Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 44178 (2)
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. LA LA c-4) WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: North Tarrant Parkway Surgery Center, LLC Address, State, Zip Code: 900 Congress Ave., Ste. 240 I Austin, TX 78701 Phone, E-Mail: 900 Congress Ave., Ste. 240 1 Austin, TX 78701 Authorized Signatory/Title: Dustin Johnson, Manager Project Name: Monterra Medical Campus Project Location: 3000 Block of N. Tarrant Pkwy. & I-35W Plat Case No.: FP-012-044 Plat Name: Monterra by Hillwood Mapsco: 35G CFA: 2012-084 DOE: 6950 To be completed by staff Received by: � , Y Kt_ Council District: 2 City Project No: 02028 Date: 13 OFFICIAL. RECORD CITY SECRETARY( NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X_, Street Lights & Signs (C)__. E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the depai lucent having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and perfonnuance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, stolen drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in confoiniance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Monterra Medical Campus CFA No.: 2012-084 DOE No.: 6950 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 192,365.00 $ 156,140.00 36,225.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 168,540.00 $ 102,335.00 66,205.00 AIM Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees $ 360,905.00 $ $ 3,847.30 3,847.30 7,694.60 E TPW Inspection Fee (4%) $ 6,741.60 F. TPW Material Testing (2%) $ 3,370.80 G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 10,112.40 Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period 4.1 $ 17,807.00 $ $ Choice Amount (ck one) 360, 905.00 360,905.00 240,456.25 210,675.00 451,131.25 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this I day of le b 1-mac ,20 1 . CITY OF FORT WORTH - Recommended by: Water Department La Wendy Chi- abulal, EMBA, P.E. Developme t Engineering Manager Approved as to Form & Legality: • Douglas W. Black Assistant City Attorney M&C No. 4/4' Date: /VIaii J. Kayser City Secretary Transportation & Public Works Department Dougl s W. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager �.o-o-p-a7atl�ghT000ct000 . *oar Pia O Ltlet-8° Frj og 0 % o °oo 0000 North Tarrant Parkway Surgery Center, LLC Signature Print Name: Dustin Johnson Title: Manager ©FFHCD UAL RECOR CITY S N ff Fira MU 9 TR ., Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Izi Ilr Eg n Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Dram Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) DRAWING FILE: @\2011.000.003\2011 72300D\deg \CFA\vicinity mop.dwa I VIC DOE No: 6950 City Project No: 02028 0 N 1,000' SCALE 1"=1,000' 1 PROJECT NORTH TARRANT \ PKWY LOCATION 2 000' OFFICE EQUITY SOLUTIONS 365 Miron, Suite A Southlake, TX 76092 Tel: (817)416-3981 Fax: (817)416-8372 (_J 12.73 e Baird, Hampton & Brown, Inc. 4� Engineering 8c Surveying 4550 S1L 360 S e 180, Cropevine, 7X 78051 Td(817)25 -8550 Fmc(817)251-8810 wr918NC.com 7BPE FIRM 144 VICINITY MAP m m MONTERRA MEDICAL CAMPUS nit FORT WORTH, TEXAS DATE: DECEMBER 2012 0 O Z 0 F Z W 0 0 J O THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF KONSTANTINE BAKINTAS, P.E. Tx No. 67022 IT 15 NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. BNB PROJECT NO: 2011.723.002 M l 1 t=1 O 1-4 m J o tri mod 0 x m 0 0 r 1-3 CONNECT TO EX. 16" WATER MAIN °z DB: BHB CB: KB DATE: DECEMBER 2012 der of Aij�Ve 15 po°e 56 Volumep R.T.c.43T. /ii PROP 10" WATER nr PROP F 0.053 1 Lot I' cemoo' peteRet A. 51ide j472 Coeur p.R.i.ci. r of Remo' tneent LP 56 Ail in105, Powe volume' n.R.i.cT. 6 Al Inest15, PeAe 56 Volumep43 RT.C'T' I// ROP FH ONNEC T 12 ' ATER PRIVATEI WATER 7.5 N EXISTING „1 /1/ 0 LEGEND PROPERTY UNE BUILDING FOOTPRINT FUTURE BUILDING CURB & GUTTER ASPHALT PAVEMENT WATER LINE WATER VALVE AIR RELEASE VALVE FIRE HYDRANT METER BOX SANITARY SEWER SEWER MANHOLE STORM DRAIN STORM MANHOLE 150' PROPOSED Z r • 300' =II INN 15' WATER EASEMENT (BY SEPARATE INSTRUMENT) Remoi ...rent LP 56 An Inc 15, Powe Volump T J. SCALE 1"=150' \DOE No: 6950 City Project No: 02028 CONNECT TO EX. 12" WATER MAIN o • 0 Page l of 1 Item BID LIST ITEM No. 1 3305.0103 2 3305.0109 3 3311.0361 4 3311.0001 5 3312.0001 6 3311.0161 7 3312.1001 8 3312.2003 9 3312.2103 10 3312.2203 11 3312.3001 12 3312.3002 13 3312.3004 14 3312.4108 15 3312.4113 16 3312.0002 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for WATER IMROVEMENTS to Serve Monterra Medical Campus DESCRIPTION Exploratory Excavation of Existing Utilities Trench Safety 10" PVC Water Pipe Ductile Iron Water Fittings Fire Hydrant 6" PVC Water Pipe 2" Water Air Release Valve & Vault 1" Water Service 1 1/2" Water Service 2" Water Service 4" Gate Valve 6" Gate Valve 10" Gate Valve 12" x 10" Tapping Sleeve & Valve 16" x 10" Tapping Sleeve & Valve Water Sampling Station QTY UNIT PRICE 3 EA $1,250.00 2270 LF $1.00 2140 LF $40.00 1.7 TON $4,000.00 4 EA $2,500.00 130 LF $34.00 1 EA $3,500.00 4 EA $700.00 1 EA $1,000.00 8 EA $1,100.00 4 EA $600.00 6 EA $800.00 5 EA $1,500.00 1 EA $3,500.00 1 EA $5,000.00 2 EA $2,000.00 Total for Water Improvements AMOUNT $3,750.00 $2,270.00 $85,600.00 $6,800.00 $10,000.00 $4,420.00 $3,500.00 $2,800.00 $1,000.00 $8,800.00 $2,400.00 $4,800.00 $7,500.00 $3,500.00 $5,000.00 $4,000.00 $156,140.00 CITY OF FORT WORTH Water, Sewer, Paving & Drainage Improvements to Serve Monterra Medical Campus C.P. 02028 DRAWING FILE E:\2011.000.000\2011.723.000\dwg\CFA\sonriory sewer.dwg I Sewer Layout rn 0 trl 171 H cn 00 In a H �ti 7c1x w trl tri t=i DB: BHB CB: KB DATE DECEMBER 2012 m m Z y G N Z = - 0 rn -0 0 o o- C O 0 z A O X y ti Z v . ° _ IT, z E. c 0 0 70 o „,0 o N N OM mz y P.O R z c 0 V - Z zp Z 0 z m Z 0 A rn 7 Trr PROPII10 WATER nr osf Rev'estment LPe 56 Ail In 4315, Pig Volumep R.1.C.1. 041 L°i 1 e{ n Ceme 92 petenet A• Slide CObin P.R.1.C.7. PU PROP PUBLIC SS PRIVATE SERVICE 1H Rem°m gent LP 56 Ail Inve43 5. Po9e V0Wmen R.t C.1. pllnvestm5 pa9 56 Volump.R 1.G•1 PRIVATE \SERVICE N EXISTING I of LEGEND PROPERTY LINE BUILDING FOOTPRINT FUTURE BUILDING CURB & GUTTER ASPHALT PAVEMENT WATER LINE WATER VALVE FIRE HYDRANT METER BOX SANITARY SEWER SEWER MANHOLE STORM DRAIN STORM MANHOLE Remoindeeot LP Ail Invest 15 Pon e 56 Volumep TC.i. 150' III =MI SCALE 1"=150' PROPOSED 300' Z • • DOB No: 6950 ity Project No: 02028 e`Y \\ACo Page 1 of 1 Item BID LIST ITEM No. 1 3305.0109 2 3331.4115 3 3301.0002 4 3331.3101 5 3331.3201 6 3339.1001 7 3339.1003 8 9999.0002 9 3305.0112 10 3301.0101 11 3339.0001 12 3305.0107 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for SANITARY SEWER IMPROVEMENTS to Serve Monterra Medical Campus DESCRIPTION Trench Safety 8" PVC Sewer Pipe Post -CCTV Inspection 4" Sewer Service 6" Sewer Service 4' Manhole 4 Extra Depth Manhole Normal Drop at Ex. Manhole Concrete Collar Manhole Vacuum Testing Epoxy Manhole Liner Manhole Adjustment, Minor QTY UNIT PRICE AMOUNT 370 LF $1.00 370 LF $36.00 370 LF $3.00 5 EA $550.00 1 EA $775.00 3 EA $2,500.00 17 VF $125.00 1 EA $2,000.00 3 EA $300.00 3 EA $200.00 25 VF $175.00 4 EA $100.00 $370.00 $13,320.00 $1,110.00 $2,750.00 $775.00 $7,500.00 $2,125.00 $2,000.00 $900.00 $600.00 $4,375.00 $400.00 Total Bid for Sanitary Sewer Improvements $36,225.00 CITY OF FORT WORTH Water, Sewer, Paving & Drainage Improvements to Serve Monterra Medical Campus C.P. 02028 warn Jan DB: BHB CB: KB DATE: DECEMBER 2012 IBHB PROJECT NO: 2011.723.002 7 1/- PRO'• EFT TURN" SIGN 1 If 777 in„ Rem estmenT LP 55 Ail Kw, 4315,Peg e VolurneD R T.C.i. 0 ! 1Biock 1 Peterson C Lot 1, 51 de rretea rY 2 Gobin p.R.T.0 T. L tinder° P ARilBern1eTL 56 InV5Po9e Volum n R.T.GT. Ait LP l InVe5�5nPaAe 56 VolumeRT•C•T• N EXISTING / / / /1/ LEGEND PROPERTY LINE BUILDING FOOTPRINT FUTURE BUILDING CURB & GUTTER ASPHALT PAVEMENT WATER LINE WATER VALVE FIRE HYDRANT METER BOX SANITARY SEWER SEWER MANHOLE STORM DRAIN STORM MANHOLE 150' iII OMNI .SPHALT P MENT Renici ent I' 56 Ap InV431 Page VolumeD R T,GL SCALE 1"=150' PROPOSED 300' Z • DOE No: 6950 City Project No: 02028 \ Page l of l Item BID LIST ITEM No. 1 3110.0101 2 3471.0001 3 0241.1100 4 3217.4301 5 3123.0101 6 3124.0101 7 3211 0112 8 3212.0504 9 3212.0302 10 3212.0900 11 3217.0010 12 3217.0205 13 3217.1002 14 3217.1004 15 3217.2102 16 3291.0100 17 3292.0400 18 3441.4006 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for PAVING IMPROVEMENTS to Serve Monterra Medical Campus DESCRIPTION Site Clearing Traffic Control Remove Asphalt Pvmt Remove 4" Pvmt Marking Unclassified Excavation Embankment 6" Flex Base Type A, GR-1 7" Asphalt Base Type B 2" Asphalt Pvmt Type D Asphalt Crack Sealant 4" SLD Pvmt Marking Paint (Y) 8" SLD Pvmt Marking Paint (W) Lane Legend Arrow Lane Legend Only REFL Raised Marker TY I-C Topsoil Seeding, H ydromulch "NO LEFT TURN" Aluminum Sign Ground Mount QTY UNIT 1 LS 2 MO 1200 SY 600 LF 1300 CY 1300 CY 1180 SY _ 1054 SY 1054 SY 12 GA 550 LF 150 LF 1 EA 1 EA 8 EA 212 CY 6.35 SY 1 EA PRICE $1,000.00 $2,000.00 $4.00 $0.50 $12.00 $4.00 $5.00 $40.008 $15.00 $10.00 $0.50 $0.50 $100.00 $100.00 $5.00 $15.00 $5.00 $500.00 Total Bid for Paving Improvements AMOUNT $1,000.00 $4,000.00 $4,800.00 $300.00 $15,600.00 $5,200.00 $5,900.00 $42,160.00 $15,810.00 $120.00 $275.00 $75.00 $100.00 $100.00 $40.00 $3,180.00 $3,175.00 $500.00 $102,335.00 CITY OF FORT WORTH Water, Sewer, Paving & Drainage Improvements to Serve Monterra Medical Campus C.P. 02028 DRAWING EKE: E:\2011.000.000\2011.723.000\dwg\CFA\storm drofn.dwg I Water Layout 0 0trj y� 1,64trj �� dx 04 iatri bd Oy n Pdtd tri a a b H [ zcii D8: BHB CB: KB DATE: DECEMBER 2012 m Z00'£ZL'ItOZ 7 X. 24" RCP ui 1 II HEADWALL - ur EX CHANNEL CENTERLINE \ �� FUTURE PRIVATE STORM DRAIN Retrain'. eerient LP56 pil 1814315, Page volum o.R.T.c.T. Lj gL CK PRO OSED P VATE 'STOR CFA NO. 2012-084 PROP —L1 HEADWALL / — G otpI Bo eteN ern Pe A, Slide 1472 c0bi P R T c.T. EX CHANNEL CENTERLINE 1 esRetP v pIuiml18 Dj43RTc.PTo9° 5ReyanL6 N EXISTING ui u/ N LEGEND PROPERTY LINE BUILDING FOOTPRINT FUTURE BUILDING CURB & GUTTER ASPHALT PAVEMENT WATER LINE WATER VALVE FIRE HYDRANT METER BOX SANITARY SEWER SEWER MANHOLE STORM DRAIN STORM MANHOLE PROPOSED L _ 150' 300' SCALE 1"=150' Z • OE No: 6950 ND Project No: 02028 EDGE OF WATER 012-084 Ren estrient- 56 A e14315P volume I7 R.T.c.T• XISTING PON� N N X. HEAb AL // N N Page 1 of 1 Item BID LIST ITEM No. 1 3341.0103 2 3341.0205 3 3341.0208 4 3349.0002 5 3349.4106 6 9999.0001 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for STORM DRAIN IMPROVEMENTS to Serve Monterra Medical Campus DESCRIPTION 18" RCP, Class III 24" RCP, Class III 27" RCP, Class III 5' Storm Junction Box 27" SET, 1 pipe 5' Curb Inlet QTY UNIT PRICE AMOUNT 245 LF $42.00 395 LF $55.00 245 LF $62.00 2 EA $3,500.00 2 EA $2,000.00 4 EA $2,000.00 Total Bid for Drainage Improvements $10,290.00 $21,725.00 $15,190.00 $7,000.00 $4,000.00 $8,000.00 $66,205.00 CITY OF FORT WORTH Water, Sewer, Paving & Drainage Improvements to Serve Monterra Medical Campus C.P. 02028