HomeMy WebLinkAboutContract 43563 (2)ENGINEERING AND/OR CONSTRUCTION
REIMBURSEMENT AGREEMENT
(„MA-U1/40I h100
CITY OF FORT WORTH, TEXAS o I3NSF RAILWAY TRACK INSTALLATION!
ALLIANCE AIRPORT RUNWAY EXTENSION PROJFG T
THIS AGREEMENT is made and entered into by and between the CITY OF FORT
WORTH, a Texas home -rule municipal corporation ("City"), by and through its duly authorized
assistant city manager, and DFNTON COUNTY ELECTRIC COOPERATIVE, INC., d/b/a
COSERV ELECTRIC, with a mailing address of 7701 South Stemmons, Corinth, Texas 76210-
1842, Attention: Chief Executive Officer ("Company").
WITNESSE I H:
WHEREAS, Company owns and operates certain overhead electricity lines and related
facilities (the "Facility") in Tarrant County, Texas, said Facility being a part of Company's
electricity distribution and delivery system; and
WHEREAS, City is expanding its Alliance Airport and desires to install or cause to be
installed new BNSF Railway tracks in Fort Worth, Texas (the "BNSF Tracks") and City has
requested that Company reroute, adjust and/or take protective action on a portion of the Facility
(the "Relocation"), in order to accommodate the BNSF Tracks; and
WHEREAS, Company has agreed to provide the Relocation services subject to payment
for relocation costs as detailed herein as generally depicted on Exhibit "A"; and
WHEREAS, City has agreed to reimburse Company for the costs and expenses for the
Engineering and Construction and Field Services for the Relocation project, estimated at
$25,162.76 as shown on Exhibit "B" attached hereto and made a part hereof; and
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between City and Company as follows:
RECITALS:
The recitals, above, are incorporated into this Agreement insofar as they contain
material elements germane to the Parties.
REIMBURSEMENT BY CITY:
A. City agrees to pre -pay Company $25,162.76 (equal to 100%) of the estimated
maximum cost for the Relocation, based on Exhibit B attached hereto.
B. Company prepared, and City has reviewed and approved, the estimated cost for
the Engineering and Construction and Field Services necessary for the Relocation.
The estimated Relocation cost is $25,162.76 (Exhibit "B"). City agrees to reimburse
to Company all actual costs incurred to complete the relocation. Such reimbursment
(excluding the amount paid in the preceding paragraph A, above and excluding 5%
per invoice which shall be withheld as retainage by City) shall be paid to Company
within 30 days of presentation of a statement(s) showing actual costs and supporting
documentation of work completed.
a. Should the verified actual cost be greater than the estimated cost, City
shall remit the difference to Company within thirty (30) days of the
Reimbursement Agreement
City of Fort Worth & CoSery Electric
Alliance Runway Extension Utility Relocation
Page 1 of 6
OFFICIAP 121LL (_WAI
U Ut7C,oC UC , `li
presentation of a statement showing actual costs and support materials.
b. If the actual cost exceeds the estimated cost by more than Fifty Thousand
Dollars ($50,000), City must obtain City Council authorization for the
increased payment amount and shall not be bound to the 30 day payment
requirement but shall seek said approval within a reasonable time and shall
remit the approved amount within five (5) business days following City
Council authorization.
C. City reserves the right to review and verify any presented invoice or statement for
accuracy.
D. Company shall submit to City within 45 days of completion a final accounting for
all Relocation expenses incurred under this Agreement City shall promptly review
and approve (or contact Company for additional information if needed) the final
accounting and promptly remit the retainage held following approval.
E. The obligation of the City to make a cost reimbursement payment under this
Agreement does not constitute a general obligation or indebtedness of City for which
the City is obligated to levy pledge or collect any form of taxation.
INGRESS AND EGRESS: City hereby grants to Company the right of ingress and
egress across all lands owned, leased or controlled by City as may be reasonable and/or
necessary for Company to perform the Relocation.
AUDIT• City shall have the right, upon reasonable notice and dunng normal business
hours, to audit and obtain copies of the portions of the books, records, and accounts of
Company relating specifically to the Relocation for up to two years after the date Company
completes the Relocation.
HOLD HARMLESS AND INDEMNIFICATION: City, its successor or assigns, shall hold
Company harmless and free from any and all claims of damages which may occur arising out
of City's, its successors' and assigns' negligence in connection with the development of the land
or in particular with this project to expand Alliance Airport and/or install new BNSF Railway
tracks.
Company shall be liable for and shall promptly and fully compensate City for liabilities,
claims and costs resulting from the negligent activities of Company employees, agents and/or
contractors in connection with the Relocation. Company agrees to indemnify and hold
harmless the City, its officers, agents and employees, against and from any and all
liability, Toss and expense and shall defend all claims resulting from loss of life or
damage or injury to persons or property directly or indirectly resulting from the work
performed by Company to the extent such loss, damage or injury, is caused by the
negligence or willful misconduct of Company or its agents in connection with the
Relocation. As a necessary condition for such liability and indemnity pursuant to this
paragraph to be enforceable against Company:
(i) Company must be notified in writing promptly of any and all claims,
liability, loss and expense for which City seeks indemnification from
Company, and
(ii) Company shall have sole control of the defense of any and all claims,
liability, loss and expense and all negotiations for their settlement or
compromise.
NO THIRD PARTY: This Agreement is solely for the benefit of the City and Company,
and neither the City nor Company intends by any provision of this Agreement to create, and
Reimbursement Agreement
City of Fort Worth & CoSery Electric
Alliance Runway Extension Utility Relocation
Page 2 of 6
there are not created by this Agreement, any rights in any third-party beneficiaries, or to confer
any benefit or enforceable rights; under this Agreement or otherwise, upon anyone other than
the City and Company.
VENUE, AND JURISDICTION,: This Agreement shall be governed by the laws of the
State of Texas. Venue for any action brought to interpret or enforce, or arising out of or incident
to, the terms of this Agreement shall be in, Tarrant County, Texas, or the United States, District
Court for the Northern District of Texas, Fort Worth Division.
ENTIRETY OF AGREEMENT- This Agreement constitutes, the, entire agreement
between the parties hereto relating to the subject matter hereof, and no alterations of the terms
and conditions of this Agreement shall be valid uniess in writing and signed by both of the
parties hereto. This Agreement shall be binding upon and inure to the benefit of the parties
hereto, their successors and assigns.
S,IG,NATURE PAGE TO FOLLOW
Reimbursement Agreement
City of Fort Worth&CoSery Electric
Alliance Runway Extension Utility Relocation
Page 3 of 6
IN WITNESS WHEREOF, this Agreement shall become effective
becomes fully executed by the parties.
DENTON COUNTY ELECTRIC COOPERATIVE, INC.
d/b/a CoSery Electric,
a Texas electric cooperative corporation
By:( _
Name:_cads R. Trivitt
Title:'dentoEnerfry Seen/ices
Date: .Rthi 6 /
m&c: ifu/k
Date:
Reimbursement Agreement
City of Fort Worth & CoSery Electric
Alliance Runway Extension Utility Relocation
Page 4 of 6
as of the date it
CITY of FORT WORTH
By:
Date:
Fernando Costa
Assistant City Manager
"Mai�
Recommended by:
fis,�-
Douglas W. Wiersig
Director, T/PW Department
Approved as
Form and Legality:
Douglas V . Black
Assistant City Attorney
Attest:
Mary J Kay er
City Secretary
x„:" rflp;,tr1t
A4 ;c oey (c) 0000000' +a
?,
PrIS
"tA
00
0 0
OA 4°
Ffn ll »LT?. ll i9 �� Ef
ACKNOWLEDGMENTS
STATE OF TEXAS )
)ss
COUNTY OF DENTON )
Before me, a NotaryPublic in and for said countyand state, on this 02/`fit dayof
_
AV6OS7 , 2012 personally appeared CPR -TLC %iP/V/ TT , to me known to
be the identical person who subscribed the name of the maker thereof to the foregoing
instrument as Sk. V./' SEXIOCas of Denton County Electric Cooperative, Inc., d/b/a
CoSery Electric, a Texas electric cooperative corporation, and acknowledged to me that he
executed the same as his free and voluntary act and deed, and as the free and voluntary act
and deed of such corporation for the uses and purposes set forth.
Witness my hand and official seal this the &/S*day of 4V60S7 , 2012
My Commission Expires: Y/c.L9/47O/8
STATE OF TEXAS )
)ss
COUNTY OF TARRANT )
Notary Public iamb
v YAR
eel&t
s�p�Y PGB�iN11.1. BaR
of Texas
MS
• Public,
Notary Expires
Commission
Y 2012
}s., . ti.v August 24,
Before me, the undersigned authority, on this day personally appeared Fernando Costa,
Assistant City Manager of the CITY OF FORT WORTH, a Texas home -rule municipal
corporation, known to me to be the person whose name is subscribed to the foregoing
instrument and acknowledged to me that in his capacity as Assistant City Manager of the CITY
OF FORT WORTH, he executed the same as the act of such corporation for the purposes and
consideration therein expressed.
Witness my hand and official seal this the sia day • /..�1%� 2012.
Notary Public
My Commission Expires: *Ms-1.3
Reimbursement Agreement
City of Fort Worth & CoSery Electric
Alliance Runway Extension Utility Relocation
Page 5 of 6
EVON
1ADANIELS
MY COMMISSION EXPIRES 3
July 10, 2013
EXHIBITS TO FOLLOW
LIST
EXHIBIT A: Description of Relocation —To Be Provided
EXHIBIT B: Description of Relocation Costs To Be Provided
Reimbursement Agreement
City of Fort Worth & CoSery Electric
Alliance Runway Extension Utility Relocation
Page 6 of 6
wwwecoservocom
BILL TO:
CITY OF FORT WORTH
1000 THROCKMORTON STREET
FORT WORTH, TX 76102
LINE I LINE ITEM / DESCRIPTION
Remit To: `" .`ls
#.
CoSery Electric
7701 South Stemmons
Corinth, TX 76210=1842
Ph no: (940) 32107800
1 Relocate BNSF Main Line For Alliance
Airport (City Project #00960) @ 10575
Sam Reynolds Rd, Justin 76247
1 _IL
UANTITY I UOM
1
COMMENTS
Please remit payment to the attention of Accounting at the address I
above. Include the invoice number on your payment.
Invoice
NUMBER
. -46003575
DATE
16-MAY-12
TERMS
90 Day Estimate
EXPIRATION DATE
14-AUG-12
WORK ORDER NO.
201106317
REFERENCE
JQUALLS
i
UNIT PR6M I EXTENDED PRICE
Each 25,162.77
SUBTOTAL
25,162.77
TAX
0.00
25,162.77
TOTAL
25,162.77
® Pricing is valid for 90 days and expires on expiration date above.
® No construction will commence until total amount is paid.
• Easements, permits, and service agreements may also be necessary before construction will commence.
® This invoice is for construction only and does not reflect the fees associated with establishing an account for a
new meter set.
New Railroad
R.O.W. Pin
NOTES:
1. Before construction starts, Contractor shall meet with a CoSery representative.
2. Contractor to locate all utilities prior to commencement of construction.
3. No existing communications.
241'
258'
#1/0 ACSR
Pin - — — nrlsF l: o w
111 3 Switches to be moved to a
new location per Coserv.
Pin,
111111111 k
319' /ft/p'ACSR
AGSR
Pin
10'
NsAil 1
n 2
(RT 0"38'5 /")
\1
'1
1
206' 196'
#1/0 ACSR
B.N.S.F. RAILROAD
RNSF R-O-W
EXHIBITt\
LEGEND:
• EXISTING POLE LOCATION
PROPOSED POLE LOCATION
RETIRE POLE LOCATION
PROPOSED GUY LOCATION
AY EXISTING THREE-PHASE OVERHEAD
EXISTING OVERHEAD FACILITIES
PROPOSED OVERHEAD FACILITIES
RETIRE OVERHEAD FACILITIES
ROADS
FENCE
GRAPHIC SCALE
0 100' 200'
McCORD ENGINEERING INC.
Texas Registered Engineering Firm F-2664
916 Southwest Parkway East
College Station, TX 77840
THIS DOCUMENT IS RELEASED FOR THE
PURPOSE OF VISUAL REPRESENTATION ONLY.
IT IS NOT TO DE USED IN CONJUNCTION WITH ANY
OTHER LEGAL. DOCUMENT OR FOR ANY PURPOSE
OTHER THAN THE AFOREMENTIONED.
1'=1a0
DRAWN by:
REG
COSERV ELECTRIC
CIoesTRUCTIO
TY OF FORTUWORTH
(RAILROAD CROSSING)
(W.O. #201106317-1 )
McCORD ENGINEERING, INC.
9f8 southwest Parkway East
College station, Texas 77842
DATE:
12.8.11
JOB CODE:
COS-2-1'.40
13.413� ISHEET NO
1 or 1
MEI-9644 R GJT
12-21-11