HomeMy WebLinkAboutContract 44101 (2)CITY o F RT WORTH, TEXAS
STANDAD AGREEMENT FOR ENGINE'S ING RELATED DESIGN SERVICES
This AGRLJ MENT is between the City of Fort Worth, a Texas home -rule
municipality (the "CITY"), and TranSystems Corporation dlbla TranSystems Corporation
Consultants, authorized to do business in Texas, (the "ENGINEER"), for a PROJECT
generally described as: DFW Airport Reclaimed Water Delivery System Mush Line Design.
Ail iicle I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article 11
Compensation
•
A. The ENGI NEER's compensation is set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1)
The Engineer shall provide the City sufficient documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINE} 'N. will issue monthly invoices for ail work performed under this
AGRIf1-MAN I . Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article i, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
City of Fort Worth, Tex.=ss
Standard Agreement fcq En fop .t ela e
PMO Official Release t+a�te .1041201 `
Page 1 of 16 tsT9 SECRETARY :1
Fre WORTH, TX
:, 'ces
01-24-13 17 IN
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5)
If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' wntten notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B Standard of Care
The standard of care applicable to the ENGINEER s services will be the
degree of skill and diligence normally employed in the State of Texas by
professional engineers or consultants performing the same or similar
services at the time such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 2 of 16
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER
D Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
ENGINEER to make exhaustive or continuous on -site inspections to
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 3 of 16
(3)
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on -site
observation(s) of a deviation from the Contract Documents, the ENGINEER
shall inform the CITY.
When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time of preparation, in accordance
with Attachment A.
(2) In providing opinions of cost financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties, quality type,
management or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore the ENGINEER makes no
warranty that the CITY's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
matters at issue between the CITY and the construction contractor that
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2n12
Page 4 of 16
affect the amount that should be paid.
H. Record Drawings
Record drawings if required, will be prepared, in part on the basis of
information compiled and furnished by others, and may not always represent
the exact location type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in the information from others that is incorporated
into the record drawings.
Minority and Woman Business Enterprise (M/WBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, as amended, the
City has goals for the participation of minority business enterprises and
woman business enterprises in City contracts Engineer acknowledges the
M/WBE goal established for this contract and its accepted written
commitment to M/WBE participation. Any misrepresentation of facts (other
than a negligent misrepresentation) and/or the commission of fraud by the
Engineer may result in the termination of this Agreement and debarment
from participating in City contracts for a period of time of not less than three
(3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in
order to conduct audits in compliance with the provisions of this article
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05(nai2nl?
Page 5 of 16
(3)
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000 00 per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
i. The CITY shall be included as an insured under the CGL, using
ISO additional insured endorsement or a substitute providing
equivalent coverage, and under the commercial umbrella, if any
This insurance shall apply as primary insurance with respect to
any other insurance ob. self-insurance programs afforded to the
CITY. The Commercial General Liability insurance policy shall
have no exclusions by endorsements that would alter or nullify:
premises/operations products/completed operations contractual,
personal injury, or advertizing injury which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1 000,000 each accident. Such insurance shall cover
liability arising out of "any auto', including owned, hired, and non -owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non -owned is
acceptable.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMQ Official Release Date; n5m412n12
Page 6 of 16
ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims -made policy, with a minimum of $1,000,000.00 per
claim and aggregate The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shall be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall
include its employees, officers, officials, agents, and volunteers as
respects the contracted services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon
d. Any failure on part of the CITY to request required insurance
documentation shall not constitute a waiver of the insurance
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date_ n5/n4/2n19
Page 7 of 16
j.
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first -dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credit may also be acceptable to the
CITY.
g.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
i. The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
Lines of coverage, other than Professional Liability, underwritten on a
claims -made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement The certificate of
insurance shall state both the retroactive date and that the coverage is
claims made.
k. Coverages whether written on an occurrence or claims -made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
1. The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05I04/2n19
Page 8 of 16
required by the ENGINEER to
equivalent insurance coverage as
sub consultants/subcontractors
ENGINEER shall provide CITY
certificate of insurance.
L. Independent Consultant
maintain the same or reasonably
required for the ENGINEER When
maintain insurance coverage,
with documentation thereof on a
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
amendment to this AGREEMENT.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PM° official Release nate: 05104/9012
Page 9of16
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER s services. The CITY will be responsible for all acts of
the CITY s personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights -
of -way, and access necessary for the ENGINEER's services or PROJECT
construction.
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney insurance counselor, accountant, auditor, bond and financial
advisors, and other consultants as the CITY deems appropriate, and render
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D.
E Prompt Notice
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 10 of 16
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY. acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of
in connection with, or resulting from the engineering
services performed. Only the CITY will be the beneficiary
of any undertaking by the ENGINEER "
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 11 of 16
or person regarding the PROJECT a provision that such entity or person
shall have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Riskllnstallation insurance is maintained
at the replacement cost value of the PROJECT The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3)
The CITY will specify that the Builders Riskllnstallation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
Article VI
General Legal Provisions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 12 of 16
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
CITY S approval will be obtained in writing prior to proceeding with
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 13 of 16
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the
ENGINEER exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party
Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
u nderstandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
n egligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
n egligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 14 of 16
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal or unenforceable in any respect, such invalidity,
illegality or unenforceabihty will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, or unenforceable
provision had never been contained herein Articles V.F., VI.B , VI D , VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its officers, agents and employees from and
against all claims or liability arising out of the violation of any such order, law
ordinance, or regulation, whether it be by itself or its employees.
Article Vil
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. The following attachments
and schedules are hereby made a part of this AGREEMENT:
Attachment A - Scope of Services
Attachment B — Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 05/04/2012
Page 15 of 16
Executed and effective this the
BY:
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
Date: ZZA.i
APPROVAL RECOMMENDED:
13
1-
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND
LEGALITY
B
oug las W. Black
Assistant City Attorney
ATTEST
i ?
1Mary J. Kayser
City Secretary
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 08/09/2012
Page 16 of 16
day of )ar1 , 203.
BY:
ENGINEER
TranSystems Corporation d/b/a
TranSystem Corporation Consultants
Raul Pena III, P.E.
Senior Vice President
Date' a" y/zC.
M&C No.: 25986
M&C Date: December4, 7n17
P dL g(yz
tt�tt�,t$jx �
' (`�9 0oo00 000,
ebba VC5VPatCr
tiatitZ
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
A
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
ATTACHMENT A
Scope for Enaineerina Design Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
DFW AIRPORT RECLAIMED WATER DELIVERY SYSTEM FLUSH LINE DESIGN
CITY PROJECT NO. 2025
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7, ROW/Easement Services
Task 8, Survey and Subsurface Utility Engineering Services
Task 9. Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
■ communicate effectively,
■ coordinate internally and externally as needed, and
■ proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
o Task and allocate team resources
1.2. Communications and Reporting
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 18
•
•
•
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements
Conduct review meetings with the CITY at the end of each design phase
Prepare invoices and submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the Water
Department
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project
Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs ENGINEER shall work with regulatory
authorities to obtain approval of the designs and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company representative.
•
ASSUMPTIONS
•
•
•
12 MWBE reports will be prepared
4 meetings with city staff
12 monthly water department progress reports will be prepared
12 monthly project schedule updates will be prepared
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 2 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
G. Plan Submittal Checklists (See Task 9)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to
■ Study the project,
• Identify and develop alternatives that enhance the system,
■ Present (through the defined deliverables) these alternatives to the CITY
• Recommend the alternatives that successfully addresses the design problem, and
® Obtain the CITY's endorsement of this concept.
ENGINEER will develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
• In addition to data obtained from the CITY, ENGINEER will research proposed
improvements in conjunction with any other planned future improvements that
may influence the project
• The ENGINEER will also identify and seek to obtain data for existing conditions
that may impact the project including but not limited to; utilities, agencies (TxDOT
and railroads), City Master Plans, and property ownership as available from the
Tax Assessor's office.
The data collection efforts will also include conducting special coordination
meetings with affected property owners and businesses as necessary to develop
sewer re-routing plans.
• The ENGINEER shall visit the project site and obtain the meter numbers and sizes
on all existing meters to be replaced on the project and shall identify existing
sample stations and fire line locations.
2.2. The Conceptual Design Package shall include the following:
•
•
•
•
Cover Sheet
• Graphic exhibits and written summary of alternative design concepts considered,
strengths and weaknesses of each, and the rationale for selecting the
recommended design concept.
Proposed phasing of any water and sanitary sewer work that is included in this
project documented in both the project schedule and narrative form.
• Documentation of key design decisions.
Estimates of probable construction cost.
ASSUMPTIONS
City of Port Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 3 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• 3 copies of the conceptual design package (30% design) will be delivered..
Report shall be letter sized and comb- bound with a clear plastic cover.
Drawings will be 11 "x17" size fold outs bound in the report
DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw
• ENGINEER shall prepare the meeting minutes of the Concept Review meeting
and revise the report if needed.
• ENGINEER shall not proceed with Preliminary Design activities without obtaining
written approval by the CITY of the Conceptual Design Package.
•
DELIVERABLES
A. Conceptual Design Package
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
P reliminary plans and specifications shall be submitted to CITY per the approved Project
S chedule
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings and Specifications shall include the
following:
• Cover Sheet
•
•
A Proiect Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1 400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8' Iron Rod); X Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base Z coordinate on City Datum only; descriptive location
(i.e set in the centerline of the inlet in the South curb line of North Side Drive at the
East end of radius at the Southeast corner of North Side Drive and North Main
Street).
Overall proiect easement layout sheet(s) with property owner information.
• Overall project water and/or sanitary sewer layout sheets The water layout sheet
shall identify the proposed water main improvement/ existing water mains in the
vicinity and all water appurtenances along with pressure plane boundaries, water
tanks pump stations, valves, and fire hydrants. The sewer layout sheet shall
identify the proposed sewer main improvement/existing sewer mains and all
sewer appurtenances in the vicinity.
• Overall water and/or sanitary sewer abandonment sheet.
• Coordinates on all P.C.'s, P T.'s, P.I.'s, manholes, valves, mainline fittings, etc.,
in the same coordinate system as the Control Points.
• Bench marks per 1,000 ft of plan/profile sheet — two or more.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 4 of 18
0
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
Bearings given on all proposed centerlines, or baselines.
S tation equations relating utilities to paving, when appropriate.
P lan and profile sheets which show the following: proposed water and/or sanitary
sewer plan/profile and recommended pipe size, fire hydrants, water service lines
and meter boxes, gate valves, isolation valves, manholes, existing meter
n umbers and sizes that are to be replaced, existing sample locations, existing fire
line locations, existing utilities and utility easements, and all pertinent information
n eeded to construct the project. Legal description (Lot Nos. Block Nos., and
Addition Names) along with property ownership shall be provided on the plan
view
• The ENGINEER shall make provisions for reconnecting all identifiable water and/or
wastewater service lines which connect directly to any main being replaced,
including replacement of existing service lines within City right-of-way or utility
easement. When the existing alignment of a water and sanitary sewer main or
lateral is changed provisions will be made in the final plans and/or specifications
by the ENGINEER to relocate all service lines which are connected to the existing
main and connect said service lines to the relocated main.
• The following shall be applicable at all locations where it is necessary to relocate or
reroute the existing private sanitary sewer service line due to the abandonment or
realignment of the existing public sanitary sewer lateral or main: The CITY shall
furnish the ENGINEER with a sample format of how the sewer service line
reroute/relocation should be designed and submitted for construction During
design survey if a rod can be inserted through the cleanout to the bottom of the
service Tine, the ENGINEER will obtain the flow line elevation and design the
service line prior to advertising the project for bid. If the service flow line
information cannot be obtained during design survey, the ENGINEER shall delay
the design of the sewer service line until after a Quality Level A Subsurface Utility
Engineering (SUE investigation has been performed) The Level A SUE will be
performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY
prior to bidding if the CITY determines that it is needed for satisfactory completion
of the design; or (3) by the Contractor after the project has been bid, by means of a
bid item to that effect. In all options, the ENGINEER shall propose appropriate de -
hole locations in the project and collect flow line elevation and other applicable
information of the sewer service line. The ENGINEER shall use this information to
provide the design for the sanitary sewer service line to be rerouted or relocated.
• Provide map showing location of new manhole construction at the end of existing
sewer segments, 90 degree bends, or tee connections. Site survey or specific
design plans for manhole construction is not included as part of the scope. The
contract documents shall specify that it is the Contractor's responsibility to
coordinate utility location, etc. manhole construction.
• The ENGINEER will prepare standard and special detail sheets for water line
installation and sewer rehabilitation or replacement that are not already included in
the D section of the CITY's specifications. These may included connection details
between various parts of the project, tunneling details, boring and jacking details,
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 5 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
waterline relocations, details unique to the construction of the project, trenchless
details, and special service lateral reconnections.
3.3. Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4. Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.5. Permitting In addition to preparation of these plans in a timely manner, it will also be
critical to initiate discussions with all permitting agencies. Our experience tells us that early
discussions with permitting agencies allow us to incorporate their concerns into our design
prior to submitting for permit. We anticipate the following agencies and companies will be
needed to be coordinated with for permitting or approvals;
• DFW Airport
• Trinity River Authority
• US Army Corps of Engineers
• Koch Pipeline
• Explorer Pipeline
ASSUMPTIONS
• 5 sets of half size plans will be delivered for the Constructability Review.
• 5 sets of half size plans will be delivered for the Preliminary Design (60%
design).
• 2 sets of specifications will be delivered for the Preliminary Design (60% design).
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
•
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 6 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• 10 sets of 24" x 36" size drawings will be delivered for Utility Clearance.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Utility Clearance drawings
C. Storm Water Pollution Prevention Plan
D Estimates of probable construction cost
E Data Base listing names and addresses of residents and businesses affected by
the project.
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
For projects that disturb an area greater than one (1) acre, the Contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention Plan
(SWPPP) with appropriate regulatory agencies. The Engineer will prepare the iSWM
Construction Plan according to the current CITY iSWM Criteria Manual for Site
Development and Construction which will be incorporated into the SWPPP by the
contractor.
•
•
Draft Final plans (90%) and specifications shall be submitted to CITY per the approved
Project Schedule
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Construction Documents (100%) to the CITY per the approved Project Schedule.
Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in
State of Texas.
• The ENGINEER shall submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. This estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
• 5 sets of half size drawings and 1 sets of full size drawings and 1 specifications will be
delivered for the 90% Design package.
A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• 5sets of half size drawings and 5 specifications will be delivered for the 100% Design
package
•
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 7 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• [Engineer to provide estimated final sheet list (cover/index, general notes, control point
location, easement layout, SUE plan sheets, no. of plan/profiles, special detail sheets,
etc.)]
DELIVERABLES
A. 90% construction plans and specifications.
B. 100% construction plans and specifications.
C. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
D. Original cover mylar for the signatures of authorized CITY officials.
TASK 5 BID PHASE SERVICES
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a .xls file.
Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files.
The .pdf will consist of one file of the entire plan set. The .dwf will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders
•
City of Fort Worth, Texas
Attachment A
P MO Release Date: 07.23.2012
Page 8 of 18
•
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders
• Attend the bid opening in support of the CITY.
Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on Buzzsaw.
Incorporate all addenda into the contract documents and issue conformed sets.
•
•
•
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6 0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall be created from the original
CAD drawing files and shall contain all associated sheets of the particular plan
set. Smaular PDF and DWF files for each sheet of a plan set will not be,
accepted. PDF and DWF files shall conform to naming conventions as follows:
1. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
11. Water and Sewer file name example — "X-35667_org36.pdf' where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755_orgl8.pdf
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
Buzzsaw.
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the
plans were prepared in DGN format, they shall be converted to DWG prior to
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 9 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
uploading. The naming convention to be used for the DWG files shall be as
follows:
I. TPW files shall use the W number as for PDF and DWF files, but shall
Include the sheet number in the name — "W-1956_SHT01.dwg', "W-
1956_SHT02.dwg", etc.
II. Water and Sewer file names shall use the X number as for PDF and
DWF files but shall include the sheet number in the name — "X-
12155_SHT01.dwg' , "X-12755_SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number (817) 392 8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
•
The project will be bid only once and awarded to one contractor.
• 7 sets of construction documents will be sold to and made available on Buzzsaw
for plan holders and/or given to plan viewing rooms.
• 10 sets of Half size and 5 sets of full size drawings plans and 5 specifications
(conformed if applicable) will be delivered to the CITY.
PDF, DWF and DWG files will be uploaded to Buzzsaw.
•
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
• After the pre -construction conference the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 10 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
The ENGINEER shall attend the "Final" project walk through and assist with preparation of
final punch list
•
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
o As -Built Survey
o Red -Line Markups from Contractor
o Red -Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
•
•
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 11 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956_rec47.pdf " where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is
of a record drawing plan set, ` 47" shall be the total number of sheets in this
file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_recl8.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in Buzzsaw.
ASSUMPTIONS
•
•
•
3RF1's are assumed.
1 Change Orders are assumed
One copy of full size (22"x34") mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E Final Punch List items
F. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager
7.1. Right -of -Way Research
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 12 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• The ENGINEER shall determine rights -of -way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM
for real property acquisition
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY s Buzzsaw site.
ASSUMPTIONS
•
•
1 Easements or right-of-way documents are anticipated.
No Temporary right -of -entry documents are anticipated.
• Right -of -Way research and mapping includes review of property/right-of-way records
based on current Internet based Tarrant Appraisal District (TAD) information available at the
start of the project and available on -ground property information (i.e. iron rods, fences,
stakes etc.). It does not include effort for chain of title research, parent track research,
additional research for easements not included in the TAD, right-of-way takings, easement
vacations and abandonments, right-of-way vacations, and street closures.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 13 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
N orth Side Drive at the East end of radius at the Southeast corner of North Side Drive and
N orth Main Street).
- Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control
No Tess than two horizontal bench marks, per line or location.
Bearings given on all proposed centerlines, or baselines.
Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
8.3 Tree Survey — trees (6" and larger) within the proposed
construction limits will be tied and identified.
8.4 Subsurface Utility Engineering - This proposal contains
approximately 3,700If of Level B services along the proposed
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 14 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
water line route. In addition five Level A test holes are proposed
at the TRA lines, Koch Pipeline and Explorer Pipeline.
a. Designating Procedures (QL "B") - Prior to beginning
field designating activities, the field manager will
review the project scope of work and available utility
records. Once these initial reviews are complete, the
field manager and technicians will begin designating
the approximate horizontal position of known
subsurface utilities within the specified project limits. A
suite of geophysical equipment (electromagnetic
induction, magnetic) will be used to designate
metallic/conductive utilities (e.g. steel pipe, electrical
cable, telephone cable). Non-metallic/non-conductive
u tilities will be designated using other proven methods,
such as rodding and probing. Where access is
available, a sonde will be inserted into the utility line
(e.g. PVC gravity sewer pipe) to provide a medium for
signal transmission, which can then be designated
u sing geophysical equipment. The field manager will
produce detailed sketches depicting each utility as well
as relevant surface features such as roadways,
buildings, manholes, fire hydrants, utility pedestals,
valves, meters, etc. Each utility will be labeled with a
u nique ID code. Paint and pin flags will be used to
designate the utilities in the field. A labeled pin flag or
paint mark will be used to mark each location where a
surveyed point is required. Surveyed points will
typically be placed at 100-foot intervals on utilities
running parallel to the alignment and at 50-foot
intervals on utility crossings. The locations will be
n umbered sequentially for each individual utility line.
Preliminary field sketches depicting the designated
utilities will be prepared for use during subsequent
surveying activities.
b. Locating Procedures (QL "A") - Non-destructive vacuum
excavation equipment will be utilized to excavate test
holes at the required locations. Once each utility is
located, the utility type, size, material, depth to top and
general direction will be recorded. Each test hole will
be assigned a unique ID number and will be marked
with rebar/cap, nail/disk, or chiseled X, as appropriate.
The test -hole ID number and other pertinent utility
information will be placed at each test -hole location.
Test -hole excavations will be backfilled with appropriate
material and the original surface will be restored. When
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 15 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
test holes are required under pavement a 10" core drill
to prevent spalling. The test hole will be backfilled with
clean, dry backfill and finished with like material,
(concrete or asphalt) The backfill will be compacted in
lifts by mechanical means to prevent future settlement.
Test -hole locations will be added to the previously
mentioned field sketches for use during surveying
activities.
ASSUMPTIONS
• Topographic survey along water reclamation route will include no more than 25 ft. in
each direction.
• Level A testing is limited to 3 locations
DELIVERABLES
A.
B.
Copies of field survey data and notes signed and sealed by a licensed surveyor.
Drawing of the project layout with dimensions and coordinate list.
TASK 9. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic
Attachment "A" Signal
Type (Submit All
@ 30%)
Street
Storm Water
Water / Sewer
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 16 of 18
Storm
Water
30%
Storm
Water
60%
Street
Lights
(Submit
All @
30%
Water
/Sewer
(Submit
All @
60%)
X
Traffic
Engineering
(Submit All
@ 60%)
X
Traffic
Control
30%
Traffic Traffic
Control Control
60% 90%
Required for all work in City
ROW
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
*If included in street project
ASSUMPTIONS
• No work inside roadway ROW
DELIVERABLES
A. Half Size Plans
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services - CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's wntten request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
•
entries.
•
Negotiation of easements or property acquisition including temporary right -of -
Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
•
•
•
•
•
•
God.
Construction management and inspection services
Periodic site visits during construction phase
Design phase public meetings
P erformance of materials testing or specialty testing services.
S ervices necessary due to the default of the Contractor.
S ervices related to damages caused by fire, flood, earthquake or other acts of
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 17 of 18
ATTACHMENT A
DESIGN SERVICES FOR
RECLAIM SYSTEM FLUSHING MAIN AT DFW AIRPORT
CITY PROJECT NO.: 2025
• Services related to warranty claims, enforcement and inspection after final
completion.
•
•
Services related to submitting for permits (ie.TxDOT, railroad, etc...)
S ervices related to Subsurface Utility Engineering Levels A, B, C or D
S ervices related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY
• Construction Shop drawing review, samples and other submittals submitted by the
contractor.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
•
•
•
•
Tree Mitigation is not included
Permitting fees or licensing fees are not included
S CADA system design is not included
An environmental assessment is not included
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 18 of 18
ATTACHMENT "B"
Compensation
Design Services for
DFW Airport Reclaimed Water Delivery
System Flush Line Design
City Project No. 2025
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $128,957 as
summarized in Exhibit "B-2" Payment of the total lump sum fee shall be
considered full compensation for the services described in Attachment A for all
labor materials, supplies, and equipment necessary to complete the project.
B. The ENGINEER shall be paid monthly payments as shown in Exhibit "B-1".
Section 1 — Method of Payment.
Each invoice is to be verified as to its accuracy and compliance with the terms of
this contract by an officer of the ENGINEER
II. Schedule
Final Plans for construction shall be completed within 200 calendar days after the
`Notice to Proceed" letter is issued.
EXHIBIT B-1
Professnonal Services Payment Request Project Manager: I
Project: 1DFW Airport Reclaimed Water Delivery Systems Flush Line Design
City Project #:
City Sec Number:
Purchase Order:
Company Name: TranSystems Corporation Consultants
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Sewer Invoice
(Mike Hobbs, PE
(SEWER
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: mrhobbsetransystems.com
Office Address: 500 West 7th Street, suite 00, Fort Worth, Texas 76102
Telephone: 817-334-4449
Fax: 817-336-2247
FAC and Work Type Description
Totals This Payment Request
LOCK
UNLOCK
Agreement
Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Amount Date Amount Completed Previously Invoice Balance
$128,957.001 $0.00 $128,957.00 $0.00 $0.00 $0.00 $128,957.00
$128,957.00 $0.00 $128,957.00 $0.00 $0.00 $0.00 $128,957.00
Overall Percentage Complete: 0.00000000%
1
Task No
Task Description
Principal
Rate $250
11.0 Project Management
1.1 Managing the Team
1 CM/QC
1.2 Communications and Reporting
1 Pre -Design Coordhation Meeting
1 Design Submittal Renew Meetings
1 Prepare Baseine Schedule
1 Prepare Monthly Progress Reports with
1 Schedule
11 Prepare Monthly MBE/SBE Reports
12.0
2.1
2.2
Conceptual Design (30.Petcentl
Data Collection
Conceptral Design Package
Coley Sheet
Exhmits and Summary
Tree ImoactAnatysis
Construction Estimate - not required
3.0 Preliminary Design (60 Percent)
3.1 Preliminary Design Package
3.1.1 Cover
3.1, Overall Lalout
3.1. Control Map
3.1. General Notes
I 3.1. Plan and Plan/Proffe Sheets
31. Details at TRA Connection
3.1. Meter Station Site Plan
3.1.F Meta Station Chiefs (2)
3.1.£ Modifications to temp. flushing system
3.1.1 Cathodic Protection
I 3.1.1 Specifications
3.2 Construction Estimate
3.3 Constructabtiity Renew
3.4 UM/Clearance
1 3.5 Permitting
3.5. Koch
35.: Explorer
3.5.- TRA
3.5.- USACOE
14.0 Final Design
Final Draft (90%) Construction Plans and
4.1 Soecl¶oations
4.2 Final f100%)Plans and Specifications
4.3 Cons W cion Estimates (90°% and 100%)
5.0 Bid Phase
5.1 Bid Support
5 Unload Documents to Buzzsaw
j Sol Contract Documents and Maintain
Plan Holders List
Issue Addenda
Attend Bld Openhg
Tabulate Bids and Recommend Award
5.2 War Drawings
8.0 Construction Phase Services
6.1 .Construction Support
C. Attend Preconsbuction Conference
No PubEc Meetnp
6.2 Record Drawings/As Buit
7.0
7.1
ROW/Easement Services
Right -of -Entry Documents
8.0 Survey
8.1 Design Survey
82 SUE
Totals
Description
Conceptual Design (30%)
Prelunkary Design (80%)
Final Design (10%)
Survey
Subtotal
Total
City of Fort Worth, Texas
Attachment 8 - Level of Effort Supplement
Twical Water and Sewer Replacement
FW W TR Official Release Date: 8.09.2012
EXHIBIT B-2
Level of Effort Spreadsheet
TASKIHOUR BREAKDOWN
Design Services for
DFW Airport Reclaimed Water Delivery System Flush Line Design
City Project No. 2025
I Labor hours)
Project Project Tech I CADD
Manage) Enaineer
$195 $135 $95- $75
0 52 10 0 01
0
8
el
16
4
10
12
41
10
6 24
8
16
4
4 12 12
2
4 5
42 142 208 30
2
16
2
1
1
2
2
2
8
2
14
4
4
61
O 3
3
O 7
0
0
3
4
8
6
O 6,
10 1381
I Water Line Footage
1 SewerLine Footage
4
8
30 100
20
20
20
12
16
8
a
12
al
61
8
8
12
12
8
4
4
21
2
0
1921
3,750
3 750
(A) Total Fee
8) Suney Fee
C) TotS Fee (j survey Fee
I Water Fee (100%of C) I
i $128,957.00
WP 1 Water
31 538,687.00
32 I S77,374.00
33 I 512 895.00
51 i 50.00
$128,957.00
$128 957.00
8
8
6
8
8
I
Total Label
Administrative Cost
$50
12 412.090
53.120
$780
53 300
51 170
$2.340
12 51.380
0 $6.370
S7,3651
salS300
53 3001
51.4051
SO
50
subconsultant
MWBE Non-MWBE
SO so so
Expanse
Total Expense Task Sub Total
Travel ( Reproduction Cost
40 40 4711
$35
16 452.170 SO SO
10
18 01 8
12
4
e 4
$450
$600
$940
52 070
$16 670
S3 370
$3 370
53910
52.415
$2.795
S1.880
$1.470
$2.000
51.840
50
51.470
51.470
$3.400
$2 010
46.9601
53 250
$1.600
51.910
8 4 15 $2.935
8 5780
4
0 8
4
24
24
0
2701 581
100%
0%
100%
Si 28,957
50
5128 957
Sewer Fee (O%of C) 1
$0.00
Sewer
S0.00
$0.00
$0.00
50.00
50.00
8 5400
3 5735
$270
4 5470
$300
0 41.965
$555
so
$1,380
0+ 41.940
it 51,940
01 53.450
$3,450
51 $87,880
535
535
SO $200
$200)
SO $o Sol
SO $0 $70
$70
SO SO so
$23265 511.600 S01,
$11600
$11.600 $3751
523,265
$23,265
So So
SO
50
50
so
so
so
$50 5120
550 Sas
so
5o
50
535
50
$0
$2,000
$2,000
4300
$35
SO
$0
50
so
SO
$35
S0
$2.200
50
52.200
50
$300
so
SO
so
so
50
5300 S300
$0 470
SO
S0
570
SO
s0 534.865
$2,3501 $37.590
to
so
Prolect Summary
Total Hours
Total Labor
Total Expense
MBE/SBE Subconsuitant
Non-MBEJSBE Subconsultant
10% Sub Markup
MBE/SBE Participation
Total Protect Cos if
$12,090
53,120
$780
3.300
$1.170
$2.340
$1.380
56,490
51.450
So
5300
53.3001
31.440
so
$52.205
So
$450
$600
$16.670
51,680
$1,470
52.035
52.010
$9.160
$3.250
54.000
$1,910
43.235_
$760
5400
5735
$270
5470
S600
32.035
$585
SO
51.450
$1.940
$1.940
$38.315
$3.450
$125,470.00
j
719
587.880
537,590
523,265
$11.00
53.487
18.0%
4128.957.00
EXHIBIT B-3
CITY OF FORT WORTH
WATER DEPT
DFW Airport Reclaimed Water Deleivery Systems Flush Line Design
CITY PROJECT NUMBER 2025
CONCEPTUAL OPINION OF PROBABLE COST
Prepared by:
TranSystems Corporation Consultants
8/13/2012
ITEM
No. Description QTY.
1 20" Water Line
2 20" Valve w/ Vault
3 Meter
4 Connection
5 3" Air Release Valves
6 8" Blow Off Valves
7 Fittings
8 SWPPP
9 Backflow Preventer
10 Connection Structure at TRA
11 Trench Safety
12 Pavement Repair
13 De -Hole
14 Cathodic Protection
3700
3
1
1
2
2
2.0
1.0
1.0
1.0
3700
200
3
1,0
UNIT
UNITS PRICE
LF
EA
EA
EA
EA
EA
TON
LS
EA
LS
LF
LF
EA
LS
OPCC Total
20% Contingency
TOTAL
$ 130.00
$ 28,000.00
$ 50,000.00
$ 20,000.00
$ 8,000.00
$ 8,000.00
$ 7,000.00
$ 5,000.00
$ 20,000.00
$ 1.75
$ 60.00
$ 1,500.00
$ 35,000.00
TOTAL
AMOUNT
481,000.00
84,000.00
50,000.00
20,000.00
16,000.00
16,000,00
14,000.00
5,000.00
20,000.00
6,475.00
12,000.00
4,500.00
25,000.00
753,975
150,795
904,770
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT AND
ATTACHMENT A
Design Services for
DFW Airport Reclaimed Water Delivery System Flush Line Design
City Project No. 2025
4
.7
9
10
11
12
Task Name
Notice to Proceed
Permit to Survey at DFW
Survey
SUE
Concept Design
City, TRA and DFW Review
Preliminary Design
City, TRA and DFW Review
Permitting
Final Design
City, TRA and DFW Review
City Approvals and Bid Preparation
Project: Attachment D
Date: Thu 12/6/12
Task
Split
Milestone
Summary
Rolled Up Task
Rolled Up Split
Rolled Up Milestone
Rolled Up Progress
Attachment D
Schedule
Reclaimed Water Delivery System Flush Line Design
City Project Number 2025
Duration
Jan
0 days>,1/2
3 wks
4 wks
4 wks
3 wks
3 wks
1 mon
3 wks
2 mons
2 wks
3 wks
1 wk
-fi 1 External Tasks
Project Summary
• Extemal Milestone
' Inactive Task
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
11111111111111111111111,1
17,Pr rt ir�;,vra
1111111111111111111111111
11 1 II 1 111 1 I III 11111 111111 1
2013
I Feb I Mar I Apr I Mav I Jun I Jul I Aua
Duration -only
Manual Summary Rollup
Manual Summary
Start -only
i Finish -only
Progress
cl Deadline
Page 1
ATTACHMENT E
LOCATION MAP
Design Services for
DFW Airport Reclaimed Water Delivery System Flush Line Design
CITY PROJECT NO. 2025
DPW Reclaim
Meter Location
N
AIRPORT
TRA Sewer Mains 1
20-inch Reclaim
Flushing Line
20-inch Reclaim Water Main
City of Fort Worth, Texas
Mayor and ouncil Communication
COUNCIL ACTION: Approved on 12/4/2012
DATE: Tuesday, December 04, 2012
LOG NAME 60DFWFLUSH-TRANS
SUBJECT:
REFERENCE NO.: **C-25986
Authorize Execution of an Engineering Agreement with TranSystems Corporation d/b/a TranSystems
Corporation Consultants in the Amount of $128 957.00 for the DFW Airport Reclaimed Water Delivery
System Flush Line Design (COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an engineering Agreement with
TranSystems Corporation d/b/a TranSystems Corporation Consultants, in the amount of $128,957.00 for
the DFW Airport reclaimed water delivery system flush line design.
DISCUSSION:
The Agreement will provide for the design of a flushing line for the Eastside Reclaimed Water System to
the DFW International Airport. Since the Reclaimed Water System is not in service all the time, the
reclaimed water must be periodically flushed to prevent stagnation. The flushed reclaimed water must be
conveyed in a pipe line to a nearby Trinity River Authority Regional sewe- main because reclaimed water
is considered waste water by the Texas Commission on Environmental Quality and cannot be flushed
onto open ground.
TranSystems Corporation d/b/a TranSystems Corporation Consultants is in compliance with the City's
BDE Ordinance by committing to 27 percent SBE participation on this project. The City's SBE goal on this
project is 19 percent.
Additional funding of $12,000.00 is required for project management.
This project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Sewer Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers
FROM Fund/Account/Centers
P275 531200 705290202531
P275 531200 705290202532
$28.228.00
$56,455.00
Logname. 60DFWFLUSH-TRANS Page 1 of 2
CERTIFICATIONS:
Submitted for City Manager's trice by:
Oriainatina Department Head:
Additional Information Contact:,
P275 531200 705290202533
P275 531200 705290202551
Fernando Costa (6122)
S. Frank Crumb (8207)
Roberto Sauceda (2387)
ATTACHMENTS
1. 60DFWFLUSH-TRANS COMPLIANCE.r df (CFW internal)
2. 60DFWFLUSH-TRANS FAR.odf (CFW Internal)
3. 60DFWFLUSH-TRANS MAP.Ddf (Public)
4. P275 485111 availabet funds.docx (CFW Internal)
$9.409.00
$34,865.00