).XLS Page 2 ITEM# DESCRIPTION 1 6" RC Street Pavement w/7" Curb 2 8" Lime Stabilized Subgrade 3 Hydrated Lime (42#/SY) 4 Std. 4' Sidewalk 5 ADA Sidewalk Ramp 6 Remove Existing FOR Barricade 7 City Bond for Paving Improvement (TOTAL PAVING JACOBSENGINEERING GROUP INC 777 MAIN STREET, FORT WORTH, TEXAS „76102. PHONE NQ. (817) 735-6000 TEHAMA RIDGE PHASE VC BID QTY PG. 17 996 1020 21 0 0 1 1 January 4, 2013 PAVING BID QTY BID QTY PG.18 PG. 19 1779 2139 1833 2202 38 46 0 14 0 2 1 1 0 0 BID QTY PG. 20 TOTAL UNIT 1593 6,507 S.Y. 1641 6,696 S.Y. 34 141 TON 77 91 L.F. 0 2 EA. 0 3 EA. 0 1 L.S. PRICE AMOUNT $28.50 $185,449.50 $3.25 $21,762.00 $160.00 $22,560.00 $13.00 $1,183.00 $1,000.00 $2,000.00 $500.00 $1,500.00 $2,500.00 $2,500.00 $236,954.50 i1 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TRSC CFA Cost Estimate (20121205).XLS Page 3 JACOBS ENGINEERING'GRO;UP INC 777 MAIN STREET,; FORT WORTH, TE•X•AS 76102 PHONE NO (817) 735 6000 TEHAMA RIDGE PHASE VC January 4, 2013 STORM DRAIN SYSTEM BID QTY ITEM# DESCRIPTION PG. 21 TOTAL UNIT PRICE AMOUNT 1 24" RCP - CLASS III 225 225 L.F. $55.00 $12,375.00 2 24" Sloped End Headwall 1 1 EA. $2,500.00 $2,500.00 3 Std. 10' Curb Inlet 1 1 EA. $2,500.00 $2,500.00 4 12" Rock Rip Rap (18" Depth w/6" Bedding) 44 44 S.Y. $75.00 $3,300.00 5 Trench Safety 225 225 L.F. $2.00 $450.00 !TOTAL STORM DRAIN SYSTEM $21,125.001 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205). 'lade 4 JACOBS ENGINEERING GROUP INC 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE. 735-6000 TEHAMA RIDGE PHASE VC January 4, 2013 STREET LIGHTS BID QTY ITEM# DESCRIPTION PG.26 UNIT PRICE AMOUNT 1 Conduit 2" 228 L.F. $10.00 $2,280.00 2 #10G Wire 684 L.F. $4.00 $2,736.00 3 D25-6 Light Poles 7 EA. $2,200.00 $15,400.00 4 100W HPS Cobra Luminaire Type 7 EA. $200.00 $1,400.00 5 Type 4 Foundation 7 EA. $800.00 $5,600.00 6 Ground Box 1 EA. $500.00 $500.00 (TOTAL STREET LIGHTS & SIGNS $27,916.001 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205).XLS Page 5 ITEM# DESCRIPTION 1 Stop/Street Name Signs TOTAL STREET LIGHTS & SIGNS JACOBS ENGINEERING GROUP INC 777 MAIN STREET; FORT' WORTH, TEXAS' 76102;I PHONE NO '(817) 735 6000 TEHAMA RIDGE PHASE VC January 4, 2013 STREET LIGHTS BID QTY 4 UNIT EA. PRICE $250.00 AMOUNT $1,000.00 $1,000.001 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205).XLS Page 6 ITEM# 1 WATER 2 SANITARY SEWER SUBTOTAL FEES 'TOTAL FEES JACOBS;ENGINEERING G, EROUP INC. '`777MAIN 'STREET, FORT WORTH, TEXAS,' PHONE NO. (817) 735-6000 TEHAMA RIDGE PHASE VC DESCRIPTION ITEM# DESCRIPTION 1 STREET PAVING 2 STORM DRAINAGE 3 STREET LIGHTS 4 STREET SIGNS SUBTOTAL FEES 'TOTAL FEES ITEM# DESCRIPTION 1 WATER 2 SANITARY SEWER 3 STREET PAVING 4 STORM DRAINAGE 5 STREET LIGHTS 6 STREET SIGNS IITOTAL CFA CONSTRUCTION IITOTAL WATER/SEWER FEE January 4, 2013 FEE CALCULATION WATER AND SANITARY SEWER FEE CALCULATION PAVING AND STORM DRAINAGE CFA SUMMARY AMOUNT $115,728.00 $70,766.00 2% INSPECTION FEE 2% TESTING FEE $2,314.56 $1,415.32 $3,729.88 4% INSPECTION AMOUNT FEE $236,954.50 $21,125.00 $27,916.00 $1,000.00 $9,478.18 $845.00 $1,116.64 $40.00 $11,479.82 $2,314.56 $1,415.32 $3,729.81 $7,459.76 2% TESTING FEE $4,739.09 $422.50 $0.00 $0.00 $5,161.59 IITOTAL PAVING/STORM DRAIN/LIGHTING FEE $16,641.41 TOTAL $115,728.00 $70,766.00 $236,954.50 $21,125.00 $27,916.00 $1,000.00 $473,489.50 1I $7,459.76 II $16,641.411 G:\JOB\WFXK9500\600DISC\620 Specs\5C\CFA\20121206-3rd Submittal (Final)\TR5C CFA Cost Estimate (20121205).XLS Page 7 I:\SLD\WFXK9500\700 CADD\702 Civil\tr5cCFA—A.dwg, 11/12/2012 11:31 AM. Baxter, Travis 11 PROJECT LOCATION H FORT WORTH, of. _OLDENEIGHTS 0 0 0 c FORT F WORTH E.T.J. cv HERITAA TRACE _ ILO T) \ 0 0 FORT W JJ c EEC --\ GOLD,=N1 TRIANGLE B 0 LE FORT Vv 0 Jai 0 ~ q L J MAPSCO PAGE 21N & 21P COUNCIL DISTRICT NO. 2 NOT TO SCALE VICINITY MAP TEHAMA RIDGE PHASE VC JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SL.D\WFXK9500\700 CADD\702 Civil\tr5cCFA—A.dwg, 11/12/2012 11:13 AM, Baxter, Travis 26 19 EXISTING s>j.. \`o TEHAMA RIDGE 1% PHASE 4A" J_{/ DOE #5353 / yr \\ FILE #W-1861 "/ ,— /,,- LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE // PROPOSED FIRE HYDRANT EXISTING WATER LINE EXISTING GATE VALVE EXISTING FIRE HYDRANT LIMITS OF PROJECT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED LOT 39X, BLOCK 10 PRIVATE OPEN SPACE LOT 12X, BLOCK 9 PRIVATE OPEN SPACE SCALE:1" = 150' WATER 1-,_. EXHIBIT'A' TEHAMA RIDGE 24 23 PHASE VC \ 35 1 "" EXISTING` \ 36 37 Og I JACOBS zTEHAMA RIDGE, 38 39 L HASE5B 777 MAIN STREET %DOE #6713 FORT WORTH, TX 76102 FILE�,0-2186/ /- / PHONE 817-735-6000 28 ,.: • DOE #5353 /- \ \ 1 coex FILE #W=1861 / — \ • i / ' \ N \ st / LOT 39X, BLOCK 10 26 PRIVATE OPEN SPACE 27 to LEGEND rs, PROPOSED SANITARY SEWER 0 PROPOSED MANHOLE 0 0 EXISTING SANITARY SEWER — — — — — — 0 EXISTING MANHOLE /' EXISTING\ 0 S' LIMITS OF PROJECT TEHAMA RIDGE , '‘ PHASE , ;DOE #,6-713 • PROPOSED SEWER LINES ARE 8" -9 UNLESS OTHERWISE INDICATED FILE\j/W-2186/ • •• EXISTING TEHAMA RIDGE PHASE 4A, J \o. 1 0 c.' / .,,) ..* / .y.0 •sii\'‘ , / / \N- /4, / 4" 7 \ // •-syst„------ — 6 18 % 20 21 \ & 9 LOT 12X, BLOCK 9 PRIVATE OPEN SPACE 12 8- SS 33 25 • 14 22 SCALE: 1" = 150' WASTEWATER EXHIBIT 'A-1' TEHAMA RID GE 1 24 23 PHASE VC \ ® JACOBS 40 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I: \ SLD \WFXK9500 \ 700 CADD\ 702 Civil \tr5cCFA—A.dwg, 11/12/2012 11:14 AM, Baxter, Travis 27 TEHAMA PI-ASE DOE /#535: , FILE #1k---1861 PROPOSED 29'B/B ROADWAY/50'ROW 26 -------- \ 1 LEGEND PROPOSED 4'SIDEWALK (BY HOMEBUILDER) PROPOSED 4'SIDEWALK (BY DEVELOPER) PROPOSED ADA RAMPS (BY DEVELOPER) LIMITS OF PROJECT 0 LOT 39X, BLOCK 10 PRIVATE OPEN SPACE 10 34 EXISTING TEHAMA PHASE 5,13z \ DOE #6713 / 35 20 25 LOT 12X, BLOCK 9 PRIVATE OPEN SPACE 12 16 21 24 13 15 14 22 23 SCALE:1" = 150' PAVING EXHIBIT 'B' TEHAMA RID GE PHASE VC ® \ JACOBS 40 777 MAIN STREET FORT WORTH, TX 76102 FILE' ft-W-2186/ \!*** PHONE 817-735-6000 9 I:\SLD\WFXK9500\700 CADD\702 Civil\tr5cCFA.dwg, 12/5/2012 4:19 PM, Baxter, Travis 27 25 /�/ oy\ 24 SA.J q0 TEHAMA' RIDG�� ,PHASE 4A DOE #5353 FILE #W-1861 LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET PROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT T 11 / LOT 39X, BLOCK ,1'O PRIVATE OPEN SPACE / / 10 / 11 EXIS1 NG �7ssrr TEHAM RIDC PHASE 5B D,OE #6713 / 7 FILE #W i186 20 25 12 21 24 24" HDWL SCALE:1" = 150' LOT 12X, BL CK 9 PRIVATE OPEN SPACE � I 13 22 23 40 PROP. 20 DRAINAGE EASEMENT (BY SEPT. INST.) STORM DRAIN EXHIBIT'B-1' TEHAMA RIDGE PHASE VC JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 0 1- 11/12/2012 11:12 AM, Baxter, 1) 0 0 n 0 0 i PROPOSED SINGLE STREET LIGHT 0 0 EXISTING SINGLE STREET LIGHT x LIMITS OF PROJECT EXISTING TEHAMA RIDGE PHASE 4A DOE #5353', FILE #W-1861' 27 26 co LEGEN D O c LOT 39X, BLOCK 10 PRIVATE OPEN SPACE EXISTING` TEHAMA RIDGE PHASE 5,8 'DOE #6'713 / 'FILE #W-2186/ \ LOT 12X, BLOCK 9 PRIVATE OPEN SPACE 12 SCALE:1" = 150' STREET LIGHTS EXHIBIT 'C' TEHAMA RID GE PHASE VC JACOBS 40 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 0 6, Z .z,. STREET SIGNS ;20 e EXHIBIT 'C-1' ..,,, b*-5. oTEHAMA RIDGE c4 1 PHASE VC 69 LEGEND \ ,r> PROPOSED STREET SIGN u-)8 A ‘,.' TEHAVA RIDGE, . " EXISTING \ JACOBS 0 % LIMITS OF PROJECT , DOE 0713 / '-- i ..- ' T EXISTING STREET SIGN A \,. PHASE 5,13 -I- 777 MAIN STREET FORT WORTH, TX 76102 0 - FILE\ W-2186/ 7------- ---7- ---.... PHONE 817-735-6000 ---- / . EXISTING TEHAMA RIDGE PHASE 4A, DOE •#5353 FILE #W-,186,1' LOT 39X, BLOCK 10 PRIVATE OPEN SPACE LOT 12X, BLOCK 9 PRIVATE OPEN SPACE SCALE:1" = 150' -7- -----