Loading...
HomeMy WebLinkAboutContract 52822-CO1 CSC No.52822-COI ORTH® City of Fort Worth 8' Change Order Request l oject Narnel 2020 Concrete Restoration Contract 2 City Sec# 52822 Client PmJW 0(4 102106 Project Desc row Concrete restoration at various locations Contractorl Omega Contracting,Inc. Change Order# Date 6/1912020 City Project Mgr.I Traiqul Islam City inspector Jarad Souders Contract Time Dept. TPW Totals (WD) Original Contract Amount $738,771.50 $738,771.50 170 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $738,771.50 $738,771.50 170 Amount of Proposed Change Order $181,810.00 $181,810.00 45 Revised Contract Amount $920,581.50 $920,581.50 215 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $181,810.00 $181,810.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 24.61% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $923,464.38 JIJSTIF1Q T10N(W,50NS)FOR01IA94E'0R119R, This change order is adds 2,000 square yards of concrete panel replacement to the contract.During construction,it was identified that Wheaton Drive and Hardeman Street required more panel replacement due to extensive grading issues.Meacham Boulevard,Mark IV Parkway and Sunset Trace Trail had more unforeseen failures than anticipated which resulted in additional panel replacement.Hardeman Street has asphalt base failures which require 181 cubic yards additional unclassified excavation.This contract also needs to add 1,400 square feet of driveway replacement and 175 cubic yards of flexbase for Wheaton Drive and Sunset Trace.Due to the raised street grade at Wheaton Drive and Sunset Trace,40 cubic yards of topsoil and 300 square yards of block sod were used to eliminate parkway drainage issues.To complete this addtional work,45 calendar days are proposed to be added to the contract. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Omega Contracting,Inc. Inspecoo nspeagpo.up . or ate Pro ect anager/Program Manager ate r 2-f- Z J 01 Ze Asslstant,Dlrec ept Da Director,Contraoting Department(Dept) t)qfe Assistant'CityMornay Date Assistant City Manager --_Ratg Council Action('rf required) M&C Number —Q M&C Date Approved H11�111¢L RECORD tr15 la95: ROW(oat1g9? SECRETARY F: WORTH,Tx LC " CD 0 N f691 — co N LO N O C.Q O 0 0 (f7 O '. N O O O N O 10 Imo• N f0 Ef} LO 69- 63 6a Ef} U O � Z U m U- > > > � to U U cn U 0 CD CD 0 0 0 UClO o 0 0 0 CD CD o ao ti o � 4t (`a CD co � - N N O N a� 0 4•- � U � (6 Q r{ C U) = U W d 0 an Q Z O L a ° � a Eo 0p o U � u t U N O U CCS (a UO C CD O U p Z c O > U CL > M _O- U) O ~ cv •U W s= (U O (E C) co EO U p O m a) U o CD U (n > Co o U N cu a a� Cl Clq C O •� -o O N N CDU O F-- V C6 (6 E M a) U rr� a W U Uj U O o > N O .O O O m H O C 0 U N (D C O O a. v a"i 0� Q LL m H G� o U a W m -t 1— Z 0 0 0 0 0 0 cc cc c 0 a � Q N v- O N N bA f6 d a C O Q N 4J qA C to t U FORT_�H City of Fort Worth Change Order Deletions Project Name 2020 Concrete Restoration Contract 2 City Sec# 52822 Client Project# 102106 Project Description Concrete restoration at various locations Contractor Omega Contracting,Inc. Change Order# 0 Date 6/19/2020 City Project Mgr. Traiqul Islam City Inspector Jarad Souders DELETIONS ITEM DESCRIP1 ION DEPT ty Unit Unit Cost I ota TPW $0.00 Sub Total Deletions I sual Change Order Deletions Page 1 of 1 MIWBE Breakdown for this Change Order MIKE SubYpe of Seruice Amount for this t;0 N/A Total $000 ' Previous Change Orders GATE' :AMOUNT' None Total $0:00 M&C Review Page 1 of 2 of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRTWORT11 REFERENCE **M&C 20- 202020 CONCRETE DATE: 6/16/2020 NO.: 0427 LOG NAME: RESTORATION CONTRACT 2 CHANGE ORDER 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 1 in the Amount of$181,810.00 to the Contract with Omega Contracting Inc. for 2020 Concrete Restoration Contract 2 for a Revised Contract Amount of$920,581.50 and the Addition of 45 Calendar Days to the Project Schedule. Update the FY2020-2024 Capital Improvement Plan and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 2, 4, 5, 6 and 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of Change Order No. 1, in the amount of $181,810.00, and the addition of 45 calendar days to the project schedule to City Secretary Contract No. 52822 with Omega Contracting Inc., thereby increasing the contract amount to $920,581.50 (City Project No. 102106); and 2. Adopt the attached Appropriation Ordinance to adjust appropriations in the General Capital Projects Fund by decreasing receipts and appropriations in the Contract Street Maintenance Programmable project (City Project No. P00020) in the amount of $181,810.00 and increasing receipts and appropriations in the 2020 Concrete Restoration Contract 2 project by the same amount. DISCUSSION: On September 10, 2019, by Mayor&Council Communication (M&C) 19-0145, the City Council authorized the execution of a contract with Omega Contracting, Inc., in the amount of $738,771.50, for the 2020 Concrete Restoration Contract 2 project along Hardeman Trail (Miller Avenue to Burke Road), Mark IV Parkway(E loop 820 to Cantrell Sansom Road), Martin Street (Shackleford Street to Trentman Street), Meacham Boulevard (Pylon Street to Blue Mound Road), Sunset Trace Drive (Latrobe Trace way to Trace ridge Parkway)and Wheaton Drive (Wedgmont Circle North to Walton Avenue). This Change Order No.1 will provide an additional 2,000 square yards of concrete pavement replacement to the contract and remove Martin Street from the contract. During construction, it was determined that more concrete panel replacement, driveway replacement, unclassified excavation, flexible base, and top soil placement are required due to severe grading issues on Wheaton Drive and Hardeman Street, and more unseen failures on Wheaton Drive, Hardeman Street, Mark IV Parkway, Sunset Trace Drive and Meacham Boulevard. As a result, 2,000 square yards of additional concrete panels are needed for replacement to address these issues. It is also recommended to remove Martin Street from the contract due to limited project funding. Additionally, to complete this work staff recommends that the contract time be extended by 45 calendar days. The General Capital funding was included in the 2020-2024 Capital Improvement Plan for the Contract Street Maintenance Programmable project P00020 and the Concrete Restoration Contract 2 static project 102106. In order to administratively track the spending of all funding sources in one project, appropriation ordinances are needed to move appropriations from the programmable project to the jointly funded static project. This action will update the 2020-2024 Capital Improvement Plan. http://apps.cfwnet.org/council_packet/mc review.asp?ID=27995&councildate=6/16/2020 6/24/2020 M&C Review Page 2 of 2 Appropriations for Concrete Restoration Contract 2 project are depicted below: Existing Additional Fund Appropriations Appropriations Project Total* RestorConcration 2020-2 $925,000.00 $ 0.00 925,000.00 General Capital 810.00 $ Projects Fund 30100 $ 0.00 $181, 181,810.00 Project Total $925,000.00 1 $181,810.00 1 $1,106,810.00 This Change Order will have no impact on the Transportation and Public Works annual operating budget. M/WBE OFFICE—Omega Contracting, Inc. agrees to maintain its initial MBE commitment of 18\% that it made on the original contract and extend and maintain that same MBE commitment of 18\% to this first change order. Therefore Omega Contracting, Inc. remains in compliance with the City's BIDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. The Project is located in COUNCIL DISTRICTS 2, 4, 5, 6 and 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the General Capital Projects Fund Contract Street Maintenance programmable project, as appropriated, and that upon approval of the above recommendations and adoption of the attached Appropriation Ordinance, funds will be available in the General Capital Projects Fund Concrete Restoration 2020-2 project to support the approval of the above recommendations and execution of the contract extension. Prior to an expenditure being incurred, the Transportation & Public Works Department has the responsibility of verifying the availability of funds. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year ChartField 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (ChartField 2 Submitted for City Manager's Office by: Dana Burghdoff(8018) Originating Department Head: William Johnson (7801) Additional Information Contact: Jeffrey Perrigo (8117) ATTACHMENTS 202020 CONCRETE RESTORATION CONTRACT 2 CHANGE ORDER 1 30100 A020.docx MAP CHANGE ORDER 1.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=27995&councildate=6/16/2020 6/24/2020 7/15/2020 BIM 360 Document Management B AUTODESK'BIM 360- fortworthgov>102106-Concrete restoration 2020-2 at various locations- 9 TI Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews 1 Review detail CLOSED #19 Change Order Approval Workflow Export Report This review is closed. Name Description Version Markup Comments Apprc PROGRESS TI Tarjqu s alTTffi­_____!1un 30,11:41 AM _ C01 CPN10210b.pdf -- V3 0 DB WJ 3 Comments A "" - <tariqul.islam@fortworthtexas.gov- Submitted to Reviewer 1 Reviewerl Initial Review 1 n JP Jeffrey Perrigo Jun 30,12:28 PM <jeffrey.pe rrigo@ fortworthtexas.gov- Submitted to Reviewer 2 Reviewer 2 Initial Review 2 n LZ Lane Zarate Jut 7,10:28 AM <La n e.za rate @ fo rtwo rth texa s.gov> Submitted to Reviewer 3 Approved Reviewer 3 Initial Review 3 n LP Lauren Prieur Jut 7,11:17 AM <Lau ren.prieur@ fortworthtexas.gov Submitted to Reviewer 4 No Comments Reviewer 4 Initial Review 4 n WJ William Johnson Jut 7,11:32 AM <wi Lliam.johnson @fortworthtexas.gov: Submitted to Reviewer 5 Reviewer 5 Initial Review 5 n DB Douglas Black Jul 13,12:42 PM <doug.black@fortworthtexas.gov> Submitted to Approver Approved.M&C is attached to the several documents making up the CO package even though not i referenced at the bottom of the CO doc. 1 Approver Final Review n f DB Dana Burghdoff Jut 13,1:34 PM <da na.bu rghdoff@fortworthtexas.gov, Review ended i Review closed https://does.b360.autodesk.com/projects/3a3a66b9-587f-4928-bfc6-98c9dd74335b/reviews/a8fe689c-5c9e-45c9-9506-e37181758190 1/1 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Tariqul Islam / 7'ariq"(g(44tt, Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature R Wet ATTEST: Mary J.Kayser, City Secretary 1E