HomeMy WebLinkAboutContract 44225 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
City Secretary
COUNTY OF TARRANT § Contract No. ti Ire IC
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: ATC MF No. 1, L.P.
Address, State, Zip Code: 13600 Heritage Parkway, Suite 200 I Fort Worth, TX 76177
Phone, E-Mail: (817) 224-6000 I Russell.laughlin@hillwood.com
Authorized Signatory/Title: L. Russell Laughlin, Sr. Vice President
Project Name: Prairie Vista Dr. & Feather Grass Lane at Alliance Town Center
Project Location: Alliance Town Center, Lot 19, Blk. A
Plat Case No.: FP-012-031 Plat Name: Prairie Vista Dr. & Feather Grass Ln. R-O-W
Mapsco: 21Y
CFA: 2013-006 DOE: 6947
To be completed by taff.• •
Received by: � site':
Council District: 2 City Project No: 02027
Date:
OFFICIAL RECORD
CITY SECRETARY
RECEIVEU FEB 2 9 Mai1
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. 'The following checked exhibits are made a part hereof:
Water (A) , Sewer
(A-1) at Paving (B) X, Storm Drain (B-1) X_, Street Lights & Signs
(C)X.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured licensed and
bonded to do work in public streets and/or prequalified to perfoim i
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold hainuless and defend the City, its officers agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants. or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property including death, resulting from, or m any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold handless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stall r drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Prairie Vista Dr. & Feather Grass Ln. at Alliance Town Center
CFA No.: 2013-006 DOE No.: 6947
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total $ 1,014,493.90
Developer's Cost
$
$
$
703,107.90
147,232.00
164,154.00
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
$ 1,014,493.90
$
$
$
E TPW Inspection Fee (4%) $ 34,013.60
F. TPW Material Testing (2%) $ 17,006.80
G. Street Light Inspsection Cost $ 6,566.16
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 57,586.55
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$ 57,586.55
$
$
$
$
$
Choice
Amount (ck one)
1,014,493.90
1,014,493.90
1,268,117.38
1,268,117.38
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and sai Developer has executed this
instrument in cw adruplicate, at Fort Worth, Texas this e day of - Ain /
, 20 )
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
n
Douglas W. Buck
Assistant City Attorney
M&C No. Al i-
Date:
ATTEST:
Mary J. K
City Secret
ATTEST:
I "-
Signature
rint) Name:
Transportation & Public Works Department
DouglW. Wiersig, P.E.
Director
Approved by City Manager 's Office
77Ainst ass44 ‘2.—
Fernando Costa
Assistant City Manager
4coalAtAtta,,
ittf947044%
cFP
9
sato
O��
e
0
0
L*0000°
Clee 41/nal
Ma& SI
ATC MF No. 1, L.P.
a Texas limited partnership
By: ATC MT No. 1 GP, LLC
a Texas limited liability company
its general partner
9
Si ;nature
Print Name: L. Russell Laughlin
Title: Senior Vice President
i
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
included Attachment
Location Map
Exhibit A: Water Improvements
Water Istimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
n
n
n
C
►1
►"
►1
(Remainder of Page Intentionally Left Blank)
File: K:\DAL_Civil\61171000—ATC\61171002d\ATC—MF1—OffSite\Dwg\OCE—LocatianMap.dwg [COVER] 2/8/2013 8:17am
Xrefs: X8511.dwg Images:
b
o
P,1 14
I
JVH NOLL VO07
ITEM NO. BID ITEM
1 Mobilization
2 Erosion Control/S WPP
3 Install 16' Pole, 150 W Pulse Po c
4 2" awo Conduit
5 3" sc40 Conduit
6 Street Signs • Install
7 Not Used
8 Site Clearing
9 Italic Control
10 Unclasifed Excavation
11 rill
12 Lime
13 8" Lime Treatment
14 8" Cone Pavement
15 4" Conc Sidew Ik
16 Romer Free Rump. Tvne B
17 Brick Pavement
18 7" Conc Curb and Gutter
19 4" SLD Puvem nt Markin Tune (W)
20 I8" SLD Pavement Marking Tu (W)
21 Lone Legend Arrow
22 Lone Legend DB L Arrow
23 Raised Marker TY Y
24 REFL Raised Marker TY II -A -A
25 REFL Reseed Marker TY IIC-R
26 Topwil
27 Block Sod Placement
28 Seeding. Hvdromulcb
CFA QUANTITY MATRIX
SAGESTONE VILLAGE AT ALLIANCE TOWN CENTER
SHEET NO.
UNIT C-07 C-08 C-09 C-11 C-12 C-13 C-23
LS 1
1
2388 2945 2627
I 2728 27962 3410
40 50 45
3156 3892 3472
3013 3717 3315
7201 8882 7922
1230 1517 1353
108 133 119
9 9 9
54 68 60
10 4
160 80
1
1
223 521
75 174
8
1
APPROX UNITS UNIT PRICE I ITEM TOTAL
C-24 C-25 C-26 C-27 C-34
1 $2,500.00 $2,500.00
1 1 $4,015.00 $4,015.00
18 20 36 $3,443.00 5123,948.00
3890 $8.00 $31,120.00
220 $10.00 $2,200.00
2 2 4 $450.00I $1,800.00
1 $4,000.00 $4,000.00
1 $2,500.00 $2,500.00
7960 $2.50 $19,900.00
34100 $3.50 $119,350.00
135 $150.00 $20,250.00
10520 $3.00 $31,560.00
10045 534,001 $341,530.00
24005 $2.50 $60,012.50
14 $1,000.00 $14,000.00
240 572.00I $17,280.00
4100 $2.00 i $8,200.00
360 $2.00 $720.00
27 $6.00 $162.00
1 $200.00 $200.00'
1 $250.00 $250.00
744 $5.00 $3,720.00
249 $6.00 $1,494.00
8 $6.00 $48.00
182 $12.00 $2,184.00
1640 1640 $3.00 $4,920.00
35427 35427 $1.20 $42,512.40
29 Not Used
30 Trench SuEly
31 21" RCP. anus 111
32 24" RCP. Cluxr III
33 42" RCP. Clnoi III
34 SA Box Culvert
35 4' Stnnn June6 n Box
36 5'Stonn Juncli n Box
37 SET. Type 1 for Box Culvertu
38 24" SET. I pin
39 42" SET. 1 pip
40 10' Curb Inlet
41 Rock Rin Ran
LF
LF
LF
LF
LF
EA
EA
CY
EA
EA
EA
SY
UNIT TOTAL
114
428
58
121
229
407 237
58 69
129 188
220
1 1
3,2 3 2
1
1
2 2 2
120 84 42
1072 $1.00 $1,072.00
185 $42.00 $7,770.00
438 $45.00 $19,710.00
220 $90.00 $19,800.00
229 $280.00 $64,120.00
1 $3,000.00 $3,000.00
2 $4,000.00 $8,000.00
8 $800.00 $6,560.00
1 $1,200.00 $1,200.00
1 $2,800.00 $2,800.00
6 $2,200.00 $13,200.00
360 $75.00 $27,000.00
$1,014,499.90
THE CITY OF FORT WORTH, TEXAS
PLANS FOR THE CONSTRUCTION OF
FLIRT WORTH STORM DRAIN, PAVING, STREET LIGHTING
& STREETSCAPE IMPROVEMENTS
TO SERVE
PRAIRIE VISTA DRIVE AND FEATHER GRASS LANE
AT ALLIANCE TOWN CENTER
BETSY PRICE
MAYOR
TOM HIGGINS
CITY MANAGER
DOUGLAS W. WIERSIG, P.E.
DIRECTOR, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
S. FRANK CRUMB, P.E.
DIRECTOR, WATER DEPARTMENT
UTILITY CONTACTS
DIY OF FORT "'PRIM WATER DFP
RIME (81) an-02a8
ON_E SWRCF LIMMNNICATON
MOE M7.445-4003
�i Sanamw 01 -0004tRANSPORTATON /PO1P
HIONC 87-33.5-7096
LSTMas 1,iFRGRRNTEuwwCNW: YYFMRE ud ASI, seal! oAO4 PtWHC 017-303-2900 P*OC 017-431-41541
D.O.E. NO.
FILE Nn
CITY PROJECT NO.
6947
K-2250
02027
RKC
•
LOCATION MAP
.MAPSCO# 21—Y
COUNCIL DISTRICT #2
OWNER/DEVELOPER:
ATC MF No,1, L.P.
13600 HERITAGE PARKWAY
SUITE 200
FORT WORTH, TEXAS 76177
CONTACT: JOSEPH C. SCHNEIDER, P.E.
PHONE: (817) 224-6000
STOP!
CALL BEFORE YOU DIG
DIG TESS
1-800-DIG-TESS
(@ least 72 hours prior to dipping)
INDEX OF SHEETS
SHEET NO, DESCRIPTION
ENGINEER:
KIMLEY-HORN & ASSOCIATES, INC.
12750 MERIT DRIVE, SUITE 1000
DALLAS, TEXAS 75251-1516
CONTACT: HUGO MORALES, P.E.
PHONE: (972) 770-1300
FAX: (972)239-3820
TEXAS REGISTERED ENGINEERING FIRM F-928
JANUARY 2013
c-01
C-02
CO3
C-01
C-05
C-00
C.07
C-08
C-00
C-10
C-11
C.12
0.13
C-14
C-15
C-18
O47
C-10
C-19
C-20
C-21
C-22
C-23
C24
C-25
C-20
C-27
C28
C-2O
C.30
CJ1
cat
Ci3
C-34
C-35
LC 10
LS1.1
LS 2.1
COVER SHEET
PLAT
GENERAL NOTES
DRAINAGE AREA MAP
OVERALL DRAINAGE AREA MAP
GRADING PLAN FEATHER GRASS LANE
GRADINO PLAN PRAIRIE VISTA DRIVE
PAVING PLAN AND PROFILE FEATHER GRASS LN STA 04000 TO 7 1002
PAVING PLAN AND PROFILE PRAIRIE VISTA DR. STA 040.0OTO WO 00
PAVING PLAN AND PROFILE PRARIE VISTA DR STA 04000 TO 114322
PAVING POINTS FEATHER GRASS LANE
PAVING POINTS PRAIRIE VISTA DRIVE STREET
PAVEMENT MARKING AND SIGNAGE PLAN FEATHER GRASS LANE
PAVEMENT MARKING AND SIGNAGE PLAN PRAIRIE VISTA DRIVE
CITY OF FORT WORTH SIDEWALK RAMP DETAILS
CITY OF FORT WORTH SIDEWALK RAMP DETAILS
CRY OF FORT WORTH PAVEMENT DETAILS
CITY OF FORT WORTH PAVEMENT DETAILS
CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 1 OF 3
CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 20F3
CITY OF FORT WORTH TYPICAL PAVEMENT MARKINGS 3 OE 3
TRAFFIC CONTROL PLAN
TXDOT STANDARD DETAIL TGP(2-2Wtl
STORM SEWER LINE A PLAN AND PROFILE
STORM SEWER LINE S PLAN AND PROFILE
STORM SEWER LINE C PLAN AND PROFILE
STREET LIGHTING PLAN FEATHER GRASS LANE
STREET LIGHTING FLAN PRAIRIE VISTA DRIVE STREET
STREET LIGHTING PLAN PRAIRIE VISTA DRIVE STREET
TXDOT STANDARD DETAIL TCP G2498
CITY OF FORT WORTH STREET LIGHT POLE FOUNDATION DETAILS
CITY OF FORT WORTH STREET LIGHT POLE DETAILS
CRY OF FORT WORTH STREET LIGHT ELECTRICAL CONNECTION DETAILS
GITY OF FORT WORTH STREET LIGHT CONDUIT & GROUND 00X DETAILS
EROSION CONTROL PLAN
EROSION CONTROL DETAILS
LANDSCAPE MATERIALS AND LEGEND
LANDSCAPE SITEWORK
FLATWORK DETAILS
DOUGLAS W. WIERSIG, P.E.
DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
eA S° e9' fKr,akarG P.E.LV MM D
PROG M MANAGER
6, LCPjz. RE.
VILWLD
PROJECT MANAGER
DATE
2,3,1 ./ ZO(3
DUI.
1/zr,/n/7
DATE
/API/3
DA IL
SHE.T
C-01
GRAPHIC SCALE IN FEET
0 75 150 300
•
•
•
BF
ROP 8' SIDEWALK
PROP IV THICK .J
,!CONCRETE PAVEMENT ..
FRCP ROW ..
PROP ROW
1 TI
Ar
•
m
PRAIRIE VISTA
DRIVE
•
—i
..I
•
_III::, J
L-PROP V SIDEWALK
Ft_
's
1
U
00000000
0000000
0000000000
51
...•
uu 000uvv.p.w•/./•oin •
•
1-•-)
PRAIRIEVIST .I
R/VE 1
PAVING IMPROVEMENTS:
PRAIRE VISTA DRIVE AND
FEATHER GRASS LANE AT
ALLIANCE TOWN CENTER
✓ ..
.Yp.VO
preorlot
PROP 8' SIDEWALK
PROP r THICK
CONCRETE PAVEMENT
EXHIBIT B
000000000000
0000000000
0000
oo
l
Km ley--Hom
IMF 1 and Associates, Inc.
._.tu_aw..._
PRAIRIE Yor.P1.
DRIVE •
PROPOSED TEMPORARY DRAINAGE CHANNEL
r
V-,
MANHOLE 24" RCP
I
GRAPHIC SCALE IN FEET
0 75 150 300
ROPOSED STORM
3
• I
1.161.1.1
\4.
STORM DRAIN IMPROVEMENTS:
PRAIRE VISTA DRIVE AND FEATHER GRASS
LANE AT ALLIANCE TOWN CENTER
EEADWALL
V
MANHOLE,.
EXISTING DRAINAGE POND
7•
MANHOLE
RG c-; it
ROPOSED STORM
SYSTEM
\®�HEADWJLIC
EXHIBIT B-1
•
Kimley-Hom
and Associates, Inc.
0
En
-o
I • 6
11
_C
1/1
I if)
CO
Z X
-0
.-.71 6
' 77.
• c
C.) 0
1 1
Ill .-
0 E
o
.' 1]
't]
• ]
] u-
c_)
1-] ]
-0 or
N N
0 X
0
,c -0
o
▪ x
0
o
o
R.
• 01
-J • 1
<
0 :t
w
6 "
GRAPHIC
S
C
A
L
E
IN
FE
E
T
0 75 150
3
0
0
I I
,9} tit
/is? kg];
•
gi)] • -,
// :,?fr"] ,r11,
0.0 ;]:Cl
r
•1
•
•
I 1
'-••
•/
•
-
•
•
•
"
•
'
w
"—
•••
,]
• ; • ,
lOit
,
9,iiIi,fii1leI.:lI,ll::if
I,% -) LA •`'..?
.
,
`
:
r
.
-i:7-
.7.
t,
cI
r,"
,2
i 1
-
-]_
1.
..
..
..7..:
„
.
••..
.-
_
_
r.i
"•-ik1
1
L..:
-1I II1
y ........C-.• I-S1r- /, „ / '.
-,-V,e,
7
,\
--rrr-1 '//LGHTPOLESgyp) 1iS\--PC,„--,r; ''
2 , ] \I it
1:rit1—-/1
C.r Hi (Ji\1)Ii /IIh00,, EII,ilikHII III0 / . PROPOSED
., LIGHT;; I )- :1) '
C \ig:jiln;"
\ ;
,
1 1 ...,.„-- ..... .
.,.j. . I,L,II11
(rya.i
13/1 I // /
PROPOSED _7- ,?
-:;•
WPOLES) .2
- 0-z:m- -
tr
.,..„,
55
‘,........„„/
. ....----,
. .... , %
PRAIRIE VISTA
,---x.,:--
.....-:
,,,--.....„
..s^i,-,--rt"'-;,L.1. ar;,-,---
' n", , ., : i6:12,-,--=: air -
PROPOSED
RIGHT-OF-WAY
STREET LIGHTS IMPROVEMENTS:
PRAIRE VISTA DRIVE AND FEATHER GRASS
LANE AT ALLIANCE TOWN CENIER
•
j zy
•2".-'1.•,<
,,. 4, -;;;;;---"
.. _.„
?=:''':,., -,- , •
1.-r- . , . . r-,]-7-7:-.0-: `•-...‘, : -] i',- •
---C.--z/ • .
EXHIBIT C
0 PROPOSED STREET LIGHT
I Kmley-Hom
In 1 and Associates, Inc,
UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price
I Item
No.
Spec.
Item
Name of Pay Item with
Unit Price in Words
Storm Drain, Paving, Street Lighting & Streetscape Improvements
1
Mobilization
Approx.
Quantity
Unit
1 LS
Twenty Five Hundred dollars and 0/100 cents per unit
2 - Erosion Control/SWPPP 1 LS
Four Thousand Fifteen dollars and 0/100 cents per unit
3 - Street Signs - Install
4
5
6
7
8 3110.0101
9 3471.0001
10 3123.0101
11 3123.0102
12 3211.0400
13 3211.0502
14 3213.0103
15 3213.0301
Bid Proposal
One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents
Install 16' Pole, 150 W Pulse Pole
One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents
2" PVC SC40 Conduit
One Hundred Sixty Four Thousand One Hundred Sixty dollars and 0/100 cents
3" PVC SC40 Conduit
Four Hundred Fifty dollars and
16' Pole Foundation/Footing
Four Hundred Fifty dollars and
Site Clearing
Four Thousand dollars and
Traffic Control
Twenty -Five Hundred dollars and
Unclassified Excavation
Two dollars and
Fill
Three dollars and
Lime
One Hundred Fifty dollars and
8" Lime Treatment
Three dollars and
8" Conc Pvmt
Thirty Four dollars and
4" Conc Sidewalk
Two dollars and
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
50/100 cents per unit
50/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
50/100 cents per unit
4 EA
38 EA
3,890 LF
220 LF
38 EA
1 LS
1 LS
7,960 CY
34,100 CY
135 TN
10,520 SY
10,045 SY
24,005 SF
Unit Bid
Price
Total Amount
$ 2,500.00 2,500.00
$ 4,015.00 4,015.00
$ 450.00 1,800.00
$ 2,243.00 85,234.00
$ 8.00 31,120.00
$ 10.00 2,200.00
$ 1,200.00 45,600.00
$ 4,000.00 4,000.00
$ 2,500.00 2,500.00
$ 2.50 19,900.00
$ 3.50 119,350.00
$ 150.00 20,250.00
$ 3.00 31,560.00
$ 34.00 341,530.00
$ 2.50 60,012.50
Page 1
UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price
Item
No.
Spec.
Item
16
17 3214.0100
18 3216.0102
19 3217.0007
20 3217.0402
21 3217.1002
22 3217.1003
23 3217.2002
24 3217.2103
25 3217.2104
26 3292.0099
27 3292.0100
28 3292.0400
29 3293.0106
30 3305.0109
Name of Pay Item with
Unit Price in Words
Barrier Free Ramp, Type P-1
One Thousand dollars and
Brick Pvmt
Seventy Two dollars and
7" Conc Curb and Gutter
Two dollars and
4" SLD Pvmt Marking Tape (W)
Two dollars and
18" SLD Pvmt Marking Tape (W)
Six dollars and
Lane Legend Arrow
Two Hundred dollars and
Lane Legend DBL Arrow
Two Hundred Fifty dollars and
Raised Marker TY Y
Five dollars and
REFL Raised Marker TY II -A -A
Six dollars and
REFL Raised Marker TY II-C-R
Six dollars and
Topsoil
Twelve dollars and
Block Sod Placement
Three dollars and
Seeding, Hydromulch
One dollar and
Not Used
Zero dollars and
Trench Safety
One dollar and
Approx.
Quantity
14
Unit
EA
Unit Bid
Price
Total Amount
0/100 cents per unitl $ 1,000.00 14,000.00
240 SY
0/100 cents per unit $ 72.00 17,280.00
4,100 LF
0/100 cents per unit $ 2.00 8,200.00
360 LF
0/100 cents per unit $ 2.00 720.00
27 LF
0/100 cents per unit $ 6.00 162.00
1 EA
0/100 cents per unit $ 200.00 200.00
1 EA
0/100 cents per unit $ 250.00 250.00
744 EA
0/100 cents per unit $ 5.00 3,720.00
249 EA
0/100 cents per unit $ 6.00 1,494.00
8 EA
0/100 cents per unit $ 6.00 48.00
182 CY
0/100 cents per unit $ 12.00 2,184.00
1,640 SY
0/100 cents per unit $ 3.00 4,920.00
35,427 SY
20/100 cents per unit $ 1.20 42,512.40
0 EA
0/100 cents per unit $ - 0.00
1,072 LF
0/100 cents per unit $ 1.00 1,072.00
Bid Proposal Page 2
UNIT 3: ROADWAY AND DRAINAGE (PRAIRIE VISTA DRIVE/FEATHER GRASS LANE) 00 42 43 Proposal Form Unit Price
Item Spec.
No. Item
Name of Pay Item with
Unit Price in Words
31 3341.0201 21" RCP, Class III
'Forty Two dollars and
32 3341.0205 24" RCP, Class III
33 3341.0402
Forty Five dollars and
42" RCP, Class III
Ninety dollars and
34 3341.1501 8x4 Box Culvert
35 3349.0001
36 3349.0002
37 3349.4001
38 3349.4105
39 3349.4111
40 3349.5001
41
'Two Hundred Eighty dollars and
4' Storm Junction Box
Three Thousand dollars and
5' Storm Junction Box
Four Thousand dollars and
SET, Type I
Eight dollars and
24" SET, 1 pipe
Twelve Hundred dollars and
42" SET, 1 pipe
Twenty Eight Hundred dollars and
10' Curb Inlet
Twenty Two Hundred dollars and
Rock Rip Rap
Twenty Two Hundred dollars and
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
0/100 cents per unit
BID SUMMARY
Approx.
Quantity
185
TOTAL STREETS $
TOTAL STORM DRAIN $
TOTAL STREET LIGHTS $
GRAND TOTAL AMOUNT BID $
Unit
LF
438 LF
220 LF
229 LF
1
EA
2 EA
8.20 CY
1
1
EA
EA
6 EA
360 SY
Unit Bid
Price
Total Amount
$ 42.00 7,770.00
$ 45.00 19,710.00
$ 90.00 19,800.00
$ 280.00 84,120.00
$ 3,000.00 3,000.00
$ 4,000.00 8,000.00
$ 800.00 6,560.00
$ 1,200.00 1,200.00
$ 2,800.00 2,800.00
$ 2,200.00 13,200.00
$ 75.00 27,000.00
703,107.90
147,232.00
164,154.00
1,014,493.90
Bid Proposal Page 3