HomeMy WebLinkAboutContract 44084 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract Na GAO 11
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Pulte Homes of Texas, L.P.
Address, State, Zip Code: 4800 Regent Blvd., Ste. 100 I Irving, TX 75063
Phone, E-Mail: 972-304-2849 1 curt.millward@pultegroup.com
Authorized Signatory/Title:
Project Name: Trails of Fossil Creek - Magma Drive Crossing
Project Location: NW of Intersection of Bonds Ranch Rd. & Wagley Robertson Rd.
Plat Case No.: FP-O 11-012 Plat Name: Trails of Fossil Creek
Mapsco: 20S
CFA: 2012-079 DOE: 6931
To be completed by staff.•
Received by:
Council District: 7 City Project No: 02007
Date: LA 1
•
OFFICIAL RECORD'
CITY SECRETARY
0 '1-22-1 3 A 10 : 1 1 IN
1
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) __X_,
Sewer (A-1) at Paving (B) _X_, Storm Drain (B-1) X , Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused. in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
iniuries, death or damages are caused, in whole or in part. by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Trails of Fossil Creek — Magma Drive Crossing
CFA No.: 2012-079 DOE No.: 6931
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
$ 18,452.00
$
Water and Sewer Construction Total $ 18,452.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
$
$
$
54,298.50
265,905.00
6,385.00
TPW Construction Cost Total $ 326,588.50
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
$ 345,040.50
$
$
$
369.04
369.04
738.08
E. TPW Inspection Fee (4%) $ 12,808.14
F. TPW Material Testing (2%) $ 6,404.07
G. Street Light Inspsection Cost $ 255.40
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 19,467.61
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
MIMI
$ 20,205.69
$
$
$
$
$
Choice
Amount (ck one)
345,040.50 X
345,040.50
23,065.00
408,235.63
431,300.63
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in uadruplicate, at Fort Worth, Texas this 1 , day of a`ts,,,,-enit,/
, 20 .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi Babulal, EMBA, P.E.
Developme t Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No.
Date:
ATTEST:
Mary J. Kays
City Secretary
ATTEST:
dir
fOtip 117
ar.0oa 000
o
00
0
d
O
0
o°d00000a ice
*roteatad).
seZ/razZy/
Signature
(Print) Name:
Transportation & Public Works Department
Douglas
Director
Wiersig, P.E.
Approved by City Manager's Office
Ca�
Fernando Costa
Assistant City Manager
,S;.:01/
Pulte Homes of Texas, L.P.
By: Pulte Nevada I, LLC
Its general partner
9
Print Name:
Title:
Vec
4es/44i /and a
Signature
Meen/
OFFICIAL RECORDS
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
rs
►1
•
ri
z
►1
z
(Remainder of Page Intentionally Left Blank)
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
BLUE MOUND
BONDS RANCH
I
V)
Q
TR OF
FOSS
CREEK
PHASE 1
SITE
WHI
COUNTRY BAYNE
rL
H
(HI KS RD)
LOCATION MAP
NOT TO SCALE
DOE NO. 6931
CITY PROJECT NO. 02007
JBI Partners, Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
December 11, 2012 — SHEET 1
Case No. FP-011-012
Final Plat
TRAILS OF FOSSIL CREEK
BLOCK T, LOT 49
16.144 ACRES OUT OF
HENRY ROBERTSON SURVEY, ABSTRACT NO. 1259
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
MDC THE TRAILS LIMITED PARTNERSHIP
548 E. Carpenter Freeway, Suite 1500
Irvin, Texas 75062
JBI PARTNERS, INC
16301 Quorum Dr
ive, Suite 200B
Addison, Texas 75001
OWNER
(214)630-0481
SURVEYOR/ENGINEER
(972)248 7676
JBI Partners, Inc.
16301 Quo um Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
December 11, 2012 — SHEET 2
0
W
m
J
cn
-EXIST ▪ 8" WATER
CONNECT TO EXISTING I
• 8" WATER LINE
DOE 4450
WATER PROJ #
P163-060163015245
15'X90' WATER EASEMENT
(BY SEPARATE INSTRUMENT)
PULTE HOMES OF TEXAS, L.P.
(CALLED 35.285 ACRES)
DOC. NO. D212269394
SCALE: 1 "=100'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
LOT 20, BLOCK J
CITY PARKLAND
FLOODPLAIN &
UTILITY EASEMENT
CAB. Al PG. 10235
P.R.T.C.T.
rA
EXIST.
8" WATER
15'
WATER
EASEMENT
OPEN SPACE
LOT 49 ELOCK T
PRIVATE OPEN SPACE
FLOODPLAIN EASEMENT
LEGEND
P ROP. WATERLINE
P ROP. VALVE
PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8' UNLESS
OTHERWISE INDICATED.
MDC THE TRAILS LIMITED PARTNERSHIP
(PART OF A CALLED 221.457 ACRE TRACT)
DOC. NO. 203444504
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O.E NO. 6931)
December 11, 2012 — SHEET 3
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
NO SEWER INFRASTRUCTURE
THIS CONTRACT
SANITARY SEWER
EXHIBIT A-1
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O.E N0. 8931)
December 11, 2012 -- SHEET 4
EX. F=L:SPA� ��
V
rJ
U1
m
(,J
CO
PULTE HOMES OF TEXAS, L.P.
(CALLED 35.285 ACRES)
DOC. NO. D212269394
SCALE: 1 "=100'
TAMPED TOPSOIL l
PER 5£GI1INA�
J2 91 19 T\
STMAARO
PER ACTION 32 13
COLPAC1ED ACCEPTABLE NAME BA0011 PET(
SECTOR 31 24 00
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
LOT 20, BLOCK J
CITY PARKLAND
FLOODPLAIN Rr
UTILITY EASEMENT
CAB. A, PC. 10235
P.R.T.C.T
EXIST.
CONCRETE
TRAIL
'ERF OMR
,3 BARS 0 1B• o CB.M.
LEGEND
EXIST.
CONCRETE
TRAIL
OPEN SPACE
LOT 49 BLOCK T
PRIVATE OPEN SPACE
FLOODPLAIN EASEMENT
=3' R.o.11
1' ROAM
20.5'
TANOARD T CURB PER 32 13
13-0525
T-W ROKORCED CWCRE1E P
PER SECTION 32 13 13
(S GE MA)4 03%
20.5'
MDC-THE TRAILS LIMITED PARTNERSHIP
(PART OF A CALLED 221.457 ACRE TRACT)
DOC. NO. 203444504
PROPOSED B• LAE STABRIZED LONCITUDRAL CONSTRUCTOR
SUEIGRADE JOINT PER 32 13 13-0
0 30 IBS/SY
PER SECTOR 32 11 29
TYPICAL 60' ROW
PAVEMENT SECTION DFTAII
N.T.S.
PROP. 60' ROW PAVEMENT SECTION
PROP. SIDEWALK SECTION
PARKWAY
`jl' PER Ff. (M11N.)
4:1 (MAX.)
MOOD SDCMMX
PDI SECTOR 32 13 20
TAMPED TOPSOIL
PER SEC11a4 32 91 19
PACIED ACCEPTABLE
RAMIE BAOO'EL PER SCCDOI 31 24 00
PAVING
EXHIBIT B
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O.E NO. 6931)
December 11, 2012 — SHEET 5
EH
1
W
m
V
EXIST.
48' RCP
W
LOT 20, BLOCK J
CITY PARKLAND
FLOODPLAIN &
UTILITY EASEMENT
CAB. A, PG. 10235
P.R.T.C.T
CONSTRUCT APPROX. ' 36 S.Y. OF 12"
THICK ROCK RIPRAP 'UND:RLAIN BY
6" THICK BEDDING Wf'.
GEOTEXTILE LINING
EXIST.
4R' RCP
PULTE HOMES OF TEXAS, L.P.
(CALLED 35.285 ACRES)
DOC. NO. D212269394
SCALE: 1 "=100'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
-
MDC-THE TRAILS LIMITED PARTNERSHIP
(PART OF A CALLED 221.457 ACRE TRACT)
DOC. NO. 203444504
X ' ,,„,BC
I5S9A
5 M
CONSTRUCT APPROX. 560 S.Y. OF 12"
THICK ROCK RIPRAP NDERLAIN BY
6' THICK BEDDING W/
GEOTEXTILE LINING
OPEN SPACE
LOT 49 BLOCK T
PRIVATE OPEN SPACE
FLOODPLAIN EASEMENT
STORM DRAIN
EXHIBIT B-1
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O.E N0. 6931)
December 11, 2012 — SHEET 6
o-
Li
EX. F FDSDA� D�
040
J
tV
w
m
W
CO
PULTE HOMES OF TEXAS, L.P.
(CALLED 35.285 ACRES)
DOC. NO. D212269394
SCALE: 1 "=100'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
LOT 20, BLOCK J
CITY PARKLAND
FLOODPLAIN &
UTILITY EASEMENT
CAB. A, PG. 10235
P.R.T.C.T
PROPOSED
GROUND BOX
OPEN SPACE
LOT 49 BLOCK T
PRIVATE OPEN SPACE
FLOODPLAIN EASEMENT
LEGEND
PROPOSED STREET LIGHT
-100 WATT HPS COBRA WITH
0 TYPE 3 DIST. AND DROP
GLASS LUMINAIRE
-25' LIGHT STANDARD
C 0 EXISTING STREET LIGHT
• PROPOSED GROUND BOX
MDC-THE TRAILS LIMITED PARTNERSHIP
(PART OF A CALLED 221.457 ACRE TRACT)
DOC. NO, 203444504
STREET LIGHTING
EXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O.E N0. 6931)
December 11, 2012 — SHEET 7
SCALE: 1 "=100'
JBI Partners, Inc.
16301 Quorum Drive, Suite 2008
Addison, Texas 75001
Tel 972-248-7676
Fax 972-248-1414
NO STREET SIGNS
THIS CONTRACT
STREET SIGNS
EXHIBIT C-1
PLANS FOR THE CONSTRUCTION OF WATER,
PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
TRAILS OF FOSSIL CREEK, MAGMA DRIVE
(D.O E NO. 6931)
December 11, 2012 -- SHEET 8
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON DECEMBER 20, 2012
FORT WORTH, TEXAS
JBI PROJECT NO. PUL003
ITEM NO.
3311.0261
3311.0262
3312.3003
3312.0103
3311.0001
BID ITEM
8" PVC Water Pipe
8" PVC Water Pipe, CSS Backfill
8" Gate Valve
Connection to Existing 8" Water Main
Ductile Iron Water Fittings
3341.1602 5 barrel 9'x5' Box Culvert
3349.1000 Headwall, Box Culvert [TxDOT Type "PW" Headwall]
9999.0001 Install TxDOT handrail
3137.0110 Special Riprap [Concrete apron at 5 barrel 9'x5' RCB]
3317.0110 Special Riprap [12" rock riprap on 6" bedding material; D50-5"]
3317.0110 Special Riprap [12" rock riprap on 6" bedding material; D50-.8"]
3125.0101
9999.0002
9999.0003
3211.0502
3211.0400
3213.0302
3213.0301
3317.0110
9999.0004
9999.0005
3471.0001
3441.310
3441.3301
3441.3002
3441.1501
3441.3011
3441.1410
UNIT TOTAL
SWPPP>_ 1 acre
Connect to existing storm drain
71/2" Conc Pvmt
8" Lime Treatment
Lime
5" Conc Sidewalk
4" Conc Sidewalk
Special Riprap [3"-5" Grouted rock riprap]
Street barricade
Connect to existing concrete street pavement
Traffic Control
OOW HPS PC Lighting Fixture
Rdwy Illum Foundation TY 1,2, and 4
Rdwy Illum Assmbly TY 8,11,D-25, and D-30
Ground Box, Small, w/ Lid
2" CONDT PVC SCH 40 (T)
NO 10 Insulated Elec Condr
UNIT
LF
LF
EA
EA
TON
LF
EA
LF
SY
SY
SY
LS
EA
SY
SY
TN
SF
SF
SY
LF
LF
LS
EA
EA
EA
EA
LF
LF
SHEET NO.
5 10 11
260
128
3
1
0.6
TRAILS OF FOSSIL CREEK, MAGMA DRIVE CROSSING
11A 19
ITEM UNIT
TOTAL PRICE
260 $30.00
128 $34.00
3 $950.00
1 $750.00
0.6 $4,500.00
64 64 $1,550.00
2 2 $23,900.00
200 $145.00
254 254 $95.00
361
560
1
1
200
1,002
1,060
15.9
207
1,921
75
41
41
1
361 $75.00
560 $65.00
1 $1,500.00
1 $800.00
1,002 $32.50
1,060 $3.00
15.9 $160.00
207 $3.00
1,921 $3.50
75 $60.00
41 $50.00
41 $15.00
1 $1,500.00
$600.00
1 1 $1,200.00
1 1 $2,200.00
1 1 $500.00
145 145 $9.00
145 145 $4.00
ITEM
TOTAL COST
$7,800.00
$4,352.00
$2,850.00
$750.00
$2,700.00
$18,452.00
$99,200.00
$47,800.00
$29,000.00
$24,130.00
$27,075.00
$36,400.00
$1,500.00
$800.00
$265,905.00
$32,565.00
$3,180.00
$2,544.00
$621.00
$6,723.50
$4,500.00
$2,050.00
$615.00
$1,500.00
$54,298.50
$600.00
$1,200.00
$2,200.00
$500.00
$1,305.00
$580.00
$6,385.00
$345,040.50
H:\Projects\PUL003\IMAGES \Submittals\(20121220) CFA Submittal \PUL003 CFA Quantity Matrix.xls
DOE 6931 1 1 FP-011-012
CITY PROJECT NO. 02007