Loading...
HomeMy WebLinkAboutContract 44225 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS City Secretary COUNTY OF TARRANT § Contract No. ti Ire IC WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: ATC MF No. 1, L.P. Address, State, Zip Code: 13600 Heritage Parkway, Suite 200 I Fort Worth, TX 76177 Phone, E-Mail: (817) 224-6000 I Russell.laughlin@hillwood.com Authorized Signatory/Title: L. Russell Laughlin, Sr. Vice President Project Name: Prairie Vista Dr. & Feather Grass Lane at Alliance Town Center Project Location: Alliance Town Center, Lot 19, Blk. A Plat Case No.: FP-012-031 Plat Name: Prairie Vista Dr. & Feather Grass Ln. R-O-W Mapsco: 21Y CFA: 2013-006 DOE: 6947 To be completed by taff.• • Received by: � site': Council District: 2 City Project No: 02027 Date: OFFICIAL RECORD CITY SECRETARY RECEIVEU FEB 2 9 Mai1 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. 'The following checked exhibits are made a part hereof: Water (A) , Sewer (A-1) at Paving (B) X, Storm Drain (B-1) X_, Street Lights & Signs (C)X. E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured licensed and bonded to do work in public streets and/or prequalified to perfoim i water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold hainuless and defend the City, its officers agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property including death, resulting from, or m any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold handless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stall r drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Prairie Vista Dr. & Feather Grass Ln. at Alliance Town Center CFA No.: 2013-006 DOE No.: 6947 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 1,014,493.90 Developer's Cost $ $ $ 703,107.90 147,232.00 164,154.00 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees $ 1,014,493.90 $ $ $ E TPW Inspection Fee (4%) $ 34,013.60 F. TPW Material Testing (2%) $ 17,006.80 G. Street Light Inspsection Cost $ 6,566.16 H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ 57,586.55 Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period $ 57,586.55 $ $ $ $ $ Choice Amount (ck one) 1,014,493.90 1,014,493.90 1,268,117.38 1,268,117.38 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and sai Developer has executed this instrument in cw adruplicate, at Fort Worth, Texas this e day of - Ain / , 20 ) CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: n Douglas W. Buck Assistant City Attorney M&C No. Al i- Date: ATTEST: Mary J. K City Secret ATTEST: I "- Signature rint) Name: Transportation & Public Works Department DouglW. Wiersig, P.E. Director Approved by City Manager 's Office 77Ainst ass44 ‘2.— Fernando Costa Assistant City Manager 4coalAtAtta,, ittf947044% cFP 9 sato O�� e 0 0 L*0000° Clee 41/nal Ma& SI ATC MF No. 1, L.P. a Texas limited partnership By: ATC MT No. 1 GP, LLC a Texas limited liability company its general partner 9 Si ;nature Print Name: L. Russell Laughlin Title: Senior Vice President i OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement included Attachment Location Map Exhibit A: Water Improvements Water Istimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate n n n C ►1 ►" ►1 (Remainder of Page Intentionally Left Blank) File: K:\DAL_Civil\61171000—ATC\61171002d\ATC—MF1—OffSite\Dwg\OCE—LocatianMap.dwg [COVER] 2/8/2013 8:17am Xrefs: X8511.dwg Images: b o P,1 14 I JVH NOLL VO07 ITEM NO. BID ITEM 1 Mobilization 2 Erosion Control/S WPP 3 Install 16' Pole, 150 W Pulse Po c 4 2" awo Conduit 5 3" sc40 Conduit 6 Street Signs • Install 7 Not Used 8 Site Clearing 9 Italic Control 10 Unclasifed Excavation 11 rill 12 Lime 13 8" Lime Treatment 14 8" Cone Pavement 15 4" Conc Sidew Ik 16 Romer Free Rump. Tvne B 17 Brick Pavement 18 7" Conc Curb and Gutter 19 4" SLD Puvem nt Markin Tune (W) 20 I8" SLD Pavement Marking Tu (W) 21 Lone Legend Arrow 22 Lone Legend DB L Arrow 23 Raised Marker TY Y 24 REFL Raised Marker TY II -A -A 25 REFL Reseed Marker TY IIC-R 26 Topwil 27 Block Sod Placement 28 Seeding. Hvdromulcb CFA QUANTITY MATRIX SAGESTONE VILLAGE AT ALLIANCE TOWN CENTER SHEET NO. UNIT C-07 C-08 C-09 C-11 C-12 C-13 C-23 LS 1 1 2388 2945 2627 I 2728 27962 3410 40 50 45 3156 3892 3472 3013 3717 3315 7201 8882 7922 1230 1517 1353 108 133 119 9 9 9 54 68 60 10 4 160 80 1 1 223 521 75 174 8 1 APPROX UNITS UNIT PRICE I ITEM TOTAL C-24 C-25 C-26 C-27 C-34 1 $2,500.00 $2,500.00 1 1 $4,015.00 $4,015.00 18 20 36 $3,443.00 5123,948.00 3890 $8.00 $31,120.00 220 $10.00 $2,200.00 2 2 4 $450.00I $1,800.00 1 $4,000.00 $4,000.00 1 $2,500.00 $2,500.00 7960 $2.50 $19,900.00 34100 $3.50 $119,350.00 135 $150.00 $20,250.00 10520 $3.00 $31,560.00 10045 534,001 $341,530.00 24005 $2.50 $60,012.50 14 $1,000.00 $14,000.00 240 572.00I $17,280.00 4100 $2.00 i $8,200.00 360 $2.00 $720.00 27 $6.00 $162.00 1 $200.00 $200.00' 1 $250.00 $250.00 744 $5.00 $3,720.00 249 $6.00 $1,494.00 8 $6.00 $48.00 182 $12.00 $2,184.00 1640 1640 $3.00 $4,920.00 35427 35427 $1.20 $42,512.40 29 Not Used 30 Trench SuEly 31 21" RCP. anus 111 32 24" RCP. Cluxr III 33 42" RCP. Clnoi III 34 SA Box Culvert 35 4' Stnnn June6 n Box 36 5'Stonn Juncli n Box 37 SET. Type 1 for Box Culvertu 38 24" SET. I pin 39 42" SET. 1 pip 40 10' Curb Inlet 41 Rock Rin Ran LF LF LF LF LF EA EA CY EA EA EA SY UNIT TOTAL 114 428 58 121 229 407 237 58 69 129 188 220 1 1 3,2 3 2 1 1 2 2 2 120 84 42 1072 $1.00 $1,072.00 185 $42.00 $7,770.00 438 $45.00 $19,710.00 220 $90.00 $19,800.00 229 $280.00 $64,120.00 1 $3,000.00 $3,000.00 2 $4,000.00 $8,000.00 8 $800.00 $6,560.00 1 $1,200.00 $1,200.00 1 $2,800.00 $2,800.00 6 $2,200.00 $13,200.00 360 $75.00 $27,000.00 $1,014,499.90 THE CITY OF FORT WORTH, TEXAS PLANS FOR THE CONSTRUCTION OF FLIRT WORTH STORM DRAIN, PAVING, STREET LIGHTING & STREETSCAPE IMPROVEMENTS TO SERVE PRAIRIE VISTA DRIVE AND FEATHER GRASS LANE AT ALLIANCE TOWN CENTER BETSY PRICE MAYOR TOM HIGGINS CITY MANAGER DOUGLAS W. WIERSIG, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT S. FRANK CRUMB, P.E. DIRECTOR, WATER DEPARTMENT UTILITY CONTACTS DIY OF FORT "'PRIM WATER DFP RIME (81) an-02a8 ON_E SWRCF LIMMNNICATON MOE M7.445-4003 �i Sanamw 01 -0004tRANSPORTATON /PO1P HIONC 87-33.5-7096 LSTMas 1,iFRGRRNTEuwwCNW: YYFMRE ud ASI, seal! oAO4 PtWHC 017-303-2900 P*OC 017-431-41541 D.O.E. NO. FILE Nn CITY PROJECT NO. 6947 K-2250 02027 RKC • LOCATION MAP .MAPSCO# 21—Y COUNCIL DISTRICT #2 OWNER/DEVELOPER: ATC MF No,1, L.P. 13600 HERITAGE PARKWAY SUITE 200 FORT WORTH, TEXAS 76177 CONTACT: JOSEPH C. SCHNEIDER, P.E. PHONE: (817) 224-6000 STOP! CALL BEFORE YOU DIG DIG TESS 1-800-DIG-TESS (@ least 72 hours prior to dipping) INDEX OF SHEETS SHEET NO, DESCRIPTION ENGINEER: KIMLEY-HORN & ASSOCIATES, INC. 12750 MERIT DRIVE, SUITE 1000 DALLAS, TEXAS 75251-1516 CONTACT: HUGO MORALES, P.E. PHONE: (972) 770-1300 FAX: (972)239-3820 TEXAS REGISTERED ENGINEERING FIRM F-928 JANUARY 2013 c-01 C-02 CO3 C-01 C-05 C-00 C.07 C-08 C-00 C-10 C-11 C.12 0.13 C-14 C-15 C-18 O47 C-10 C-19 C-20 C-21 C-22 C-23 C24 C-25 C-20 C-27 C28 C-2O C.30 CJ1 cat Ci3 C-34 C-35 LC 10 LS1.1 LS 2.1 COVER SHEET PLAT GENERAL NOTES DRAINAGE AREA MAP OVERALL DRAINAGE AREA MAP GRADING PLAN FEATHER GRASS LANE GRADINO PLAN PRAIRIE VISTA DRIVE PAVING PLAN AND PROFILE FEATHER GRASS LN STA 04000 TO 7 1002 PAVING PLAN AND PROFILE PRAIRIE VISTA DR. STA 040.0OTO WO 00 PAVING PLAN AND PROFILE PRARIE VISTA DR STA 04000 TO 114322 PAVING POINTS FEATHER GRASS LANE PAVING POINTS PRAIRIE VISTA DRIVE STREET PAVEMENT MARKING AND SIGNAGE PLAN FEATHER GRASS LANE PAVEMENT MARKING AND SIGNAGE PLAN PRAIRIE VISTA DRIVE CITY OF FORT WORTH SIDEWALK RAMP DETAILS CITY OF FORT WORTH SIDEWALK RAMP DETAILS CRY OF FORT WORTH PAVEMENT DETAILS CITY OF FORT WORTH PAVEMENT DETAILS CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 1 OF 3 CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 20F3 CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 3 OE 3 TRAFFIC CONTROL PLAN TXDOT STANDARD DETAIL TGP(2-2Wtl STORM SEWER LINE A PLAN AND PROFILE STORM SEWER LINE S PLAN AND PROFILE STORM SEWER LINE C PLAN AND PROFILE STREET LIGHTING PLAN FEATHER GRASS LANE STREET LIGHTING FLAN PRAIRIE VISTA DRIVE STREET STREET LIGHTING PLAN PRAIRIE VISTA DRIVE STREET TXDOT STANDARD DETAIL TCP G2498 CITY OF FORT WORTH STREET LIGHT POLE FOUNDATION DETAILS CITY OF FORT WORTH STREET LIGHT POLE DETAILS CRY OF FORT WORTH STREET LIGHT ELECTRICAL CONNECTION DETAILS GITY OF FORT WORTH STREET LIGHT CONDUIT & GROUND 00X DETAILS EROSION CONTROL PLAN EROSION CONTROL DETAILS LANDSCAPE MATERIALS AND LEGEND LANDSCAPE SITEWORK FLATWORK DETAILS DOUGLAS W. WIERSIG, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT eA S° e9' fKr,akarG P.E.LV MM D PROG M MANAGER 6, LCPjz. RE. VILWLD PROJECT MANAGER DATE 2,3,1 ./ ZO(3 DUI. 1/zr,/n/7 DATE /API/3 DA IL SHE.T C-01 GRAPHIC SCALE IN FEET 0 75 150 300 • • • BF ROP 8' SIDEWALK PROP IV THICK .J ,!CONCRETE PAVEMENT .. FRCP ROW .. PROP ROW 1 TI Ar • m PRAIRIE VISTA DRIVE • —i ..I • _III::, J L-PROP V SIDEWALK Ft_ 's 1 U 00000000 0000000 0000000000 51 ...• uu 000uvv.p.w•/./•oin • • 1-•-) PRAIRIEVIST .I R/VE 1 PAVING IMPROVEMENTS: PRAIRE VISTA DRIVE AND FEATHER GRASS LANE AT ALLIANCE TOWN CENTER ✓ .. .Yp.VO preorlot PROP 8' SIDEWALK PROP r THICK CONCRETE PAVEMENT EXHIBIT B 000000000000 0000000000 0000 oo l Km ley--Hom IMF 1 and Associates, Inc. ._.tu_aw..._ PRAIRIE Yor.P1. DRIVE • PROPOSED TEMPORARY DRAINAGE CHANNEL r V-, MANHOLE 24" RCP I GRAPHIC SCALE IN FEET 0 75 150 300 ROPOSED STORM 3 • I 1.161.1.1 \4. STORM DRAIN IMPROVEMENTS: PRAIRE VISTA DRIVE AND FEATHER GRASS LANE AT ALLIANCE TOWN CENTER EEADWALL V MANHOLE,. EXISTING DRAINAGE POND 7• MANHOLE RG c-; it ROPOSED STORM SYSTEM \®�HEADWJLIC EXHIBIT B-1 • Kimley-Hom and Associates, Inc. 0 En -o I • 6 11 _C 1/1 I if) CO Z X -0 .-.71 6 ' 77. • c C.) 0 1 1 Ill .- 0 E o .' 1] 't] • ] ] u- c_) 1-] ] -0 or N N 0 X 0 ,c -0 o ▪ x 0 o o R. • 01 -J • 1 < 0 :t w 6 " GRAPHIC S C A L E IN FE E T 0 75 150 3 0 0 I I ,9} tit /is? kg]; • gi)] • -, // :,?fr"] ,r11, 0.0 ;]:Cl r •1 • • I 1 '-•• •/ • - • • • " • ' w "— ••• ,] • ; • , lOit , 9,iiIi,fii1leI.:lI,ll::if I,% -) LA •`'..? . , ` : r . -i:7- .7. t, cI r," ,2 i 1 - -]_ 1. .. .. ..7..: „ . ••.. .- _ _ r.i "•-ik1 1 L..: -1I II1 y ........C-.• I-S1r- /, „ / '. -,-V,e, 7 ,\ --rrr-1 '//LGHTPOLESgyp) 1iS\--PC,„--,r; '' 2 , ] \I it 1:rit1—-/1 C.r Hi (Ji\1)Ii /IIh00,, EII,ilikHII III0 / . PROPOSED ., LIGHT;; I )- :1) ' C \ig:jiln;" \ ; , 1 1 ...,.„-- ..... . .,.j. . I,L,II11 (rya.i 13/1 I // / PROPOSED _7- ,? -:;• WPOLES) .2 - 0-z:m- - tr .,..„, 55 ‘,........„„/ . ....----, . .... , % PRAIRIE VISTA ,---x.,:-- .....-: ,,,--.....„ ..s^i,-,--rt"'-;,L.1. ar;,-,--- ' n", , ., : i6:12,-,--=: air - PROPOSED RIGHT-OF-WAY STREET LIGHTS IMPROVEMENTS: PRAIRE VISTA DRIVE AND FEATHER GRASS LANE AT ALLIANCE TOWN CENIER • j zy •2".-'1.•,< ,,. 4, -;;;;;---" .. _.„ ?=:''':,., -,- , • 1.-r- . , . . r-,]-7-7:-.0-: `•-...‘, : -] i',- • ---C.--z/ • . EXHIBIT C 0 PROPOSED STREET LIGHT I Kmley-Hom In 1 and Associates, Inc, UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price I Item No. Spec. Item Name of Pay Item with Unit Price in Words Storm Drain, Paving, Street Lighting & Streetscape Improvements 1 Mobilization Approx. Quantity Unit 1 LS Twenty Five Hundred dollars and 0/100 cents per unit 2 - Erosion Control/SWPPP 1 LS Four Thousand Fifteen dollars and 0/100 cents per unit 3 - Street Signs - Install 4 5 6 7 8 3110.0101 9 3471.0001 10 3123.0101 11 3123.0102 12 3211.0400 13 3211.0502 14 3213.0103 15 3213.0301 Bid Proposal One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents Install 16' Pole, 150 W Pulse Pole One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents 2" PVC SC40 Conduit One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents 3" PVC SC40 Conduit Four Hundred Fifty dollars and 16' Pole Foundation/Footing Four Hundred Fifty dollars and Site Clearing Four Thousand dollars and Traffic Control Twenty -Five Hundred dollars and Unclassified Excavation Two dollars and Fill Three dollars and Lime One Hundred Fifty dollars and 8" Lime Treatment Three dollars and 8" Conc Pvmt Thirty Four dollars and 4" Conc Sidewalk Two dollars and 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 50/100 cents per unit 50/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 50/100 cents per unit 4 EA 38 EA 3,890 LF 220 LF 38 EA 1 LS 1 LS 7,960 CY 34,100 CY 135 TN 10,520 SY 10,045 SY 24,005 SF Unit Bid Price Total Amount $ 2,500.00 2,500.00 $ 4,015.00 4,015.00 $ 450.00 1,800.00 $ 2,243.00 85,234.00 $ 8.00 31,120.00 $ 10.00 2,200.00 $ 1,200.00 45,600.00 $ 4,000.00 4,000.00 $ 2,500.00 2,500.00 $ 2.50 19,900.00 $ 3.50 119,350.00 $ 150.00 20,250.00 $ 3.00 31,560.00 $ 34.00 341,530.00 $ 2.50 60,012.50 Page 1 UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price Item No. Spec. Item 16 17 3214.0100 18 3216.0102 19 3217.0007 20 3217.0402 21 3217.1002 22 3217.1003 23 3217.2002 24 3217.2103 25 3217.2104 26 3292.0099 27 3292.0100 28 3292.0400 29 3293.0106 30 3305.0109 Name of Pay Item with Unit Price in Words Barrier Free Ramp, Type P-1 One Thousand dollars and Brick Pvmt Seventy Two dollars and 7" Conc Curb and Gutter Two dollars and 4" SLD Pvmt Marking Tape (W) Two dollars and 18" SLD Pvmt Marking Tape (W) Six dollars and Lane Legend Arrow Two Hundred dollars and Lane Legend DBL Arrow Two Hundred Fifty dollars and Raised Marker TY Y Five dollars and REFL Raised Marker TY II -A -A Six dollars and REFL Raised Marker TY II-C-R Six dollars and Topsoil Twelve dollars and Block Sod Placement Three dollars and Seeding, Hydromulch One dollar and Not Used Zero dollars and Trench Safety One dollar and Approx. Quantity 14 Unit EA Unit Bid Price Total Amount 0/100 cents per unitl $ 1,000.00 14,000.00 240 SY 0/100 cents per unit $ 72.00 17,280.00 4,100 LF 0/100 cents per unit $ 2.00 8,200.00 360 LF 0/100 cents per unit $ 2.00 720.00 27 LF 0/100 cents per unit $ 6.00 162.00 1 EA 0/100 cents per unit $ 200.00 200.00 1 EA 0/100 cents per unit $ 250.00 250.00 744 EA 0/100 cents per unit $ 5.00 3,720.00 249 EA 0/100 cents per unit $ 6.00 1,494.00 8 EA 0/100 cents per unit $ 6.00 48.00 182 CY 0/100 cents per unit $ 12.00 2,184.00 1,640 SY 0/100 cents per unit $ 3.00 4,920.00 35,427 SY 20/100 cents per unit $ 1.20 42,512.40 0 EA 0/100 cents per unit $ - 0.00 1,072 LF 0/100 cents per unit $ 1.00 1,072.00 Bid Proposal Page 2 UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price Item Spec. No. Item Name of Pay Item with Unit Price in Words 31 3341.0201 21" RCP, Class III 'Forty Two dollars and 32 3341.0205 24" RCP, Class III 33 3341.0402 Forty Five dollars and 42" RCP, Class III Ninety dollars and 34 3341.1501 8x4 Box Culvert 35 3349.0001 36 3349.0002 37 3349.4001 38 3349.4105 39 3349.4111 40 3349.5001 41 'Two Hundred Eighty dollars and 4' Storm Junction Box Three Thousand dollars and 5' Storm Junction Box Four Thousand dollars and SET, Type I Eight dollars and 24" SET, 1 pipe Twelve Hundred dollars and 42" SET, 1 pipe Twenty Eight Hundred dollars and 10' Curb Inlet Twenty Two Hundred dollars and Rock Rip Rap Twenty Two Hundred dollars and 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit 0/100 cents per unit BID SUMMARY Approx. Quantity 185 TOTAL STREETS $ TOTAL STORM DRAIN $ TOTAL STREET LIGHTS $ GRAND TOTAL AMOUNT BID $ Unit LF 438 LF 220 LF 229 LF 1 EA 2 EA 8.20 CY 1 1 EA EA 6 EA 360 SY Unit Bid Price Total Amount $ 42.00 7,770.00 $ 45.00 19,710.00 $ 90.00 19,800.00 $ 280.00 84,120.00 $ 3,000.00 3,000.00 $ 4,000.00 8,000.00 $ 800.00 6,560.00 $ 1,200.00 1,200.00 $ 2,800.00 2,800.00 $ 2,200.00 13,200.00 $ 75.00 27,000.00 703,107.90 147,232.00 164,154.00 1,014,493.90 Bid Proposal Page 3