Loading...
HomeMy WebLinkAboutContract 44014-A1 (2)AMENDMENT NO. 1 TO COMMUNITY FACILITIES AGREEMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO. LNO '1q.- COUNTY OF TARR.ANT § AUTHORIZING M&C NO. �ed(011S WHEREAS, the City of Fort Worth (City) and Texas Christian University (Developer) entered into a Community Facilities Agreement, City Secretary Contract No. 44014 ("CFA"); and WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to add City participation in an amount $161,895 for the City's portion of costs associated with the 10-inch water main contemplated by the CFA; and th WHEREAS, the City Council authorized execution of Amendment No. 1 to the CFA on the ICI day of (atnaLrLj , 2013 via M&C C'at0 NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CFA: Cost Summary Table is amended to be and read: Water Water With 15% Contingency Water Inspection Fee 2% Water Material Testing Fee 2% Total Water Cost Developer Cost $ 190,994 $ 190,994 $ 3,820 $ 3,820 $ 198,634 1. Water Department Cost TPW Cost Total Cost 135,364 155,669 3,113 3,113 161,895 8 663 6,933 $ 6,933 - $ 360,529 The cost stated is based on the public bid. The reimbursement of the Participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above depending upon actual quantities from the Notice of Final Completion package (`Green sheet'). AMENDMENT NO. 1 16-Inch Waterline for TCU Worth Hills Village Page 1 of 5 ‘tt,ce\\Ic.0 Oig 29 TO Paving Cost Share 50/50 Program: Developer Cost Paving $ Paving with Contingency 15% $ Paving Inspection 8% $ Paving Material Testing 8% $ Total Paving Cost I $ Water Department Cost 68,101 $ 68,101 $ 5,448 $ 5,448 $ 78,997 I $ TPW Cost 68,101 78,316 6,265 6,265 90,846 • Total Cost 136,202 146,417 11,713 11,713 169,843 City Participation on 16" Waterline (City pays for 8"/16" in Stadium Drive and 12"/16" in Bellaire Drive North) Stadium Drive Item No. Description 16-inch C905 PVC Water 1 Line 2 8-inch PVC Water Line 3 4 5 6 7 16-inch DIP Water Line 16-inch Gate Valve 4-inch- Blow Off- w/ Sump Manhole Fittings for 16 inch or Greater Trench Safety System 8 Traffic Control for Utilities 9 Chlorinate and Pressure Test Pavement Repair- 2 inc Min 10 HMAC 11 12 Erosion Control Measures Traffic Control for Pavement Repair Subtotal AMENDMENT NO. 1 16-Inch Waterline for TCU Worth Hills Village Page 2 of 5 Unit LF LF LF EA EA TN LF LF LF LF LS LS Qty 979 5 $ 65 2 2 3.81 1,044 1,044 1,044 1,044 0.68 0.68 Contractor Price Price Price Difference Percentage $ 81.00 $ 26.00 55.00 $ 115.00 $ 11,000.00 $ 5,300.00 $ 6,000.00 $ 2.00 $ 10.00 $ 1.00 $ 40.00 $ 4,000.00 $ 3,000.00 $ 57.50 $ 5,500.00 $ 2,650.00 $ 3,000.00 1.00 5.00 0.50 20.00 $ 2,000.00 City Participation $ 25,454.00 $ 3,737.50 $ 11,000.00 $ 5,300.00 $ 11,430.00 $ 1,044.00 $ 5,220.00 $ 522.00 $ 20,880.00 $ 1,360.00 $ 1,500.00 $ 1,020.00 86,967.50 Bellaire Drive Item No. 1 2 3 4 5 6 7 8 9 10 11 Description 16-inch C905 PVC Water Line 12-inch C900 PVC Water line 16-inch Gate Valve 12-inch Gate Valve 1 inch- Air & Vacuum Release w/Vault Fittings for 16 inch or Greater Trench Safety System Traffic Control for Utilities Chlorinate and Pressure Test Pavement Repair- 2 inc Min HMAC Erosion Control Measures Traffic Control for Pavement 12 Repair Subtotal Total Unit Qty LF LF EA EA EA TN LF LF LF LF LS LS Notes: 1. Fittings are calculated as follows: Pipelines in Stadium 979'+65'=1,044' Pipelines in Bellaire 398' Remaining pipelines 85' All pipelines 1,527' 2. City participation percentage: 16-8/16=0.50 16-12/16=0.25 AMENDMENT NO. 1 16-Inch Waterline for TCU Worth Hills Village Page 3 of 5 398 5 4 1 1 1.46 398 398 398 398 0.26 0.26 68% 26% 6% 100% Contractor Price Price Difference 81.00 $ 11.00 70.00 11,000.00 $ 8,800.00 2,200.00 3,600.00 6,000.00 2.00 10.00 1.00 40.00 4,000.00 3,000.00 50% in Stadium 25% in Bellaire Price Percentage $ 900.00 $ 1,500.00 $ 0.50 $ 2.50 $ 0.25 $ 10.00 $ 1,000.00 City Participation $ 4,378.00 35,200.00 $ 900.00 $ 2,190.00 $ 199.00 $ 995.00 $ 99.50 $ 3,980.00 $ 260.00 $ 750.00 $ 195.00 $ 48,396.50 $ 135,364.00 City Participation on paving (50/50 Program) Item # Description 1 Remove and Replace Concrete Curb & Gutter Remove and Replace Wheelchair Ramp and Install standard 4-inch ADA Wheelchair Ramp (with 2 detectable warning Dome -Tile surface) 3 Asphalt Pavement and Base Repair 4 Butt Joint -Milling 5 2-Inch Surface Milling 6 Crack Sealing of Existing Pavement 7 2-Inch HMAC Surface Course Tyne "D' Mix 8 Water Valve Box Adjustment with Steel Riser 9 Stop Bar / Crosswalk 10 Manhole Adjustment with Steel Riser 11 Manhole Adjustment Concrete Collar 12 Centerline Striping / Reflective Buttons Total Paving 2 Unit Qty Unit Price LF 124 $ 35.00 EA CY EA SY GAL SY EA LF EA EA LS 3 112 2 7,798 78 7,798 4 324 5 1 1 1,500.00 200.00 300.00 2.25 30.00 10.00 125.00 4.00 250.00 450.00 3,000.00 Total Price $ 4,340.00 $ 4,500.00 $ 22,400.00 $ 600.00 $ 17,545.50 $ 2,340.00 $ 77,980.00 $ 500.00 $ 1,296.00 ) $ 1,250.00 I $ 450.00 $ 3,000.00 $ 136,201.50 All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and effect. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) AMENDMENT NO. 1 16-Inch Waterline for TCU Worth Hills Village Page 4 of 5 EXECUTED on this the Worth, Tarrant County, Texas. , 2013, in Fort CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Approval Recommended: ,( L • Frank Crumb, P.E., Director Water Department A s proved s to Form & Legality: • • Duglas W. Black Assistant City Attorney M&C No. - ZCd 5 Date: 2 -r�l�l� ATTEST: (, ary J. Ka City Secretary DEVELOPER Texas ChristiUniversity \tr?s By: Approved by City Manager's Office: cOn Fernando Costa, Assistant City Manager .q• e�'�, oQo� 7111pOn�� at uoP 'tea oas. It U A d 4'4 QQQ 0 o!'i2isI o� Briai'G. Grre l ice Chancellor For Finance a Administration AMENDMENT NO. 1 16-Inch Waterline for TCU Worth Hills Village Page 5 of 5 000 se ir r p Q - \ g L.i w 0 e1ii. tt\ OFFICIAL RECORD CITY SECRETARY tF.1NORTH, TX M&C Review Page 1 of 2 DATE: CODE: SUBJECT: COUNCIL ACTION: Approved on 2/19/2013 2/19/2013 REFERENCE NO.: C **C-26115 LOG NAME: PUBLIC HEARING: Authorize Amendment of a Community Facilities Agreement, City Contract No. 44014, with Texas Christian University and Authorize City Participation in the Amount of $161 895 00 for Construction of a Sixteen -Inch Water Main on Stadium Drive and Bellaire Drive North (COUNCIL DISTRICT 9) Official site of the City of Fo t Worth, Texas FORT WORTII 60TCU WORTH HILLS VILLAGE 16-INCH WATER TYPE: CONSENT NO RECOMMENDATION: It is recommended that the City Council authorize the execution of an amendment to the Community Facilities Agreement with Texas Christian University for the City to participate in the amount of $161,895.00 for the construction of a sixteen -inch water main on Stadium Drive and Bellaire Drive North to serve Texas Christian University and the surrounding area. DISCUSSION: Texas Christian University (TCU), the developer, has executed a private construction contract for the installation of community facilities to serve a student housing development located within its campus (see attached map). The City required the water main to be oversized up to 16-inch from existing eight-inch/12-inch. The total construction cost for the improvements for this development is $360,529.00. The Amendment is for City participation for the construction of the 16-inch water main in the amount of $161,895.00 to improve the service to TCU and the surrounding area. The Developer's estimated cost for water improvements are subject to construction inspection and material testing fees. Cost summary table: Water Contingency (15 Percent) Water With Contingency Water Inspection Fee (Two Percent) Water Material Testing Fee (Two Percent) Total Water Cost The cost stated is based on the public inspection and material testing fees) is depending upon actual quantities from Developer Cost $190,994.00 $ - $190,994.00 $ 3,820.00 Water Department Cost $135,364.00 $ 20,305.00 $155,669.00 $ 3,113.00 Total Cost $326,358.00 $ 20,305.00 $346,663.00 $ 6,933.00 • $ 3,820.00 $ 3,113.00 $ 6,933.00: $198,634.00 $161,895.00 $360 529.00 bid The reimbursement of the participation (excluding not a lump sum amount and may be less than stated above the Notice of Final Completion package (Green sheet). This project is located in COUNCIL DISTRICT 9. http://apps.cfwnet.org/council_packet/mc_review.asp7ID=17996&councildate=2/19/2013 03/18/2013 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Project Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P265 539140 609140193183 $155.669.00 P265 531350 609140193185 $3.113.00 P265 531200 609140193184 $3,113.00 Submitted for City Manaaer's Office by: Fernando Costa (6122) Oriainatina Department Head: S. Frank Crumb (8207) Additional Information Contact: Viesha Kaminska (8428) ATTACHMENTS 16-inch Water in Stadium-Bellaire.odf http://apps.cfwnet.org/council_packet/mc review.asp7ID=17996&councildate=2/19/2013 03/18/2013