Loading...
HomeMy WebLinkAboutContract 43991-A1 (2)cn V SFCPPIARY C ONTI: 1, OP, AMENDMENT No. 1 TO CITY SECRETARY CONTRACT WHEETAAO, the City of Fort Worth (CITY) and Khafra Engineering Consultants, Inn., (ENGINEER) made and entered into City secretary Contract No. 43991, (CONTRACT) which was authorized by MAC C=2 5 911 on the 9u1 day of October, 2012 in the amount of $14 6 , 110 . 0 0 . VEUMMEAB,the CONTRACT involves engineering services for the following project: SANITARY SEWER REHABILITATION CONTRACT 87 and WHEREAN, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW dills +'REF©I IH:, CITY and ENGINE ;R, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 20, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $4,022.00. 2. Article Si of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and sern1.ces performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $150,132.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall regain in full force and effect (4 I Page 9PHC1441. RECORD CITY SECRETARY r.r aw i �'r! �1._ rim RECEIVED APR a n gnatoz, =slow. . City of Format Worth Fernando Cd(Pal osta As. s start City Man tfo DATE: 4//2 /T r APP RECOMMENDED: S. Frank Crumb, POE, Director, Water Depart nt APPROVED AS TO FORM AM D g as W . Black Assistant City Attorney 'ATTEST: Mary J. Kayse City Secretary as of the date last written by ENGINBER Khafra � ;nginee ing Consultants ..Inc Valentino Bates, P.E. President DATE: a q s Date: uIA t 4to obi+\ ecl ia i4D‘ %%kr Page a-2 ®21 i o `80 00420 hirkka CITY SE \ - `lit `''ill March 20, 2013 Rakesh Chaubey, P.E. Fort Worth Water Department Project Manager 311 West 10t`' Street Fort Worth, TX 76102 Re: Letter of Request for Amendment ndment 1 to Soso R hahffl tion Contract 87 Mr. Chaubey: The additional work to be done under this amendment will cover the survey work for the two additional laterals that were added to the project after the engineering agreement was executed. The new sewer laterals are as follows: main/Lateral Street L4149 Backyard of Reed St. Lc4333 Backyard of Wirnan Dr. We ask that an amount of $4,022 be added to our orginal contract amount as noted below: Orginal Agreement Amount Proposed Amendment 1 Amount $146,11© $ 4.022 Final Contract Amount $150,132 If you have any questions after you review the contents of this letter please feel free to contact me. Respectfully, Dietrich Bankhead, I'.I�., PMP Project Manager KHAFRA ENGINEERING CONSULTANTS, INC. 2720 North Stemmons Freeway, Suite 1000, South Tower Dallas, TX 75207 (214) 689-9100 FAX (214) 689-9948