HomeMy WebLinkAboutContract 44085 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No.
1-1 (16<
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Travis Avenue Baptist Church
Address, State, Zip Code: 800 West Berry St. 1Fort Worth, TX 76110
Phone, E-Mail: (817) 924-4266
Authorized Signatory/Title: ; r �t /9 e i .
Project Name: Travis Avenue Baptist Church Water & Storm Drain Improvements
Project Location: 800 West Berry St.
Plat Case No.: N/A Plat Name: South Hemphill Heights
Mapsco: 76Z
CFA: 2012-085 DOE: 6930
To be completed by staff
Received by: ( \t ar
Council District: 8 City Project No: 02001
13 Al 0: 1 1 IN
1
Date: \ i �C�' I i`
r
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) Paving (B) Storm Drain (B-1) X , Street Lights &
Signs (C)e.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
depaitinent having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case maybe.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perfonnu the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Depat tinent
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said- DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its fmancial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name* Travis Avenue Baptist Church Water & Storm Drain Improvements
CFA No.: 2012-085 DOE No.: 6930
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 17,825.00
2. Sewer Construction $ -
Water and Sewer Construction Total $ 17,825.00
B. TPW Construction
1. Street $
2. Storm Drain $ 102,610.00
3. Street Lights Installed by Developer $ -
TPW Construction Cost Total $ 102,610.00
Total Construction Cost (excluding the fees): $ 120,435.00
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 356.50
D. Water/Sewer Material Testing Fee (2%) $ 356.50
Sub -Total for Water Construction Fees $ 713.00
E TPW Inspection Fee (4%) $ 4,104.40
F. TPW Material Testing (2%) $ 2,052.20
G. Street Light Inspsection Cost $
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 6,156.60
Total Construction Fees: $ 6,869.60
Choice
Financial Guarantee Options, choose one Amount (ck one)
Bond = 100% $ 120,435.00 I
Completion Agreement = 100% / Holds Plat $ 120,435.00 I
Cash Escrow Water/Sanitary Sewer= 125% $ 22,281.25 veier
Cash Escrow Paving/Storm Drain = 125% $ 128,262.50
Letter of Credit = 125% w/2vr expiration period I $ 150,543.75
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and saj4 Developer has exec d this
instrument in quadruplicate, at Fort Worth, Texas this 043010 day of 4/4(.4.1),
,201
CITY OF FORT WORTH - Recommended by:
Water Department
t,
Wendy Chi-B �ulal, EMBA, P.E.
Development/engineering Manager
C(LH
Approved as to Form & Legality:
Doug as W. Black
Assistant City Attorney
Date:
ATTEST:
Mary J. �ayse reir
City Secretary
ATTEST:
Transportation & Public Works Department
Douglas . Wiersig, P.E.
Director
I) &Jr tr)i
Approved by City Manager's Office
ctide44.41.
Fernando Costa
Assistant City Manager
Ase VOA 4t1h
# too 00 40. <it
gat. oa
0o
�o
Le
0
0
*00
74.1 Otoe (Jt 1 it)
Signature
(Print) Name: �Itkflt&
�a
O
Q aaooa
a�llill].ZlQ 4'��.tr
S O
:iklittee
CAROL ANN WARREN >
• Public State of Texas )
1 Notary 1
* %� : # = My Commission Expires
— — - • ••• •v v .r
d
27
Travis Avenue Baptist Church
9
•
Print Name:
Signature
c-kecte-1 b.bean
Title: t 2,n Lem Pcis-kr
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
►1
NIPF
C
H
n
a
►a
n
n
(Remainder of Page Intentionally Left Blank)
LACE
WORTH
'II
es.
Whitey -kettle ent
-STWOIPTH N7thSt
VILLAGE
FSTOV-
LLS
820
0
6700 Rdgha Rap. 5!a 700
To s Rerpba6m r 000644
'G
PROJECT
LOCATION
Baird, Hampton & Brown, Inc.
Eng'neering ac Surveying
FL conks 1X 6116 Td(617)556- 277 f04617}1.19-9245 E-LotnaOtt6nuao
96 RN.ECT j 2011.122.000
BLJE
v
OL\3
HALTO N WATAU GA
CITY
Lt
0
z
NE 28th St. /
CO
Vic
liBerryl St.
0
0
Seminary Dr.
DGFCLIFF
VILLAGE
135
Loop 820
WOR
East Frwy
Rosedale St.
FOREST
Storm Drain Relocation & New Water Services
Travis Avenue Baptist Church
PROJECT LOCATION MAP
ILL
K
Lake
Arlington
\FDAL
CHECKED BY: BB
BHB PROJECT: 2011.178.003
DATE: December, 2012
W11
TER I
SERVICE
CONN
i ESVVICE YA
COVN
H
•
CQNN. 0 SEX. 8" WATT
IJNE 8`16 TAPIJANG S
& VALVE
1
L
50 25 0
GRAPHIC SCALE
r
•
•
•
At
•
0 0
i" 4
•
•
•
•
•
•
•
1II!c�n,L, � 111141 Hi II 11111111111
NEW 3" METER SERVICE &
T- END W.L. AT
_E�SURE THAT W.L.
IS 2' BELOW-sil l: RIM
NEW 6" FIRE LINE
END AT PROP. LINE
ENSURE THAT WATER LINE
IS 2' BELOW STORM DRAIN
IBM #2�
NEW 2" METER SERVICE & BOX
STUB OUT 4 LF 2" W.L.
& PLUG FUTURE IRRIGATION METER)
ENSURE THAT 2" W.L. IS 2' BELOW
STORM DRAIN
_CO •
• i
• S.e •. , ram
•
EVE
•
•
•
•
•l
•
If f% /rattrawl
20;e171y871.
50
Baird, Hampton & Brown, Inc.
Engineering Ss Surveying
Ixe Taw R 6 'M4.. �i .of�l .6a ft Vnc 76116 7!(617A3sm h{dtE -i17042 6 OM ,-
•
2037
Roof Drain
41.
Drop
Ity Easement Vol. 388-142, Pt: 9739.0 t.
.03
.05
684.29
•
II,:'::,:.
301rt-1
5 3t5
687.05
West Ber
c++R,, „, Street
•
•
3 6
WnWft
0653
nWR
616
86.76
404
• CO
4043
t 4044
6EI5.32 686.76
48 RCP
Ft=a7e.ar
Storm Drain Relocation & New Water Services
Travis Avenue Baptist Church
EXHIBIT A - WATER IMPROVEMENTS
SS
AMA - 4021: An,/
CHECKED BY: BB
BHB PROJECT: 2011.178.003
DATE: December, 2012
•
•
•
m
1
5 !SIDI-D
SDMH
oncrete Side
Conc.
Uemj I
f•
r
50 25 0
GRAPHIC SCALE
1
0 0 0
•
•
• I/, ••
P yhals , I
4 ,
1 .
r m ��, •. .
•
•
PROPOSED 5' SDMH
RCP
ID D
cCT\\Q FAX
sphalt
EXISTINCA0Ve48" RCP
204X20' Visibility Es
el. 358-14Pg.
P.R,T.C.T.
50
o e Baird, Hampton & Brown Inc.
Eng'neering 8c Surveying
6303 Ai Wb�La .. 514 700 Ft Worth, IX 6116 Tet(617)338- 277 fac(617)336-9245 E-182t8480616ictan
Taos R
egatrvbm f-000044 9E PROJECT t 2011.122000
SD\
/ / /
Concrete
35,i 1 Pavement
1015 k15
687.05 -
West Berry St Nor1a61e Width Right-o/_k,%) e e t
2037
• Roof groin
groin
ity Easement Vol. 388-142, Pg. 973.ST.C.T.
4.05
684.29
3556
•AOnUnit
13653
AOnUnit
N
4
• CO
041
4043
5E154.32
4044
686.76
4091 4097
__• ct ,_!2 GL 4 399 t
� :, '�EB6 48
T8p0887.QT 0_--_i_
48mCP
FL=8788T
Storm Drain Relocation & New Water Services
SS
407 4021 V
41 3 4117
• G • GL
4118
Travis Avenue Baptist Church CHECKED BY: BB
1
BHB PROJECT: 2011.178.003
EXHIBIT B 1 - STORM DRAINAGE IMPROVEMENTS DATE: December, 2012
CFA PROJECT QUANTITY MATRIX
TRAVIS AVENUE BAPTIST CHURCH
ITEM
SHEET NO. TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 4 6 11
Unit 1
1 Remove Sidewalk SF 50 50 $2.00 $100.00
2 8"x6" Tapping Sleeve & Valve EA 1 1 $2,200.00 $2,200.00
3 8"x4" Tapping Sleeve & Valve Ea 1 1 $1,750.00 $1,750.00
4 2" Water Service EA 1 1 $2,300.00 $2,300.00
5 3" Water Meter and Vault EA 1 1 $7,500.00 $7,500.00
6 6" PVC Water Pipe LF 35 35 $35.00 $1,225.00
7 7" Conc Pvmt Repair, HES SY 50 50 $50.00 $2,500.00
8 4" Conc Sidewalk SF 50 50 $5.00 $250.00
Total Unit 1 $17,825.00
Unit 3
9 Remove 48" Storm Line LF
10 Remove Storm Junction Structure EA
11 5' Storm Junction Box EA
12 Storm Junction Structure EA
13 8" HDPE Storm Drain LF
14 12" HDPE Storm Drain LF
15 24" RCP, Class III LF
16 48" RCP, Class III LF
17 48" RCP, Class IV LF
18 Trench Safety LF
19 8' Wide Asphalt Pvmt Repair, Residential SY
20 6" Conc Pvmt Repair SY
21 Traffic Control Month
1
357 357 $60.00 $21,420.00
1 1 $750.00 $3,500.00
1 1 $3,500.00 $5,500.00
2 2 $5,500.00 $28.00
10 10 $14.00 $150.00
12 12 $15.00 $900.00
4 4 $75.00 $592.00
304 304 $148.00 $48,640.00
20 20 $160.00 $30.00
350 350 $1.50 $12,250.00
140 140 $35.00 $6,300.00
40 40 $45.00 $1,800.00
1 $1,500.00 $1,500.00
Total Unit 3 $102,610.00
TOTAL UNITS 1 AND 3 $120,435.00